SU1193202A1 - Apparatus for preparing hot asphalt-concrete mixture - Google Patents

Apparatus for preparing hot asphalt-concrete mixture Download PDF

Info

Publication number
SU1193202A1
SU1193202A1 SU843746567A SU3746567A SU1193202A1 SU 1193202 A1 SU1193202 A1 SU 1193202A1 SU 843746567 A SU843746567 A SU 843746567A SU 3746567 A SU3746567 A SU 3746567A SU 1193202 A1 SU1193202 A1 SU 1193202A1
Authority
SU
USSR - Soviet Union
Prior art keywords
hot
concrete mixture
drying drum
fractions
hot asphalt
Prior art date
Application number
SU843746567A
Other languages
Russian (ru)
Inventor
Ekaterina V Popova
Yurij P Lagutin
Lyudmila I Gutikova
Original Assignee
Rostovskij Inzh Str Inst
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rostovskij Inzh Str Inst filed Critical Rostovskij Inzh Str Inst
Priority to SU843746567A priority Critical patent/SU1193202A1/en
Application granted granted Critical
Publication of SU1193202A1 publication Critical patent/SU1193202A1/en

Links

Landscapes

  • Road Paving Machines (AREA)

Description

Изобретение относится к строительству и промышленности строительных материалов, в частности к устройствам для приготовления горячей асфальтобетонной смеси. 5The invention relates to the construction and building materials industry, in particular to devices for making hot asphalt concrete mix. five

Цель изобретения - снижение энергозатрат.The purpose of the invention is to reduce energy consumption.

На чертеже изображено устройство, общий вид.The drawing shows the device, the overall appearance.

Устройство для приготовления горя- 10 чей асфальтобетонной смеси состоит из агрегату. 1»5ватан^я, три бункера κοτο^άϊ^ предназначены для крупных фракций. минерАЙьн^Дд материала и цри помоги ,<ррёнспортера 2 соедине- 15 ны с загрузочной камерой сушильного барабана‘3/'закрытого бункера-дозатоЬл 4 дйя'мелкой фракции, оснащенного фильтром 5 и колокольной заслонкой (не показана), пневмонасоса 6 20A device for making hot asphalt mix consists of an aggregate. 1 ”5vatan ^ i, three bunkers κοτο ^ άϊ ^ are for large factions the minerAYN ^ dd of material and help, the conveyor 2 is connected with the loading chamber of the drying drum /3 / 'closed bunker-dosato yl 4 of the fine fraction, equipped with filter 5 and bell damper (not shown), pneumopump 6 20

и трубопровода 7, соединяющего бункер-дозатор 4 с промежуточным расходным бункером 8, виброконвейера 9 с кожухом 10, к которому со стороны приемной горловины подведен газоход 25 11, другой конец которого подключен к камере отвода газов сушильного барабана 3. Выпускной конец виброконвейера 9 при помощи течки 12 соединен с отсеком накопительного зр бункера 13 для горячей мелкой фракции. Цод камерой выгрузки сушильного барабана 3 расположено приемное устройство "горячего" элеватора 14, выходное отверстие которого размеще- 3 но над плоским вибрационным грохотом 15, имеющим два сита с размерами ячеек 15x15, 35x35 мм. Накопительный бункер расположен под грохотом 15 и соединен через весовой дозатор 16 со смесителем 17. Устройство также имеет приспособления 18 и 19 для введения в смеситель 17 минерального порошка и битума и установленный в кабине оператора пульт 20 системы управления.and pipeline 7 connecting the metering hopper 4 with the intermediate feed hopper 8, the vibrating conveyor 9 with the housing 10, to which the flue 25 11 is connected from the receiving neck, the other end of which is connected to the gas discharge chamber of the drying drum 3. estrus 12 is connected to the storage compartment of the bunker 13 for the hot fines fraction. DPC discharge chamber drying drum 3 is arranged a receiving device "hot" elevator 14, the outlet of which razmesche- 3 but on a flat vibrating screen 15 having two screens with a mesh size of 15x15, 35x35 mm. The storage hopper is located below the screen 15 and is connected through the weighing dispenser 16 to the mixer 17. The device also has devices 18 and 19 for introducing mineral powder and bitumen into the mixer 17 and the control system console 20 installed in the operator's cabin.

Устройство для приготовления горячей асфальтобетонной смеси работает следующим образом.A device for making hot asphalt mix works as follows.

Минеральный материал - щебень крупных фракций подается на агрегат 1 питания, где производится его предварительное дозирование, затем при помощи транспортера 2 его загружают в сушильный барабан 3, где осуществляют высушивание и нагрев. Нагретый в сушильном барабане 3 щебень подается при помощи "горячего" элеватора 14 на грохот 15, где он сортируется по фракциям, а затем накапливается в отсеках накопительного бункера 13. Параллельно подаче крупных фракций щебня из закрытого бункера-дозатора 4 пневмонасосом 6 по трубопроводу 7 подается песок (мелкая фракция) в промежуточный расходный бункер 8, а из него - на виброконвейер 9. К кожуху 10 виброконвейера 9 по газоходу 11 поступают топочные газы после сушильного барабана 3.Mineral material - crushed stone of large fractions is fed to the power unit 1, where it is pre-dosed, then with the help of conveyor 2 it is loaded into the drying drum 3, where drying and heating are carried out. The crushed stone heated in the drying drum 3 is fed by the “hot” elevator 14 to the screen 15, where it is sorted into fractions and then accumulated in the compartments of the storage bin 13. Parallel to the supply of large fractions of rubble from the closed metering hopper 4 by pneumopump 6 through line 7 sand (fine fraction) to the intermediate feed bunker 8, and from it to the vibroconveyor 9. To the casing 10 of the vibroconveyor 9, the flue 11 enters the flue gases after the drying drum 3.

В процессе подачи мелкой фракции по виброконвейеру 9 к накопительному бункеру 13 происходит ее высушивание и нагрев при помощи топочных газов вторичного использования. Из отсеков накопительного бункера 13 мелкая и крупные фракции, пройдя окончательное дозирование с помощью дозатора 16, поступают в смеситель 17. Затем в весовой дозатор 16 подают минеральный порошок с помощью приспособления 18, битум - с помощью приспособления 19.In the process of supplying the fine fraction via the vibroconveyor 9 to the accumulation bunker 13, it is dried and heated using recycled flue gases. From the compartments of the storage bin 13, fine and coarse fractions, having passed the final dosing using the dispenser 16, enter the mixer 17. Then the mineral powder is fed into the weighing dispenser 16 using the tool 18, the bitumen using the tool 19.

Управление установкой выполняется с пульта 20, установленного в кабине оператора.The installation is controlled from the console 20 installed in the operator’s cabin.

Предлагаемое выполнение устройства обеспечивает снижение затрат энергии на высушивание и нагрев фракций минерального материала.The proposed implementation of the device provides a reduction of energy costs for drying and heating fractions of mineral material.

Claims (1)

УСТРОЙСТВО ДЛЯ ПРИГОТОВЛЕНИЯ ГОРЯЧЕЙ АСФАЛЬТОБЕТОННОЙ СМЕСИ, включающее агрегат питания с дозирующими и подающими приспособлениями мелких и крупных фракций минерально-A DEVICE FOR PREPARING A HOT ASPHALT-CONCRETE MIXTURE, including a power unit with metering and feeding devices of small and large mineral fractions £ £ 1 one
го материала, сушильный барабан с тепловой камерой и элеватором, грохот^ -бункеры для горячих фракций минерального материала, расположенный под ними смеситель, приспособления для введения в смеситель минерального порошка и битума и систему управления, отличающееся тем, что, с целью снижения энергозатрат, оно снабжено виброконвейером, расположенным между подающим мелкие фракции приспособлением и бункером , для горячих мелких фракций, а тепловая камера выполнена в виде охватывающего виброконвейер кожуха, соединенного посредством газохода с полостью сушильного барабана.material, a drying drum with a heat chamber and an elevator, a sieve of ^ bunkers for hot fractions of mineral material, a mixer located under them, devices for introducing mineral powder and bitumen into the mixer, characterized in that, in order to reduce energy costs, equipped with a vibroconveyor located between the fine fraction supplying device and the hopper for hot fines, and the heat chamber is designed as a housing covering the vibroconveyor connected via a gas duct and with the cavity of the drying drum. <o 1one И 93202And 93202 II
SU843746567A 1984-03-11 1984-03-11 Apparatus for preparing hot asphalt-concrete mixture SU1193202A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843746567A SU1193202A1 (en) 1984-03-11 1984-03-11 Apparatus for preparing hot asphalt-concrete mixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843746567A SU1193202A1 (en) 1984-03-11 1984-03-11 Apparatus for preparing hot asphalt-concrete mixture

Publications (1)

Publication Number Publication Date
SU1193202A1 true SU1193202A1 (en) 1985-11-23

Family

ID=21121245

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843746567A SU1193202A1 (en) 1984-03-11 1984-03-11 Apparatus for preparing hot asphalt-concrete mixture

Country Status (1)

Country Link
SU (1) SU1193202A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5100239A (en) * 1986-12-19 1992-03-31 Shimizu Construction Co., Ltd. Method of manufacturing concrete
US5251976A (en) * 1992-04-06 1993-10-12 Astec Industries, Inc. Asphalt plant adapted for the batch production of asphalt mix containing recycle asphalt paving
CN102363947A (en) * 2011-11-14 2012-02-29 余金全 Reductive regeneration system and reductive regeneration process for pavement surface milling material

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5100239A (en) * 1986-12-19 1992-03-31 Shimizu Construction Co., Ltd. Method of manufacturing concrete
US5251976A (en) * 1992-04-06 1993-10-12 Astec Industries, Inc. Asphalt plant adapted for the batch production of asphalt mix containing recycle asphalt paving
CN102363947A (en) * 2011-11-14 2012-02-29 余金全 Reductive regeneration system and reductive regeneration process for pavement surface milling material

Similar Documents

Publication Publication Date Title
US4477250A (en) Asphalt recycle plant and method
CN102358705B (en) Process for producing sintered ceramsite by using solid waste materials, and system thereof
US4892411A (en) Asphalt mixer apparatus and method
US4136964A (en) Apparatus for simultaneously mixing and conveying particulate material
CN102345265A (en) Separation feeding-type hot mix intermittent asphalt mixture blending machine and production technology therefor
SU1193202A1 (en) Apparatus for preparing hot asphalt-concrete mixture
US4585354A (en) Device for preparing roadway paving materials
SU749666A2 (en) Concrete mix preparing unit
US3369798A (en) Apparatus for and method of blending dry materials
SU1286672A1 (en) Apparatus for prefabricated hot asphalt-concrete mix
KR960017074A (en) Waste Ascon Regenerator
RU2801997C1 (en) Process line for the production of dry building mixtures
KR930009343B1 (en) Process for producing and device of cement a mixture sand
SU902825A1 (en) Apparatus for activating caked cement
JPH045543Y2 (en)
RU2132897C1 (en) Device for producing hot asphalt-concrete mixture
RU2223854C2 (en) Method of preparation of clay raw material and device for realization of this method
SU791547A2 (en) Unit for preparing concrete mix
RU2123423C1 (en) Sulfuric concrete and related article production line
RU2033327C1 (en) Apparatus for production of low-water consumption binder
KR19990031893A (en) Recycling method of waste asphalt concrete mixture
JPH072648Y2 (en) Sieving and storage equipment for aggregates in asphalt plants
RU2132426C1 (en) Asphalt-concrete mixing plant
JP2546738B2 (en) Asphalt mixture manufacturing method and manufacturing apparatus
KR101578497B1 (en) Dryer for rwcycle ascon plant