SU1198230A1 - Power installation - Google Patents

Power installation Download PDF

Info

Publication number
SU1198230A1
SU1198230A1 SU823504746A SU3504746A SU1198230A1 SU 1198230 A1 SU1198230 A1 SU 1198230A1 SU 823504746 A SU823504746 A SU 823504746A SU 3504746 A SU3504746 A SU 3504746A SU 1198230 A1 SU1198230 A1 SU 1198230A1
Authority
SU
USSR - Soviet Union
Prior art keywords
boiler
furnace
heat pipe
heating chamber
transfer device
Prior art date
Application number
SU823504746A
Other languages
Russian (ru)
Inventor
Дмитрий Никитович Гринченко
Михаил Павлович Кулик
Лариса Федоровна Ермакова
Original Assignee
Львовский Ордена Ленина Политехнический Институт Им.Ленинского Комсомола
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Львовский Ордена Ленина Политехнический Институт Им.Ленинского Комсомола filed Critical Львовский Ордена Ленина Политехнический Институт Им.Ленинского Комсомола
Priority to SU823504746A priority Critical patent/SU1198230A1/en
Application granted granted Critical
Publication of SU1198230A1 publication Critical patent/SU1198230A1/en

Links

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

ЭНЕРГЕТИЧЕСКАЯ УСТАНОВКА, содержаща  паровой котел с конвективным газоходом, воздушную турбину с компрессором и включенную между последними камеру подогрева воздуха, сообщенную теплопередающим устройством с топкой котла, отличающа с  тем, что, с целью повышени  надежности установки при одновременном расширении диапазона регулировани , теплопередающее устройство выполнено в виде тепловой трубы, холодный конец которой размещен в камере подогрева , а гор чий - в топке, причем котел снабжен байпасной линией, включенной между газоходом и топкой в зоi не размещени  гор чего конца тепловой трубы. (Л ENERGY INSTALLATION, containing a steam boiler with a convective gas duct, an air turbine with a compressor and an air heating chamber connected between the latter, communicated by a heat transfer device with a boiler furnace, characterized in that the heat transfer device is made as a heat pipe, the cold end of which is placed in the heating chamber, and the hot end is in the firebox, and the boiler is equipped with a bypass line connected between and a home furnace zoi not accommodate the hot end of the heat pipe. (L

Description

Изобретение относитс  к теплоэнер гетике и может быть использовано в комбинированных установках с. паровой и пиковой воздушной турбинами. Цель изобретени  - повьапение надежности установки при одновременном расширении диапаз.она регулировани . На чертеже изображена схема предл гаемой энергетической установки. Компрессор 1 соединен через камеру 2 подогрева воздуха с воздушной турбиной 3, на валу которой установлен электрогенератор 4. Паровой.котел с топкой 5 и конвективным газохо дом 6 соединен с паровой турбиной {не показана). Камера 2 сообщена с котлом при помощи теплопередающего устройства, выполненного в виде тепловой трубы, холодный конец 7 которой размещен в камере 2, а гор чий конец 8 - в топке 5. Газоход 6 соеди нен байпасной линией 9 с топкой 5 в зоне размещени  гор чего конца 8 теп ловой трубы. На начальном участке байпасной линии 9 помещен отдельный дымосос 10с приводным двигателем 11 На валу электрогенератора 4 установлен тахогенератор 12, соединенный с блоком управлени  13, который соединен также с приводным двигателем 11. Вместо дымососа к начальному участ:ку линии 9 может быть подключен дутьевой вентил тор, соединенный с при водным двигателем (не показан). 30 Установка-работает следующим образом . Сжатый компрессором 1 воздух подают через камеру 2 подогрева в воздушную турбину 3. В топке 5 парового котла сжигают топливо, а полученный в котле пар направл ют в паровую турбину дл  выработки электрической мощности. Тепло, полученное в топке 5 котла, передают посредством тепловой трубы воздуху, проход щему по камере 2. Воздушна  турбина 3 работает только в случа х пиковых нагрузок, При помощи тахогенератора 12 измер ют обороты турбины 3, и сигнал от : него подают на блок управлени  13, св занный с приводным двигателем 11 дымососа 10. В случае уменьшени  нагрузки или же при остановках турбины 3 уменьшаетс  выходной, сигнал тахогенератора 12, а блок управлени  13 выдает команду на увеличение оборотов приводного двигател  11, и дымосос 10 подает большее количество газов с низкой температурой из газохода 6 в зону действи  гор чего конца 8 тепловой трубы, предотвраща  его пережег, что повьшгает надежность установки. Таким образом регулируют процесс изменени  количества передаваемого тепла в камере 2 путем охлаждени  гор чего конца 8 тепловой трубы, тем самым расшир етс  диапазон регулировани  мощности турбиныЗ,а следовательно,и установки в целом.This invention relates to heat and energy engineering and can be used in combined installations. steam and peak air turbines. The purpose of the invention is to increase the reliability of the installation while expanding the range of regulation. The drawing shows a diagram of the proposed power plant. Compressor 1 is connected via an air heating chamber 2 with an air turbine 3, on whose shaft an electric generator 4 is installed. Steam boiler with furnace 5 and convective gas holding 6 is connected with steam turbine (not shown). Chamber 2 communicates with the boiler by means of a heat transfer device made in the form of a heat pipe, the cold end 7 of which is placed in chamber 2, and the hot end 8 is in the furnace 5. The flue 6 connects a bypass line 9 to the furnace 5 in the hot zone end 8 of heat pipe. At the initial part of the bypass line 9, a separate exhaust fan 10c with a driving motor 11 is placed. A tachogenerator 12 is connected to the shaft of the electric generator 4 and connected to the control unit 13, which is also connected to the driving engine 11. Instead of the smoke exhauster, a blowing fan connected to a water engine (not shown). 30 Installation-works as follows. The air compressed by compressor 1 is fed through the heating chamber 2 to the air turbine 3. In the furnace 5 of the steam boiler, fuel is burned, and the steam produced in the boiler is sent to the steam turbine to generate electrical power. The heat received in the furnace 5 of the boiler is transmitted to the air passing through chamber 2 through the heat pipe. The air turbine 3 operates only in cases of peak loads. The speed of the turbine 3 is measured using the tachogenerator 12, and the signal from: it is fed to the control unit 13 connected with the driving motor 11 of the smoke exhauster 10. In the event of a decrease in load or when the turbine 3 stops, the output signal of the tacho generator 12 decreases, and the control unit 13 issues a command to increase the speed of the drive engine 11, and the exhaust fan 10 delivers larger quantities gases from a low temperature duct 6 into the zone of action of the hot end 8 of the heat pipe, preventing it burned the that povshgaet reliable installation. In this way, the process of changing the amount of heat transferred in chamber 2 is regulated by cooling the hot end 8 of the heat pipe, thereby expanding the range of power control of the turbine 3 and, consequently, of the installation as a whole.

Claims (1)

ЭНЕРГЕТИЧЕСКАЯ УСТАНОВКА, содержащая паровой котел с конвектив ным газоходом, воздушную турбину с компрессором и включенную между последними камеру подогрева воздуха, сообщенную теплопередающим устройством с топкой котла, отличающаяся тем, что, с целью повышения надежности установки при одновременном расширении диапазона регулирования, теплопередающее устройство выполнено в виде тепловой трубы, холодный конец которой размещен в камере подогрева, а горячий - в топке, причем котел снабжен байпасной линией, включенной между газоходом и топкой в зог—ч не размещения горячего конца тепло- § вой трубы.ENERGY INSTALLATION, comprising a steam boiler with a convective gas duct, an air turbine with a compressor and an air heating chamber connected between the latter, communicated by a heat transfer device with a boiler furnace, characterized in that, in order to increase the reliability of the installation while expanding the control range, the heat transfer device is made in in the form of a heat pipe, the cold end of which is located in the heating chamber, and the hot end is in the furnace, and the boiler is equipped with a bypass line connected between the gas duct and opkoy in sor-h not accommodate the hot end of heat pipe § howling. SU „„1198230SU „„ 1198230
SU823504746A 1982-10-25 1982-10-25 Power installation SU1198230A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823504746A SU1198230A1 (en) 1982-10-25 1982-10-25 Power installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823504746A SU1198230A1 (en) 1982-10-25 1982-10-25 Power installation

Publications (1)

Publication Number Publication Date
SU1198230A1 true SU1198230A1 (en) 1985-12-15

Family

ID=21033477

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823504746A SU1198230A1 (en) 1982-10-25 1982-10-25 Power installation

Country Status (1)

Country Link
SU (1) SU1198230A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Андрющенко А .И. , Лапшов В.И. Парогазовые установки электростанций, М.: Энерги , 1965, с. 41. Патент DE № 839290, кл. 46 h, опублик. 1952. *

Similar Documents

Publication Publication Date Title
SU1198230A1 (en) Power installation
US2663146A (en) Combined gas and steam power plant
RU1809247C (en) Draft control device
SU1195020A1 (en) Steam-gas plant
SU916886A1 (en) Boiler unit
CN220541063U (en) Quick response boiler for thermal power peak regulation
SU737694A1 (en) Boiler plant
SU1728577A1 (en) Boiler unit of heat-electric generating plant
SU1285263A1 (en) Method of recovering waste heat of boiler effluent gases
SU1268870A1 (en) Boiler installation of thermoelectric plant
RU2101528C1 (en) Combined-cycle plant
RU2092705C1 (en) Combined cycle plant
SU1506227A1 (en) Boiler unit
SU706548A2 (en) Steam-gas plant
SU932102A2 (en) Boiler unit
SU1735669A1 (en) Method of control of thermal load of head-recovery plant
SU1663308A1 (en) Method of cooling boilers
JPS62111131A (en) Burner of low-calory gas burning gas turbine
RU2092704C1 (en) Combined-cycle plant
SU489428A2 (en) Arrangement for burning coal fines
RU1793146C (en) Boiler plant
SU1210008A1 (en) Boiler air supply system
SU1341359A1 (en) Steam-gas unit
SU1129456A1 (en) Boiler unit
JPS5443331A (en) Steam turbine plant