SU1209526A1 - Device for loading hoppers with loose material - Google Patents
Device for loading hoppers with loose material Download PDFInfo
- Publication number
- SU1209526A1 SU1209526A1 SU823417858A SU3417858A SU1209526A1 SU 1209526 A1 SU1209526 A1 SU 1209526A1 SU 823417858 A SU823417858 A SU 823417858A SU 3417858 A SU3417858 A SU 3417858A SU 1209526 A1 SU1209526 A1 SU 1209526A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- shaft
- unloading
- additional
- loading
- mine
- Prior art date
Links
Description
1one
Изобретение относитс к устройствам дл загрузки складов, в частности последовательно расположен™ ных бункеров, и может быть исполь зовано в строительной, пищевой, химической и других отрасл х на родного хоз йства.The invention relates to devices for loading warehouses, in particular, sequentially located storage bins, and can be used in construction, food, chemical and other branches of the native household.
Цель изобретени - пов1ьшение производительности и надежности работььThe purpose of the invention is to increase productivity and reliability.
На фиг,1 изображено устройство;, общий ВИД из фиг. 2 - то же, вид сбоку; на фиг.З - вид А на фиг.1; на фиг.4 вид Б на фиг.1; на фиг.5- узел I на фиг.З; на фиг. 6 - узел И на фиг.З; на фиг, 7 конструкци предохранительного клапана; на фиг.8 конструкци гасител скорости; на фиг.9 - вид В на фиг,.FIG. 1 shows a device ;, a general view of FIG. 2 - the same, side view; in FIG. 3, view A in FIG. 1; figure 4 view B in figure 1; Fig.5 - node I in Fig.Z; in fig. 6 - node And on fig.Z; Fig. 7 shows a safety valve design; 8, the design of the speed quencher; figure 9 is a view In fig ,.
Устройство .дл загрузки бункер ов сыпучим материалом включает вертикальную шахту 1 подъема, разгрузочный участок шахты 2, наклонную загрузочную шахту 3, пе реходной отсек 4, возвратный участок шахты 5, допол нительную вертикальную шахту 6, передвижные тележки 7, которые могут одновременно находитьс в шахтах I, 69 2 и 3, например, по одной в каждой ,The device for loading bulk materials with a silo includes a vertical lift shaft 1, a discharge section of a shaft 2, an inclined loading shaft 3, a transfer compartment 4, a return section of a shaft 5, an additional vertical shaft 6, mobile carriages 7 that can simultaneously be in the mines I, 69 2 and 3, for example, one in each,
В шахте 1 установлена одна из те лежек 7, под которой образована полость 8, подключенна -к вент ш то- РУ 9( и предохранительные упоры 10, В верхней части шахты 1 установлены предохранительный клапан 1 и вентил торна станци с вентил торами 12 и 13.In shaft 1, one of the trolleys 7 is installed, under which cavity 8 is formed, connected to - by fan 9 (and safety stops 10; In the upper part of mine 1, safety valve 1 and fan station with fans 12 and 13 are installed .
Разгрузочный участок шахты 2 снабжен пневмоцилиндрами 14, соединенными с шиберами 15, установленными в роликах 16, и пневмоцилиндрами 17, соединенными с шиберами 18.The discharge section of the shaft 2 is equipped with pneumatic cylinders 14 connected to the gates 15 mounted in the rollers 16, and pneumatic cylinders 17 connected to the gates 18.
В шахте 3 установлены пневмоци- ли:кдры 14, соединенные с шиберами 19 и 20, установленными в роликах 16. Шахта 3 имеет воронку 21.In mine 3, pneumatic tires are installed: cylinders 14, connected to gates 19 and 20 installed in rollers 16. Mine 3 has a funnel 21.
Шахта 6 снабжена венти.п торной станцией с вентил тором 22, гшевмо- цилиндром 14, соединенным с шибе ром 15, установленным в роликах J6. В шахте 6 установлены одна нз тележек 7, предохранительные спускные клапаны 23, гасители. 24 скорости.The shaft 6 is equipped with a fan-supporting station with a fan 22, a main cylinder 14, connected to a gate 15 mounted in the rollers J6. In the mine 6, one petrol tank car 7 is installed, safety drain valves 23, dampers. 24 speeds.
Передвижные тележки 7 снабжены автономной системой разгрузки, состо щей из пневмоцилиндров 25, имеющих возвратные пружины 26, трубопровода 27 со штуцером, гибких трубопроводов 28, шибера 29. Сист ема раз Mobile carriages 7 are equipped with an autonomous unloading system, consisting of pneumatic cylinders 25, having return springs 26, a pipeline 27 with a fitting, flexible pipelines 28, a gate 29. System times
0952609526
toto
грузки тележек 7 управл етс пневмо- системой .шахты 2 через трубу 30 с помощью переходного соединительного корпуса 31, имеющего передвиткной клапан 32 и возвратную пружину 33. Тележки 7 снабжены самоориентирукнци- ми колесами 34.The loads of the carriages 7 are controlled by the pneumatic system of the shaft 2 through the pipe 30 by means of the transitional connecting body 31 having a front-turn valve 32 and a return spring 33. The carriages 7 are equipped with self-guiding wheels 34.
Клапан 11 управл етс пневмоцилинд- ром 35.The valve 11 is controlled by a pneumatic cylinder 35.
Устройство работает следующим образом .The device works as follows.
При включении вентил тора 9 воздух нагнетаетс в полость В. Давление воздуха в полости 8 возрастает . В полости над тележкой 7 давление остаетс равным атмосферному вследствие того, что она сообщена с окружающим пространством через открытый клапан 11. Разность давлений в полости Вив полости над тележкой 7 приводит к возникновению усили на тележку 7, котора движетс к верхней части шахты 1 через предохранительные упоры 10, которые утапливаютс при наезде колёс 34 тележки 7, а затем после прохода тележки 7 возвращаютс в исходное положение,When the fan 9 is turned on, air is injected into cavity B. The air pressure in cavity 8 increases. In the cavity above the carriage 7, the pressure remains equal to atmospheric because it communicates with the surrounding space through the open valve 11. The pressure difference in the cavity of the Viv cavity over the carriage 7 causes a force on the carriage 7, which moves to the upper part of the shaft 1 through safety stops 10, which sink when the wheels 34 are driven by the trolley 7, and then after the passage of the trolley 7, they return to their original position,
Кажда из тележек 7 проходит следующий цикл работы: загрузка в шахте 3, подъем в шахте 1 и перемещение в требуемое место разгрузки в шахте 2; разгрузка и передвижение по отсеку 4; скатывание по наклонной шахте 5 в шахту 6; опускание в шахте 6 и скатывание в шахту 3,Each of the carts 7 passes the following cycle of work: loading in mine 3, lifting in mine 1 and moving to the desired unloading place in mine 2; unloading and movement in compartment 4; rolling down the inclined shaft 5 into the shaft 6; lowering in mine 6 and rolling down into mine 3,
Одновременно и независимо могут осуществл тьс следуюпще операции; загрузка тележки 7 в шахте 3; разгрузка тележки 7 в шахте 2; подъем тележки 7 в шахте I; опускание тележки 7 в шахте 6; передвижение тележки 7 в отсек 4; скатывание тележки 7 по шахте 5.At the same time and independently, the following operation can be performed; loading trolley 7 in mine 3; unloading trolley 7 in the mine 2; lifting trolley 7 in mine I; lowering the trolley 7 in the mine 6; the movement of the trolley 7 in the compartment 4; rolling trolley 7 around the mine 5.
Дл создани воздушной подушки в шахте 6 включаетс вентил тор 22. В шахте 3 загрузка тележек 7 происходит через воронку 21.To create an air cushion in the shaft 6, a fan 22 is turned on. In the shaft 3, the loading of the carriages 7 takes place through the funnel 21.
При достижении тележкой 7 верхнейWhen the cart reaches 7 top
части шахты 1 пневмоцилиндрами 14 открываютс шиберы 15, которые перемещаютс в роликах 16; пневмоци- линдром 35 закрываетс клапан 11; пневмоцилиндром 17 открываетс шибер 18 в требуемом месте разгрузки шахты 2, а затем включаетс вентил тор 12. Давление воздуха, создаваемое вентил торами 12 и 9, переparts of the shaft 1 with pneumatic cylinders 14 open gates 15, which move in rollers 16; pneumatic cylinder 35 closes valve 11; the pneumatic cylinder 17 opens the gate 18 at the desired discharge point of the shaft 2, and then the fan 12 is turned on. The air pressure created by the fans 12 and 9,
мещает тележку 7 в шахту 2. После этого закрываютс шиберы 5; выключаетс вентил тор 12; открываетс клапан 11, который возвращаетс в исходное положение пружинами раст жени при возврате штока пневмо- цилиндра 35 в первоначальное положение; открываетс шибер 19 пневмо- цилиндром 14. Одна из тележек 7 с грузом, наход ща с в шахте 3, перемещаетс в шахту 1, при этом шибер 19 закрываетс , и открываетс шибер 20, Поэтому друга тележка 7 из шахты 6 перемещаетс в шахту 3 под загрузку и шибер 20 закрьшает- с , В это врем тележка 7 с грузом переместивша с из шахты 3 в шахту 1, поднимаетс к верхней части шахты 1. Одновременно дл перемещени тележки 7 в шахту 6 включаетс вентил тор 13, Давление воздуха, создаваемое вентил тором 13, переме . щает тележку 7 в отсек 4, а затем в наклонную шахту 5, по которой с помощью самоориентирующих колес 34 тележка 7 скатываетс в шахту 6,moves the trolley 7 into the shaft 2. Thereafter, the gates 5 are closed; fan 12 is turned off; opens valve 11, which returns to its original position with tension springs when the rod of pneumatic cylinder 35 returns to its original position; The gate 19 is opened by the pneumatic cylinder 14. One of the carriages 7 loaded in mine 3 is moved to the shaft 1, the gate 19 is closed and the gate 20 is opened. Therefore, the other car 7 from mine 6 is moved to the shaft 3 under the loading and the gate 20 is closed; At this time, the trolley 7 with cargo moved from mine 3 to mine 1 rises to the upper part of mine 1. At the same time, fan 13 is turned on to move trolley 7 to mine 6, the air pressure generated by the fan 13, variable. pushes the carriage 7 into compartment 4 and then into the inclined shaft 5, along which with the help of self-guiding wheels 34, the carriage 7 rolls down into the shaft 6,
В шахте 6 пневмоцилиндром 14 открываетс шибер 15, который перемещаетс в роликах 16, После этого тележка 7 начинает опускатьс к дну шахты 6. Воздупша подушка, созданна вентил тором 22, в шахте 6 и гасители 24 скорости, за счет поглощени энергии сжатыми пр ткинами, позвол ет тележке 7 плавно опускатьс . По мере опускани тележки 7 к дну шахты 6 повьш1аетс давление воздушной подушки, поэтому срабатывают клапаны 23, тем самым давление воздушной подущки поддерживаетс на прежнем фовне, и тележка 7 плавно опускаетс на дно шахты 6, Затем она под собственным весомIn the shaft 6, the pneumatic cylinder 14 opens the gate 15, which moves in the rollers 16. After that, the carriage 7 starts to descend to the bottom of the shaft 6. The airbag created by the fan 22 in the shaft 6 and the dampers 24 speeds, due to the energy absorbed by the compressed straps, allows trolley 7 to be lowered smoothly. As the trolley 7 is lowered to the bottom of the shaft 6, the pressure of the air cushion increases, so the valves 23 are actuated, thereby the pressure of the air boost is maintained at the same level, and the trolley 7 is gently lowered to the bottom of the shaft 6, then under its own weight
152152
66
0952609526
скатываетс в шахту 3 до шибера 20, В это же врем одна из тележек 7 с грузом подаетс под разгрузку. Тележка 7 с грузом из шахты 3rolls into the shaft 3 to the gate 20, At the same time, one of the carts 7 with the load is fed for unloading. Cart 7 with a load of mine 3
5 подаетс в шахту 1. После подачи этой тележки в шахту 1 открываетс щибер 20, и тележка 7 из шахты 6 подаетс под загрузку в щахту 3, Подача тележки 7 из верхней час-5 is fed into the shaft 1. After the trolley is fed into the shaft 1, the spike 20 is opened, and the cart 7 from the shaft 6 is fed for loading into the shaft 3, the feed of the cart 7 from the upper part
10 ти шахты 1 в любое промежуточное10 mines 1 in any intermediate
положение шахты 2 осуществл етс сле- дуюцим образом, Пневмоцилиндрами 14 открываютс щиберы 15 до требуемого места разрузки; открываетс ши-the position of the shaft 2 is carried out as follows; The pneumatic cylinders 14 open the tongs 15 to the required place of unloading; opens shi
(5 бер 18 пне ймоцилиндром 17; пневмоцилиндром 35 закрываетс клапан 11; включаетс вентил тор 12 и тележка 7 перемещаетс в место разгрузки; после разгрузки тележки 7 открьг-(5 ber 18 to the engine cylinder 17; pneumatic cylinder 35 to close the valve 11; the fan 12 is turned on and the carriage 7 moves to the unloading place; after the carriage 7 unloads, the
20 ваютс оставшиес закрытыми шиберами 1 5 и закрываетс шибер 18,под действием давлени воздуха, созданного вентил тором 12, после чего тележка 7 перемещаетс ,20 the remaining shutters 1 5 are closed and the gate 18 is closed by the pressure of the air created by the fan 12, after which the carriage 7 is moved,
25 Разгрузка тележек 7 может осуществл тьс по всей длине шахты 2,25 The carriage 7 can be unloaded along the entire length of the shaft 2,
Разгрузка тележки 7 осуществл етс следующим образом. Воздух из пневмо си с те мы шахты 2 через трубу 30 по-The unloading of the trolley 7 is carried out as follows. Air from the pneumatic system with mine 2 through pipe 30
30 даетс в корпус 31, при этом клапан 32 передвигаетс в штуцер трубопровода 27, а воздух через гибкие трубопроводы 28 попадает в пневмоци- линдры 25, которые открывают шибер 29 емкости и груз высыпаетс из тележки 7,30 is given to the housing 31, while the valve 32 is moved to the fitting of the pipeline 27, and the air through the flexible pipes 28 enters the pneumatic cylinders 25, which open the container gate 29 and the cargo is poured out of the carriage 7,
После прекращени подачи воздуха из пневмосистемы шахты 2 через трубу 30 пневМОцилиндры 25 с помощью пружин 26 закрывают шибер 29, Б это . же врем пружиной 33 клапан 32 возвращаетс в исходное положение в корпус 31,After stopping the supply of air from the pneumatic system of the shaft 2 through the pipe 30, the pneumatic cylinders 25 with the help of springs 26 close the gate 29, B this. At the same time, the spring 33, the valve 32 returns to its original position in the housing 31,
8 eight
L IL i
3535
4040
. г. g
&ид А& id A
Фиг. 3FIG. 3
fut.Sfut.S
ФИ2.6FI2.6
2323
v /7 ТАv / 7 TA
ЖЖLJ
XX
ывyv
fPw.8fPw.8
Фи&. 7Fi &. 7
2222
Фиг. 9FIG. 9
Составитель Н.Никитина Редактор В.Петраш Техред Т.Тулик Корректор С.ЧерниCompiled by N.Nikitin Editor V.Petrash Tehred T.Tulik Proofreader S.Cherni
Заказ 445/25 Тираж 833ПодписноеOrder 445/25 Circulation 833 Subscription
ЫШИПИ Государственного комитета СССРUSSR State Committee
по делам изобретений и открытий 113035, Москва, Ж-35 Раушска наб., д.4/5for inventions and discoveries 113035, Moscow, Zh-35 Raushsk nab., 4/5
Филиал ШШ Патент, ГцУжгород, ул.Проектна , 4Branch ShSh Patent, HtsUzhgorod, Proektna St., 4
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823417858A SU1209526A1 (en) | 1982-02-09 | 1982-02-09 | Device for loading hoppers with loose material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823417858A SU1209526A1 (en) | 1982-02-09 | 1982-02-09 | Device for loading hoppers with loose material |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1209526A1 true SU1209526A1 (en) | 1986-02-07 |
Family
ID=21004818
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU823417858A SU1209526A1 (en) | 1982-02-09 | 1982-02-09 | Device for loading hoppers with loose material |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1209526A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2707497C1 (en) * | 2018-12-29 | 2019-11-26 | Юрий Михайлович Гайдуцкий | Mechanized storage- accumulators of granules with reloader |
-
1982
- 1982-02-09 SU SU823417858A patent/SU1209526A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 914418, кл. В 65 G 3/04, 1980. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2707497C1 (en) * | 2018-12-29 | 2019-11-26 | Юрий Михайлович Гайдуцкий | Mechanized storage- accumulators of granules with reloader |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3055446A (en) | Air-supported cargo platform or container | |
CN208761426U (en) | Cargo movement system | |
CN105883278B (en) | Carrying cargo system, carrying cargo case and the device for cargo consolidation handling | |
CN208883025U (en) | Loading apparatus and loading system | |
SU1209526A1 (en) | Device for loading hoppers with loose material | |
CN113696386A (en) | Full-automatic composite film curing production line | |
US7661910B2 (en) | Hydraulic elevation apparatus and method | |
US4249679A (en) | Sealing closure for asphalt mix storage bin outlet | |
CN111674967A (en) | Overturning unloading conveying device and overturning unloading conveying method | |
CN209481185U (en) | Slapple activating furnace with feeding device | |
CN206032764U (en) | Automatic loading mechanism of unloading | |
RU2707497C1 (en) | Mechanized storage- accumulators of granules with reloader | |
US3542218A (en) | Apparatus for closing the coal hopper outlet on a larry car | |
US4170944A (en) | Arrangement for transportation of cargoes in containers | |
CN216231896U (en) | Refrigerator car convenient to unload | |
US5575595A (en) | Low profile parallel railcar discharge adaptor | |
US4020958A (en) | Bulk material container loading and system | |
CN203306748U (en) | Movable intelligent grain unloading machine | |
US4316682A (en) | Ore carrier | |
US3101183A (en) | Pneumatic dispatch system | |
CN113233120A (en) | Three-dimensional push type automatic charging tray discharging system and discharging method | |
RU85423U1 (en) | BUNKER DEVICE | |
CN112079135A (en) | Material conveying control method for mixing station and mixing station | |
CN117550298B (en) | Bulk material feeding system and method | |
CN101857030A (en) | Belt type bunker car |