SU1420160A1 - Method of combination mining of mineral deposits - Google Patents

Method of combination mining of mineral deposits Download PDF

Info

Publication number
SU1420160A1
SU1420160A1 SU864159369A SU4159369A SU1420160A1 SU 1420160 A1 SU1420160 A1 SU 1420160A1 SU 864159369 A SU864159369 A SU 864159369A SU 4159369 A SU4159369 A SU 4159369A SU 1420160 A1 SU1420160 A1 SU 1420160A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pit
formation
underground
space
ore
Prior art date
Application number
SU864159369A
Other languages
Russian (ru)
Inventor
Александр Дмитриевич Черных
Олег Степанович Брюховецкий
Владимир Дмитриевич Юхименко
Original Assignee
Московский Геологоразведочный Институт Им.Серго Орджоникидзе
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Московский Геологоразведочный Институт Им.Серго Орджоникидзе filed Critical Московский Геологоразведочный Институт Им.Серго Орджоникидзе
Priority to SU864159369A priority Critical patent/SU1420160A1/en
Application granted granted Critical
Publication of SU1420160A1 publication Critical patent/SU1420160A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

Изобретение относитс  к горной пром-ти. Цель изобретени  - повышение эффективности разработки за счет снижени  потерь полезного ископаемого вовлечением в добычу приконтурных запасов руд и предотвращени ч сдвижени  нерабочего борта карьера (К). Проход т подземные транспортные иThis invention relates to the mining industry. The purpose of the invention is to increase the development efficiency by reducing the loss of the mineral by engaging in the extraction of marginal ore reserves and preventing the shift of the non-working pit board (K). Pass underground transport and

Description

(L

to to

о:about:

фуг. Jfug. J

выпускные выработки. Дл  проведени  буровых работ в приконтурном участке на уровне нижней отметки К под нерабочим бортом образуют технологическое пространство 6 на высоту уступа К с формированием столбчатых поддерживающих целиков. Рудный массив верхнего подземного этажа обуривают из указанного пространства 6 нисход щими скважинами 8 и отбивают секцион- нь1м взрыванием скважинных зар дов ВВ снизу вверх. Отбойку .сначала производ т со стороны вис чего бока до границы зоны сдвижени  борта К с образованием единого очистного прост1final workings. To carry out drilling operations in the marginal area at the level of the lower mark K, under the non-working side, form a technological space 6 to the height of the ledge K with the formation of columnar supporting pillars. The ore massif of the upper underground floor is filled from the indicated space with 6 downward wells 8 and beat sectionalized by blasting borehole explosive charges from bottom to top. The cutting is first performed from the side of the side of which to the border of the zone of displacement of the bead K with the formation of a single cleansing space.

Изобретение относитс  к горной промышленности и может быть использовано при открыто-подземной доработке полезных ископаемых под бортами и за контурами карьеров.The invention relates to the mining industry and can be used in open-pit and underground mining of minerals under the sides and outside of the open-pit contours.

Целью изобретени   вл етс  повьше ние эффективности разработки за счет снижени  потерь полезного ископаемог вовлечением в добычу приконтурных запасов руд и предотвращени  сдвижени  нерабочего борта карьера.The aim of the invention is to increase the development efficiency by reducing the loss of minerals by involving in the mining of marginal ore reserves and preventing the non-working pit board from slipping.

На фиг. 1 показан дорабатьшаемьш приконтурньш участок продольный разрез; на фиг. 2 - разрез А-А на фиг. 1 (вкрест простирани  приконтур ной залежи); на фиг. 3 - план горных работ под бортом и за контуром карьера . .FIG. Figure 1 shows the longitudinal section of the contoured section; in fig. 2 shows section A-A in FIG. 1 (across the edge of the margin); in fig. 3 - plan of mining operations under the board and behind the pit contour. .

Способ осуществл ют следующим образом .The method is carried out as follows.

Месторождение сначала отрабатывают открытым способом до границы 1, .затем подкарьерные запасы полезных ископаемых отрабатывают рггкрыто под- земным способом с образованием единого очистного пространства 2. Йри разработке выт нутых месторождений открытым способом в торцовых част х карьеров остаютс  выклинивающиес  части основных залежей, открыта  разработка которых  вл етс  нецелесообразной ввиду превьш1ени  граничного коэффициента вскрьшш и изъ ти  ценных плодородных земель. Дл  их дора- ботки ранее образованное под дном First, the field is mined openly to border 1, then the subculture reserves of mineral resources are mined underground, with the formation of a single clearing space 2. In the open pit mining, open pit mines remain in the face parts of the open-pit mines. It is inexpedient in view of the increase in the boundary coefficient of the supremacy and the withdrawal of valuable fertile lands. For their refinement, the previously formed under the bottom

ранства между К и подземным этажом. Затем отбойку производ т со стороны лежачего бока до указанной границы с образованием единого очистного пространства между К и подземным этажом и формированием образовавшимис  очистными пространствами ленточного поддерживающего целика 9.После этого отбивают рудный массив за зоной сдвижени  в контурах образованных очистных пространств с погашением части целика 9 вдоль его продольной оси. Отбитую горную массу выпускают через подземные выработки. 3 ил.between K and the underground floor. Then the blasting is made from the side of the recumbent side to the specified border with the formation of a single cleansing space between K and the underground floor and the formation of the clearing spaces formed of the belt supporting pillar 9. After that, the ore mass is fought off behind the displacement zone in the contours of the clearing spaces formed with the maturing of the pillar 9 along its longitudinal axis. Repulsed rock mass produced through underground workings. 3 il.

. .

д d

j j

5 . 5five . five

00

карьера очистное пространство 2 продолжают развивать в направлении залегани  приконтурной залежи под борт 3 и за контур 4 карьера. С этой, целью существующий под дном карьера транс- портно-выпускной горизонт удлин ют в сторону залегани  приконтурной залежи , затем залежь подсекают вьшу.ск- ными воронками 5. Дл  проведени  буровых работ в приконтурном участке на уровне дна карьера 1 на высоту карьерного уступа камерно-столбовой системой разработки образуют технологическое пространство 6, откуда карьерными буровыми станками 7 ведут бурение нисход щих скважин 8 на глубину соответствующего под дном карьера очистного пространства. Доставку буровых станков, а также погрузочного оборудовани  из зоны карьера осуществл ют по буровым штольн м, пройденным из карьера до вьфаботанного пространства 6 бурового горизонта. Дл  предотвращени  сдвижени  нерабочего борта карьера по центру дорабатываемой приконтурной залежи оставл ют ленточный поддёрживаюш 1й целик 9 из полезного ископаемого, причем ширину целика до границы зоны сдвижени  10 на участке принимают в 1,2-1,5 раза шире, чем за зоной сдвижени . Выемку полезного ископаемого в приконтурной зоне осуществл ют поэтапно, сначала со стороны вис чего бока приконтурной залежи 11 до границы зоны сдвижени , затемopen pit cleaning space 2 continues to develop in the direction of the occurrence of marginal deposits under the board 3 and beyond the contour 4 of the pit. For this purpose, the transport and exhaust horizon existing under the pit bottom is lengthened to the side of the marginal reservoir, then the deposit is cut by the outflow deflectors 5. For drilling operations in the marginal section at the bottom of the pit 1 to the height of the quarry - the column development system forms the technological space 6, from where the quarry drilling machines 7 drill downhole wells 8 to the depth of the cleaning space corresponding to the bottom of the quarry. The delivery of drilling rigs, as well as loading equipment from the pit area, is carried out by drilling galleries, passed from the quarry to the drilling zone 6 of the drilling horizon. In order to prevent the non-working pit board from moving along the center of the near-shore deposit, the belt pillar 1 of 9 from the mineral is left, and the width of the pipe to the boundary of the zone of displacement in the area is 1.2-1.5 times wider than the zone of displacement. Mineral excavation in the marginal zone is carried out in stages, first from the hanging side of the marginal deposit 11 to the boundary of the displacement zone, then

со стороны лежачего бока 12 прикон- турной залежи. Отбойку полезного ископаемого , залегающего непосредственно под бортом карьера до границы зоны сдвижени  как со стороны лежачего бока , так и со стороны вис чего бока при прикон турной залежи, ведут взрьшани- ем скважинных зар дов ВВ секци ми 13 снизу вверх. В некоторых случа х дл  о1ополнительного креплени  борта карьера с берм карьерных уступов бур т сквалсины 14 и потолочину прикон- турного участка и бермы карьерных уступов скрепл ют металлическими тросами. После этого рудный массив за зоной сдвижени  отбивают в контурах образованных очистных пространств с вовлечением в добьму части ленточного целика вдоль его продольной оси. Формул, а изобретени from the side of the recumbent side 12 of the marginal deposit. The breaking of the mineral deposit that lies directly under the pit wall to the boundary of the displacement zone both from the side of the recumbent side and from the side of the side of which at the adjacent deposit is conducted by charging the explosive charges 13 with sections 13 upwards. In some cases, squalls 14 and the ceiling of the marginal area and the berms of the career ledges are fastened with metal cables to attach the side of the quarry from the berms of the quarry ledges. After that, the ore massif behind the displacement zone is fended off in the contours of the formed clearing spaces with involvement of the tape rear sight along the longitudinal axis into the dobmu part. Formulas and inventions

Способ комбинированной разработки месторождений полезных ископаемых, включающий проходку подземных транс- портных и выпускных вьфаботок, обури- вание рудного массива верхнего подземного этажа скважинами с нижней .отметки карьера,, отбойку рудного массива взрыванием скважинных зар дов ВВ и выпуск .отбитой горной массы через подземные выработки, о т л и -The method of combined development of mineral deposits, including the sinking of underground transport and exhaust floating operations, the ore massif of the upper underground level being drilled by wells from the pit bottom mark, blasting of the ore massif by blasting of explosive borehole explosive charges, and the release of rock mass through underground workings , about tl and -

.L

6060

чающийс  тем, что, с цепью повьппени  эффективности разработки за счет снижени  потерь полезного ископаемого вовлечением в добычу при- контурных запасов руд и предотвращени  сдвижени  нерабочего борта карьера , перед об фиванием рудного массива на уровне нижней отметки карьера под нерабочим бортом образуют технологическое пространство на высоту уступа карьера с формированием столбчатых поддерживающих целиков, рудный цасск в обуривают из указанного пространства и отбивают секционным взрыванием скважинных зар дов ВВ снизу вверх сначала со стороны вис чего бока до границы зоны сдвижени  борта карьера с образованием единого очистного пространства между карьером и подземным этажом, а затем со стороны лежачего бока до указанной границы с образованием единого очистного .пространства между карьером и подземным этажом и формированием между образованными очистными простр анствами ленточного поддерживающего целика, после чего отбивают рудный массив за зоной сдвижени  в контурах образованных очистных пространств с погашением части ленточного целика вдоль его продольной оси.due to the fact that with a chain of development efficiency by reducing the loss of minerals by involving ore reserves in mining and preventing the non-working pit board from slipping, they form a technological space before the ore mass at the lower grade of the pit below the non-working board a quarry with the formation of columnar supporting pillars, ore Tsassk in the mine from the specified space and beat off by sectional blasting of explosive charges from bottom to top and Started from the side of the side to the border of the pit moving area with the formation of a single cleansing space between the quarry and the underground floor, and then from the side of the recumbent side to the specified border with the formation of a single cleansing area between the open pit and the underground floor and the formation between the formed clearing spaces belt support pillar, then beat off the ore massif behind the displacement zone in the contours of the formed clearing spaces with the redemption of part of the belt pillar along its length flax axis.

Фиг,1Fig, 1

/2/ 2

Y///////////////// / A Фиг, 2Y /////////////// / A FIG. 2

Claims (1)

Формула изобретенияClaim Способ комбинированной разработки месторождений полезных ископаемых, включающий проходку подземных транс- 25 портных и выпускных выработок, обуривание рудного массива верхнего подземного этажа скважинами с нижней отметки карьера,- отбойку рудного массива взрыванием скважинных зарядов ВВ и выпуск отбитой горной массы через подземные выработки, о т л и под нерабочим бортом образуют технологическое пространство на высоту уступа карьера с формированием столбчатых поддерживающих целиков, рудный массив обуривают из указанного пространства и отбивают секционным взрыванием скважинных зарядов ВВ снизу вверх сначала со стороны висячего бока до границы зоны сдвижения борта карьера с образованием единого очистного пространства между карьером и подземным этажом, а затем со стороны лежачего бока до указанной границы с образованием единого очистного пространства между карьером и подземным этажом и формированием между образованными очистными пространствами ленточного поддерживающего целика, после чего отбивают рудный массив за зоной сдвижения в контурах образованных очистных пространств с погашением части ленточного целика вдоль его продольной оси.A method for the combined development of mineral deposits, including the excavation of underground transport and 25 mine workings, drilling the ore massif of the upper underground floor with wells from the bottom mark of the quarry, - breaking the ore mass by blasting explosive bore charges and discharging the rock mass through the underground workings, about t l and under the idle side they form the technological space to the height of the pit ledge with the formation of columnar supporting pillars, the ore mass is drilled from the specified space and they are beaten up by sectional blasting of borehole explosive charges from the bottom up, first from the side of the hanging side to the boundary of the pit side shift zone with the formation of a single treatment space between the pit and the underground floor, and then from the lying side to the specified border with the formation of a single treatment space between the pit and the underground floor and the formation between the formed treatment spaces of the tape support pillar, after which the ore mass is beaten off behind the displacement zone in the contours formed by the treatment s maturing spaces pillar rod portion along its longitudinal axis. Фиг. 7FIG. 7
SU864159369A 1986-12-10 1986-12-10 Method of combination mining of mineral deposits SU1420160A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864159369A SU1420160A1 (en) 1986-12-10 1986-12-10 Method of combination mining of mineral deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864159369A SU1420160A1 (en) 1986-12-10 1986-12-10 Method of combination mining of mineral deposits

Publications (1)

Publication Number Publication Date
SU1420160A1 true SU1420160A1 (en) 1988-08-30

Family

ID=21272109

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864159369A SU1420160A1 (en) 1986-12-10 1986-12-10 Method of combination mining of mineral deposits

Country Status (1)

Country Link
SU (1) SU1420160A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР №1023085, кл. Е 21 С 41/00, 1983. Авторское свидетельство СССР № 690181, кл. Е 21 С 41/02, 1979. *

Similar Documents

Publication Publication Date Title
CN104989404B (en) It is pseudo- in Steeply dipping narrow deposits arteries and veins to tilt ore deposit Medium-long hole mining method
RU2397324C1 (en) Method for development of minor inclined and sloping ore lodes
RU2209972C2 (en) Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks
RU2348808C2 (en) Method of preparing bottom of block
SU1420160A1 (en) Method of combination mining of mineral deposits
RU2757619C1 (en) Method for developing low-powered steel ore bodies
RU2790648C1 (en) Method for underground development of steeping ore bodies in descenting order with chamber system
RU2030581C1 (en) Method for combined mining of thick ore bodies
RU2099524C1 (en) Combined method of mining of formation of steeply dipping coal seams
SU1384755A1 (en) Method of mining gently-sloping and sloping ore bodies
SU1461930A1 (en) Method of combined mining of mineral deposits
RU2094612C1 (en) Method for opening steep thin ore deposits
RU2290510C1 (en) Open underground method for extracting formations of mineral resources
RU2755287C1 (en) Method for developing thin and low-powered steel-falling ore bodies
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
SU1439240A1 (en) Method of combined exploitation of mineral deposits
SU1083662A1 (en) Method of mining steep-slope ore-bodies
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
RU2232894C1 (en) Method for subterranean excavation of mineral deposits by means of chamber-column method
RU1810549C (en) Method for hole hydraulic mining of minerals from deeply seated deposits
SU1337517A1 (en) Method of combined underground/open mining of coal beds
RU2096617C1 (en) Method for development of mineral deposits
RU2254467C1 (en) Method for extraction of steep-dropping and slanting deposits of lowe and average massiveness
UA32583U (en) Method for development of steep shallow ore deposits in contour zone of pits
SU1456572A1 (en) Method of mining mineral deposits