Prior art keywords
steel tower
boom
mounting frame
fixed
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006282489A
Other languages
Japanese (ja)
Other versions
JP2008101338A (en
Inventor
光亮 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanwa Tekki Corp
Original Assignee
Sanwa Tekki Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanwa Tekki Corp filed Critical Sanwa Tekki Corp
Priority to JP2006282489A priority Critical patent/JP4974275B2/en
Publication of JP2008101338A publication Critical patent/JP2008101338A/en
Application granted granted Critical
Publication of JP4974275B2 publication Critical patent/JP4974275B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Electric Cable Installation (AREA)

Description

本発明は、既設小型鉄塔を大型鉄塔に建て替えるために小型鉄塔に取り付けて、大型鉄塔を組み立てるための資材を吊る台棒装置に関するものである。   The present invention relates to a pedestal device for attaching materials for assembling a large steel tower by attaching the small steel tower to a small steel tower in order to rebuild an existing small steel tower.

従来、既設小型鉄塔を大型鉄塔に建て替える工事においては、大型クレーン車により鉄塔の構成材などの資材を吊り上げて組み上げている。また、市街地、山岳部のようなクレーン車の乗り入れが困難な場所では、簡易的に台棒装置を使用している。この台棒装置は、小型鉄塔の頂部にブームをロープで縛り止めて固定している。ブームの前後方向の位置調整は、起伏操作用ワイヤをその先端部から小型鉄塔上のガイド滑車を介して地上で操作して行う。ガイド滑車はブームの水平方向の位置を決定してからその向きに合わせて固定する。ブームの左右方向の位置決めは、ブームの左右両側に支線を張り、これを地上から操作して行う。ブームは起伏可能に構成され、その先端から吊りワイヤを下ろして地上の資材を吊り上げ、大型鉄塔を順次組み上げる作業に使用する。吊りワイヤはブームの基部を介して地上で操作する。大型鉄塔を小型鉄塔の頂部付近の高さ位置まで組み上げたら、台棒装置を建設途中の大型鉄塔に移設して工事を継続する。
また、鉄塔の上端部の主柱材間に枠材をわたした支持枠を鉄塔に設け、ブームを枠材に起伏可能に支持させた特許文献1に記載のデリック装置がある。この装置は、対向する枠材の両端部に一対の前脚及び後脚を枢支し、前脚、後脚の上端を結合部材にそれぞれ枢支し、ブームの起伏操作用ワイヤを結合部材とブームの先端部との間の滑車に掛け回し、地上の起伏用ウインチへ係止し、吊り上げワイヤを地上の吊り上げ用ウインチで操作してブーム4で資材を吊るものである。
特開平10−102823号公報
Conventionally, in a construction for rebuilding an existing small steel tower to a large steel tower, materials such as steel tower components are lifted and assembled by a large crane vehicle. Further, in places where it is difficult to enter a crane vehicle such as an urban area or a mountainous area, a base bar device is simply used. In this pedestal device, a boom is tied and fixed to the top of a small steel tower with a rope. The position adjustment of the boom in the front-rear direction is performed by operating the hoisting operation wire from the tip thereof on the ground via a guide pulley on a small steel tower. After determining the horizontal position of the boom, the guide pulley is fixed according to the direction. Positioning of the boom in the left-right direction is performed by extending branch lines on the left and right sides of the boom and operating this from the ground. The boom is constructed so that it can be raised and lowered, and it is used for the work of assembling large steel towers in sequence by lifting the suspension wire from the tip of the boom and lifting the material on the ground. The suspension wire is operated on the ground via the base of the boom. After assembling the large steel tower to the height near the top of the small steel tower, move the base bar device to the large steel tower under construction and continue the construction.
Further, there is a derrick device described in Patent Document 1 in which a support frame in which a frame material is provided between main column members at the upper end of the steel tower is provided on the steel tower, and a boom is supported by the frame material so as to be raised and lowered. This device pivotally supports a pair of front legs and rear legs on both ends of the opposing frame member, pivots the upper ends of the front legs and rear legs to the coupling member, and connects the boom hoisting operation wire to the coupling member and the boom. The material is hung on a pulley between the front end portion, locked to a hoisting winch on the ground, and the hoisting wire is operated by the hoisting winch on the ground to suspend the material by the boom 4.
JP-A-10-102823

上記従来の台棒装置では、ブームを鉄塔に縛り付けて取り付けるので、作業が容易でない。また、支線を鉄塔の左右両側の距離をおいた位置から張って水平方向の位置を固定するので、資材を吊り上げるときに左右の支線のバランスを取りながらの操作となって作業が困難であるし、ブームが左右に振れ易く、確実に位置決めできない。しかもブームの水平方向の向きに合わせて小型鉄塔上のガイド滑車の向きを決めて固定しなければ起伏操作用ワイヤによるブームの起伏操作を行うことができない。このような煩雑な作業にかかわらず、特に市街地での工事は短期間で遂行しなければならない。
特許文献1に記載のデリック装置においては、ブームの水平方向の向きが固定されてしまい、鉄塔の設置環境に応じて資材の上げ下ろし位置を変更することができない。
そこで、本発明は、既設の小型鉄塔に取付けることができ、ブームの水平方向の位置決めが容易かつ確実であると共に、その位置変更が容易で、鉄塔の組立の作業効率を向上させることができ、工期の短縮化が可能で、さらにブームの向きにかかわらず円滑に起伏操作できる鉄塔組立用台棒装置を提供することを課題としている。
In the conventional base bar device, since the boom is tied to the steel tower and attached, the operation is not easy. Also, since the branch line is stretched from the left and right sides of the tower to fix the horizontal position, it is difficult to work while lifting the material while balancing the left and right branch lines. The boom tends to swing left and right and cannot be positioned reliably. Moreover, if the direction of the guide pulley on the small steel tower is determined and fixed in accordance with the horizontal direction of the boom, the hoisting operation of the boom cannot be performed using the hoisting operation wire. Despite such complicated work, construction in urban areas must be completed in a short period of time.
In the derrick device described in Patent Document 1, the horizontal direction of the boom is fixed, and the material raising / lowering position cannot be changed according to the installation environment of the steel tower.
Therefore, the present invention can be attached to an existing small steel tower, the horizontal positioning of the boom is easy and reliable, its position can be easily changed, and the work efficiency of the steel tower assembly can be improved. It is an object of the present invention to provide a tower assembly base bar device that can shorten the work period and that can be smoothly raised and lowered regardless of the direction of the boom.

上記課題を解決するため、第1の発明においては、既設小型鉄塔Tの上部に取付枠体2を固定し、この取付枠体2に旋回部材4を水平方向に回転可能に支持させ、かつ所望の角度位置で固定し、この旋回部材4に起伏可能にブーム9の基端部を連結し、吊り上げワイヤ11の一端をウインチへ係止し、鉄塔Tを経てブーム9の先端部に掛け回し、資材を上げ下ろし可能に設け、また一端を起伏用ウインチへ係止し、鉄塔Tを経て取付枠体2より上方の鉄塔Tとブーム9の先端部との間に掛け回し、鉄塔T上で鉄塔Tの組み立てに必要な資材の吊り上げ作業を行うように鉄塔組立用台棒装置1を構成した。
第2の発明においては、取付枠体2に固定する固定部6に水平方向に回動自在に連結体7を軸支して旋回部材4を構成し、固定部6に水平方向の所望の角度位置を選択可能な複数の差込み孔6aを設け、連結部7にブーム9の基端を起伏自在に連結し、差込み孔6aに固定ピン8を択一的に差し込んで連結部7を固定部6に対して所望の角度で回り止めさせた。
第3の発明においては、水平方向に回転位置を変えるブーム9を起伏操作する起伏操作用ワイヤ10を小型鉄塔Tを介して地上にガイドするために小型鉄塔Tの上下位置にガイド滑車14,15を取り付け、ガイド滑車14を小型鉄塔Tに水平方向に旋回自在に設けた縦方向の支持管14aに軸支し、支持管14a内を経由する起伏操作用ワイヤ10を受け入れるように支持管14aの下部にガイド滑車15を臨ませた。
In order to solve the above-described problem, in the first invention, the mounting frame 2 is fixed to the upper part of the existing small steel tower T, the swiveling member 4 is supported by the mounting frame 2 so as to be rotatable in the horizontal direction, and desired. The boom 9 is fixed at an angular position, the base end of the boom 9 is connected to the swinging member 4 so as to be able to move up and down, one end of the lifting wire 11 is locked to the winch, and is hung around the tip of the boom 9 through the steel tower T. The material can be raised and lowered, and one end is locked to the hoisting winch. The steel tower T is passed through the tower T between the tower T above the mounting frame 2 and the tip of the boom 9. The tower assembly pedestal device 1 was constructed so as to perform the lifting work of the materials necessary for assembly.
In the second aspect of the invention, the connecting member 7 is pivotally supported by the fixed portion 6 fixed to the mounting frame 2 so as to be rotatable in the horizontal direction to form the turning member 4, and the fixed portion 6 has a desired horizontal angle. A plurality of insertion holes 6a whose positions can be selected are provided, the base end of the boom 9 is connected to the connection part 7 so as to be raised and lowered, and the fixing pin 8 is alternatively inserted into the insertion hole 6a to connect the connection part 7 to the fixing part 6 Against the desired angle.
In the third aspect of the invention, guide pulleys 14 and 15 are disposed at the vertical positions of the small steel tower T in order to guide the hoisting operation wire 10 for raising and lowering the boom 9 that changes the rotational position in the horizontal direction to the ground via the small steel tower T. The guide pulley 14 is pivotally supported on a vertical support pipe 14a provided on the small steel tower T so as to be pivotable in the horizontal direction, and the support pipe 14a is received so as to receive the undulation operation wire 10 passing through the support pipe 14a. A guide pulley 15 was placed at the bottom.

本発明においては、装置を既設小型鉄塔に取付枠体を介して容易に取り付け、あるいは取り外すことができ、またブームの水平方向の位置決めが容易かつ確実で、左右へ振れ止めすることができるし、ブームの水平方向の位置を容易に変更でき、鉄塔の設置環境に応じて資材の上げ下ろし位置を調整することができ、鉄塔の組立の作業効率が向上するので、新規大型鉄塔の建設作業を迅速に遂行でき、さらにブームの旋回位置の調整時に、ガイド滑車が首振り動してその向きに合わせるから、ガイド滑車の向きを調整する必要がないし、ブームの起伏操作用ワイヤがガイド滑車からはずれることなく円滑にガイドされるという効果を有する。   In the present invention, the device can be easily attached to or detached from the existing small steel tower via the attachment frame, and the horizontal positioning of the boom is easy and reliable, and can be prevented from shaking to the left and right. The horizontal position of the boom can be changed easily, the position of raising and lowering materials can be adjusted according to the installation environment of the tower, and the efficiency of assembling the tower is improved. The guide pulley swings and adjusts to the direction when adjusting the pivot position of the boom, so there is no need to adjust the direction of the guide pulley, and the boom hoisting operation wire does not deviate from the guide pulley. It has the effect of being guided smoothly.

本発明の実施の一形態を図面を参照して説明する。
図1及び図2において、既設小型鉄塔Tを覆うように図示しない大型鉄塔を新設するために、小型鉄塔T上に台棒装置1を取り付けて大型鉄塔の組立作業に利用する。この台棒装置1は、取付枠体2で小型鉄塔Tに取り付けられる。取付枠体2は、小型鉄塔Tの頂部の外側に嵌合させるように略矩形を成す。図6に示すように取付枠体2は鉄塔の構成材T1に取付金具3で固定される。取付金具3は、構成材T1への当て板3aと、構成材T1周りを囲んで当て板3aにねじ止める上下左右の小アングルボルト3bとを備えている。図3乃至図5に示すように、取付枠体2は四辺をアングル材2aで構成され、アングルボルト2bで互いに固定されている。
An embodiment of the present invention will be described with reference to the drawings.
In FIG. 1 and FIG. 2, in order to newly install a large steel tower (not shown) so as to cover the existing small steel tower T, the base bar device 1 is attached on the small steel tower T and used for the assembly work of the large steel tower. This bar apparatus 1 is attached to a small steel tower T by an attachment frame 2. The attachment frame 2 is substantially rectangular so as to be fitted to the outside of the top of the small steel tower T. As shown in FIG. 6, the mounting frame 2 is fixed to the structural member T1 of the steel tower with the mounting bracket 3. The mounting bracket 3 includes a contact plate 3a to the component material T1 and upper, lower, left and right small angle bolts 3b that surround the component material T1 and are screwed to the contact plate 3a. As shown in FIGS. 3 to 5, the mounting frame 2 is composed of angle members 2 a on four sides, and is fixed to each other by angle bolts 2 b.

取付枠体2の両端部には旋回部材4が設けられている。図7及び図8に示すように、旋回部材4は取付枠体2のほぼ中央を水平方向に横断してアングルボルト5aで固定されるH形鋼で構成されたブームビーム5と、ブームビーム5に固着された固定板6と、この固定板6及びブームビーム5に水平に回動自在に軸支され、ブーム9を連結する連結板7と、固定ピン8とを備えている。固定板6の円弧状縁部には固定ピン8を抜き差し自在の差込み孔6aがほぼ等角度間隔で多数設けられている。連結板7の一端部には縦方向の軸部7aが下方へ突設され、両側縁部にはブーム9を連結ピンで軸支するために対向して立ち上がったブラケット7cが設けらけれ、他端にはガイド滑車18用の滑車取付片7cが設けられている。連結板7には差込み孔6aに対応して固定ピン8を抜き差し自在に貫通させて抜け止めする差込み孔7dを有する。   Revolving members 4 are provided at both ends of the mounting frame 2. As shown in FIGS. 7 and 8, the pivot member 4 includes a boom beam 5 made of H-shaped steel which is fixed by an angle bolt 5 a across the center of the mounting frame 2 in the horizontal direction, and the boom beam 5. A fixing plate 6 fixed to the base plate 6, a connecting plate 7 that is pivotally supported by the fixing plate 6 and the boom beam 5 so as to be pivotable horizontally, and connects the boom 9, and a fixing pin 8. A large number of insertion holes 6a through which the fixing pins 8 can be freely inserted and removed are provided at substantially equal angular intervals on the arc-shaped edge of the fixing plate 6. A vertical shaft 7a projects downward from one end of the connecting plate 7, and brackets 7c are provided on both side edges so as to support the boom 9 with a connecting pin. A pulley mounting piece 7c for the guide pulley 18 is provided at the end. The connecting plate 7 has an insertion hole 7d corresponding to the insertion hole 6a, through which the fixing pin 8 is removably inserted to prevent the insertion.

図1に示すように、ブーム9の先端部の上下位置には、起伏操作用ワイヤ10を掛ける滑車12と、吊りワイヤ11を掛ける滑車13が夫々軸支されている。起伏操作用ワイヤ10は滑車12から小型鉄塔Tに設けられたガイド滑車14,15に案内され、地上に至る。吊りワイヤ11は滑車13から旋回部材4の滑車取付片7cに吊られたガイド滑車16に案内されて、地上に至る。起伏操作用ワイヤ10の操作によりブーム8が起伏動作して、吊りワイヤ13を前後に移動でき、吊りワイヤ11の操作により滑車13に吊られたフック等の吊り金具を上下動する。   As shown in FIG. 1, a pulley 12 for hanging the hoisting operation wire 10 and a pulley 13 for hanging the suspension wire 11 are pivotally supported at the vertical position of the tip of the boom 9. The hoisting operation wire 10 is guided from the pulley 12 to the guide pulleys 14 and 15 provided on the small steel tower T and reaches the ground. The suspension wire 11 is guided from the pulley 13 to the guide pulley 16 suspended on the pulley mounting piece 7c of the turning member 4 and reaches the ground. By operating the hoisting operation wire 10, the boom 8 moves up and down to move the hanging wire 13 back and forth, and by operating the hanging wire 11, the hanging metal fitting such as a hook suspended on the pulley 13 is moved up and down.

図9及び図10に示すように、ガイド滑車14,15は、小型鉄塔Tに取り付けた滑車取付枠16に設けられている。滑車取付枠16は、小型鉄塔Tの頂部の外側に嵌合させて固定するために取付枠体2とほぼ同様の構成を成す。滑車取付枠16のほぼ中央には水平方向に起伏ビーム17が固定されている。起伏ビーム17の両端部にガイド滑車14,15が設けられる。ガイド滑車14は起伏ビーム17に水平方向に回転自在に軸支された支持管14aの上部に軸支される。ガイド滑車15は起伏ビーム17の下部に支持管14aに臨むように前後に位置をずらして軸支されている。支持管14a内にはガイド滑車14に掛かる起伏操作用ワイヤ10が挿通され、ガイド滑車14の向きのいかんに関わらずガイド滑車15に受け入れられるようになっている。   As shown in FIGS. 9 and 10, the guide pulleys 14 and 15 are provided on a pulley mounting frame 16 attached to the small steel tower T. The pulley mounting frame 16 has substantially the same configuration as the mounting frame body 2 in order to be fitted and fixed to the outside of the top portion of the small steel tower T. A undulation beam 17 is fixed in the horizontal direction at substantially the center of the pulley mounting frame 16. Guide pulleys 14 and 15 are provided at both ends of the undulation beam 17. The guide pulley 14 is pivotally supported on an upper portion of a support tube 14a that is pivotally supported by the undulation beam 17 in a horizontal direction. The guide pulley 15 is pivotally supported at a lower portion of the undulation beam 17 so that the position thereof is shifted back and forth so as to face the support tube 14a. A wire 10 for raising and lowering the guide pulley 14 is inserted into the support tube 14a so that it can be received by the guide pulley 15 regardless of the direction of the guide pulley 14.

この台棒装置1においては、小型鉄塔Tの頂部付近の上下位置に取付枠体2及び滑車取付枠16を外側に嵌合させるように夫々取り付ける。取付枠体2及び滑車取付枠16は、構成材T1に取付金具3の小アングルボルト3bをねじ止めるだけで簡単にかつ確実に固定でき、また小アングルボルト3bを緩め外して簡単に撤去できる。取付枠体2にはブーム8を連結し、滑車12及び滑車取付枠16上のガイド滑車14,15には起伏操作用ワイヤ10を掛け、また滑車13,18には吊りワイヤ11を掛ける。ブーム9は旋回部材4で旋回させて所望の水平角度に向け、固定ピン8を差込み孔5a,7dに差し込めば、左右方向への振れもなく確実に固定される。このとき、ブーム9を旋回させて位置を変えても、ガイド滑車14がこれに追従して首振り動作するが、起伏操作用ワイヤ10のガイド滑車14の受入位置が変わらず、起伏操作用ワイヤ10が外れることなく確実に受け入れられる。吊りワイヤ11は、起伏操作用ワイヤ10でビーム9の上下角度を調整することにより、前後位置が決まり、資材を吊って上げ下げすることができる。   In this pedestal device 1, the mounting frame 2 and the pulley mounting frame 16 are respectively attached to the upper and lower positions near the top of the small steel tower T so as to be fitted to the outside. The mounting frame 2 and the pulley mounting frame 16 can be easily and securely fixed to the component T1 simply by screwing the small angle bolt 3b of the mounting bracket 3, and can be easily removed by loosening and removing the small angle bolt 3b. The boom 8 is connected to the mounting frame body 2, the hoisting operation wire 10 is hung on the guide pulleys 14 and 15 on the pulley 12 and the pulley mounting frame 16, and the suspension wire 11 is hung on the pulleys 13 and 18. If the boom 9 is swung by the swivel member 4 and directed to a desired horizontal angle, and the fixing pin 8 is inserted into the insertion holes 5a and 7d, the boom 9 is securely fixed without shaking in the left-right direction. At this time, even if the boom 9 is turned to change the position, the guide pulley 14 swings in accordance with this, but the receiving position of the guide pulley 14 of the hoisting operation wire 10 does not change, and the hoisting operation wire 10 is reliably accepted without losing. By adjusting the vertical angle of the beam 9 with the hoisting operation wire 10, the hanging wire 11 can determine the front-rear position, and can lift and lower the material.

本発明に係る鉄塔組立用台棒装置の正面図である。It is a front view of the tower | rod tower apparatus for steel tower assembly which concerns on this invention. 台棒装置の平面図である。It is a top view of a bar apparatus. 取付枠体の正面図である。It is a front view of an attachment frame. 取付枠体の平面図である。It is a top view of an attachment frame. 取付枠体の側面図である。It is a side view of an attachment frame. 取付金具の正面図である。It is a front view of a mounting bracket. 旋回部材の正面図である。It is a front view of a turning member. 旋回部材の平面図である。It is a top view of a turning member. ガイド滑車の正面図である。It is a front view of a guide pulley. ガイド滑車の平面図である。It is a top view of a guide pulley.

符号の説明Explanation of symbols

1 台棒装置
2 取付枠体
3 取付金具
3b 小アングルボルト
4 旋回部材
5 ブームビーム
6 固定板
6a 差込み孔
7a 軸部
7c ブラケット
7 連結板
8 固定ピン
9 ブーム
10 起伏操作用ワイヤ
11 吊りワイヤ
14 ガイド滑車
14a 支持管
15 ガイド滑車
16 滑車取付枠
T 既設小型鉄塔
T1 構成材
DESCRIPTION OF SYMBOLS 1 Bar apparatus 2 Mounting frame 3 Mounting bracket 3b Small angle bolt 4 Turning member 5 Boom beam 6 Fixing plate 6a Insertion hole 7a Shaft 7c Bracket 7 Connecting plate 8 Fixing pin 9 Boom 10 Lifting operation wire 11 Suspension wire 14 Guide Pulley 14a Support tube 15 Guide pulley 16 Pulley mounting frame T Existing small steel tower T1 Constituent material

Claims (2)

既設小型鉄塔の上部に固定される取付枠体と、
この取付枠体に水平方向に回転可能に支持され、かつ所望の角度位置で固定される旋回部材と、
この旋回部材に起伏可能に基端部が連結されるブームと、
一端がウインチへ係止され、前記鉄塔を経て前記ブームの先端部に掛け回され、資材を上げ下ろし可能な吊り上げワイヤと、
前記取付枠体より上方位置の鉄塔と前記ブームの先端部との間に掛け回され、前記鉄塔を経て一端が起伏用ウインチへ係止されたブームの起伏操作用ワイヤとを具備し、
前記旋回部材は、取付枠体に固定されて、水平方向の所望の角度位置を選択可能な複数の差込み孔を有する固定部と、
この固定部に水平方向に回動自在に軸支されて、前記ブームの基端を起伏自在に連結し、固定部の差込み孔に択一的に差し込んで所望の角度で回り止めする固定ピンを貫通させる連結部とを具備し、
前記既設小型鉄塔上で大型鉄塔の組み立てに必要な資材の吊り上げ作業を行うことを特徴とする鉄塔組立用台棒装置。
A mounting frame fixed to the upper part of an existing small steel tower;
A swiveling member that is rotatably supported by the mounting frame in the horizontal direction and fixed at a desired angular position;
A boom whose base end is connected to the swivel member in a undulating manner;
One end is locked to the winch, passed through the steel tower, hung around the tip of the boom, and a lifting wire capable of raising and lowering materials,
A boom hoisting operation wire which is hung between a steel tower above the mounting frame and a tip of the boom and has one end locked to a hoisting winch through the steel tower;
The swivel member is fixed to the mounting frame and has a plurality of insertion holes that can select a desired angular position in the horizontal direction;
A fixed pin that is pivotally supported by the fixed portion so as to be pivotable in the horizontal direction, connects the base end of the boom so as to be raised and lowered, and is selectively inserted into the insertion hole of the fixed portion to prevent rotation at a desired angle. A connecting portion to penetrate,
A tower device for assembling a steel tower, which performs a lifting work of materials necessary for assembling a large steel tower on the existing small steel tower.
前記起伏操作用ワイヤを前記ブームから前記鉄塔を介して地上にガイドするために、前記鉄塔に取り付けられ、前記鉄塔に水平方向に旋回自在に設けられた縦方向の支持管に軸支された上部のガイド滑車と、前記支持管内を経由する起伏操作用ワイヤを受け入れるように支持管の下部に臨む位置に設けられた下部のガイド滑車とを具備することを特徴とする請求項1に記載の鉄塔組立用台棒装置。   In order to guide the hoisting operation wire from the boom to the ground via the steel tower, the upper part is attached to the steel tower and is pivotally supported by a vertical support pipe provided in the steel tower so as to be pivotable horizontally 2. The tower according to claim 1, further comprising: a guide pulley, and a lower guide pulley provided at a position facing a lower portion of the support pipe so as to receive a wire for raising and lowering operation that passes through the support pipe. Assembly bar device.
JP2006282489A 2006-10-17 2006-10-17 Tower assembly for steel tower assembly Active JP4974275B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006282489A JP4974275B2 (en) 2006-10-17 2006-10-17 Tower assembly for steel tower assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006282489A JP4974275B2 (en) 2006-10-17 2006-10-17 Tower assembly for steel tower assembly

Publications (2)

Publication Number Publication Date
JP2008101338A JP2008101338A (en) 2008-05-01
JP4974275B2 true JP4974275B2 (en) 2012-07-11

Family

ID=39435874

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006282489A Active JP4974275B2 (en) 2006-10-17 2006-10-17 Tower assembly for steel tower assembly

Country Status (1)

Country Link
JP (1) JP4974275B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107257105A (en) * 2017-06-29 2017-10-17 云南电网有限责任公司曲靖供电局 A kind of 500kV livewire work hoisting platform

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101975147B (en) * 2010-11-18 2013-07-17 宁波锦浪新能源科技有限公司 Scissor-type wind power tower and installation method thereof
CN112202107B (en) * 2020-11-17 2022-09-16 国网山东省电力公司昌乐县供电公司 Insulator wire fixing and lifting device
CN113146857B (en) * 2021-04-30 2022-08-02 哈尔滨工程大学 Diamond rope saw carrier for nuclear facility dismantling

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS523814Y2 (en) * 1971-07-13 1977-01-26
JPS60173591U (en) * 1984-04-26 1985-11-16 三和テッキ株式会社 Derrick boom swivel device
JPH02140372A (en) * 1988-11-22 1990-05-30 Hotsukou Denshiya:Kk Iron tower pushing-up construction method
JPH0664891A (en) * 1992-08-14 1994-03-08 Sato Kensetsu Kogyo Kk Manually-operated minicrane for work on steel tower
JP4349604B2 (en) * 2001-03-22 2009-10-21 中部電力株式会社 Derrick device for top work of transmission tower
JP3973215B2 (en) * 2003-03-26 2007-09-12 三和テッキ株式会社 Steel tower-mounted base bar device and its assembly method
JP3988938B2 (en) * 2003-05-23 2007-10-10 東京電力株式会社 Raising the tower

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107257105A (en) * 2017-06-29 2017-10-17 云南电网有限责任公司曲靖供电局 A kind of 500kV livewire work hoisting platform
CN107257105B (en) * 2017-06-29 2018-09-28 云南电网有限责任公司曲靖供电局 A kind of 500kV livewire work hoisting platform

Also Published As

Publication number Publication date
JP2008101338A (en) 2008-05-01

Similar Documents

Publication Publication Date Title
JP4974275B2 (en) Tower assembly for steel tower assembly
JP6348453B2 (en) crane
JP5117815B2 (en) Crane hook device
KR100865480B1 (en) Direct apparatus for live wire using trane truck
JP2007284167A (en) Mounting method of boom for movement type crane and boom mounting unit
US7015872B1 (en) Mast assembly
JP5540875B2 (en) Hook part holder and hook device of wheel crane
KR20140139256A (en) pipe layer adjustable boom length
US20050061761A1 (en) Crane
JP3973215B2 (en) Steel tower-mounted base bar device and its assembly method
CN110453905A (en) A kind of reversible steel mesh piece horizontal keel bracket
JP2009167617A (en) Slide scaffold facility
CN210289043U (en) Anti-toppling scaffold
US1613409A (en) Crane
JP4584862B2 (en) Installation method of automatic tension adjusting device for train line
JP2000291261A (en) Boom for building steel tower
JPS62222993A (en) Simple crane for constructing steel tower and steel-tower construction method using said crane
JP6246707B2 (en) Boom mounting device and crane
JP5699027B2 (en) Excavator
JP4597935B2 (en) Top part mechanism of leader in pile driving device
JP5264299B2 (en) Crane jib support equipment
CN217708633U (en) Mounting tool for mounting large-diameter spiral steel pipe
JP4573356B2 (en) Floor slab peeling method
CN210577546U (en) Rotary supporting arm for cable bridge
KR100874222B1 (en) Combination structure of rotation arm and harrow plate to rotavator axis of harrow apparatus

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090522

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110526

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110622

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110809

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110822

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120404

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120406

R150 Certificate of patent or registration of utility model

Ref document number: 4974275

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150420

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250