SU130598A1 - The way to take into account the influence of leakage currents on the measurement results of high resistances by a single bridge - Google Patents

The way to take into account the influence of leakage currents on the measurement results of high resistances by a single bridge

Info

Publication number
SU130598A1
SU130598A1 SU640877A SU640877A SU130598A1 SU 130598 A1 SU130598 A1 SU 130598A1 SU 640877 A SU640877 A SU 640877A SU 640877 A SU640877 A SU 640877A SU 130598 A1 SU130598 A1 SU 130598A1
Authority
SU
USSR - Soviet Union
Prior art keywords
influence
account
measurement results
take
way
Prior art date
Application number
SU640877A
Other languages
Russian (ru)
Inventor
В.А. Кочан
Original Assignee
В.А. Кочан
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by В.А. Кочан filed Critical В.А. Кочан
Priority to SU640877A priority Critical patent/SU130598A1/en
Application granted granted Critical
Publication of SU130598A1 publication Critical patent/SU130598A1/en

Links

Description

Насто щее изобретение относитс  к способам учета вли ни  токов утечек на результаты измерений больших сопротивлений одинарным мостом посредством измерени  сопротивлений утечек элементов мостовой схемы и внесени  поправок в результаты измерений.The present invention relates to methods for taking into account the influence of leakage currents on the measurement results of high resistances by a single bridge by measuring the leakage resistances of the elements of the bridge circuit and amending the measurement results.

Предлагаемый способ отличаетс  от известных тем, что сопротивлени  утечек измер ют у каждого из трех известных плеч моста в отдельности при собранной схеме моста.The proposed method differs from the known ones in that the leakage resistances are measured at each of the three known shoulders of the bridge separately with an assembled bridge circuit.

Такой способ дает возможность повысить точность измерений больших сопротивлений одинарным мостом.This method makes it possible to improve the accuracy of measurements of large resistances with a single bridge.

На чертеже изображена схема измерений сопротивлений при использовании предлагаемого способа.The drawing shows a diagram of measurements of resistance when using the proposed method.

Измерение производитс  одинарным мостом, составленным из неизвестного сопротивлени  / и трех известных сопротивлений Ry, и Величина сопротивлений утечек Г и гз определ етс  путем измерени  сопротивлени  утечки каждого из трех известных плеч , з и в отдельности в собранной схеме моста. Дл  этой цели в конструкции моста должны быть предусмотрены две перемычки дл  отключени  плеч моста при измерении их сопротивлений утечек.The measurement is made by a single bridge composed of an unknown resistance / and three known resistances Ry, and the magnitude of the leakage resistances G and r3 is determined by measuring the leakage resistance of each of the three known arms, h and separately in the assembled bridge scheme. For this purpose, two bridges should be provided in the bridge construction to disconnect the bridge arms when measuring their leakage resistance.

При измерении больших сопротивлений всегда должна быть включена перва  декада плеча сравнени  , максимальное значение плеча отношени  и соответствующее значение сопротивлени  в зависимости от диапазона измерений (т. е. Ю л, 100 ом и максимум ЮООо ).When measuring large resistances, the first decade of the reference arm, the maximum value of the ratio shoulder, and the corresponding value of the resistance should always be included depending on the measurement range (i.e., U l, 100 ohm, and maximum OOOO).

Сопротивление утечки плеча сравнени  в принципе должно зави сеть от положени  декадного переключател , но, как показывает опыт, при значении 2 1000 ом оно практически не зависит от положени  переключател ; поэтому можно определить его дл  любого положени  переключател . Также достаточно определить сопротивление утечкиThe leakage resistance of the comparison arm in principle should depend on the network position of the decade switch, but experience shows that with a value of 2 1000 ohms it practically does not depend on the position of the switch; therefore, it can be defined for any position of the switch. It is also sufficient to determine the leakage resistance.

зГчеТиУ ГначТа сТ РПредмет изобретени  Способ учета вли ни  токов утечек на результаты измеоений BACKGROUND OF THE INVENTION Method of accounting for the influence of leakage currents on the results of changes

-S S r si-EE-S S r si-EE

J -9Д laJ -9D la

/./.

SU640877A 1959-10-10 1959-10-10 The way to take into account the influence of leakage currents on the measurement results of high resistances by a single bridge SU130598A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU640877A SU130598A1 (en) 1959-10-10 1959-10-10 The way to take into account the influence of leakage currents on the measurement results of high resistances by a single bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU640877A SU130598A1 (en) 1959-10-10 1959-10-10 The way to take into account the influence of leakage currents on the measurement results of high resistances by a single bridge

Publications (1)

Publication Number Publication Date
SU130598A1 true SU130598A1 (en) 1959-11-30

Family

ID=48401714

Family Applications (1)

Application Number Title Priority Date Filing Date
SU640877A SU130598A1 (en) 1959-10-10 1959-10-10 The way to take into account the influence of leakage currents on the measurement results of high resistances by a single bridge

Country Status (1)

Country Link
SU (1) SU130598A1 (en)

Similar Documents

Publication Publication Date Title
SU130598A1 (en) The way to take into account the influence of leakage currents on the measurement results of high resistances by a single bridge
GB779158A (en) Improvements relating to conductivity bridges
SU121863A1 (en) Bridge for measuring large resistances
US2677102A (en) Transfer conductance test set
US2866948A (en) Test circuit for interconnected components
SU137964A1 (en) Electric bridge for measuring non-electric values
SU64846A1 (en) Device for monitoring the isolation of a two-wire network
SU121862A1 (en) Device for separate measurement of active and reactive components of complex resistances
SU568898A1 (en) Quasi-bridge resistance meter
SU382973A1 (en) METHOD OF MEASURING SMALL RESISTANCES
SU455298A1 (en) Method of calibration of high voltage divider
SU428286A1 (en) DIGITAL MEASURING BRIDGE
SU124983A1 (en) A method for measuring mechanical and electromagnetic constant time of a dc motor
SU560183A1 (en) Method of compensating the resistance of wires and contacts of a multipoint measuring bridge switch
SU387291A1 (en) METHOD OF TESTING THE DOUBLE BRIDGE
GB1536390A (en) Ohmmeters
SU70909A1 (en) Unbalanced AC Bridge
SU111839A1 (en) Wheatstone Bridge
SU974280A1 (en) Remote converter of resistannce increment to current ratio
SU106305A1 (en) Device for measuring temperature differences
SU1608589A1 (en) Apparatus for measuring resistance
SU143913A1 (en) Automatic frequency-dependent measuring bridge
GB1086749A (en) Improvements in and relating to resistance testers
GB639230A (en) Improvements in and relating to alternating current bridge circuits
SU531106A1 (en) Method for determining the location of damage to insulation of stranded cables