SU1265355A1 - Mounting platform of tubing and block laying machine - Google Patents

Mounting platform of tubing and block laying machine Download PDF

Info

Publication number
SU1265355A1
SU1265355A1 SU843840488A SU3840488A SU1265355A1 SU 1265355 A1 SU1265355 A1 SU 1265355A1 SU 843840488 A SU843840488 A SU 843840488A SU 3840488 A SU3840488 A SU 3840488A SU 1265355 A1 SU1265355 A1 SU 1265355A1
Authority
SU
USSR - Soviet Union
Prior art keywords
boom
support base
hinge
frame
link
Prior art date
Application number
SU843840488A
Other languages
Russian (ru)
Inventor
Николай Дмитриевич Лазаревич
Сергей Александрович Лапин
Валентин Юрьевич Рудаков
Original Assignee
Научно-исследовательский институт строительства угольных и горнорудных предприятий "Кузниишахтострой"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-исследовательский институт строительства угольных и горнорудных предприятий "Кузниишахтострой" filed Critical Научно-исследовательский институт строительства угольных и горнорудных предприятий "Кузниишахтострой"
Priority to SU843840488A priority Critical patent/SU1265355A1/en
Application granted granted Critical
Publication of SU1265355A1 publication Critical patent/SU1265355A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Description

Изобретение относится к машинам для проходки горных выработок, имеющим монтажные площадки для вспомогательных работ, преимущественно для возведения элементов сборной крепи.The invention relates to machines for tunneling, with mounting sites for auxiliary works, mainly for the construction of elements of the prefabricated lining.

Цель изобретения — повышение удобства выполнения работ.The purpose of the invention is to increase the convenience of work.

На фиг. 1 изображена монтажная площадка при разных углах наклона стрелы, вид сбоку; на фиг. 2 — то же, при горизонтальном положении стрелы; на фиг. 3 — то же, вид сверху.In FIG. 1 shows an installation site at different angles of inclination of the boom, side view; in FIG. 2 - the same, with the horizontal position of the boom; in FIG. 3 - the same, top view.

Монтажная площадка тюбингоукладчика состоит из рамы 1, жестко закрепленных на раме ярусных ступеней 2 и ограждения 3. Рама 1 закреплена на трубе 4, сквозь которую пропущена ось 5, вставленная в отверстие в стреле 6. К трубе 4 закреплен кронштейн 7 с отверстием, к которому шарнирно присоединена тяга, состоящая из двух звеньев 8 и 9, связанных между собой шарниром 10. Звено 9 тяги шарнирно закреплено к опорному основанию 11 стрелы 6. Стрела 6 закреплена на опорном основании 11 с возможностью поворота в вертикальной плоскости при помощи шарнира 12. Таким образом, тело стрелы 6, тяги из звеньев 8 и 9, кронштейн 7 и часть опорного основания между шарниром 12 и точкой закрепления звена 9 с опорным основанием образуют шарнирный параллелограмм для поддержания в рабочем положении рамы 1 со ступенями 2. Опорное основание 11 имеет упор 13, выполненный в виде пластины и закрепленный с возможностью поворота и фиксации положения фиксатором в виде штифта 14, закрепленным в опорном основании 11. Упор 13 размещен на опорном основании 11 так, чтобы при наклоне стрелы относительно горизонтали на угол 25—30° обеспечивалась возможность его взаимодействия с звеном 9 тяги.The mounting platform of the tubing spreader consists of a frame 1, rigidly fixed to the frame of the tiered steps 2 and the guard 3. The frame 1 is mounted on the pipe 4, through which the axis 5 is inserted, inserted into the hole in the boom 6. An arm 7 with a hole is fixed to the pipe 4 a link is pivotally connected, consisting of two links 8 and 9, interconnected by a hinge 10. Link 9 of the link is pivotally attached to the support base 11 of the boom 6. The arrow 6 is fixed to the support base 11 with the possibility of rotation in the vertical plane by the hinge 12. Thus the base, the boom body 6, the rods from the links 8 and 9, the bracket 7 and the support base part between the hinge 12 and the fastening point of the link 9 with the support base form a hinged parallelogram to maintain the frame 1 with steps 2 in working position. The support base 11 has a stop 13 made in the form of a plate and fixed with the possibility of rotation and fixing the position by a latch in the form of a pin 14, fixed in the supporting base 11. The stop 13 is placed on the supporting base 11 so that when the boom is tilted relative to the horizontal by an angle of 25-30 °, l the possibility of its interaction with link 9 thrust.

Для производства работ у кровли выработки стрелу 6 поворачивают вверх относительно шарнира 12 так, чтобы монтируемый элемент крепи, например тюбинг, находился у кровли выработки. При этом его монтаж и закрепление с другими тюбингами производят с верхних ступеней 2 монтажной площадки, расположение которой обеспечивает рабочему возможность стоять не сгибаясь. При монтаже боковых тюбингов, расположенных ниже, стрелу 6 опускают, ступени 2 сохраняют горизонтальное положение за счет параллелограммного механизма, в котором тяга из звеньев 8 и 9, работающая на растяжение, вытянута в одну линию.For work at the roof of the excavation, the boom 6 is turned upward relative to the hinge 12 so that the mounted support element, for example tubing, is located at the roof of the excavation. At the same time, its installation and fastening with other tubings is carried out from the upper steps of 2 mounting sites, the location of which provides the worker with the opportunity to stand without bending. When installing the side tubing located below, lower the boom 6, the steps 2 maintain a horizontal position due to the parallelogram mechanism in which the traction from the links 8 and 9, working in tension, is stretched in one line.

При захвате тюбинга стрелой 6 из вагонетки 16 или любого другого наземного транспортного средства стрелу 6 опускают до горизонтального положения. При этом при наклоне стрелы 6 относительно горизонтали на угол 25—30° в положении упора 13, показанном на фиг. 1 и 2, звено 9 тяги вступает в контакт с упором 13. Опускание стрелы 6 вниз не изменяет положение звена 9 тяги, а звено 8 тяги поворачивается относительно шарнира 10, при этом кронштейн 7 поворачивается вместе с рамой 1 относительно стрелы 6, т.е. поворачивается вся монтажная площадка в вертикальной плоскости с подъемом ее относительно нижней кромки стрелы 6. В таком положении монтажной площадки стрела 6 может быть беспрепятственно установлена в непосредственной близости от кузова вагонетки 15, что обеспечивает возможность с помощью прицепного устройства захватить тюбинг из вагонетки. В этом же положении монтажной площадки появляется возможность производить стрелой 6 другие технологические операции в непосредственной близости от почвы выработки. При необходимости упор 13 можно повернуть вниз, т.е. в положение, когда он не взаимодействует со звеном 9 тяги, и ступени 2 монтажной площадки сохраняют свое рабочее (горизонтальное) положение при опускании стрелы до тех пор, пока площадка не коснется почвы.When the tubing is captured by the boom 6 from the trolley 16 or any other land vehicle, the boom 6 is lowered to a horizontal position. In this case, when the boom 6 is tilted relative to the horizontal by an angle of 25-30 ° in the stop position 13 shown in FIG. 1 and 2, the link 9 of the rod comes into contact with the stop 13. Lowering the boom 6 down does not change the position of the link 9 of the rod, and the link 8 of the rod rotates relative to the hinge 10, while the bracket 7 rotates together with the frame 1 relative to the arrow 6, i.e. . the entire mounting pad is rotated in a vertical plane with its rise relative to the lower edge of the boom 6. In this position of the mounting pad, the boom 6 can be freely installed in the immediate vicinity of the body of the trolley 15, which makes it possible to grab the tubing from the trolley using a tow hitch. In the same position of the installation site, it becomes possible to carry out other technological operations with arrow 6 in the immediate vicinity of the excavation soil. If necessary, the emphasis 13 can be turned down, i.e. to the position when it does not interact with the link 9 of the traction, and the steps 2 of the mounting platform retain their working (horizontal) position when lowering the boom until the platform touches the soil.

Claims (2)

Изобретение относитс  к машинам дл  проходки горных выработок, имеющим монтажные площадки дл  вспомогательных работ , преимущественно дл  возведени  элементов сборной крепи. Цель изобретени  - повышение удобства выполнени  работ. На фиг. I изображена монтажна  площадка при разных углах наклона стрелы, вид сбоку; на фиг. 2 - то же, при горизонтальном положении стрелы; на фиг. 3 - то же, вид сверху. Монтажна  площадка тюбингоукладчика состоит из рамы 1, жестко закрепленных на раме  русных ступеней 2 и ограждени  3. Рама 1 закреплена на трубе 4, сквозь которую пропущена ось 5, вставленна  в отверстие в стреле 6. К трубе 4 закреплен кронщтейн 7 с отверстием, к которому шарнирно присоединена т га, состо ща  из двух звеньев 8 и 9, св занных между собой шарниром 10. Звено 9 т ги шарнирно закреплено к опорному основанию 11 стрелы 6. Стрела 6 закреплена на опорном основании I1 с возможностью поворота в вертикальной плоскости при помощи шарнира 12. Таким образом , тело стрелы 6, т ги из звеньев 8 и 9, кронштейн 7 и часть опорного основани  между шарниром 12 и точкой закреплени  звена 9 с опорным основанием образуют шарнирный параллелограмм дл  поддержани  в рабочем положении рамы 1 со ступен ми The invention relates to mining machines that have mounting platforms for auxiliary operations, mainly for erecting lining elements. The purpose of the invention is to improve the convenience of work. FIG. I shows the mounting pad at different angles of the boom, side view; in fig. 2 - the same, with a horizontal boom; in fig. 3 - the same, top view. The mounting platform of the pipe laying machine consists of a frame 1 rigidly fixed on the frame of brown steps 2 and a barrier 3. The frame 1 is fixed on the pipe 4, through which the axis 5 is passed, inserted into the hole in the boom 6. The pipe 7 is fixed to the bracket 7 with the hole to which A hinge joint, consisting of two links 8 and 9, interconnected by a hinge 10. A link of 9 tons of hinge is hingedly attached to the support base 11 of the boom 6. The boom 6 is fixed on the support base I1 and can be rotated in a vertical plane with the help of a hinge 12. Taki , the boom body 6, the thrust of the links 8 and 9, the bracket 7 and a base portion of the support between the hinge point 12 and fixing unit 9 to the support base form a hinged parallelogram to maintain in working position the frame 1 with stages E 2. Опорное основание 11 и.меет упор 13, выполненный в виде пластины и закрепленный с возможностью поворота и фиксации положени  фиксатором в виде штифта 14, закрепленным в опорном основании 11. Упор 13 размещен на опорном основании 11 так, чтобы при наклоне стрелы относительно горизонтали на угол 25-30° обеспечиЕ5алась возможность его взаимодействи  с звеном 9 т ги. Дл  производства работ у кровли выработки стрелу 6 поворачивают вверх относительно шарнира 12 так, чтобы монтируемый элемент крепи, например тюбинг, находилс  у кровли выработки. При этом его монтаж и закрепление с другими тюбингами производ т с верхних ступеней 2 монтажной площадки , расположение которой обеспечивает рабочему возможность сто ть не сгиба сь. При монтаже боковых тюбингов, расположенных ниже, стрелу 6 опускают, ступени 2 сохран ют горизонтальное положение за счет параллелограммного механизма, в котором т га из звеньев 8 и 9, работающа  на раст жение, выт нута в одну линию. При захвате тюбинга стрелой 6 из вагонетки 16 или любого другого наземного транспортного средства стрелу 6 опускают, до горизонтального положени . При этом при наклоне стрелы 6 относительно горизонтали на угол 25-30° в положении упора 13, показанном на фиг. 1 и 2, звено 9 т ги вступает в контакт с упором 13. Опускание стрелы 6 вниз не измен ет положение звена 9 т ги, а звено 8 т ги поворачиваетс  относительно щарнира 10, при этом кронщтейн 7 поворачиваетс  вместе с рамой 1 относительно стрелы 6, т.е. поворачиваетс  вс  монтажна  площадка в вертикальной плоскости с подъемом ее относительно нижней кромки стрелы 6. В таком положении монтажной площадки стрела 6 может быть беспреп тственно установлена в непосредственной близости от кузова вагонетки 15, что обеспечивает возможность с помощью прицепного устройства захватить тюбинг из вагонетки. В этом же положении монтажной площадки по вл етс  возможность производить стрелой 6 другие технологические операции в непосредственной близости от почвы выработки. При необходимости упор 13 можно повернуть вниз, т.е. в положение, когда он не взаимодействует со звеном 9 т ги, и ступени 2 монтажной площадки сохран ют свое рабочее (горизонтальное) положение при опускании стрелы до тех пор, пока площадка не коснетс  почвы. Формула изобретени  Монтажна  площадка тюбингоблокоукладчика , включающа  раму, шарнирно соединенную с поворотной в вертикальной плоскости стрелой, установленной на опорном основании, и удерживаемую в рабочем положении параллелограммным механизмом, т га которого шарнирно соединена с опорным основанием и кронштейном рамы, отличающа с  тем, что, с целью повышени  удобства выполнени  работ, т га выполнена из двух щарнирно соединенных между собой звеньев, а опорное основание имеет поворотный упор с фиксатором, взаимодействующий с одним из звеньев т ги при опускании стрелы.2. The support base 11 and. Has a stop 13, made in the form of a plate and fixed with the possibility of rotation and fixation of the position of the retainer in the form of a pin 14, fixed in the support base 11. The stop 13 is placed on the support base 11 so that when the boom is tilted relative to the horizontal at an angle of 25-30 °, it was possible to interact with the 9-ti link. In order to carry out work at the roof of the excavation, the boom 6 is turned upwards relative to the hinge 12 so that the mounting element, such as tubing, is mounted at the roof of the excavation. At the same time, its mounting and fastening with other tubings is carried out from the upper steps 2 of the assembly site, the location of which provides the worker with the opportunity to stand without being bent. When mounting the side tubings located below, the boom 6 is lowered, the steps 2 remain horizontal position due to the parallelogram mechanism, in which the pull from links 8 and 9, working in tension, is stretched in one line. When seizing the tubing by the boom 6 from the trolley 16 or any other ground vehicle, the boom 6 is lowered to a horizontal position. Moreover, when the boom 6 is inclined relative to the horizontal at an angle of 25-30 ° in the position of the stop 13 shown in FIG. 1 and 2, the 9 ti link comes into contact with the anvil 13. Lowering the boom 6 downwards does not change the position of the 9 ti link, and the 8 ti link rotates relative to the hinge 10, while the brackets 7 rotate with the frame 1 relative to the boom 6 i.e. The entire assembly platform is rotated in a vertical plane with its elevation relative to the lower edge of the boom 6. In this position of the assembly site, the boom 6 can be freely installed in the immediate vicinity of the body of the trolley 15, which makes it possible to grab the tubing from the trolley by means of a hitch. In the same position of the installation site, it is possible for the boom 6 to perform other technological operations in the immediate vicinity of the production soil. If necessary, the stop 13 can be turned down, i.e. to the position where it does not interact with the link of 9 tons, and the steps 2 of the assembly site retain their working (horizontal) position when lowering the boom until the platform touches the ground. Claims The mounting platform of the tubing blocker, comprising a frame pivotally connected to a vertical pivot boom mounted on a support base, and held in working position by a parallelogram mechanism, the rod of which is pivotally connected to the support base and the frame bracket, characterized in that the purpose of improving the convenience of work, ha ha is made of two links hinged together among themselves, and the support base has a swivel support with a lock that interacts with one it is one of the links ti gi when lowering the boom. a a // // 77 7П2.7P2.
SU843840488A 1984-11-27 1984-11-27 Mounting platform of tubing and block laying machine SU1265355A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843840488A SU1265355A1 (en) 1984-11-27 1984-11-27 Mounting platform of tubing and block laying machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843840488A SU1265355A1 (en) 1984-11-27 1984-11-27 Mounting platform of tubing and block laying machine

Publications (1)

Publication Number Publication Date
SU1265355A1 true SU1265355A1 (en) 1986-10-23

Family

ID=21157346

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843840488A SU1265355A1 (en) 1984-11-27 1984-11-27 Mounting platform of tubing and block laying machine

Country Status (1)

Country Link
SU (1) SU1265355A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894804A (en) * 2018-08-14 2018-11-27 河北钢铁集团矿业有限公司 A kind of pick block construction in layer method of high Large chamber

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Патент DE № 2535823, кл. В 66 F 11/04, опублик. 1973. Информационный листок о научно-техническом достижении № 2-82. - Кемеровский межотраслевой центр научно-технической информации и пропаганды, 1981. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894804A (en) * 2018-08-14 2018-11-27 河北钢铁集团矿业有限公司 A kind of pick block construction in layer method of high Large chamber

Similar Documents

Publication Publication Date Title
CN207079647U (en) Rope shovel with non-linear excavation component
US4788783A (en) Ski-track forming apparatus
JPH07150892A (en) Hydraulic excavator
SU884579A3 (en) Section of mechanized shielded roof support
SU1265355A1 (en) Mounting platform of tubing and block laying machine
JP2007085017A (en) Work machine
US6401368B1 (en) Method and apparatus for excavating a trench
JP4974275B2 (en) Tower assembly for steel tower assembly
US3779604A (en) Mineral mining installations
FR2530701A1 (en) Multi-position bucket
US4256186A (en) Roof drilling and bolting apparatus
JP3069850B2 (en) Tide gate with protective fence
KR100236220B1 (en) A leader equipment for ground excavating able to attach general excavator
RU96579U1 (en) LATERAL WORKING EQUIPMENT
SU1113560A1 (en) Support-gripping arrangement mounted on heading machine
JPH0324710Y2 (en)
CN209927491U (en) Breaking hammer for rock and soil sampling
CN217080530U (en) Support with rotatable guide rod and automatic reset function
JP3366602B2 (en) Front attachment support device for ground excavator
CN214733838U (en) Mining self-moving U-shaped steel crank arm lifter
SU1373823A1 (en) Device for placing elements of tunnel lining
RU52445U1 (en) SECTION OF THE FRAME MECHANIZED FASTENERS WITH THE DEVICE FOR EXTRACTION FROM THE SOIL OF THE BASIS OF THE SECTION
SU1206438A1 (en) Support-setting machine for mine workings
JPS61140500A (en) High place operating machine
RU2215153C2 (en) Powered support unit