SU1204684A1 - Arrangement for trenchless laying of pipelines under interfering objects - Google Patents
Arrangement for trenchless laying of pipelines under interfering objects Download PDFInfo
- Publication number
- SU1204684A1 SU1204684A1 SU843713180A SU3713180A SU1204684A1 SU 1204684 A1 SU1204684 A1 SU 1204684A1 SU 843713180 A SU843713180 A SU 843713180A SU 3713180 A SU3713180 A SU 3713180A SU 1204684 A1 SU1204684 A1 SU 1204684A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- casing
- arrangement
- string
- pipelines under
- trenchless laying
- Prior art date
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
1one
Изобретение относитс к горной и строительной промьшшенности и может быть использовано дл бестраншейной прокладки подземных коммуникаций .The invention relates to the mining and construction industry and can be used for trenchless laying of underground utilities.
Цель изобретени - повьшение надежности работы за счет сшшени раст гивающих усилий в сечени х колонны бурильных труб.The purpose of the invention is to increase the reliability of operation due to the tension stitching in the sections of the drill pipe.
На чертеже изображено устройств дл бестраншейной прокладки трубопроводов под преп тстви ми, общий вид в разрезе; на фиг. 2 - узел I на фиг. 1 (в увеличенном вз-ще) .The drawing shows devices for trenchless laying of pipelines under obstacles, a general view in section; in fig. 2 — node I in FIG. 1 (in an enlarged view).
Устройство состоит из колонны бурильных труб 1, расположенной в пилотной скважине и соединенной с раздвижным расширителем 2, который через шпиндель 3 соединен с пневмопоршнем 4, имеющим скольз щее уплотнение 5 в днищах 6 колонны 7 обсадньк труб. Внутри колонны 7 находитс разделительна пробка 8, котора имеет клапан 9, стопорную манжету 10 и спускной клапан 11. На торец колонны 7 обсадных труб насажен башмак 12 с уплотнени ми 3, которые облегают обсадную колонну 7 и направл ющий цилиндр 14, жестко скрепленный с упором 15, через который проходит воздухопровод 16, Упор 15 укреплен на направл ющих 17 станины 18 и может передвигатьс при наращивании колонны 7 обсадных труб. Впускной клапан св зан tiepe3 рычаг 19 с тросом 20.The device consists of a string of drill pipes 1, located in the pilot well and connected to an expanding expander 2, which is connected through spindle 3 to a pneumatic piston 4 having a sliding seal 5 in the bottoms 6 of the column 7 of the casing. Inside column 7 there is a separation plug 8, which has a valve 9, a stopper cuff 10 and a drain valve 11. At the end of the casing string 7, a shoe 12 with seals 3 is fitted, which fit the casing 7 and the guide cylinder 14, rigidly fastened to the stop 15, through which the air duct 16 passes; The stop 15 is fixed on the guides 17 of the frame 18 and can move as the casing 7 is expanded. The inlet valve is associated with a tiepe3 lever 19 with a cable 20.
Устройство работает следующим образом.The device works as follows.
После проходки пилотной скважины 21 к колонне бурильных труб 1 присоедин ют расширитель 2, к которому через шпиндель 3 и пневмо- поршень 4 подсоедин ют колонну 7 обсадных труб. Внуть колонны 7 устанавливают разделительную пробку 8, от спускного клапана 11 вывод т трос 20 через упор 15. На свободный торец обсадной колонны 7 устанавливают башмак 12, на который : насаживают направл ющий цилинд 14 с упором 15, затем упор 15 креп т к направл ющим 17 станины 18. После этого колонной бурильных труб 1 передаетс к расширителю 2 крут щий момент и т говое усилие, создаваемые любым известным способом , по ней же прокачиваетс промы04684After the pilot hole 21 has been drilled, an expander 2 is attached to the string of drill pipes 1, to which the casing string 7 is connected via spindle 3 and pneumatic piston 4. Introduce columns 7, install a separating plug 8, pull the cable 20 from the drain valve 11 through the stop 15. On the free end of the casing 7, install the shoe 12 on which: guide cylinder 14 is mounted with the stop 15, then the stop 15 is fixed to the guides 17 of the frame 18. After this, the string of drill pipes 1 transmits a torque and pulling force generated by any known method to the expander 2, through which 0404684 is pumped
вочньш агент, который поступает в расширитель 2, проходит через его промьшочные отверсти и уносит на поверхность пшам по затрубному про5 странству 22. Затем по воздухопроводу 16 подвод т под давлением воздух , который через клапан 9 посту- в замкнутую полость, ограниченную стенками колонны обсадныхThe active agent, which enters the expander 2, passes through its industrial openings and takes the surface of the ps through the annular space 22. Then, through the air duct 16, air is supplied under pressure through the valve 9 into the closed cavity, which is bounded by the walls of the casing.
О труб, днищем 6 и разделительной пробкой В, и за счет давлени на днище 6 колонна 7 обсадных труб начинает внедр тьс в расшир емую скважину, а пневмопоршень 4 через About the pipes, the bottom 6 and the separation plug B, and due to the pressure on the bottom 6, the casing string 7 begins to be inserted into the expanding well, and the pneumatic piston 4 through
5 шпиндель 3 создает осевую нагрузку на расширитель 2, 5 spindle 3 creates an axial load on the expander 2,
По мере расширени скважины 21 колонна 7 обсадных труб продвигаетс на длину направл ющего цилинд20 ра 14. Во врем этого процесса стопорна манжета 10 прижата к колонне 7 за счет высокого давлени в полости манжеты 0, котора при открытом клапане 9 сообщена с об25 ластью высокого давлени . После прекращени подачи высокого давлени по воздухопроводу 16 клапан 9 отсекает полость манжеты 10, оставив ее н колонну обсадных труб под высо30 КИМ давлением. Затем направл юпц1й цилиндр 14 вместе с упором 15 смещают вправо по направл ющим 17, снимают башмак 12 и наращивают колонну 7 обсадных труб сваркой оче35 редной трубы., после чего заново монтируют всю оснастку ( на конец пристыкованной трубы устанавливают башмак 12, насаживают на него направ- ЛЯЮ1ЦИЙ цилиндр 14 с упором 15As the well 21 expands, the casing string 7 advances the length of the guide cylinder 14. During this process, the stop cuff 10 is pressed against the string 7 due to the high pressure in the cavity of the cuff 0, which, when the valve 9 is open, is in communication with the high pressure area. After stopping the supply of high pressure through the air line 16, valve 9 cuts off the cavity of the cuff 10, leaving it on the casing string under high KIM pressure. Then, the directional cylinder 14 together with the stop 15 is displaced to the right along the guides 17, the shoe 12 is removed and the column 7 of the casing is boosted by welding the secondary pipe. After that, the entire rig is reassembled - LYaYuTsII cylinder 14 with emphasis 15
4Q и креп т упор 15 к направл ющим 17 станины 18). Тросом 20 открывают спускной клапан 11, при этом ослабл етс прижатие стопорной манжеты 10 к стенкам колонны 74Q and fasten the anvil 15 to the guides 17 of the frame 18). The cable 20 opens the drain valve 11, while loosening the locking cuff 10 against the walls of the column 7.
45 обсадных труб, и разделительна пробка 8 от давлени в полости колонны 7 обсадных труб смещаетс вправо до упора в башмак I2. Затем спускной клапан 1 закрьшают, вновь45 casing pipes, and a separating plug 8 from the pressure in the cavity of the casing string 7 is shifted to the right up to the stop in the shoe I2. Then the drain valve 1 is closed again.
iQ подвод т под высоким давлением воздух по воздухопроводу 16 через клапан 9 в замкнутую полость колонны 7 обсадных труб и процесс прокладки колонг Ы 7 обсадных труб в расjr пшр емую пилотную скважину продолжаетс . В период наращивани колон- ш,1 обсадных труб расширение пилотной скважннь не прекрашаетс .The iQ feeds high-pressure air through the air duct 16 through valve 9 into the closed cavity of the casing string 7 and the process of laying the casing 7 of the casing into the expansion pilot well continues. During the build-up period, 1 casing, the expansion of the pilot well does not stop.
Редактор Т.ПарфеноваEditor T. Parfenova
Составитель С.РобатеньCompiled by S.Robaten
Техред О.Неце Корректор Л.ПатайTehred O. Niece Proofreader L. Patay
Заказ 8497/28 Тираж 648ПодписноеOrder 8497/28 Circulation 648 Subscription
ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee
по делам изобретений и открытий 113035, Москва, Ж-35, Раушска наб., д. 4/5for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab., 4/5
Филиал ППП Патент, г. Ужгород, ул. Проектна , 4Branch PPP Patent, Uzhgorod, st. Project, 4
Фиг. 2.FIG. 2
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843713180A SU1204684A1 (en) | 1984-03-21 | 1984-03-21 | Arrangement for trenchless laying of pipelines under interfering objects |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843713180A SU1204684A1 (en) | 1984-03-21 | 1984-03-21 | Arrangement for trenchless laying of pipelines under interfering objects |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1204684A1 true SU1204684A1 (en) | 1986-01-15 |
Family
ID=21108332
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU843713180A SU1204684A1 (en) | 1984-03-21 | 1984-03-21 | Arrangement for trenchless laying of pipelines under interfering objects |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1204684A1 (en) |
-
1984
- 1984-03-21 SU SU843713180A patent/SU1204684A1/en active
Non-Patent Citations (1)
Title |
---|
Патент US № 2839271, кл. 175-53, 1958. Авторское свидетельство .СССР 1159989, кл. Е 02 F 5/18, 1983. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2769385C2 (en) | Downhole patch installation tool | |
US6712151B2 (en) | Tubing expansion | |
US3799277A (en) | Force applicator | |
KR920004610B1 (en) | Tube joint for use with multi-walled tube assembly | |
US7255516B2 (en) | Method and apparatus for replacement of underground pipe | |
US5083608A (en) | Arrangement for patching off troublesome zones in a well | |
US5735344A (en) | Tubing hanger with hydraulically energized metal annular seal with new design tubing hanger running tool | |
US6761507B2 (en) | Method and apparatus for replacement of underground pipe | |
SU1747673A1 (en) | Device for application of patch liner to casing pipe | |
AU2002212537A1 (en) | Downhole apparatus and method for expanding a tubing | |
US6880638B2 (en) | Device for an opening in an outer sleeve of a sleeve valve and a method for the assembly of a sleeve valve | |
CN101160451B (en) | Device and method for installing a rock bolt and a rock bolt installation rig | |
JPH04309686A (en) | Dirt charger to cementing head or ore chute equipment in offshor drilling | |
KR101160707B1 (en) | Method and device for installing a self-drilling expandable rock bolt and a self-drilling expandable rock bolt | |
RU2443849C2 (en) | Control device of pneumatic tool for processing of well or pipe | |
SU1204684A1 (en) | Arrangement for trenchless laying of pipelines under interfering objects | |
NO340038B1 (en) | Mechanical coupling, a tool assembly and an inflatable gasket comprising the mechanical coupling | |
RU2164587C2 (en) | Gear to shut off tubing string | |
SU1314008A1 (en) | Lubricator | |
RU2243357C2 (en) | Technological packer | |
RU2805050C2 (en) | Method for removing part of downhole tubular metal structure and system for implementing the method | |
SU1203231A1 (en) | Well-drilling apparatus | |
RU2084613C1 (en) | Hydraulic packer | |
SU977617A1 (en) | Machine for trenchless burying of pipelines under obstructions | |
GB2173839A (en) | Long range borehole drilling equipment |