SU1234587A1 - Method of completing wells with loosely cemented collector rock - Google Patents

Method of completing wells with loosely cemented collector rock Download PDF

Info

Publication number
SU1234587A1
SU1234587A1 SU843813931A SU3813931A SU1234587A1 SU 1234587 A1 SU1234587 A1 SU 1234587A1 SU 843813931 A SU843813931 A SU 843813931A SU 3813931 A SU3813931 A SU 3813931A SU 1234587 A1 SU1234587 A1 SU 1234587A1
Authority
SU
USSR - Soviet Union
Prior art keywords
tubing
reservoir
cemented
liner
trunk
Prior art date
Application number
SU843813931A
Other languages
Russian (ru)
Inventor
Микиша Огостинович Ашрафьян
Николай Михайлович Саркисов
Олег Александрович Лебедев
Александр Алексеевич Дергачев
Original Assignee
Всесоюзный научно-исследовательский институт по креплению скважин и буровым растворам
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский институт по креплению скважин и буровым растворам filed Critical Всесоюзный научно-исследовательский институт по креплению скважин и буровым растворам
Priority to SU843813931A priority Critical patent/SU1234587A1/en
Application granted granted Critical
Publication of SU1234587A1 publication Critical patent/SU1234587A1/en

Links

Landscapes

  • Earth Drilling (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

1one

Изобретение относитс  к горной промьшшенности, а именно к нефтега- зодобьгеающей, и может быть использовано при заканчивании нефт ных и газовых скважин со слабосцементированными коллекторами.The invention relates to the mining industry, namely to an oil and gas recovery, and can be used in the completion of oil and gas wells with weakly cemented reservoirs.

Целью изобретени   вл етс  повышение ремонтоспособности скважины за счет упрощени  и ускорени  операции по очистке ствола и повьпиение устойчивости слабосцементированного продуктивного пласта.The aim of the invention is to improve the maintainability of the well by simplifying and accelerating the operation for cleaning the wellbore and increasing the stability of the poorly cemented reservoir.

Сущность изобретени  сводитс  к созданию за колонной равномерной полости большого диаметра и последующей бесфильтровой эксплуатации скважины , при которой вследствие снижени  фильтрационных нагрузок обеспечиваетс  больша  производительность скважины по сравнению с известными способами.The essence of the invention is the creation of a uniform cavity of a large diameter behind the column and the subsequent filterless operation of the well, in which, due to a decrease in filtration loads, greater well productivity is achieved in comparison with known methods.

Наличие полости с большой площадью обеспечивает снижение фильтрационных нагрузок и устойчивость ствола , но не устран ет осаждени  частиц Выше полости песок не осаждаетс , та как имеет место значительное увеличение скорости потока. Промывку скважины осуществл ют в зкой нефтью или другой в зкой жидкостью, не ухудшающей свойств пласта, до полной очистки ствола.The presence of a cavity with a large area provides a decrease in filtration loads and a barrel stability, but does not eliminate the sedimentation of particles. The sand does not precipitate above the cavity, as there is a significant increase in the flow velocity. The well is washed with a viscous oil or other viscous fluid that does not impair the properties of the formation, until the well is completely cleaned.

Пор док проведени  работ по данному способу включает крепление скважины до кровли продуктивного горизонта , вскрытие, пласта-коллектора и расширение ствола в этом интервале до диаметра 400-600 мм, спуск до забо  на НКТ неперфорированного хвостовика с заходом его на 3-5 м в эксплуатационную колонну, отсоединение НКТ, подъем их на 0,3-0,5 м и полу-ор И. Горват 2962/39The order of work on this method includes attaching the well to the roof of the producing horizon, opening, the reservoir and the expansion of the wellbore in this interval to a diameter of 400-600 mm, descending to the tubing of the non-perforated liner with an approach of 3-5 meters to the operational the column, the detachment of tubing, lifting them to 0.3-0.5 m and semi-op I. Gorvat 2962/39

Составитель Е. Молчанова Техред О.СопкоCompiled by E. Molchanova Tehred O. Sopko

Ко ПодCo Pod

Тираж 548 ВНШШИ Государственного комитета СССРCirculation 548 of the USSR State Committee

по делам изобретений и открытий 113035, Москва, Ж-35, Раушска  наб., д. 4/5for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab., 4/5

Производственно-полиграфическое предпри тие, г. Ужгород, ул. Проектна , 4Production and printing company, Uzhgorod, st. Project, 4

234587i234587i

чение притока флюида через кольцевое пространство и зазор между хвостовиком и НКТ, а после снижени  дебита соединение лифтовых труб с хвостови- 5 ком и проведение пр мой промывки дл  удалени  песчаной пробки,fluid flow through the annulus and the gap between the shank and the tubing, and after reducing the flow rate, connecting the elevator pipes with the shank 5 and performing a direct flush to remove the sand plug,

Данным способом бьши закончены скважины. № 90 и 91 месторождени  Каражанбас Казахской ССР, На этом 10 месторождении продуктивные горизонты на глубинах 300-350 м сложены слабосцементированными песчаниками, а нефть имеет высокую в зкость. Дл  ее извлечени  создают депрессии до 15 2-3 МПа, что приводит к разрушению пласта.The wells were completed in this way. Nos. 90 and 91 of the Karazhanbas field of the Kazakh SSR. At this 10 field, productive horizons at depths of 300–350 m are composed of poorly cemented sandstones, and oil has a high viscosity. For its extraction, depressions of up to 15–3 MPa are created, which leads to fracture of the formation.

Сквсжины № 90 и 91 бьши пробурены до кровли пласта-коллектора и обсажены 168-мм эксплуатационной колонной , после чего на глубинах 300- 315 м и 320-323 м были вск:рыты продуктивные объекты Г и Д, против которых ствол был расширен гидромониторным способом до диаметра 550- 640 мм. До забо  на 73-мм НКТ были спущены хвостовики из расчета входа их в эксплуатационную колонну на 5 м. Низ хвостовиков был оборудован башмачной направл ющей пробкой и обратным клапаном, а верх - левым переводником. После отсоединени  и установки НКТ в 0,3-0,5 м от хвостовика создали депрессию и получили .Skvszhin No. 90 and 91 were drilled to the roof of the reservoir bed and lined with a 168-mm production column, after which at the depths of 300-315 meters and 320-323 meters there were open areas: productive objects D and D, against which the trunk was expanded with a jetting method up to a diameter of 550-640 mm. Before the 73-mm tubing, shanks were lowered at the rate of entering them into the production string by 5 m. The bottom of the shanks was equipped with a shoe guide plug and non-return valve, and the top was equipped with a left sub. After disconnecting and installing the tubing in 0.3-0.5 m from the shank, they created a depression and got it.

устойчивый приток нефти. Анализ показал присутствие в добываемой про- дукии 0,05-0,1% мехпримесей, что указывало на нормальную работу скважин . Через 4 мес ра-боты соединилисьsteady flow of oil. The analysis showed the presence of 0.05-0.1% of mechanical impurities in the extracted product, which indicated normal operation of the wells. After 4 months, the workers joined

с хвостовиком, промыли скважинуwith shank, well washed

нефтью, очистив полость от песчаной пробки, и вновь пустили ее в работу.oil, clearing the cavity of the sand plug, and again let her work.

Корректор И. Эрдейи ПодписноеProofreader I. Erdeyi Subscription

Claims (1)

СПОСОБ ЗАКАНЧИВАНИЯ СКВАЖИН СО СЛАБОСЦЕМЕНТИРОВАННЫМИ КОЛЛЕКТОРАМИ, включающий крепление ствола до кровли продуктивного объекта, вскрытие его, расширение ствола против пласта-коллектора, спуск обсадной колонны и насосно-компрессорных труб, извлечение жидкости из пласта, отличающийся тем, что, с целью повышения ремонтоспособности .скважины за счет упрощения и ускорения операции по очистке ствола и повышения устойчивости слабосцементированного продуктивного пласта, в интервал пласта-коллектора спускают с упором на забой хвостовик, а жидкость извлекают по кольцевому пространству между обсадной колонной и хвостовиком и зазору между хвостовиком и насосно-компрессорными трубами, причем встречно направленные концы to насосно-компрессорных труб и хвосто-. вика оборудованы быстроразъемным герметизирующим соединением.METHOD FOR FINISHING WELLS WITH WEAKLY-CEMENTED COLLECTORS, including attaching the trunk to the roof of a productive object, opening it, expanding the trunk against the reservoir, lowering the casing and tubing, and extracting fluid from the formation, characterized in that, in order to increase the repair ability of the well. by simplifying and accelerating the operation of cleaning the trunk and increasing the stability of a poorly cemented reservoir, the liner is lowered into the interval of the reservoir with an emphasis on the bottom, and the fluid is extracted along the annular space between the casing and the liner and the gap between the liner and the tubing, the opposite ends to the tubing and tail. wikis are equipped with a quick-release sealing joint.
SU843813931A 1984-11-22 1984-11-22 Method of completing wells with loosely cemented collector rock SU1234587A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843813931A SU1234587A1 (en) 1984-11-22 1984-11-22 Method of completing wells with loosely cemented collector rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843813931A SU1234587A1 (en) 1984-11-22 1984-11-22 Method of completing wells with loosely cemented collector rock

Publications (1)

Publication Number Publication Date
SU1234587A1 true SU1234587A1 (en) 1986-05-30

Family

ID=21147281

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843813931A SU1234587A1 (en) 1984-11-22 1984-11-22 Method of completing wells with loosely cemented collector rock

Country Status (1)

Country Link
SU (1) SU1234587A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1990005832A1 (en) * 1988-11-22 1990-05-31 Tatarsky Gosudarstvenny Nauchno-Issledovatelsky I Proektny Institut Neftyanoi Promyshlennosti Method of casing the production seam in a well

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Ашрафь н М.О. и др. СИ. сер. Бурение, М.: ВНИИОЭНГ, с . 48. Авторское свидетельство СССР № 899870, кл. Е 21 В 43/08, 1979. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1990005832A1 (en) * 1988-11-22 1990-05-31 Tatarsky Gosudarstvenny Nauchno-Issledovatelsky I Proektny Institut Neftyanoi Promyshlennosti Method of casing the production seam in a well
US5031699A (en) * 1988-11-22 1991-07-16 Artynov Vadim V Method of casing off a producing formation in a well

Similar Documents

Publication Publication Date Title
US4890675A (en) Horizontal drilling through casing window
WO2020113870A1 (en) Method for cooperatively draining roof separation water and mining coal-measure gas
RU2421586C1 (en) Procedure for construction of horizontal well in devonian strata
CN110397428A (en) A kind of gas displacing coal-bed method for increasing of straight well and U-shaped butt shaft unitized production coal bed gas
CN108756884A (en) Coal mine tight roof full face ground shifts to an earlier date outburst elimination method
CN105201458A (en) Well completion method for glass fiber reinforced plastic sieve tube of coal bed gas horizontal well
CN105909225A (en) Fully mechanized caving face inter-frame oriented hydraulic fracturing top-coal weakening method
CA2025996C (en) Borehole mining process for recovery of petroleum from unconsolidated heavy oil formations
RU2612060C9 (en) Method of development of carbonate shaly oil deposits
SU1234587A1 (en) Method of completing wells with loosely cemented collector rock
CN103089193A (en) Tail pipe completion method by plugging expandable casing on top of screen pipe
US4368920A (en) Method of thermal-mine working of oil reservoir
CN106801589A (en) High temperature resistant big orifice hydraulic booster expanding suspension instrument and method
CN115822530A (en) Long horizontal section under-pressure drill rod transmission well-flushing and perforation integrated tool and method
RU2167273C1 (en) Method of casing liner installation in well
CN205135416U (en) Inflation formula tail pipe drilling operation device
CN113356824A (en) Integral development method for adjacent coal seam horizontal well in multi-coal seam development area
CN105971504A (en) Drilling structure, method and device for uncertain stratum of target reservoir
RU2513376C1 (en) Method of thermal production for shale oil
CN205172462U (en) Fluid pressure type rigidity sleeve pipe centralizer
RU2385408C1 (en) Method of development of oil or gas deposit
SU1610049A1 (en) Method of methane drainage from coal seam
RU2140521C1 (en) Method of well completion
SU1434133A1 (en) Method of degassing coal-bearing stratum thickness
SU470584A1 (en) Well boring method