SU1194992A1 - Drilling rig - Google Patents

Drilling rig Download PDF

Info

Publication number
SU1194992A1
SU1194992A1 SU843752943A SU3752943A SU1194992A1 SU 1194992 A1 SU1194992 A1 SU 1194992A1 SU 843752943 A SU843752943 A SU 843752943A SU 3752943 A SU3752943 A SU 3752943A SU 1194992 A1 SU1194992 A1 SU 1194992A1
Authority
SU
USSR - Soviet Union
Prior art keywords
mast
subframes
legs
shelter
drilling rig
Prior art date
Application number
SU843752943A
Other languages
Russian (ru)
Inventor
Игорь Иванович Толокнов
Евгений Васильевич Перекатов
Игорь Петрович Петров
Анатолий Васильевич Панков
Алексей Маркович Коломиец
Original Assignee
Производственное Геологическое Объединение "Центргеология"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Производственное Геологическое Объединение "Центргеология" filed Critical Производственное Геологическое Объединение "Центргеология"
Priority to SU843752943A priority Critical patent/SU1194992A1/en
Application granted granted Critical
Publication of SU1194992A1 publication Critical patent/SU1194992A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

БУРОВАЯ УСТАНОВКА, включакица  мачту с , раму и укрытие , содержащее вертикальные стойки , установленные на них боковые перемычки с тросовыми т гами, подвески и тент, отличающа с  - тем, что, с целью сокращени  времени на монтаж и демонтаж укрыти , подвески посредством втулок шарнирно св заны с ногами мачты и имеют шарнирно св занные с ними подрамники, причем подрамники и подвески св заны с мачтой посредством гибкой т ги.DRILLING INSTALLATION, including mast, frame and cover, containing vertical posts, side jumpers with cable lugs mounted on them, suspension brackets and awning, characterized in that, in order to reduce the time for installation and removal of the shelter, hangers are hinged the mast is connected to the legs and the subframes are articulated with them, the subframes and the suspensions being connected to the mast by means of a flexible rod.

Description

4 СО fC t , 1 Изобретение относитс  к горному делу, в частности к укрыти м дл  передвижных буровых усгановок. Цель изобретени  - сокращение времени на монтаж и демонтаж укрыти . На фиг. 1 показан каркас укрыти  в собранном состо нии; на фиг. 2 бурова  установка в рабочем состо нии , вид с торца; на фиг. 3 - укрытие в транспортном положении, вид сбоку. Укрытие дл  буровой установки содержит закрепленные на раме 1 вертикальные стойки 2, откидные боковые перемычки 3, тент (не показан) и тросовую т гу 4, присоединенную концами к от . кидным боковьм перемычкам 3. На стойках 2 закреплены ролики 5, в ручь х которых уложены тросовые т ги 4. Откидные боковые перемычки 3 св заны с подрамниками 6 откидными стойками 7. Стойки 7 имеют верхние шарнирные соединени  с подрамниками 6 и жесткое быстроразъемное соединение с откидными боковыми-перемычками 3. Подрамники св заны через шарниры 8 с длинной стороной F-образными подвесками 9. Г-образные подвески 9 своими короткими сторонами 10 шарнир но сЬединены с передними ногами 11 мачты 12 через втулки 13, перпендикул рными ногам 11 и наход щимис  в их плоскости. Снизу подрамники 6 и Г-образные подвески 9 в процессе выполнени  буровых работ подпираютс  стойками 14, установленными на землю Шарнирные соединени  Г-обраэных подвесок 9 с передними ногами 11 мачты 12, подрамников 6 с длинными сторонами Г-образной подвески 9 имею упоры, позвол ющие поворачиватьс  всем элементам относительно друг дру га вверх на 90 от исходного положени Откидные стойки 7 имеют шарнирные со инeни  с подрамниками с возможность креплени  вдоль подрамника 6. подрамника соединены с ногами мачты т гами 15 и 16, тем самым обеспечива етс  фиксаци  подрамников и Г-образных подвесок в горизонтальном положе НИИ. Взаимна  св зь между собой обес печиваетс  т гой 17. 2 Устройство работает следующим образом. При демонтаже буровой установки сначала отсоедин ют от откидных боковых перемычек 3 нижние концы откидных стоек 7 и снимают стойки 14. Далее опускаетс  мачта 12, котора , прогиба  трос между роликами 5 стоек 2, поднимает откидные боковые перемычки 3. .Одновременно Г-образные подвески 9, передвига сь вместе с ногами 11 вверх, ложатс  на мачту 12 вдоль ног 11. При этом подрамники 6 также подвернутс  вокруг шарниров 8 и займут нижнее положение вдоль мачты 12. Таким образом все элементы укрыти  впишутс  в транспортные габариты буровой установки. Непосредственно перед переездом буровой установки все эле.менты креп тс  быстроразъемными хомутами к неподвижным конструкци м буровой установки. Дл  монтажа укрыти  снимают быстроразъемные хомуты, а затем медленно поднимают мачту 12. При этом освобождаетс  т га 4 и откидные боковые перемычки 3 под действием собственного веса и веса тента опускаютс  и занимают рабочее положение. При установке мачты 11 в вертикальное положение Г-образные подвески 9 под действием собственного веса и веса подрамников 6 откидьшаютс  вниз и вперед. При этом подрамники 6 поворачиваютс  относительно шарниров 8 вбок и вниз. В горизонтальном рабочем положении Г-образные подвески 9 и подрамники 6 удерживаютс  упорами шарниров 8 элементами дополнительной устойчивости т гами 15 и 16, закрепленными верхними концами на мачте 12. Св зь между подрамниками обеспечиваетс  т гой 17. Заключительным действием в монтаже укрыти   вл етс  отвод от подрамников стоек 7 и прикрепление их нижних концов к откидным боковым перемычкам 3, а также установка стоек 14. На элементах укрыти  располагаетс  м гкий тент, который защищает установку от непогоды.4 CO fC t, 1 The invention relates to mining, in particular shelters for mobile drilling installations. The purpose of the invention is to reduce the time for installation and dismantling of the shelter. FIG. 1 shows the frame of the shelter in the assembled state; in fig. 2 drill installation in working condition, end view; in fig. 3 - shelter in transport position, side view. The shelter for the drilling rig contains vertical posts 2 fixed on the frame 1, folding side lintels 3, an awning (not shown) and a cable pull 4 connected by ends to from. side jumpers 3. Rollers 5 are fixed on racks 2, cable ropes 4 are placed in strands x. Folding side jumpers 3 are connected with subframes 6 with folding racks 7. Racks 7 have upper swivel joints with subframes 6 and a rigid quick-release connection with folding side bridges 3. The subframes are connected via hinges 8 to the long side with F-shaped suspensions 9. The L-shaped hangers 9 with their short sides 10 are hinged but connected to the front legs 11 of the mast 12 through the sleeves 13, perpendicular legs 11 and with their plane. From below, subframes 6 and L-shaped suspensions 9 in the course of drilling operations are supported by racks 14 installed on the ground. The articulated joints of L-shaped suspensions 9 with front legs 11 masts 12, subframes 6 with long sides of the L-shaped suspension 9 have stops that allow rotate all elements relative to each other upwards by 90 from the initial position. The folding legs 7 are articulated with the subframes with the possibility of fastening along the subframe 6. The subframe is connected to the legs of the mast with rods 15 and 16, thereby providing fixing of subframes and L-shaped suspensions in horizontal position of scientific research institute. Mutual communication between them is ensured by the th 17. 17. The device operates as follows. When dismantling the drilling rig, the lower ends of the hinged pillars 7 are detached from the folding side bars 3 and the racks 14 are removed. Then the mast 12 is lowered, which, by bending the cable between the rollers 5 racks 2, lifts the folding side bridges 3. At the same time, the L-shaped hangers 9 , moving together with the legs 11 upwards, lie on the mast 12 along the legs 11. At the same time, the subframes 6 are also tucked around the hinges 8 and take a lower position along the mast 12. Thus, all the cover elements will fit into the transport dimensions of the drilling rig. Immediately before moving the rig, all elements are fastened with quick-release clamps to the fixed structures of the rig. For mounting the cover they remove the quick-release clamps, and then slowly lift the mast 12. This releases the ha 4 and the folding side bridges 3 under the action of its own weight and the weight of the awning lowered and occupy the working position. When installing the mast 11 in a vertical position, the L-shaped hangers 9 under the action of their own weight and the weight of the subframes 6 fold down and forward. In this case, the subframes 6 rotate relative to the hinges 8 sideways and downwards. In the horizontal working position, the L-shaped hangers 9 and subframes 6 are supported by stops of the hinges 8 with additional stability elements 15 and 16 fixed to the upper ends of the mast 12. Communication between the subframes is provided by 17. 17. The final step in mounting the cover is to retract the subframes of the uprights 7 and attaching their lower ends to the folding side bridges 3, as well as the installation of the uprights 14. A soft awning that protects the unit from bad weather is located on the cover elements.

ItIt

ЦМ ГCM G

Claims (1)

БУРОВАЯ УСТАНОВКА, включающая мачту с ногами, раму и укрытие, содержащее вертикальные стойки, установленные на них боковые перемычки с тросовыми тягами, подвески и тент, отличающаяс тем, что, с целью сокращения времени на монтаж и демонтаж укрытия, подвески посредством втулок шарнирно связаны с ногами мачты и имеют шарнирно связанные с ними · подрамники, причем подрамники и подвески связаны с мачтой посредством гибкой тяги.A DRILLING RIG, including a mast with legs, a frame and a shelter, comprising vertical struts, lateral jumpers with cable rods, suspensions and an awning installed on them, characterized in that, in order to reduce the time for mounting and dismounting the shelter, the hangers are pivotally connected to the bushes with the legs of the mast and have subframes pivotally connected to them, the subframes and pendants being connected to the mast by means of flexible traction. * ' 1194992* '1194992
SU843752943A 1984-06-21 1984-06-21 Drilling rig SU1194992A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843752943A SU1194992A1 (en) 1984-06-21 1984-06-21 Drilling rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843752943A SU1194992A1 (en) 1984-06-21 1984-06-21 Drilling rig

Publications (1)

Publication Number Publication Date
SU1194992A1 true SU1194992A1 (en) 1985-11-30

Family

ID=21123736

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843752943A SU1194992A1 (en) 1984-06-21 1984-06-21 Drilling rig

Country Status (1)

Country Link
SU (1) SU1194992A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 918416, кл. Е 21 В 15/00, 1980. Авторское свидетельство СССР № 924341, кл. Е 21 В 15/00, 1980. *

Similar Documents

Publication Publication Date Title
US5161641A (en) Jointly movable safety net and curtain arrangement for multi-floor buildings under construction
US5299654A (en) Safety net support system
ES2328348T3 (en) FOLDING AND FOLDING BUILDING STRUCTURE FOR THE EFFECT OF YOUR WEIGHT AND WITH VERTICAL ARTICULATION AXLES.
CN211923476U (en) Electric hoist lifting system attached to lifting scaffold
US4880024A (en) Self-supporting tent
SU1194992A1 (en) Drilling rig
CN218815057U (en) Construction scaffold for building
CN215368616U (en) Hanging ladder cage for shear steel plate wall
CN209855362U (en) Tent of truss-like steel cable mechanism
RU2018622C1 (en) Derrick unit
CN207609188U (en) A kind of dust-proof curtain device
SU924341A1 (en) Drilling rig
SU557165A2 (en) Stairs
JP2903859B2 (en) Reinforcement structure of column in temporary beam system for building construction
SU960418A1 (en) Hoist for assembling derricks
CN213837988U (en) Multifunctional high-grade tent
SU1502790A1 (en) Shelter for self-propelled drilling rig
JPS60144460A (en) Scaffold apparatus and its installation
JP3381090B2 (en) Temporary roof of building site
NO823686L (en) LIFTING AND LOWERING PLATFORM CONSTRUCTION.
SU759676A1 (en) Collapsible shelter
SU1242594A1 (en) Hoistable scaffold for erecting ferroconcrete shells of structures
JP2944883B2 (en) Wind and snow fences
SU966177A1 (en) Method of spreading three-dimensional structure foldable frame
JPS5811264A (en) Protective fence for assembling and disassembling scafford