SU1010175A1 - Mounting joint of unsplit span structure with bridge intermediate pier - Google Patents

Mounting joint of unsplit span structure with bridge intermediate pier Download PDF

Info

Publication number
SU1010175A1
SU1010175A1 SU803224356A SU3224356A SU1010175A1 SU 1010175 A1 SU1010175 A1 SU 1010175A1 SU 803224356 A SU803224356 A SU 803224356A SU 3224356 A SU3224356 A SU 3224356A SU 1010175 A1 SU1010175 A1 SU 1010175A1
Authority
SU
USSR - Soviet Union
Prior art keywords
span
bridge
support
supporting
span structure
Prior art date
Application number
SU803224356A
Other languages
Russian (ru)
Inventor
Грамитон Варфоломеевич Турнава
Владимир Максович Эпштейн
Сергей Владимирович Самойлов
Юрий Константинович Сучков
Original Assignee
Специальное Конструкторское Бюро Главмостостроя
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Специальное Конструкторское Бюро Главмостостроя filed Critical Специальное Конструкторское Бюро Главмостостроя
Priority to SU803224356A priority Critical patent/SU1010175A1/en
Application granted granted Critical
Publication of SU1010175A1 publication Critical patent/SU1010175A1/en

Links

Abstract

МОНТАЖНОЕ СОЕДИНЕНИЕ НЕРАЗ:РЕЗНОГО ПРОЛЕТНОГО СТРОЕНИЯ С ПРОМЕЖУТОЧНОЙ ОПОРОЙ МОСТА, включающее попарно расположенные с обеих сторон опорной части по фасаду моста соединительные и размещенные между опорой и пролетным строением опорные элементы , отличающеес  тем, что, с целью упрощени  монтажа и де- . монтажа соединени , опорный и соединительный элементы каждой пары выполнены за одно целое в виде по край .ней мере одного жесткого металлического стержн , замоноличенного концами соответственно в теле опоры и пролетном строении.,MOUNTING CONNECTION NON-TIME: THREADED TRIPPING STRUCTURE WITH THE INTERMEDIATE BRIDGE SUPPORT, including connecting elements located in pairs on both sides of the supporting part along the facade of the bridge and supporting elements located between the support and the span, in order to simplify installation and design. the assembly of the joint, the supporting and connecting elements of each pair are made in one piece in the form at the edge of at least one rigid metal rod, embedded in the support body and the span, respectively, with the ends, respectively.

Description

у//////u //////

/f / f

ff

W /A%YXW.W / a% yxw.

елate

Изобретение относитс  к мостостр ению и может быть использовано при навесном монтаже преимущественно бо шепролетных,поперечно-члененных на блоки, железобетонных пролетных стро ений мостов дл  временного монтажно то соединени  пролетного строени  с промежуточной опорой моста. Известно монтажное устройство дл навесного монтажа неразрезного железобетонного пролетного строени  включающее укрепленные на промежуточной опоре консоли с подкосами и установленные на консол х под пролетным строением опорные блоки типа балочных клеток 1 Недостаток этого монтажного устройства заключаетс  в значительной трудоемкости его монтажа и демонтажа , а также в значительной его материалоемкости . Наиболее близким к предлагаемому  вл етс  монтажное соединение нераз резного пролетного строени  с промежуточной опорой моста, включающее попарно расположенные с обеих сторон опорной части по фасаду мост соединительные и размещенные между опорой и пролетным строением опорные элементы. В таком соединении опорные элементы выполнены в виде напр гаемой пучковой арматуры., заанкеренной в опоре и пролетном строении j2 . Недостаток известного монтгшного соединени  заключаетс  в повыи.1енной трудоемкос и его монтажа и демонтажа что обусловлено раздельным выпо нением опорных и соединительных эле ментов , а также необходимостью нат  ни  соединительных элементов и достаточно сложным их демонтажом, сопр женным с необходимостью извлечени  анкеров и арматурных пучков из тела опоры и пролетного строени . Цель изобретени  - упрощение мон тажа и демонтажа соединени . Указанна  цель достигаетс  тем, что в монтажном соединении неразрезного пролетного строени  с промежуточной опорой моста, включающем попарно расположенные с обеих сторон опорной части по фасаду мост . соединительные и размещенные между опорой и пролетным строением опорные элементы, опорный и соединител ный элементы каждой пары выполнены за одно целое в виде по крайней мере одного жесткого металлического стержн , замоноличенного концами соответственно в теле опоры и пролетном строении,. На фиг. 1 изображено монтажное соединение по фасаду моста , на фиг. 2 разрез А-Л на фиг. 1 . . . Монтажное соединение неразрезного пролетного строени  1 с промежуточной опорой 2 моста включает расположенные с обеих сторон опорной части 3 по фасаду моста жесткие металлические стержни 4, замоноличенные концами соответственно в теле one ры .2 и пролетном строении 1. Установку монтажного соединени  производ т перед, уравновешенным навесным монтажом пролетного строени  1 после установки надопорного блока его на соответствующую промежуточную ОПОРУ 2. При этом нижние концы жестких стержней 4 устанавливают и замоноличивают в тело опоры 2 при ее возведении, а после установки опорных частей 3 и надопорного блока пролетного строени  1 производ т замоноличивание верхних концов жестких элементов 4 в этот надопорный блок. При сооружении пролетного строени  1 из сборного железобетона дл  выпусков жестких элементов 4 оставл ют проемы (не показаны), замоноличиваемые с выпусками жестких элементов 4 после сборки надопорного блока или участка пролетного строени . После осуществлени  монтадка пролетного строени  нагрузку с жестких элементов 4 снимают путем разрезки их на свободном участке 5 между пролетным строением и опорой. Применение предлагаемого монтажного соединени  дл  осуществлени  навесного или полунавесного монтажа неразрезных, преимущественно сборных железобетонных, пролетных строений позвол ет существенно упростить монтаж и демонтаж подобного соединени  и исключить необходимость исполь зовани  высокопрочной пучковой арматуры и операций по ее нат жению и последующей разгрузке ее с помощью домкратов.The invention relates to bridge construction and can be used for the installation of hinged mainly pre-welded, transversely-divided blocks, reinforced concrete bridge span structures for the temporary assembly of the bridge with intermediate bridge support. A mounting device for hanging mounting of a continuous reinforced concrete span is known, which includes brackets with braces fixed to the intermediate support and support blocks of the beam cell type mounted on consoles under the span structure 1 The disadvantage of this mounting device is the considerable complexity of its assembly and disassembly, as well as significant material consumption. Closest to the present invention is a mounting joint of an uncut cutting span with an intermediate support of the bridge, including connecting elements arranged in pairs on both sides of the supporting part of the bridge and placed between the support and the span of the supporting elements. In such a connection, the supporting elements are made in the form of tensioned beam reinforcement, anchored in the support and the span j2. A disadvantage of the known montage is the increase in labor-intensive and its installation and disassembly, which is caused by separate mounting of the supporting and connecting elements, as well as the necessity of tensioning the connecting elements and their rather complex disassembly, coupled with the need to extract anchors and reinforcement beams from the body. supports and span. The purpose of the invention is to simplify the assembly and disassembly of the joint. This goal is achieved by the fact that in the assembly connection of a continuous span with an intermediate support of the bridge, including a bridge located in pairs on both sides of the supporting part along the facade. the supporting elements and the supporting and connecting elements of each pair placed between the support and the span structure are made in one piece in the form of at least one rigid metal rod, embedded in the support body and the span structure, respectively. FIG. 1 shows a mounting connection along the facade of the bridge; FIG. 2 is a cross section A-L in FIG. one . . . The assembly connection of the continuous span 1 with the intermediate support 2 of the bridge includes rigid metal rods 4 located on both sides of the supporting part 3 along the facade of the bridge, embedded inside the body of one of the ribs. 2 and the span structure 1, respectively. by mounting the span structure 1 after installing the supra-blocking unit onto the corresponding intermediate SUPPORT 2. In this case, the lower ends of the rigid rods 4 are installed and monolithic into the support body 2 and and its construction, and after installing the bearing portions 3 and Spans nadopornogo unit 1 m is produced embedment upper ends of the rigid elements 4 in this nadoporny unit. In the construction of the superstructure 1 of precast concrete, for the production of rigid elements 4, openings (not shown) are left, monolithic with the emissions of rigid elements 4 after the assembly of the supra-nodal block or section of the superstructure. After mounting the span, the load on the rigid elements 4 is removed by cutting them in the free area 5 between the span and the support. The use of the proposed assembly for the installation of suspended or semi-mounted installation of continuous, mainly precast concrete, spans allows to significantly simplify the installation and disassembly of such a connection and eliminate the need for high-strength beam reinforcement and tensioning operations and subsequent unloading it with jacks.

Claims (1)

МОНТАЖНОЕ СОЕДИНЕНИЕ НЕРАЗРЕЗНОГО ПРОЛЕТНОГО СТРОЕНИЯ' С ПРОМЕЖУТОЧНОЙ ОПОРОЙ МОСТА, включающее попарно расположенные с обеих сторон опорной части по фасаду моста соединительные и размещенные между опорой и пролетным строением опорные элементы, отличающееся тем, что, с целью упрощения монтажа и демонтажа соединения, опорный и соединительный элементы каждой пары выполнены за одно целое в виде по край ней мере одного жесткого металлического стержня, замоноличенного концами соответственно в теле опоры и пролетном строении.ASSEMBLY CONSTRAINTS OF THE UNSTRAINED SPAN STRUCTURE 'WITH THE INTERMEDIATE BRIDGE OF THE BRIDGE, including connecting elements located in pairs on both sides of the supporting part along the facade of the bridge, supporting elements located between the support and the span, characterized in that, in order to simplify mounting and dismounting of the connection, the supporting and connecting elements each pair is made in one piece in the form of at least one rigid metal rod, monolithic with the ends, respectively, in the support body and the span. SU „„1010175 (риг. 1SU „„ 1010175 (rig. 1
SU803224356A 1980-12-26 1980-12-26 Mounting joint of unsplit span structure with bridge intermediate pier SU1010175A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU803224356A SU1010175A1 (en) 1980-12-26 1980-12-26 Mounting joint of unsplit span structure with bridge intermediate pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU803224356A SU1010175A1 (en) 1980-12-26 1980-12-26 Mounting joint of unsplit span structure with bridge intermediate pier

Publications (1)

Publication Number Publication Date
SU1010175A1 true SU1010175A1 (en) 1983-04-07

Family

ID=20934316

Family Applications (1)

Application Number Title Priority Date Filing Date
SU803224356A SU1010175A1 (en) 1980-12-26 1980-12-26 Mounting joint of unsplit span structure with bridge intermediate pier

Country Status (1)

Country Link
SU (1) SU1010175A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107988856A (en) * 2017-11-28 2018-05-04 中铁第四勘察设计院集团有限公司 A kind of straddle-type monorail fixes continuous beam entirely

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Колоколов Н. М. и др. Строительство мостов М., Транспорт, 1975,.с. 305-306, рис. 21.2. 2. Баренбойм И. Ю. и др. Индустриальное строительство мостов, Киев, Буд1вельник, 1978, с. 45-46,рисЛ8 (прототип) . *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107988856A (en) * 2017-11-28 2018-05-04 中铁第四勘察设计院集团有限公司 A kind of straddle-type monorail fixes continuous beam entirely

Similar Documents

Publication Publication Date Title
US8869336B2 (en) Overhead form traveller and method
CN201395769Y (en) Tie bar arch type bracket used for building bridge pylon concrete upper cross beam
SU903465A1 (en) Method of dismantling tightened arch-cantilever bridge span structure
SU1010175A1 (en) Mounting joint of unsplit span structure with bridge intermediate pier
JP4220295B2 (en) Corrugated steel sheet web PC bridge closure method
JPH02503099A (en) Cable supported bridge and construction method
CN210066504U (en) Large-span cantilever truss type bent cap support system
KR100349865B1 (en) The Continuity Method for Prestreseed Concrete Bridge of Composite U-Type Girder
KR100403988B1 (en) Method for forming continuous p.s.c beams with steel plate girder splice and apparatus thereof
JP2632922B2 (en) Bridge construction method
KR910007423B1 (en) Method for construction p.c - beam on the bridge
SU705086A1 (en) Joint structure for joining foundation with column and foundation girders
SU1366577A1 (en) Ferroconcrete bridge span structure
SU1090789A1 (en) Method of assembling ferroconcrete bridge span structure transversely divided into blocks
SU1278380A1 (en) Ferroconcrete bridge span structure
JPS6135325B2 (en)
SU1548308A1 (en) Bridge
SU775218A1 (en) Method of erecting a bridge of the frame-and-stay structure
SU990934A1 (en) Metal frame-truss bridge and method of erecting same
RU2637534C1 (en) Bridge with cantilever supports
SU1041617A1 (en) Unsplit framework bridge
SU1145071A1 (en) Prefabricated ferroconcrete support for bridge
RU169725U1 (en) CONSOLE BRIDGE BRIDGE
SU885404A1 (en) Bridge
SU178393A1 (en) METHOD OF CONSTRUCTION OF REINFORCED CONCRETE BRIDGES