SU1444518A1 - Method of sinking a technological well in mine working influence zone - Google Patents

Method of sinking a technological well in mine working influence zone Download PDF

Info

Publication number
SU1444518A1
SU1444518A1 SU874224835A SU4224835A SU1444518A1 SU 1444518 A1 SU1444518 A1 SU 1444518A1 SU 874224835 A SU874224835 A SU 874224835A SU 4224835 A SU4224835 A SU 4224835A SU 1444518 A1 SU1444518 A1 SU 1444518A1
Authority
SU
USSR - Soviet Union
Prior art keywords
zone
solution
drilling
well
cracks
Prior art date
Application number
SU874224835A
Other languages
Russian (ru)
Inventor
Иван Алексеевич Левченко
Игнатий Макарович Петухов
Владимир Семенович Сидоров
Original Assignee
Украинский Филиал Всесоюзного Научно-Исследовательского Института Горной Геомеханики И Маркшейдерского Дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Украинский Филиал Всесоюзного Научно-Исследовательского Института Горной Геомеханики И Маркшейдерского Дела filed Critical Украинский Филиал Всесоюзного Научно-Исследовательского Института Горной Геомеханики И Маркшейдерского Дела
Priority to SU874224835A priority Critical patent/SU1444518A1/en
Application granted granted Critical
Publication of SU1444518A1 publication Critical patent/SU1444518A1/en

Links

Abstract

Изобретение относитс  к горной пром-ти и м.б. использовано при бурении с гидравлической системой уборки породы из забо  скважины, размещенной в зоне вли ни  горных выработок Цель- уменьшение стоимости проведени  сква жины . повышение эффективности ее охника , 1980, с. Общесоюзные раны и сокращение потерь запасов полезного ископаемого в предохранительных целиках. Дл  этого предварительно вокруг горной вьфабо рки определ ют ширину зоны предельно напр женного состо ни  массива. За пределами этой зоны бур т скважину (С). В процессе бурени  поддерживают ствол с промывочным раствором, устанавливают кондуктор , промежуточные обсадные колонны , основную обсадную колонну и производ т тампонирование затрубного пространства. После затвердевани  скрепл ющего раствора в трещинах ведут бурение на глубину проникновени  скрепл ющего раствора. Бурение С осуществл ют ступен ми. На первой i ; ступени бур т С до границы зоны интенсивной трещиноватости (ЗИТ). Затем измен ют консистенцию промывочного раствора и в забой С нагнетают скрепл ющий раствор дл  тампонировани  трещин. На второй ступени бур т С на глубину проникновени  скрепл ющего раствора. Последовательное бурение и тампонирование прдизвод т до пересечени  зоны ЗИТ. При этом промежуточные колонны устанавливают в интервале зон ЗИТ. Основную колонну у : устанавливают до перекрыти  внахлестку либо нижней части кондуктора, либо нижней части промежуточной колонны. (Л сл 00The invention relates to the mining industry and m. used in drilling with a hydraulic system for removing rock from the bottom of a well located in the zone of influence of mine workings. The goal is to reduce the cost of conducting a well. increasing the efficiency of her hunter, 1980, p. All-Union wounds and reduction of mineral reserves loss in safety pillars. For this, the width of the zone of the maximum stress state of the massif is preliminarily determined around the mountain ridge. Outside this zone, a well is drilled (C). During the drilling process, the barrel is maintained with the flushing solution, a jig, intermediate casing strings, main casing string are installed, and the annulus is plugged. After the fastening solution hardens in the cracks, they are drilled to the depth of penetration of the fastening solution. Drilling C is carried out in steps. On the first i; steps dr C to the border of the zone of intense fracturing (ZIT). Then the consistency of the washing solution is changed and a fastening solution is injected in face C to plug the cracks. At the second stage, the drill is drilled to the depth of penetration of the bonding solution. Sequential drilling and plugging are carried out until the ZIT zone is crossed. At the same time, the intermediate columns are installed in the zone zone ZIT The main column y: set to overlap overlapped or the lower part of the conductor, or the lower part of the intermediate column. (L SL 00

Description

Изобретение относитс  к горной промышленности и может быть использовано при бурении с гидравлической системой уборки породы из забо  скважины , размещенной в зоне вли ни  горных выработок, например, угольной шахтыо на рассто нии от выработки, меньшем ширины расчетного барьерного целика.The invention relates to the mining industry and can be used in drilling with a hydraulic system for removing rock from a well located in the zone of influence of mine workings, such as a coal mine, at a distance from the mine working that is smaller than the width of the design barrier pillar.

Целью изобретени   вл етс  уменьшение стоимости проведени  скважины, повышение эффективности ее охраны и сокращение потерь запасов полезного ископаемого в предохранительных целиках .The aim of the invention is to reduce the cost of conducting a well, increasing the efficiency of its protection and reducing the loss of mineral reserves in safety pillars.

Способ осуществл ют следующим об- .The method is carried out as follows.

Изучают горно-геологические, горно-технические услови  и услови  поверхности в районе развити  горных работ, определ ют место заложени  технической скважины. До бурени  скважины определ ют количество и ширину зоны трещиноватости у контуров встречаемых вьфаботок, проницаемость промывочного раствора в околоскважинный массив с учетом его состава, мощности , глубины залегани , литологичёс- кого состава боковых пород и состо ни  горной выработки и эффективность применений мер, обеспечивающих охрану стенок скважины от завалов, безопасное ведение горных работ в шахте и предотвращение прорыва промывочного раствора в действующие выработки.They study the mining and geological, mining and technical conditions and surface conditions in the area of development of mining operations, determine the place where the technical well is being laid. Prior to drilling a well, the number and width of the fracture zone at the contours of occurring flows, the permeability of the washing solution into the wellbore array, taking into account its composition, thickness, depth, lithological composition of the lateral rocks and the state of mine workings and the effectiveness of measures that protect walls wells from blockages, safe mining in the mine and preventing the breakthrough of drilling fluid into existing production.

Определ ют ширину предельно напр женной зоны у встречаемой горной выработки , ось проектируемой технической скважины с учетом ее искривлени  размещают от горных выработок за зоной предельно напр женного состо - 1ШЯ массива. Провер ют сопротивление сдвига пород целика по контуру прорыва между горной выработкой и технической скважиной напору промьгоочного p iicTBOpa из затопленной скважины на глубине пересечени  горной выработки По числу прогнозируемых зон интенсивной трещиноватости и конечному диа- метру ствола в свету определ ют переходные диаметры частей ствола проектируемой технической скважины, конструкцию крепи ствола и размеры обсадных труб в каждой части ствола. За кладывают устье скважины, забуривают скважину расчетным диаметром под кондуктор, креп т его и тампонируют. . Далее меньшим диаметром продолжают бурить ствол скважины до перебурива0The width of the maximum stress zone at the encountered mine workings is determined, the axis of the projected technical well, taking into account its curvature, is placed from the mine workings beyond the zone of the maximum stress state - the 1st array. The shear resistance of the rock formations along the breakthrough contour between the mine workings and the technical well is tested against the flow pressure of the flooded well at the depth of the mine workings. The transition diameters of the trunk parts of the designed technical well are determined by the number of predicted areas of intense fracturing , lining construction and dimensions of casing in each part of the barrel. The wellhead is laid, a well is drilled with a calculated diameter under the conductor, it is secured and plugged. . Further, the wellbore continues to be drilled with a smaller diameter until the re-drilling

5five

00

5five

00

5five

00

5five

00

5five

ни  зоны пород от вли ни  первой горной выработки. При этом бурение останавливают у верхней границы зоны интенсивной трещиноватости пород (за 10 м до уровн  кровли встречаемой гор- дНой вьцэаботки), измен ют консистенцию промывочного раствора в сторону уменьшени  фильтрации в массив и нагнетают в забой скважины скрепл ющий раствор , чем обеспечивают тампонирование трещин околоскважинного массива, а после затвердевани  раствора в трещинах массива продолжают бурение ступен ми на глубину упрочненных ,пород, т.е. на глубину проникновени  скрепл ющего раствора (по показанию утечки промывочного раствора). Цикл операций по тампонированию породного массива с забо  скважины и бурению ступен ми повтор ют в интервале зоны вли ни  горной выработки (в зоне интенсивной трещиноватости). Затем производ т крепление ствола в зоне вли ни  горной выработки. Промежуточную колонну обсадных труб.возвод т в интервале зоны вли ни  горной выработки или на всю длину пробуренной части ствола до захода внахлестку в кондуктор и тампонируют цементным раствором затрубное пространство.Neither the zone of rocks from the influence of the first mine workings. At the same time, drilling is stopped at the upper boundary of the zone of intensive fracturing of rocks (10 m to the level of the roof of the occurrence of high-pressure work), change the consistency of the washing solution in the direction of decreasing filtration into the massif and pumping the bonding solution into the bottom hole of the massif, and after solidification of the solution in the cracks of the massif, drilling continues by steps to the depth of the hardened rocks, i.e. to the depth of penetration of the fastening solution (as indicated by the leakage of the washing solution). The cycle of operations on plugging the rock mass from the bottom of the well and drilling in steps is repeated in the interval of the zone of influence of the mine workings (in the zone of intense fracturing). The barrel is then secured in the zone of influence of the mine workings. An intermediate casing string is produced in the zone of influence of the mine workings or on the entire length of the drilled part of the barrel before the overlap enters the conductor and plugs the annulus with cement mortar.

Дальнейшее бурение скважины продолжают меньшим диаметром до встречи очередной горной вьфаботки или проектной отметки. Перебуривание, крепление и тампонирование зоны вли ни  очередной горной выработки- производ т аналогичным образом; При достижении проектной отметки скважины возвод т основную колонну обсадных труб до уровн  последней промежуточной колонны внахлестку, если верхн   часть ствола уже закреплена, или внахлестку нижней части кондуктора, если закреплены только интервалы ствола в зонах вли ни  горных выработок. Затрубное пространство основной колонны труб тампонируют на уровне водоносных горизонтов цементирующим раствором , а между ними и в интервале крепи зон вли ни  податливым материалом, например песчано-глинистым раствором.Further drilling of the well is continued with a smaller diameter until the meeting of the next mountain run or project mark. Over-drilling, fixing and tamping of the zone of influence of the next mine working is carried out in the same way; When the well has reached the design elevation, the main casing string is raised to the level of the last intermediate column with overlap, if the upper part of the barrel is already fixed, or with overlap of the lower part of the conductor, if only the intervals of the well are fixed in the zones of influence of mine workings. The annular space of the main column of pipes is tamped at the level of the aquifers with a cementitious mortar, and between them and in the lining interval, the influence of pliable material, for example, sandy-clayey mortar.

Claims (1)

Формула изобретени Invention Formula Способ проведени  технической скважины в зонах вли ни  горных выработок, включающий ступенчтатое бурение толщи , пород, поддержание ствола промывочнымThe method of conducting technical wells in the zones of influence of mine workings, including step drilling of the strata, rocks, maintenance of the wellbore раствором в процессе бурени , установку кондуктора и промежуточных обсадных колонн после бурени  соответствующих ступеней, установку основной колонны обсадных труб после бурени  ствола скважины до проектной отметки и тампонирование затрубных пространств после установки обсадных колонн на каждой ступени, отличающийс  тем,что, с целью уменьшени  стоимости проведени  скважины, повышени  эффективности ее охраны и сокращени  потерь запасов полезного ископаемого в предохранительных целиках, предварительно определ ют ширину зоны предельно напр женного состо ни  массива вокруг выработки , скважину бур т за пределамиthe solution during drilling, installing the conductor and intermediate casing strings after drilling the corresponding steps, installing the main casing string after drilling the well bore to the design elevation and plugging the annulus after installing the casing strings at each step, characterized in that well, improving the efficiency of its protection and reducing the loss of mineral reserves in safety pillars, preliminarily determine the width of the zone individually stressed state of the array around the mine, the well is drilled outside тенсивной трещиноватости, затем измен ют консистенцию промьшочного раствора в сторону уменьшени  его фильтрации в массив, нагнетанием в забой скважины скрепл ющего раствора производ т тампонирование трещин и после затвердевани  скрепл ющего раствора в трещинах ведут бурение на глубинуextensive fracturing, then change the consistency of the industrial solution in the direction of reducing its filtration into the massif, forcing the bonding solution into the bottom of the well and plugging the cracks and, after solidifying the bonding solution in the cracks, drill to the depth проникновени  скрепл ющего раствора, при этом последовательное бурение и тампонирование трещин скрепл ющим . раствором производ т до пересечени  зоны интенсивной трещиноватости, промежуточные Колонны устанавливают в интервале зон интенсивной трещиноватости ,а основную колонну обсадных труб устанавливают до перекрыти  внахлестку нижней части кондуктора или нижней частиpenetration of the fastening solution, with sequential drilling and plugging of cracks with fastening. the solution is produced before the intersection of the zone of intense fracturing, the intermediate Columns are installed in the interval of zones of intense fracture, and the main casing string is installed to overlap the overlap of the lower part of the conductor or the lower part указанной зоны до границы зоны ин- 20 последней промежуточной колонны.the specified zone to the border of the zone of the last 20 intermediate column.
SU874224835A 1987-04-07 1987-04-07 Method of sinking a technological well in mine working influence zone SU1444518A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874224835A SU1444518A1 (en) 1987-04-07 1987-04-07 Method of sinking a technological well in mine working influence zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874224835A SU1444518A1 (en) 1987-04-07 1987-04-07 Method of sinking a technological well in mine working influence zone

Publications (1)

Publication Number Publication Date
SU1444518A1 true SU1444518A1 (en) 1988-12-15

Family

ID=21296417

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874224835A SU1444518A1 (en) 1987-04-07 1987-04-07 Method of sinking a technological well in mine working influence zone

Country Status (1)

Country Link
SU (1) SU1444518A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Акимов А.Г., Левченко И.А. О величине предохранительных целиков дл охраны технических скважин в Донбассе. В кн. Разработка месторождений полезных ископаемых. Киев: Тех46-47. нормы технологического проектировани шахтных стволов и скважин, сооружаемых способом реактивно-турбинного бурени (РБТ). М.: Южгипрошахт, 1980, с. 7-10. *

Similar Documents

Publication Publication Date Title
CN113404535B (en) Method for preventing rock burst by hydraulic fracturing of coal mine underground
CN112780340B (en) Method for preventing rock burst in advance in underground coal mine area
CN112593936B (en) Advanced comprehensive control method for multi-disaster area of deep mine
CN113404534B (en) Method for preventing rock burst by staged fracturing of L-shaped ground horizontal well
CN109611146B (en) Separation layer water drainage grouting method
CN112160792A (en) Staged hydraulic fracturing working method for underground hard top plate
SU1444518A1 (en) Method of sinking a technological well in mine working influence zone
CN114893161A (en) Multi-layer position directional drilling combined arrangement method
RU2059813C1 (en) Method for mining steeply dipping ore bodies
RU2076923C1 (en) Method of formation of flagging screen in water-encroached rocks
SU1578407A1 (en) Method of restoring mine workings
RU2760451C1 (en) Method for strengthening facked rocks during construction of connections of horizontal mining works
SU1710699A1 (en) Drill hole plugging-back method
RU2004810C1 (en) Method for drilling of inclined upward hole from underground mine working
RU2075572C1 (en) Method of forming isolation curtain around mine workings
RU2541978C1 (en) Well construction method
RU2002127100A (en) METHOD FOR DRIVING MINING DRAINAGE IN DISTURBED AND WATERWATED ARRAY
RU2704089C1 (en) Well construction method in complex geological conditions
SU1401133A1 (en) Method of preparing to mining the stores of mine fields of flooded potassium mines
SU1726766A1 (en) Method of erecting waterproofing dike in mine drifts
SU983269A1 (en) Method of lowering water level in open mines
SU1758232A1 (en) Method of consolidating rocks in vertical shaft sinking
SU1553680A1 (en) Method of control of solid roof
SU1479655A1 (en) Method of water insulation of vertical shafts
SU877031A1 (en) Method of constructing a vertical shaft