SU1283149A1 - Method of constructing hull of craft - Google Patents
Method of constructing hull of craft Download PDFInfo
- Publication number
- SU1283149A1 SU1283149A1 SU853940119A SU3940119A SU1283149A1 SU 1283149 A1 SU1283149 A1 SU 1283149A1 SU 853940119 A SU853940119 A SU 853940119A SU 3940119 A SU3940119 A SU 3940119A SU 1283149 A1 SU1283149 A1 SU 1283149A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- modules
- cable
- bulkheads
- craft
- supporting frames
- Prior art date
Links
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
Изобретение относитс к судостроению, в частности к технологии сборки корпусов плавучих средств. Цель изобретени - сокращение сроков строительства плавучего средства. При строительстве корпуса плавучего средства изготавливают несущие рамы 1. Затем сочлен ют несущие рамы 1 в р д с возможностью углового перемещени . После этого внутри несущих рам 1 размещают поперечные переборки 3 с герметичными проходами дл кабелей. Одновременно с монтажом кабельных трасс 7 на несущих рамах 1 отдельно изготавливают модули 8 н.итвучего средства, устанавливают внутри них необходимое электрооборудование и прокладывают внутрнмодульные кабели. Затем стыкуют один р д модулей между собоСь Соедин ют герметично части переборок 3 несущих рам 1 с соответствующими переборками плавучего средства. Внутри несущих рам 1 устанавливают кабельные подвески 6 закрепл ют на них кабельные трассы 7 между несущими рамами 1. Формируют BTOpoi i р д модулей 8, соедин ют внутримодульные кабе. И с кабельными тр;;ссами 7. После чего все модули оказываютс электрически взаимосв зан- 1Гь1ми между собой. 6 ил. f (Л J Ю 00 со 4:: СОFIELD OF THE INVENTION The invention relates to shipbuilding, in particular, to the technology of building hulls of floating equipment. The purpose of the invention is to reduce the construction time of the craft. During the construction of the hull of the floating means, the carrier frames 1 are made. Then the carrier frames 1 are joined in a row with the possibility of angular movement. After that, transverse bulkheads 3 with hermetic cable passages are placed inside the supporting frames 1. Simultaneously with the installation of cable runs 7 on the supporting frames 1, modules of 8 N. electrical tools are manufactured separately, the necessary electrical equipment is installed inside them and the internal module cables are laid. Then, one row of modules is joined together. Seal together part of the bulkheads 3 of the supporting frames 1 with the corresponding bulkheads of the floating equipment. Inside the supporting frames 1, cable hangers 6 are fixed to them, the cable tracks 7 between the supporting frames 1 are formed. BTOpoi and a series of modules 8 are formed and the intra-modular cable is connected. And with cable tr ;; ssi 7. After that, all the modules are electrically interconnected - each other. 6 Il. f (L J S 00 co 4 :: CO
Description
(ffus .S(ffus .S
Изобретение относитс к судостроению и касаетс технологии сборки корпусов плавучих средств.FIELD OF THE INVENTION The invention relates to shipbuilding and relates to the technology of building hulls of floating equipment.
Цель изобретени - сокращение сроков строительства плавучего средства.The purpose of the invention is to reduce the construction time of the craft.
На фиг. 1 схематически изображены несущие рамы с закрепленными на них межмодульными кабел ми, элементами герметичных переборок и кабельными трассами; на фиг. 2 - разрез А-А на фиг. 1; на фиг. 3 - несущие рамы, сложенные в пирамиду; на фиг. 4 - схе.ма прокладки внутри модульных кабелей в каждом отдельном .модуле; на фиг. 5FIG. 1 shows schematically the supporting frames with inter-module cables fixed on them, elements of hermetic bulkheads and cable routes; in fig. 2 shows section A-A in FIG. one; in fig. 3 - bearing frames folded into a pyramid; in fig. 4 - laying of the circuit inside the modular cables in each individual module; in fig. five
схема креплени модулей второго р да с модул ми первого р да; на фиг. 6 - схема скреплени между собой всех модулей с проложенными в них внутри.моду.чьными и межмодульными кабел ми.mounting scheme for modules of the second row with modules of the first row; in fig. 6 is a diagram of the bonding of all modules with each other with internally modulated modular cables and intermodular cables.
При строительстве корпуса плавучего средства по предлагаемому способу изготав- ;1ивают в услови х цеха несущие рамы 1, например , из углового нрофил . Каркас несу- н|их рам 1 обн1ивают листовым железом. ()та несупхих рам 1 равна рассто нию между соседними палубами. Длина каждой из iiecynuix рам 1 не менее рассто ни между двум водонепроницаемыми переборками . Затем сочлен ют несущие рамы 1 в р д с возможностью углового неремепхени , па- пример, с помощью гибкой св зи, в качестве которой используют трос 2. Трос 2 закреп; ют на несунхих рамах 1 одни.м из известных способов. После этого внутри несу- Н1ИХ рам 1 размещают поперечные переборки 3 герметичными проходами 4 дл кабелей , соединители 5 в количестве, соответ- ствуюпхем числу подключаемых модулей (фиг. 1). Устанавливают кабельные подвески 6 (фиг. 2) и зат гивают кабельные трассы 7 с одповременным проходом и через кабельные коробки 4 и подключением в соединител х 5, обеспечива св зь всех модулей между собо.й. Складывают несущие рамы 1 в пирамиду (фиг. 3). Од- повременно с монтажо.м кабельных трасс на несущих рамах 1 отдельно изготавливают .модули 8 плавучего средства, устанавливают внутри них необходимое электрооборудование и прокладывают внутримо- дульные кабели 9, один конец которых подключают к электрооборудованию впутри модулей 8, а другой вывод т на наружную стенку модулей (фиг. 4). Затем стыкуА1During the construction of the hull of the floating craft, according to the proposed method, the carrier frames 1, in the conditions of the workshop, are supported, for example, from an angular profile. The skeleton of the frame is one of them framed with sheet iron. () This non-dull frame 1 is equal to the distance between adjacent decks. The length of each iiecynuix frame 1 is not less than the distance between two watertight bulkheads. Then the carrier frames 1 are joined in a row with the possibility of angular reluctance, for example, by means of a flexible link, for which cable 2 is used. Cable 2 is fixed; are on the nonsunhy frames 1 one m of the known methods. After that, inside the non-H1IH frames 1, transverse bulkheads 3 are placed with hermetic cable runs 4, connectors 5 in an amount corresponding to the number of plug-in modules (Fig. 1). They install cable hangers 6 (Fig. 2) and tighten cable routes 7 with a simultaneous passage through cable boxes 4 and connecting to connectors 5, ensuring the connection of all modules between each other. Fold the carrier frame 1 in the pyramid (Fig. 3). Simultaneously with the installation of cable routes on the supporting frames 1, the floating equipment modules 8 are separately manufactured, the necessary electrical equipment is installed inside them and the intramodular cables 9 are laid, one end of which is connected to the electrical equipment of the modules 8 and the other the wall of the modules (Fig. 4). Then junction A1
ют один р д модулей 8 между собой. После их стыковки наружные стенки модулей 8 должны лежать в одной плоскости, по которой производитс стыковка с несущимиThere are one row of modules 8 among themselves. After they are docked, the outer walls of the modules 8 should lie in the same plane along which docking with the carriers is performed.
рамами 1. Транспортируют сложенную пирамиду (фиг. 3). и устанавливают ее вдоль плоскости соединени р да модулей 8 так, чтобы нижн несуща рама 1 была совмещена с первым из модулей 8. По мере готовности примыкающих модулей 8 раскладывают несущие рамы 1 пирамиды (фиг. 3) в линию (фиг. 5). Соедин ют герметично части переборок 3 несущих рам 1 с соот- ветствующи.ми переборка.ми плавучего средства . Стык между соседними несущимиframes 1. Transport the folded pyramid (Fig. 3). and install it along the plane of connection of a row of modules 8 so that the lower carrier frame 1 is aligned with the first of modules 8. As soon as the adjacent modules 8 are ready, lay the supporting frames 1 of the pyramid (Fig. 3) in line (Fig. 5). Seal the portions of the bulkheads 3 of the support frames 1 with the respective bulkheads of the craft. Junction between adjacent carriers
рамами 1 зашивают листовы.м железом, внутри несущих рам 1 устанавливают кабельные нодвески 6 и закрепл ют на них кабельные трассы 7 .между несущими рамами 1. Аналогично соедин ют внутримодуль- ные кабели 9 второго р да модулей 8, формируют второй р д модулей 8, соедин ют внутримодульные кабели 9 с кабельными трассами 7. После этого все модули оказываютс электрически взаимосв занными между собой (фиг. 6).frames 1 sew up sheets with iron, inside the supporting frames 1 install cable nodes 6 and fasten cable routes 7 to them between the supporting frames 1. Similarly, they connect the intramodular cables 9 of the second row of modules 8, form the second row of modules 8 The intermodular cables 9 are connected to the cable runs 7. After that, all the modules are electrically interconnected (Fig. 6).
2525
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU853940119A SU1283149A1 (en) | 1985-08-07 | 1985-08-07 | Method of constructing hull of craft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU853940119A SU1283149A1 (en) | 1985-08-07 | 1985-08-07 | Method of constructing hull of craft |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1283149A1 true SU1283149A1 (en) | 1987-01-15 |
Family
ID=21192840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU853940119A SU1283149A1 (en) | 1985-08-07 | 1985-08-07 | Method of constructing hull of craft |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1283149A1 (en) |
-
1985
- 1985-08-07 SU SU853940119A patent/SU1283149A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 935366, кл. В 63 В 9/06, 04.09.80. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5347703A (en) | Method of coupling a module framework to a ship structure | |
US3363597A (en) | Ship and method of construction | |
DE69014966D1 (en) | Stiffening device for cable ducts or cable routes and corresponding clamps. | |
SU1283149A1 (en) | Method of constructing hull of craft | |
US6142090A (en) | Power converter arrangement for integration into a ship structure | |
JPS6259906A (en) | Optical submarine branching device | |
SU935366A1 (en) | Vessel hull construction method | |
SU787255A1 (en) | Ship hull construction method | |
KR0132561B1 (en) | Method of installing ritting on a module frame | |
FI78431B (en) | VAEGGKONSTRUKTION FOER BONINGSUTRYMME OCH MOTSVARANDE PAO FARTYG ELLER OFFSHOREKONSTRUKTIONER. | |
SU1748656A3 (en) | Harbor boom and method of its construction | |
RU2025391C1 (en) | Sea facilities | |
SU944983A1 (en) | Ship hull block | |
RU2761958C1 (en) | Assembly method for a unified spacecraft platform | |
RU1796534C (en) | Device for laying and connected inter-module cables | |
SU1105372A1 (en) | Method of manufacturing ship hull parallel middelebody | |
SU1507640A1 (en) | Cargo vessel | |
SU1105370A1 (en) | Method of manufacturing ship module | |
SU1302361A1 (en) | Duct for multilayer laying of cables and wires | |
SU1260288A1 (en) | Method of conducting the mounting of electric equipment in construction of small-tonnage ships by unit-modular technology | |
JPH0424744Y2 (en) | ||
SU1022251A1 (en) | Electric wiring assembly | |
SU839846A1 (en) | Method of expanding a pontoon-type floating dock when afloat | |
SU1122547A1 (en) | Coupling device for connecting floating modules | |
SU1050955A1 (en) | Method of producing cylindrical part unit of the ship's hull |