SU1350361A1 - Mine crane - Google Patents

Mine crane Download PDF

Info

Publication number
SU1350361A1
SU1350361A1 SU864004013A SU4004013A SU1350361A1 SU 1350361 A1 SU1350361 A1 SU 1350361A1 SU 864004013 A SU864004013 A SU 864004013A SU 4004013 A SU4004013 A SU 4004013A SU 1350361 A1 SU1350361 A1 SU 1350361A1
Authority
SU
USSR - Soviet Union
Prior art keywords
supports
blocks
frame
slider
load
Prior art date
Application number
SU864004013A
Other languages
Russian (ru)
Inventor
Александр Ильич Петушков
Олег Валентинович Бянкин
Геннадий Андреевич Баканов
Лев Александрович Зиглин
Валентин Семенович Кирилин
Владимир Петрович Турчин
Original Assignee
Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ" filed Critical Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ"
Priority to SU864004013A priority Critical patent/SU1350361A1/en
Application granted granted Critical
Publication of SU1350361A1 publication Critical patent/SU1350361A1/en

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

Изобретение относитс  к горнодобывающей промьшшенности, в частности к средствам монтажа, демонтажа и доставки шахтного-оборудовани . Цель - снижение затрат на монтажно- демонтажные работы. Дл  этого опоры 2 и 3 несущего каркаса шахтного крана попарно соединены в своей верхней .8 11. /4 части с поперечной балкой 1 и установлены на общем основании 4, выполненном в виде рельсовой колеи с закрепленной на ней рамой 23. Опоры 2 и 3 соединены между собой в нижней части заключенным в корпус 11 гидро- цилиндром (ГЦ) 14 механизма подъема груза. Шток ГЦ 14 шарнирно соединен с ползуном 15, на котором установлен блок 16. Канат закреплен одним кондом на корпусе 11 и огибает блоки. На раме 23 установлены ГЦ 24 и 25 механизма перемещени  груза, соединенные с ползуном 26, а отрезки каната 29 и 30 огибают блоки 21, 27 и 22, 28 соответственно. При работе шток ГЦ 14 выдвигаетс  и перемещает ползун 15 с блоком .16. Через блоки нат жение каната передаетс  на груз. Дл  перемещени  груза рабочую жидкость подают в поршневзпо полость ГЦ 24.и штоковую полость ГЦ 25. Ползун 26 вместе с блоками 27 и 28 перемещаетс  вправо, а портальна  рама с грузом влево. 6 ил. ( 00 Сд о сс о: 75 Zlle Фиг.1The invention relates to the mining industry, in particular to the means of assembling, dismantling and delivering mine equipment. The goal is to reduce the cost of installation and dismantling. For this, supports 2 and 3 of the supporting frame of a shaft crane are connected in pairs in their upper .8 11. / 4 parts with a transverse beam 1 and mounted on a common base 4, made in the form of a rail track with a frame 23 fixed on it. Supports 2 and 3 are connected between each other in the lower part of the hydraulic cylinder (HZ) 14 of the load lifting mechanism enclosed in the hull. The rod HZ 14 is hingedly connected to the slider 15, on which the block 16 is mounted. The rope is fixed by one condom on the body 11 and bends around the blocks. On the frame 23, HZ 24 and 25 of the load transfer mechanism are connected, connected to the slider 26, and the sections of the rope 29 and 30 round the blocks 21, 27 and 22, 28, respectively. During operation, the HZ rod 14 extends and moves the slider 15 with the block .16. Through the blocks, the tension of the rope is transmitted to the load. To move the cargo, the working fluid is supplied to the piston cavity of the HZ 24. and the rod cavity of the HZ 25. The slider 26, together with blocks 27 and 28, is moved to the right, and the portal frame with the load to the left. 6 Il. (00 Sd about ss about: 75 Zlle Figure 1

Description

1one

Изобретение относитс  к горнодобывающей .промышленности, в частности к средствам монтажа, демонтажа и доставки шахтного оборудовани .The invention relates to the mining industry, in particular to the means of assembling, dismantling and delivering mining equipment.

Цель изобретени  - снижение затрат на монтажно -демонтажные работы.The purpose of the invention is to reduce the cost of installation and dismantling.

На фиг. 1 изображен шахтный монтажный кран, вид сбоку; на фиг. 2 - то же, вид спереди; на фиг. 3 - ме ханизм передвижени  монтажного крана , вид сбоку; на фиг. 4 - то же, план; на фиг. 5 - начальньш момент подъема монтажного крана; на фиг„6 - .завершающа  стади  подъема.FIG. 1 shows a shaft mounting crane, side view; in fig. 2 - the same, front view; in fig. 3 - mechanism of movement of the mounting crane, side view; in fig. 4 - the same plan; in fig. 5 - the initial moment of lifting the mounting crane; Fig 6 -. The final stage of recovery.

Шахтный кран выполнен в виде несущего каркаса, состо щего из поперечной балки 1, опор 2 и 3 и оснований Д. Кажда  опора соединена с попереч1350361 2The shaft crane is made in the form of a supporting frame consisting of a transverse beam 1, supports 2 and 3, and bases D. Each of the supports is connected to a transverse 1350361 2

нут в крайнее положение,а шток гидроци- линдра 24 до конца вт нут в цилиндр.Штоки гидродомкратов 1 4 механизма подъема до g конца вт нуты, грузозахватные устройства наход тс  в крайнем нижнем положении . В зависимости от массы груза последний креп т к одному или сразу двум механизмам подъема и поднимают, 1Q дл  чего в поршневую полость гидро- дилиндра 14 подают рабочую жидкость, при этом шток гидроцилиндра выдвигаетс , перемеща  ползун 15 вместе с блоком 16, нат жение цепи через блоки 15 17-19 передаетс  на поднимаемый груз Дл  перемещени  груза в поршневую полость гидроцилиндра 24 и штоковую полость гидроцилиндра 25 подают рабо- чую жидкость, ползун 26 вместе сthe hydraulic cylinder rod 24 is fully retracted into the cylinder. The hydraulic jacks 1 4 of the lifting mechanism to the g end are retracted, the load handling devices are in the lowest position. Depending on the weight of the load, the latter is attached to one or two lifting mechanisms at once and is lifted, 1Q for which working fluid is supplied into the piston cavity of the hydraulic cylinder 14, and the hydraulic cylinder rod moves forward, moving the slider 15 together with the block 16, tensioning the chain through Blocks 15 17-19 are transferred to the lifted load. To transfer the load, the working fluid is supplied to the piston cavity of the hydraulic cylinder 24 and the rod cavity of the hydraulic cylinder 25, the slider 26 together with

ной балкой 1 посредством соединитель- JQ блоками 27 и 28 перемещаетс  вправо,аbeam 1 through connector JQ blocks 27 and 28 is moved to the right, and

ных пальцев (штифтов) 5-8 и опираетс  портальна  рама вместе с грузом перена колесно-рельсовые тележки 9 и 10. двигаетс  влево и т.д.fingers (pins) 5-8 and rests the portal frame, together with the load, the wheel-rail carriages 9 and 10 move to the left, etc.

Опоры в нижней части соединены междуThe supports at the bottom are connected between

собой коробчатой станиной 11 корпуса Сборка монтажного крана выполн механизма подъема посредством пальцев 25 следующей последовательности.a box-like frame 11 of the housing Assembly of the mounting crane performed lifting mechanism through the fingers 25 of the following sequence.

12 и 13.12 and 13.

Механизм подъема грузов состоит из гидроцилиндра 14, горизонтально установленного в станине I1, шток гидроцилиндра 14 шарнирно соединен с ползуном 15, на котором установлен блок 16. В средней части станины П по центру балки 1 установлен блок 17. Цепь или канат закреплены одним концом на станине 11, огибают блоки 1 6-19.The lifting mechanism consists of a hydraulic cylinder 14, horizontally installed in the I1 bed, the hydraulic cylinder rod 14 is pivotally connected to a slide 15 on which the block 16 is mounted. In the middle part of the bed P in the center of the beam 1 there is a block 17. The chain or rope is fixed at one end on the bed 11, go around blocks 1 6-19.

Сначала монтируют механизм передвижени  крана на шпалы, закрепленные к почве выработки, устанавливают рельсы , образующие участок колеи 20, на концах которой закрепл ют блоки 21 и 22. В средней части участка колеи 20 укладывают и анкеруют к почве металлические рамы 23 с гидроцилиндрами 24 и 25 и блоками 27 и 28, установленными .на лолзуне 26. После 35 сборки гидросистемы механизма передвижени  и подключени  ее к магистральному трубопроводу или автономной маслостанции его используют как т говое устройство, с помощью котоМеханизм перемещени  крана установлен на участке рельсовой колеи 20, на концах которой закреплены обводные блоки 21 и 22. В средней части участка с обеих сторон рельсовой колеи за- 40 роро в монтажную камеру доставл ютс  креплены металлические рамы 23, по балка 1 и опоры 2 и 3. При этом опо- оси которых расположено по два гидроцилиндра 24 и 25 штоками навстречу один другому, которые соединены с ползуном 26, имеющим блоки 27 и 28. От- 45 ми част ми посредством двух штифтов резки 29 и 30 т гового каната одними 5 и 6 щарнирно соедин ютс  с балкой концами закреплены с противоположных 1. Отрезок т гового каната 29j про- сторон в нижней части опоры, а други- пущенный соответственно, через блокиFirst, the crane moving mechanism is mounted on the sleepers fixed to the working soil, rails are installed that form a track section 20, at the ends of which blocks 21 and 22 are fixed. In the middle part of the track section 20 metal frames 23 with hydraulic cylinders 24 and 25 are anchored to the soil and blocks 27 and 28, installed on the crawler 26. After 35 assembling the hydraulic system of the movement mechanism and connecting it to the main pipeline or an autonomous oil station, it is used as a traction device, using a crane movement mechanism mounted on the section of the rail track 20, at the ends of which the bypass blocks 21 and 22 are fixed. In the middle part of the section, on both sides of the rail track, metal frames 23 are fastened to the mounting chamber, beam 1 and supports 2 and 3 are attached to the mounting chamber. This axis of which is located on two hydraulic cylinders 24 and 25 with rods facing one another, which are connected to a slider 26 having blocks 27 and 28. Some 45 and 30 tons of hinge cable with shafts connected to the beam with ends fixed from the opposite one. of the 29k sideways rope line at the bottom of the support, and the others, respectively, through blocks

21 и 27, удлин ют и закрепл ют к 50 внутренней стороне опоры 3. Затем21 and 27 are elongated and fastened to the 50 inner side of the support 3. Then

включают, гидроцилйндры 24 и 25, поры своими колесно-рельсовыми тележками устанавливают на рельсы и расклинивают с внешних сторонS .а верхними-к металлической раме 23, огиба  при этом соответственно блоки 21 и 27, 22 и 28. Гидродомкраты механизмов подъема грузов и передвижени  крана привод тс  в действие от автономной маслостандии и управл ютс  с централь- .ного пульта 31.They include hydrocylinders 24 and 25, pores with their wheel-rail carts installed on rails and wedged from the outer sides. And the upper ones - to the metal frame 23, ogiba, respectively, blocks 21 and 27, 22 and 28. Hydrojacks of load lifting and crane mechanisms driven by an autonomous oil station and controlled from a central console 31.

Шахтный кран работает следующим образом.Mine crane works as follows.

В исходном положении (правое положение ) шток -гидроцилиндра 25 выдвисредством которых опоры 2 и 3 свод т при этом балку 1 поднимают. По достижении рабочего положени  опор 2 и 5 и 3 с обеих их сторон устанавливаютс  станины 11 механизмов подъема, а в верхней части балк I скрепл ют с опорами 2 и 3 штифтами 6 и 7.In the initial position (right position), the rod of the hydraulic cylinder 25 protrudes from which the supports 2 and 3 reduce at the same time the beam 1 raises. Upon reaching the working position of the supports 2 and 5 and 3, the bases of the 11 lifting mechanisms are mounted on both their sides, and in the upper part of the beam I are fastened with the supports 2 and 3 with pins 6 and 7.

Сначала монтируют механизм передвижени  крана на шпалы, закрепленные к очве выработки, устанавливают рельсы , образующие участок колеи 20, на концах которой закрепл ют блоки 21 и 22. В средней части участка колеи 20 укладывают и анкеруют к почве металлические рамы 23 с гидроцилиндрами 24 и 25 и блоками 27 и 28, установленными .на лолзуне 26. После сборки гидросистемы механизма передвижени  и подключени  ее к магистральному трубопроводу или автономной маслостанции его используют как т говое устройство, с помощью котороро в монтажную камеру доставл ютс  балка 1 и опоры 2 и 3. При этом опо- ми част ми посредством двух штифтов 5 и 6 щарнирно соедин ютс  с балкой 1. Отрезок т гового каната 29j про- пущенный соответственно, через блокиFirst, the crane movement mechanism is mounted on the sleepers fixed to the workpiece, rails are installed, forming a gauge section 20, at the ends of which blocks 21 and 22 are fixed. In the middle part of the gauge section 20 metal frames 23 with hydraulic cylinders 24 and 25 are anchored to the soil and blocks 27 and 28, installed on the crawler 26. After assembling the hydraulic system of the movement mechanism and connecting it to the main pipeline or an autonomous oil station, it is used as a traction device, using which The beam 1 and the supports 2 and 3 are in this case. In this case, the parts are connected by means of two pins 5 and 6 to the hinge joint with the beam 1. The length of the rope 29j is passed through the blocks

роро в монтажную камеру доставл ютс  балка 1 и опоры 2 и 3. При этом опо- ми част ми посредством двух штифтов 5 и 6 щарнирно соедин ютс  с балкой 1. Отрезок т гового каната 29j про- пущенный соответственно, через блокиThe beam 1 and the supports 2 and 3 are delivered to the rotor in the mounting chamber. In this case, the parts are pivotally connected to the beam 1 by means of two pins 5 and 6. The length of the rope 29j is passed through the blocks

ры своими колесно-рельсовыми тележками устанавливают на рельсы и расклинивают с внешних сторонS .а верхнисредством которых опоры 2 и 3 свод т, при этом балку 1 поднимают. По достижении рабочего положени  опор 2 и, 5 и 3 с обеих их сторон устанавливаютс  станины 11 механизмов подъема, а в верхней части балку I скрепл ют с опорами 2 и 3 штифтами 6 и 7.With their wheel-rail carts, they are mounted on rails and wedged from the outer sides. And by means of which the supports 2 and 3 are reduced, while the beam 1 is raised. Upon reaching the working position of the supports 2 and, 5 and 3, on both their sides, the bases 11 of the lifting mechanisms are installed, and in the upper part, the beam I is fastened to the supports 2 and 3 with pins 6 and 7.

Claims (1)

Формула изобретени ,Invention Formula Шахтный кран, включающий несущий каркас с поперечной балкой и установленными на основании опорами, механизмы подъема и перемещени  с гидро- цилиндрами и охватывающими обводные блоки канатами, отличающий- с   тем, что, с целью снижени  затрат на монтажно-демонтажные работы, каждый гидроцилиндр механизмов подъA shaft crane, including a supporting frame with a transverse beam and supports mounted on the base, lifting and moving mechanisms with hydraulic cylinders and ropes that surround the bypass blocks, is different in that, in order to reduce the cost of installation and dismantling, each hydraulic cylinder of the lifting mechanisms ема заключен в корпус, а гидроцилиндры каждого из механизмов перемещени  установлены на общей раме, при этом опоры несущего каркаса попарно соединены в своей верхней части с поперечной балкой, а между собой - корпусами механизмов подъема, причем кажда  пара опор установлена на общем основании, выполненном в виде рельсовой колеи с закрепленной на ней рамой механизма перемещени .The casing is enclosed in a housing, and the hydraulic cylinders of each of the displacement mechanisms are mounted on a common frame, while the supports of the supporting frame are pairwise connected in pairs in their upper part with the crossbeam, and between them are the housings of lifting mechanisms, each pair of supports being installed on a common base, view of a rail track with a frame of a moving mechanism fixed on it. V V A 7 s  A 7 s 18 IB18 IB (piK.S(piK.S Редактор Н.РогуличEditor N.Rogulich Составитель Л.Березкина Техред Л.ОлийныкCompiled by L. Berezkina Tehred L. Oliynyk Заказ 5239/33 Тираж 453ПодписноеOrder 5239/33 Circulation 453Subscription ВНИШШ Государственного комитета СССРVNISh State Committee of the USSR по делам изобретений и открытий 113035, Москва, Ж -35, Раушска  наб., д. 4/5for inventions and discoveries 113035, Moscow, F-35, Raushsk nab., 4/5 Производственно-полиграфическое предпри тие, г.. Ужгород, ул. Проектна , 4Production and printing company, city. Uzhgorod, st. Project, 4 Корректор М.ПожоProofreader M. Pojo
SU864004013A 1986-01-07 1986-01-07 Mine crane SU1350361A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864004013A SU1350361A1 (en) 1986-01-07 1986-01-07 Mine crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864004013A SU1350361A1 (en) 1986-01-07 1986-01-07 Mine crane

Publications (1)

Publication Number Publication Date
SU1350361A1 true SU1350361A1 (en) 1987-11-07

Family

ID=21215052

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864004013A SU1350361A1 (en) 1986-01-07 1986-01-07 Mine crane

Country Status (1)

Country Link
SU (1) SU1350361A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Малевич И.А. Горнопроходческие машины и комплексы. - М.: Недра, 1980, с. 155. Авторское свидетельство СССР № 693023, кл. Е 21 D 13/04, 1979. *

Similar Documents

Publication Publication Date Title
CN109236331B (en) Steel arch trolley suitable for tunnel micro-step excavation method
IE42743B1 (en) Apparatus for handling pipes or pipelines
CN204400479U (en) Mining hydraulic lifting appliance
AU2008241366B2 (en) Support frame for conveyor rollers and method for providing access to conveyor rollers
SU1350361A1 (en) Mine crane
RU2072015C1 (en) Device for laying and replacing members of railway track and method for replacing members of railway track
CN210001467U (en) Hoisting device used in limited space workshop
CN115676648A (en) Multifunctional underground maintenance vehicle
CN109357857A (en) Hitch even hangs pilot system
CN102493358B (en) Highway and railway two-purpose bridge girder erection machine
CN107604776B (en) Convenient beam transverse crane for railway track construction
CN105398950A (en) Large gantry equipment stepped beam crawling and lifting device
SU1672263A1 (en) Stand for testing wheel-motor units of locomotives
CN109357860A (en) Bend simulation mechanism, hitch even hang testing stand and its pilot system
RU213723U1 (en) DEVICE FOR INSTALLING OUTRIGERS OF TRANSPORT AND TECHNOLOGICAL MACHINE
US4074773A (en) Hole drilling machine
SU560984A1 (en) Device to move the rig
CN114029921B (en) Rail base of rail robot
RU2024761C1 (en) Transferring device
SU1588696A1 (en) Cargo-lifting device
SU1651135A1 (en) Rig for mechanical testing of r c sleepers
SU1439164A1 (en) Rail-mounted track maintenance machine
JPH01192693A (en) Bridge crane
SU815130A1 (en) Pile-driving unit
SU1423490A1 (en) Method of dismantling support beams