SU1447963A1 - Method of dismantling a bridge span structure - Google Patents

Method of dismantling a bridge span structure Download PDF

Info

Publication number
SU1447963A1
SU1447963A1 SU874216178A SU4216178A SU1447963A1 SU 1447963 A1 SU1447963 A1 SU 1447963A1 SU 874216178 A SU874216178 A SU 874216178A SU 4216178 A SU4216178 A SU 4216178A SU 1447963 A1 SU1447963 A1 SU 1447963A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pontoon
platform
dismantling
span
ballast
Prior art date
Application number
SU874216178A
Other languages
Russian (ru)
Inventor
Евгений Кириллович Бессонов
Юрий Емельянович Степанов
Original Assignee
Предприятие П/Я А-3007
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я А-3007 filed Critical Предприятие П/Я А-3007
Priority to SU874216178A priority Critical patent/SU1447963A1/en
Application granted granted Critical
Publication of SU1447963A1 publication Critical patent/SU1447963A1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Изобретение относитс  к мостостроению , и может быть использовано при демонтаже или монтаже пролетных строений мостов через водотоки. Целью изобретени   вл етс  снижение трудоемкости демонтажа. При производстве работ самоподъемную платформу 1, включающую понтон-платформу 2, опорные стойки 3, закрепленные в отверсти х 4 понтона 2, силовые гидроцилиндры 5 механизма 6 подъема и опускани  понтона 2, подвод т под пролетное строение 7, опускают стойки 3 до их опирани  на донный грунт 8, закрепл ют понтон 2 на стойках 3, балластируют понтон 2 водой с превышением веса балласта величины расчет ного усили  на временную опору от демонтируемого участка пролетного строени  7 и производ т подъем понтона 2 из воды по стойкам 3, благодар  чему они задавливаютс  в грунт 8. Затем дебалластируют понтон 2, осуществл  ют его подъем по стойкам 3 до упора в пролетное строение 7 и последующую фиксацию понтона 2 на стойках 3, после чего производ т разъединение пролетного строени  7-на отдельные части и их демонтаж плавучим краном. 2 ил. a. (ЛThe invention relates to bridge construction, and can be used when dismantling or assembling bridge spans over watercourses. The aim of the invention is to reduce the complexity of dismantling. In the production of works, a self-lifting platform 1, including a pontoon platform 2, support columns 3, mounted in holes 4 of the pontoon 2, power hydraulic cylinders 5 of the mechanism 6 for raising and lowering the pontoon 2, is brought under the span 7, lowered the struts 3 to rest on them the bottom soil 8, fix the pontoon 2 on the uprights 3, ballast the pontoon 2 with water exceeding the weight of the ballast of the magnitude of the calculated force on a temporary support from the dismantled section of the superstructure 7 and lift the pontoon 2 out of the water on the uprights 3, so that they are pushed into the ground 8. Then the pontoon 2 is debalased, its pillars 3 are raised up to the stop in the superstructure 7 and the pontoon 2 is then fixed on the pillars 3, after which the superstructure 7 is separated into separate parts and dismantled by a floating crane. 2 Il. a. (L

Description

1-§ J. JlZrl- Zt iiJ     1-§ J. JlZrl- Zt iiJ

I - - - т 1   I - - - t 1

--„ iL«T 1 I 1I- „iL“ T 1 I 1I

Место разделени Place of separation

иand

ilii ilii

Ф Од Fod

/V / /WI /// //Х 77/ V / / WI /// // X 77

tV/ /if/tV / / if /

I. .II. .I

фиг.1figure 1

/V/ /VX //V - // -VX /W /УХ/ V / / VX // V - // -VX / W / UX

Изобретение относитс  к мостостроению и может быть использовано при демонтаже или монтаже пролетных строений мостов через водотоки.The invention relates to bridge construction and can be used when dismantling or assembling bridge spans over watercourses.

Цель изобретени  - снижение трудоемкости демонтагса.The purpose of the invention is to reduce the complexity of the dismantling.

На фиг.1 изображены фасады самоподъемной платформы и демонтируемого пролетного строени  в момент спи- рани  его на платформу (плавучий кран не показан)J на фиг.2 - то же, вид в плане.Figure 1 shows the facades of the self-lifting platform and the spans being dismantled at the time of its spreading onto the platform (the floating crane is not shown) J in Figure 2 - the same, in plan view.

Самоподъемна  платформа 1 включает понтон-платформу 2, опорные стой ки 3, закрепленные в отверсти х 4 понтона 2, силовые гидроцилиндры 5 механизма 6 подъема и опускани  понтона 2..The self-lifting platform 1 includes a pontoon platform 2, support legs 3, fixed in the holes 4 of the pontoon 2, power cylinders 5 of the mechanism 6 for raising and lowering the pontoon 2 ..

При производстве работ самоподъ- емную платформу 1 подвод т под пролетное строение 7, причем дл  возможности установки платформы 1 по оси пролетного строени  7 часть стоек 3 может находитьс  на палубе понтона-2 , а не в отверсти х 4. После установки платформы 1 в проектное положение опорные стойки 3 через отверсти  4 опускают до их опирани  на донный грунт 8, закрепл ют понтон 2 н стойках 3, балластируют понтон 2 водой с превышением веса балласта величины расчетного усили  на временную опору от демонтируемого участка пролетного строени  7 и производ т подъем понтона 2 из воды по стойкам 3, в результате опорные стойки 3 погружаютс  (задавливаютс ) в грунт 8. После этого дебалластируют понтон 2, осуществл ют его подъем по стойкам 3 до упора в пролетное строение 7 и последующую фиксацию понтона 2In the course of work, the self-lifting platform 1 is brought under the superstructure 7, and to enable the installation of the platform 1 along the axis of the superstructure 7, a part of the uprights 3 can be located on the deck of the pontoon-2, and not in the openings 4. After the installation of the platform 1 in the design the position of the supports 3 through the holes 4 is lowered to their support on the bottom soil 8, the pontoon 2 is fixed to the n columns 3, the pontoon 2 is ballast water with excess weight of the ballast of the calculated force on the temporary support from the section of the span 7 to be removed and The pontoon 2 is lifted out of the water on the uprights 3, as a result, the uprights 3 are submerged (crushed) in the ground 8. After this, the pontoon 2 is de-addressed, it is lifted up the uprights 3 up to the stop in the bridge 7 and the subsequent fixation of the pontoon 2

на стойках 3. Использу  понтон-платформу 2 в качестве плиты ростверка временной опоры и монтажной площад- . ки, производ т разъединение пролетного строени  7 на отдельные части и последующий демонтаж их плавучим краном 9on racks 3. Using the pontoon platform 2 as a plate of the grillage of the temporary support and the installation area-. ki, make the separation of the superstructure 7 into separate parts and then dismantle them with a floating crane 9

Предлагаемый способ может быть использован и дл  монтажа вновь сооружаемого пролетного строени  с соот- ветствукщим изменением пор дка операций .The proposed method can also be used for the installation of a newly constructed span with a corresponding change in the order of operations.

Claims (1)

Формула изобретени Invention Formula Способ демонтажа пролетного строени  моста, включающий подведение временной опоры под участок пролетного строени , передачу части веса его на временную опору и отсоединение участка пролетного строени , отличающийс  тем, что, с целью снижени  трудоемкости демон-: тажа, под участок пролетного строени  подвод т временную опору в виде самоподъемной плавучей платформы с понтоном и проход щими через отверсти  в нем стойками, после чего стойки платформы опускают до опирани  их на донный грунт, балластируют понтон с превьшением веса балласта величины расчетного усили  на временную опору от демонтируемого участка пролетного строени , затем поднимают понтон Bbmie уровн  воды, погружают стойки платформы в грунт воздействием суммарного веса платформы и балласта, дебалластируют понтон, осуществл ют подъем его по стойкам до касани  с пролетным строением и фиксацию на стойках.The method of dismantling the bridge span, including laying a temporary support under the span section, transferring part of its weight to the temporary support and disconnecting the span section, characterized in that, in order to reduce the workload of the demon-: tazha, temporary support is under the span section in the form of a self-lifting floating platform with a pontoon and racks passing through the holes in it, after which the racks of the platform are lowered to rest on the bottom ground, the pontoon is ballasted with the weight of ballast the magnitude of the calculated force on the temporary support from the section to be dismantled, then raise the water level pontoon Bbmie, immerse the platform legs into the ground with the impact of the total platform weight and ballast, debalast the pontoon, lift it along the racks to touch the span and fix it on the racks. фиг. IFIG. I
SU874216178A 1987-01-20 1987-01-20 Method of dismantling a bridge span structure SU1447963A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874216178A SU1447963A1 (en) 1987-01-20 1987-01-20 Method of dismantling a bridge span structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874216178A SU1447963A1 (en) 1987-01-20 1987-01-20 Method of dismantling a bridge span structure

Publications (1)

Publication Number Publication Date
SU1447963A1 true SU1447963A1 (en) 1988-12-30

Family

ID=21293188

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874216178A SU1447963A1 (en) 1987-01-20 1987-01-20 Method of dismantling a bridge span structure

Country Status (1)

Country Link
SU (1) SU1447963A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2463241C1 (en) * 2011-04-05 2012-10-10 Владимир Илларионович Попов Method of disassembling transfer cranes

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Крыльцов Е.И. и др. Современные железобетонные мосты. М.: Транс порт, 1974, с. 220, рис. 111.70. Авторское свидетельство СССР № 903465, кл. Е 01 D 21/04, 1980. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2463241C1 (en) * 2011-04-05 2012-10-10 Владимир Илларионович Попов Method of disassembling transfer cranes

Similar Documents

Publication Publication Date Title
US4854782A (en) Apparatus for lifting structures
GB1524423A (en) Method of erecting offshore structures and offshore tower construction therefor
CN106894346A (en) A kind of the continuous beam bridge construction method
SU1447963A1 (en) Method of dismantling a bridge span structure
RU96122528A (en) STEAM BOILER INSTALLATION METHOD
US4290716A (en) Platform resting on the bottom of a body of water, and method of manufacturing the same
SU697643A1 (en) Arrangement for correcting the position of buildings and structures
EP0333287B1 (en) Process for the production of a hydraulic engineering structure, such as a pier, jetty and the like
SE8105655L (en) PROCEDURE FOR ASSEMBLY AND REMOVAL OF CONSUMPTION FOR THE CONCENTRATION WORK AS WELL AS A CONSUMPTION FOR IMPLEMENTATION OF THE PROCEDURE
RU2007104308A (en) SELF-LIFTING FLOATING DRILLING RIG AND ITS INSTALLATION METHOD
CN108342984B (en) Soft foundation trestle for mudflat and installation and sedimentation method thereof
KR910000869B1 (en) Method for making bridge slab by moving the frame pannel
SU1265081A1 (en) Method of docking floating platform on rising supports
SU920112A1 (en) Method of erecting a stationary platform
RU65505U1 (en) SPAN ASSEMBLY SYSTEM
KR200357965Y1 (en) Caisson Installed Support Means
SU1015040A1 (en) Island-type foundation
KR20050097735A (en) Caisson installed support means and construction method of underwater structure using it
ATE53616T1 (en) STRUCTURE SUPPORT.
RU2340723C1 (en) Bridge construction method
RU2167237C1 (en) Single-row columnar pier
JPS6448910A (en) Bridge construction method
SU1142596A1 (en) Self-raising platform
SU1460113A1 (en) Method of erecting a mooring structure
CN108221635B (en) Steel construction pavement