SU1350361A1 - Mine crane - Google Patents
Mine crane Download PDFInfo
- Publication number
- SU1350361A1 SU1350361A1 SU864004013A SU4004013A SU1350361A1 SU 1350361 A1 SU1350361 A1 SU 1350361A1 SU 864004013 A SU864004013 A SU 864004013A SU 4004013 A SU4004013 A SU 4004013A SU 1350361 A1 SU1350361 A1 SU 1350361A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- supports
- blocks
- frame
- slider
- load
- Prior art date
Links
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
Изобретение относитс к горнодобывающей промьшшенности, в частности к средствам монтажа, демонтажа и доставки шахтного-оборудовани . Цель - снижение затрат на монтажно- демонтажные работы. Дл этого опоры 2 и 3 несущего каркаса шахтного крана попарно соединены в своей верхней .8 11. /4 части с поперечной балкой 1 и установлены на общем основании 4, выполненном в виде рельсовой колеи с закрепленной на ней рамой 23. Опоры 2 и 3 соединены между собой в нижней части заключенным в корпус 11 гидро- цилиндром (ГЦ) 14 механизма подъема груза. Шток ГЦ 14 шарнирно соединен с ползуном 15, на котором установлен блок 16. Канат закреплен одним кондом на корпусе 11 и огибает блоки. На раме 23 установлены ГЦ 24 и 25 механизма перемещени груза, соединенные с ползуном 26, а отрезки каната 29 и 30 огибают блоки 21, 27 и 22, 28 соответственно. При работе шток ГЦ 14 выдвигаетс и перемещает ползун 15 с блоком .16. Через блоки нат жение каната передаетс на груз. Дл перемещени груза рабочую жидкость подают в поршневзпо полость ГЦ 24.и штоковую полость ГЦ 25. Ползун 26 вместе с блоками 27 и 28 перемещаетс вправо, а портальна рама с грузом влево. 6 ил. ( 00 Сд о сс о: 75 Zlle Фиг.1The invention relates to the mining industry, in particular to the means of assembling, dismantling and delivering mine equipment. The goal is to reduce the cost of installation and dismantling. For this, supports 2 and 3 of the supporting frame of a shaft crane are connected in pairs in their upper .8 11. / 4 parts with a transverse beam 1 and mounted on a common base 4, made in the form of a rail track with a frame 23 fixed on it. Supports 2 and 3 are connected between each other in the lower part of the hydraulic cylinder (HZ) 14 of the load lifting mechanism enclosed in the hull. The rod HZ 14 is hingedly connected to the slider 15, on which the block 16 is mounted. The rope is fixed by one condom on the body 11 and bends around the blocks. On the frame 23, HZ 24 and 25 of the load transfer mechanism are connected, connected to the slider 26, and the sections of the rope 29 and 30 round the blocks 21, 27 and 22, 28, respectively. During operation, the HZ rod 14 extends and moves the slider 15 with the block .16. Through the blocks, the tension of the rope is transmitted to the load. To move the cargo, the working fluid is supplied to the piston cavity of the HZ 24. and the rod cavity of the HZ 25. The slider 26, together with blocks 27 and 28, is moved to the right, and the portal frame with the load to the left. 6 Il. (00 Sd about ss about: 75 Zlle Figure 1
Description
1one
Изобретение относитс к горнодобывающей .промышленности, в частности к средствам монтажа, демонтажа и доставки шахтного оборудовани .The invention relates to the mining industry, in particular to the means of assembling, dismantling and delivering mining equipment.
Цель изобретени - снижение затрат на монтажно -демонтажные работы.The purpose of the invention is to reduce the cost of installation and dismantling.
На фиг. 1 изображен шахтный монтажный кран, вид сбоку; на фиг. 2 - то же, вид спереди; на фиг. 3 - ме ханизм передвижени монтажного крана , вид сбоку; на фиг. 4 - то же, план; на фиг. 5 - начальньш момент подъема монтажного крана; на фиг„6 - .завершающа стади подъема.FIG. 1 shows a shaft mounting crane, side view; in fig. 2 - the same, front view; in fig. 3 - mechanism of movement of the mounting crane, side view; in fig. 4 - the same plan; in fig. 5 - the initial moment of lifting the mounting crane; Fig 6 -. The final stage of recovery.
Шахтный кран выполнен в виде несущего каркаса, состо щего из поперечной балки 1, опор 2 и 3 и оснований Д. Кажда опора соединена с попереч1350361 2The shaft crane is made in the form of a supporting frame consisting of a transverse beam 1, supports 2 and 3, and bases D. Each of the supports is connected to a transverse 1350361 2
нут в крайнее положение,а шток гидроци- линдра 24 до конца вт нут в цилиндр.Штоки гидродомкратов 1 4 механизма подъема до g конца вт нуты, грузозахватные устройства наход тс в крайнем нижнем положении . В зависимости от массы груза последний креп т к одному или сразу двум механизмам подъема и поднимают, 1Q дл чего в поршневую полость гидро- дилиндра 14 подают рабочую жидкость, при этом шток гидроцилиндра выдвигаетс , перемеща ползун 15 вместе с блоком 16, нат жение цепи через блоки 15 17-19 передаетс на поднимаемый груз Дл перемещени груза в поршневую полость гидроцилиндра 24 и штоковую полость гидроцилиндра 25 подают рабо- чую жидкость, ползун 26 вместе сthe hydraulic cylinder rod 24 is fully retracted into the cylinder. The hydraulic jacks 1 4 of the lifting mechanism to the g end are retracted, the load handling devices are in the lowest position. Depending on the weight of the load, the latter is attached to one or two lifting mechanisms at once and is lifted, 1Q for which working fluid is supplied into the piston cavity of the hydraulic cylinder 14, and the hydraulic cylinder rod moves forward, moving the slider 15 together with the block 16, tensioning the chain through Blocks 15 17-19 are transferred to the lifted load. To transfer the load, the working fluid is supplied to the piston cavity of the hydraulic cylinder 24 and the rod cavity of the hydraulic cylinder 25, the slider 26 together with
ной балкой 1 посредством соединитель- JQ блоками 27 и 28 перемещаетс вправо,аbeam 1 through connector JQ blocks 27 and 28 is moved to the right, and
ных пальцев (штифтов) 5-8 и опираетс портальна рама вместе с грузом перена колесно-рельсовые тележки 9 и 10. двигаетс влево и т.д.fingers (pins) 5-8 and rests the portal frame, together with the load, the wheel-rail carriages 9 and 10 move to the left, etc.
Опоры в нижней части соединены междуThe supports at the bottom are connected between
собой коробчатой станиной 11 корпуса Сборка монтажного крана выполн механизма подъема посредством пальцев 25 следующей последовательности.a box-like frame 11 of the housing Assembly of the mounting crane performed lifting mechanism through the fingers 25 of the following sequence.
12 и 13.12 and 13.
Механизм подъема грузов состоит из гидроцилиндра 14, горизонтально установленного в станине I1, шток гидроцилиндра 14 шарнирно соединен с ползуном 15, на котором установлен блок 16. В средней части станины П по центру балки 1 установлен блок 17. Цепь или канат закреплены одним концом на станине 11, огибают блоки 1 6-19.The lifting mechanism consists of a hydraulic cylinder 14, horizontally installed in the I1 bed, the hydraulic cylinder rod 14 is pivotally connected to a slide 15 on which the block 16 is mounted. In the middle part of the bed P in the center of the beam 1 there is a block 17. The chain or rope is fixed at one end on the bed 11, go around blocks 1 6-19.
Сначала монтируют механизм передвижени крана на шпалы, закрепленные к почве выработки, устанавливают рельсы , образующие участок колеи 20, на концах которой закрепл ют блоки 21 и 22. В средней части участка колеи 20 укладывают и анкеруют к почве металлические рамы 23 с гидроцилиндрами 24 и 25 и блоками 27 и 28, установленными .на лолзуне 26. После 35 сборки гидросистемы механизма передвижени и подключени ее к магистральному трубопроводу или автономной маслостанции его используют как т говое устройство, с помощью котоМеханизм перемещени крана установлен на участке рельсовой колеи 20, на концах которой закреплены обводные блоки 21 и 22. В средней части участка с обеих сторон рельсовой колеи за- 40 роро в монтажную камеру доставл ютс креплены металлические рамы 23, по балка 1 и опоры 2 и 3. При этом опо- оси которых расположено по два гидроцилиндра 24 и 25 штоками навстречу один другому, которые соединены с ползуном 26, имеющим блоки 27 и 28. От- 45 ми част ми посредством двух штифтов резки 29 и 30 т гового каната одними 5 и 6 щарнирно соедин ютс с балкой концами закреплены с противоположных 1. Отрезок т гового каната 29j про- сторон в нижней части опоры, а други- пущенный соответственно, через блокиFirst, the crane moving mechanism is mounted on the sleepers fixed to the working soil, rails are installed that form a track section 20, at the ends of which blocks 21 and 22 are fixed. In the middle part of the track section 20 metal frames 23 with hydraulic cylinders 24 and 25 are anchored to the soil and blocks 27 and 28, installed on the crawler 26. After 35 assembling the hydraulic system of the movement mechanism and connecting it to the main pipeline or an autonomous oil station, it is used as a traction device, using a crane movement mechanism mounted on the section of the rail track 20, at the ends of which the bypass blocks 21 and 22 are fixed. In the middle part of the section, on both sides of the rail track, metal frames 23 are fastened to the mounting chamber, beam 1 and supports 2 and 3 are attached to the mounting chamber. This axis of which is located on two hydraulic cylinders 24 and 25 with rods facing one another, which are connected to a slider 26 having blocks 27 and 28. Some 45 and 30 tons of hinge cable with shafts connected to the beam with ends fixed from the opposite one. of the 29k sideways rope line at the bottom of the support, and the others, respectively, through blocks
21 и 27, удлин ют и закрепл ют к 50 внутренней стороне опоры 3. Затем21 and 27 are elongated and fastened to the 50 inner side of the support 3. Then
включают, гидроцилйндры 24 и 25, поры своими колесно-рельсовыми тележками устанавливают на рельсы и расклинивают с внешних сторонS .а верхними-к металлической раме 23, огиба при этом соответственно блоки 21 и 27, 22 и 28. Гидродомкраты механизмов подъема грузов и передвижени крана привод тс в действие от автономной маслостандии и управл ютс с централь- .ного пульта 31.They include hydrocylinders 24 and 25, pores with their wheel-rail carts installed on rails and wedged from the outer sides. And the upper ones - to the metal frame 23, ogiba, respectively, blocks 21 and 27, 22 and 28. Hydrojacks of load lifting and crane mechanisms driven by an autonomous oil station and controlled from a central console 31.
Шахтный кран работает следующим образом.Mine crane works as follows.
В исходном положении (правое положение ) шток -гидроцилиндра 25 выдвисредством которых опоры 2 и 3 свод т при этом балку 1 поднимают. По достижении рабочего положени опор 2 и 5 и 3 с обеих их сторон устанавливаютс станины 11 механизмов подъема, а в верхней части балк I скрепл ют с опорами 2 и 3 штифтами 6 и 7.In the initial position (right position), the rod of the hydraulic cylinder 25 protrudes from which the supports 2 and 3 reduce at the same time the beam 1 raises. Upon reaching the working position of the supports 2 and 5 and 3, the bases of the 11 lifting mechanisms are mounted on both their sides, and in the upper part of the beam I are fastened with the supports 2 and 3 with pins 6 and 7.
Сначала монтируют механизм передвижени крана на шпалы, закрепленные к очве выработки, устанавливают рельсы , образующие участок колеи 20, на концах которой закрепл ют блоки 21 и 22. В средней части участка колеи 20 укладывают и анкеруют к почве металлические рамы 23 с гидроцилиндрами 24 и 25 и блоками 27 и 28, установленными .на лолзуне 26. После сборки гидросистемы механизма передвижени и подключени ее к магистральному трубопроводу или автономной маслостанции его используют как т говое устройство, с помощью котороро в монтажную камеру доставл ютс балка 1 и опоры 2 и 3. При этом опо- ми част ми посредством двух штифтов 5 и 6 щарнирно соедин ютс с балкой 1. Отрезок т гового каната 29j про- пущенный соответственно, через блокиFirst, the crane movement mechanism is mounted on the sleepers fixed to the workpiece, rails are installed, forming a gauge section 20, at the ends of which blocks 21 and 22 are fixed. In the middle part of the gauge section 20 metal frames 23 with hydraulic cylinders 24 and 25 are anchored to the soil and blocks 27 and 28, installed on the crawler 26. After assembling the hydraulic system of the movement mechanism and connecting it to the main pipeline or an autonomous oil station, it is used as a traction device, using which The beam 1 and the supports 2 and 3 are in this case. In this case, the parts are connected by means of two pins 5 and 6 to the hinge joint with the beam 1. The length of the rope 29j is passed through the blocks
роро в монтажную камеру доставл ютс балка 1 и опоры 2 и 3. При этом опо- ми част ми посредством двух штифтов 5 и 6 щарнирно соедин ютс с балкой 1. Отрезок т гового каната 29j про- пущенный соответственно, через блокиThe beam 1 and the supports 2 and 3 are delivered to the rotor in the mounting chamber. In this case, the parts are pivotally connected to the beam 1 by means of two pins 5 and 6. The length of the rope 29j is passed through the blocks
ры своими колесно-рельсовыми тележками устанавливают на рельсы и расклинивают с внешних сторонS .а верхнисредством которых опоры 2 и 3 свод т, при этом балку 1 поднимают. По достижении рабочего положени опор 2 и, 5 и 3 с обеих их сторон устанавливаютс станины 11 механизмов подъема, а в верхней части балку I скрепл ют с опорами 2 и 3 штифтами 6 и 7.With their wheel-rail carts, they are mounted on rails and wedged from the outer sides. And by means of which the supports 2 and 3 are reduced, while the beam 1 is raised. Upon reaching the working position of the supports 2 and, 5 and 3, on both their sides, the bases 11 of the lifting mechanisms are installed, and in the upper part, the beam I is fastened to the supports 2 and 3 with pins 6 and 7.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU864004013A SU1350361A1 (en) | 1986-01-07 | 1986-01-07 | Mine crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU864004013A SU1350361A1 (en) | 1986-01-07 | 1986-01-07 | Mine crane |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1350361A1 true SU1350361A1 (en) | 1987-11-07 |
Family
ID=21215052
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU864004013A SU1350361A1 (en) | 1986-01-07 | 1986-01-07 | Mine crane |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1350361A1 (en) |
-
1986
- 1986-01-07 SU SU864004013A patent/SU1350361A1/en active
Non-Patent Citations (1)
Title |
---|
Малевич И.А. Горнопроходческие машины и комплексы. - М.: Недра, 1980, с. 155. Авторское свидетельство СССР № 693023, кл. Е 21 D 13/04, 1979. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109236331B (en) | Steel arch trolley suitable for tunnel micro-step excavation method | |
IE42743B1 (en) | Apparatus for handling pipes or pipelines | |
CN204400479U (en) | Mining hydraulic lifting appliance | |
AU2008241366B2 (en) | Support frame for conveyor rollers and method for providing access to conveyor rollers | |
SU1350361A1 (en) | Mine crane | |
RU2072015C1 (en) | Device for laying and replacing members of railway track and method for replacing members of railway track | |
CN210001467U (en) | Hoisting device used in limited space workshop | |
CN115676648A (en) | Multifunctional underground maintenance vehicle | |
CN109357857A (en) | Hitch even hangs pilot system | |
CN102493358B (en) | Highway and railway two-purpose bridge girder erection machine | |
CN107604776B (en) | Convenient beam transverse crane for railway track construction | |
CN105398950A (en) | Large gantry equipment stepped beam crawling and lifting device | |
SU1672263A1 (en) | Stand for testing wheel-motor units of locomotives | |
CN109357860A (en) | Bend simulation mechanism, hitch even hang testing stand and its pilot system | |
RU213723U1 (en) | DEVICE FOR INSTALLING OUTRIGERS OF TRANSPORT AND TECHNOLOGICAL MACHINE | |
US4074773A (en) | Hole drilling machine | |
SU560984A1 (en) | Device to move the rig | |
CN114029921B (en) | Rail base of rail robot | |
RU2024761C1 (en) | Transferring device | |
SU1588696A1 (en) | Cargo-lifting device | |
SU1651135A1 (en) | Rig for mechanical testing of r c sleepers | |
SU1439164A1 (en) | Rail-mounted track maintenance machine | |
JPH01192693A (en) | Bridge crane | |
SU815130A1 (en) | Pile-driving unit | |
SU1423490A1 (en) | Method of dismantling support beams |