SU1411490A1 - Concrete feed and shotcreting pump - Google Patents
Concrete feed and shotcreting pump Download PDFInfo
- Publication number
- SU1411490A1 SU1411490A1 SU864148355A SU4148355A SU1411490A1 SU 1411490 A1 SU1411490 A1 SU 1411490A1 SU 864148355 A SU864148355 A SU 864148355A SU 4148355 A SU4148355 A SU 4148355A SU 1411490 A1 SU1411490 A1 SU 1411490A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- concrete
- sleeve
- pump
- tank
- container
- Prior art date
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 7
- 238000010276 construction Methods 0.000 abstract description 2
- 230000003245 working effect Effects 0.000 abstract description 2
- 238000005065 mining Methods 0.000 abstract 1
- 238000000926 separation method Methods 0.000 abstract 1
- 239000000203 mixture Substances 0.000 description 5
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 239000000243 solution Substances 0.000 description 3
- 238000005507 spraying Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000001020 rhythmical effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Изобретение относ тс к устройствам дл креплени горных выработок бетоном и м.б. использовано при ремонтах и строительстве тепловых металлургических агрегатов, а также в шахтном, дорожном и гидротехническом строительстве. Цель - повышение надежности и пронзв-ти работы замечет рав1 омерной подачи бе гона в бетоно- вод. Под емкостью I дл бетона, установленной вертикально, закреплена выполненна в виде двухстенной емкости гильза (Г) 10 с возможностью их разъединени . Г 10 соединена с бетоноводом (БВ) 3 в нижней своей Ф (ЛThe invention relates to devices for securing mine workings with concrete and m. used in the repair and construction of thermal metallurgical units, as well as in mining, road and hydraulic engineering. The goal is to increase the reliability and performance of the work, noting that the equilibrium supply of begon to the concrete pipeline is equal. Under the container I for concrete, installed vertically, a sleeve (D) 10, made in the form of a double-walled container, is fixed with the possibility of their separation. G 10 is connected with betonovodom (BV) 3 in its lower f (L
Description
1212
№No
/5/five
части, В верхней боковой части Г 10 соединена трубопроводом 14 с емкостью 15 дл воды, в которой установлен шток (Ш) с приводом. В ейкости 1 вертикально установлен Ш 6, верхний конец которого соединен с приводом 12J взаимодействующим с приводом емкости 15. К нижнему концу Ш 6 шарнир- но присоединены две зеркально расположенные лопатки 8, свободные концы которых помещают в Г 10. Во внутренних стенках Г 10 выполнены каналы 13 с наклоном в сторону БВ .3. Мелсду последним и Г 10 расположен соединенныйparts, in the upper side of the G 10 is connected by pipeline 14 with a container 15 for water, in which the stem (Ø) is installed with the drive. Capacity 1 is vertically mounted Ø 6, the upper end of which is connected to a drive 12J interacting with a capacity drive 15. Two mirrored blades 8 are hingedly attached to the bottom end Ø 6 and the free ends of which are placed in Г 10. The inner walls of Г 10 are made channels 13 with a slope in the direction of BV .3. Melsda is the last and G 10 is connected
с БВ 3 переходник 1 с обратным шаровым клапаном 17. Выходной конец БВ 3 имеет сопло 4 с трубопроводом 5 сжатого воздуха. При.движении Ш 6 вверх лопатки 8, взаимодейству с бетоном, соприкасаютс между собой. В это врем происходит загрузка бетона в Г 10. При движении Ш 6 вниз лопатки 8, взаимодейству с продвинувшимс бетоном, расход тс в сторонь и взаимодействуют с Г 10 и замкнутым в ней бетоном . Бетон проталкиваетс в БВ 3 и далее в сопло 4 и на поверхность выработки . 1 з.п. ф-лы, 2 ил.with BV 3 adapter 1 with non-return ball valve 17. The output end of BV 3 has a nozzle 4 with a pipeline 5 of compressed air. With the movement of Ш 6 upwardly blades 8, interacting with concrete, they are in contact with each other. At this time, concrete is loaded into G 10. When W 6 moves down, the blades 8, interact with the advanced concrete, diverge to the side and interact with G 10 and the concrete closed in it. Concrete is pushed through BV 3 and then into nozzle 4 and onto the surface of the excavation. 1 hp f-ly, 2 ill.
1one
ЙГзобретение относитс к устройствам дл креплени горных выработок бетоном, укладываемым за опалубку или безопалубочным способом методом набрызга, и может найти применение при ремонтах и строительстве тепловых металлургических агрегатов, а также в шахтном, дорожном и гидротехническом строительстве.The invention relates to devices for securing the mine workings with concrete, laid for formwork or without a deck by the method of spraying, and can be used in the repair and construction of thermal metallurgical units, as well as in mine, road and hydraulic engineering.
Цель изобретени - .обеспечение надежной, ритмичной, производительной работы за счет равномерной подачи бетона в бетоновод.The purpose of the invention is to ensure reliable, rhythmic, productive work due to the uniform supply of concrete to the concrete pipe.
На фиг.I показан бетононасос, общий вид; на фиг.2 - разрез А-А на фиг.1.Fig. I shows a concrete pump, a general view; figure 2 - section aa in figure 1.
Бетононасос дл подачи и набрызга бетона состоит из конусной емкости 1 дл бетона, ндсоса 2, бетоновода 3, сопла 4 с трубопроводом 5 сжатого воздуха. Насос 2 выполнен из верти- .кально установленного в емкости 1 штока 6, к концу которого посредством осей 7 шарнирно присоединены две зеркально расположенные лопатки 8, снабженные упорами 9 и помещенные в гильзу 10, оснащенную конусным переходником 11, соединенным с бетоново- дом 3. Бетононасос расположен вертикально , присоединен к нижней части емкости 1 и снабжен приводом 12. В гильзе 10 выполнены каналы 13, наклоненные в сторону бетоновода 3. Каналы 13-соединены трубопроводом (высоконапорной магистралью 14) подачи раствора в жущего или воды с емкостью 15 дл воды, при этом нагнетательное устройство 16 высоконапорной магистрали 15 св зано с приводом 12 насоса 2. Ниже конусного переходника П расположен обратньй. шаровой с верхним расположением седла клапан 17.Concrete pump for supplying and splashing concrete consists of a cone tank 1 for concrete, a pump 2, a concrete pipe 3, a nozzle 4 with a pipe 5 of compressed air. The pump 2 is made of a rod 6 vertically installed in the tank 1, to the end of which, by means of the axes 7, two mirrored blades 8 are pivotally attached, equipped with stops 9 and placed in the sleeve 10, equipped with a tapered adapter 11 connected to the concrete bridge 3. The concrete pump is located vertically, connected to the lower part of the tank 1 and equipped with a drive 12. In the sleeve 10, channels 13 are made, tilted towards the concrete channel 3. Channels 13 are connected by a pipeline (high-pressure line 14) to supply the solution to a tandem or water tank. 15 for water, while the injection device 16 of the high-pressure main 15 is connected to the drive 12 of the pump 2. Below the conical adapter P is the return. ball valve with upper saddle 17.
Гильза 10 выполнена из. нескольких частей и вл етс съемной. Дл исключени попадани бетонной смеси в камеру , образованную гильзой 10 и корпусом насоса 2, гильза 10 со стороныThe sleeve 10 is made of. several parts and is removable. To prevent concrete mixture from entering the chamber formed by the sleeve 10 and the pump body 2, the sleeve 10 is from the side
камеры может быть покрыта тканью, например синтетической.the camera may be covered with a cloth, such as synthetic.
Устройство дл подачи и набрызга бетона работает следующим образом. Готова бетонна смесь загружаетс в емкость 1. При работающем насосе 2 его шток 6 совершает возвратно- поступательные движени .The device for feeding and spraying concrete works as follows. The ready-mixed concrete is loaded into the container 1. When the pump 2 is running, its rod 6 performs reciprocating movements.
При движении штока 6 вверх лопатки 8, взаимодейству с бетоном, смещаютс к продольной оси и соприкасаютс между собой упорами 9, которые обеспечивают им ориентированное относительно вертикальной оси положение . В это же врем происходит загрузка бетона в гильзу 10. При движении штока 6 вниз лопатки 8, взаимодейству с продвинувшимс вниз под со6ственнь:м весом бетоном, расход тс в стороны и взаимодействуют сWhen the rod 6 moves upwards, the blades 8, interacting with the concrete, are displaced to the longitudinal axis and contact each other with the stops 9, which provide them with a position oriented relative to the vertical axis. At the same time, the concrete is loaded into the sleeve 10. When the rod 6 moves downward of the blade 8, we interact with the concrete that has advanced downwards under the weight of concrete: it weighs to the side and interacts with
гильзой 10 и замкнутым в ней бетоном.sleeve 10 and closed in her concrete.
Бетон проталкиваетс в бетоновод 3 и далее в сопло 4, из которого смесь сжатым воздухом наноситс на поверхность , например, горной выработки. В такт с насосом 2 работает нагнетательное устройство 16, которое подает раствор в жущего или воду по высоконапорной магистрали 14 из емкости 15 и каналам 13 на стенки гильзы 10,Concrete is pushed into betonovod 3 and further into nozzle 4, from which the mixture is applied with compressed air to the surface, for example, of a mine working. In tact with the pump 2, the injection device 16 operates, which delivers the solution into the water or through the high-pressure line 14 from the tank 15 and the channels 13 to the walls of the sleeve 10,
Давление раствора в жущего или воры в высоконапорной магистрали 14 превышает давлени , возникающие в смеси при ее проталкивании, что обеспечивает посто нное смачивание в жущим или водой внутренней поверхности гильзы 10. Это облегчает передвиже- кие бетона по бетоноводу 3 и улучшает услови работы лопаток 8 и гильзы 10.The pressure of the solution in the thrust or the thieves in the high-pressure line 14 exceeds the pressure in the mixture when it is pushed, which ensures that the inner surface of the sleeve 10 is constantly wetted by the stirrer or water and improves the working conditions of the blades 8 and sleeves 10.
Производительность нагнетательного устройства 16 может регулироватьс в зависимости от состо ни бетонной смеси и дальности транспортировани бетона, Обра гный клапан. 17 исключает возвратное движение смеси и прорыва воздуха. .The capacity of the injection device 16 can be adjusted depending on the state of the concrete mix and the range of transportation of the concrete, Obdor valve. 17 eliminates the return movement of the mixture and air breakthrough. .
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU864148355A SU1411490A1 (en) | 1986-11-19 | 1986-11-19 | Concrete feed and shotcreting pump |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU864148355A SU1411490A1 (en) | 1986-11-19 | 1986-11-19 | Concrete feed and shotcreting pump |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1411490A1 true SU1411490A1 (en) | 1988-07-23 |
Family
ID=21267977
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU864148355A SU1411490A1 (en) | 1986-11-19 | 1986-11-19 | Concrete feed and shotcreting pump |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1411490A1 (en) |
-
1986
- 1986-11-19 SU SU864148355A patent/SU1411490A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 81113, кл. F 04 В 43/02, 1949. Авторское свидетельство СССР № 34972, кл. F 04 В 43/14, 1934. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4630798A (en) | Method and device for erecting building structures such as bridges, using pre-fabricated concrete beams | |
US6752213B1 (en) | Floating offshore construction, and floating element | |
CN109853575A (en) | Floating underwater rubble base bed flattening ship | |
EP1840267A3 (en) | Device and method for injecting cement grout in porous road surfaces | |
SU1411490A1 (en) | Concrete feed and shotcreting pump | |
SU689629A3 (en) | Underground mine settler | |
US4482274A (en) | Floating platform for use in deep waters, and method of installation | |
RU2139978C1 (en) | Plant for concreting cast-in-place piles | |
CN209603143U (en) | The continuous leveling ship of floating underwater rubble bedding | |
CN1073180C (en) | Sewage dredger and use thereof | |
US3334390A (en) | End ring trowelling attachment for concrete pipe making apparatus | |
CN110004933A (en) | Underwater rubble bedding laying apparatus and method | |
CN214729536U (en) | Construction platform for overwater trestle | |
US4444526A (en) | Submerged tunnel and a method of and means for constructing a submerged tunnel | |
JPS5812409B2 (en) | Basic equipment for boring platform | |
CN209620027U (en) | Underwater rubble bedding laying apparatus | |
CN209555932U (en) | Floating underwater rubble base bed flattening ship | |
US4321223A (en) | Process for placing concrete through high head | |
EP0034907B1 (en) | A submerged tunnel and a method of, and means for, constructing a submerged tunnel | |
US4912890A (en) | Air/water cranes | |
RU2807666C1 (en) | Bridge floating platform | |
SU1315314A2 (en) | Vibration platform | |
FI112521B (en) | Method and apparatus for distributing mortar | |
SU1162992A1 (en) | Power support | |
SU1703826A1 (en) | Pneumatic support unit |