SU1191519A1 - Method of constructing tubular hydraulic structures on sagging soils - Google Patents
Method of constructing tubular hydraulic structures on sagging soils Download PDFInfo
- Publication number
- SU1191519A1 SU1191519A1 SU843738440A SU3738440A SU1191519A1 SU 1191519 A1 SU1191519 A1 SU 1191519A1 SU 843738440 A SU843738440 A SU 843738440A SU 3738440 A SU3738440 A SU 3738440A SU 1191519 A1 SU1191519 A1 SU 1191519A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- base
- soils
- construction
- conduits
- subsidence
- Prior art date
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Road Paving Structures (AREA)
- Road Paving Machines (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
СПОСОБ СТРОИТЕЛЬСТВА ТРУБЧАТЫХ ГВДРОТЕХНИЧЕСКИХ СООРУЖЕНИЙ НА ПРОСАДОЧНЫХ ГРУНТАХ, включающий размещение водоводов в зоне просадочных деформаций и замачивание основани пропусками воды в фильтрующ11е водоводы , отличающийс тем, что, с целью ускорени сроков строительства и снижени стоимости, замачивание основани осуществл ют после возведени сооружени , а после завершени просадочных деформаций грунта основани зону деформаций и фильтрующие водоводы прорезают защитными ди- с афрагмами. (Л сMETHOD FOR CONSTRUCTION OF TUBULAR GVDROTEHNICHESKIH STRUCTURES FOR soil subsidence comprising placing conduits in subsidence deformation zone and soaking the base passes water filtruyusch11e conduits, characterized in that, with a view to accelerating the construction time and cost reduction, soaking a base is carried out after the erection of structures, and after completion of the subsidence deformations of the soil of the base deformation zone and filtering conduits are cut through with protective diaphragms. (L with
Description
соwith
MiMi
елate
апan
СОWITH
11191119
Изобретение относитс к ме иора- т-ивно,му строительству на просадоч- нЫх грунтах, а именно к способу строительства трубчатых гидротехнических сооружений (водовыпуски, регул торы j переезды J на вновь стро 1цихс системах орошени .The invention relates to the construction of subsurface soils, namely to the method of construction of tubular hydraulic structures (water outlets, j regulators, and J crossings on the newly built irrigation systems.
Цель изобретени - ускорение сроков строительства и снижение стоимости .10The purpose of the invention is to accelerate the construction time and reduce the cost. 10
На фиг. 1 представлен план трубча того сооружени ; на фиг. 2 - разрез на фиг.1.FIG. 1 shows a piping plan for that structure; in fig. 2 is a sectional view of FIG.
Способ осуществл ют следующим образом . 5The method is carried out as follows. five
Перед разработкой котлована под трубчатое сооружение устраиваютс Before the development of the pit under the tubular structure, arrange
51925192
траншеи 1, в которые помещают фильт .рующие водоводы 2. Траншеи 1 засыпают грунтом и отрывают котлован под сооружение. В котловане монтируют трубопровод 3 с оголовками 4. Над смонтированным трубопроводом 3 устраиваетс дорожное полотно 5. При загг. полнении канала 6 водой она через фильтрующие водоводы 2 поступает в основание и обеспечивает развитие просадочных деформаций. После завершени просадочных деформаций устраиваютс защитные диафрагмы 7, которые перерезают фильтрующие водоводы 2, что позвол ет преп тствовать движению вдоль трубопровода 3 в эксплуатационный период.trenches 1, in which the filtering conduits are placed 2. Trenches 1 are covered with soil and the excavation pit is torn off. Pipeline 3 with tips 4 is mounted in the trench. A roadbed 5 is arranged above the mounted pipeline 3. With a zig. filling channel 6 with water through the filtering conduits 2 enters the base and ensures the development of subsidence deformations. Upon completion of the subsidence deformations, protective diaphragms 7 are arranged, which cut through the filter conduits 2, which prevents movement along the pipeline 3 during the operational period.
jbA jbA
ff}Lt&.2 ff} Lt & .2
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843738440A SU1191519A1 (en) | 1984-02-20 | 1984-02-20 | Method of constructing tubular hydraulic structures on sagging soils |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843738440A SU1191519A1 (en) | 1984-02-20 | 1984-02-20 | Method of constructing tubular hydraulic structures on sagging soils |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1191519A1 true SU1191519A1 (en) | 1985-11-15 |
Family
ID=21118102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU843738440A SU1191519A1 (en) | 1984-02-20 | 1984-02-20 | Method of constructing tubular hydraulic structures on sagging soils |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1191519A1 (en) |
-
1984
- 1984-02-20 SU SU843738440A patent/SU1191519A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 953064, кл. Е 02 В 1/00, 1980. Кириллов А.А. и др. Гидротехни- , ческие сооружени на оросительных системах в массовых просадочных грунтах. М.: 1963, с.159-163. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105586859B (en) | Integral irrigation and drainage pipe system of saline-alkali soil farmland and construction method | |
GB1596936A (en) | Digging trenches and laying underground conduits therealong | |
CN108252329A (en) | The assembled pipe gallery and its construction method of building enclosure load | |
Frere et al. | Roman Britain in 1985 | |
SU1191519A1 (en) | Method of constructing tubular hydraulic structures on sagging soils | |
Macaulay | Underground | |
Negev | The high level aqueduct at Caesarea | |
SU1260451A1 (en) | Method of protecting a structure against frost-induced swelling | |
RU2081366C1 (en) | Method of repair of sagging and washed-out sections of underwater pipe line | |
SU1668548A1 (en) | Arena construction method | |
KR20010019923A (en) | method for laying of pipe and structure for layind the same | |
CN219033271U (en) | Well point pipe dewatering system for water treatment of foundation pit of unsealed investigation hole | |
SU1579949A1 (en) | Method of building drainage | |
CN211446981U (en) | Can have enough to meet need portable drainage device that cuts | |
JPS6215343Y2 (en) | ||
SU935561A1 (en) | Water power plant dam | |
SU1268669A1 (en) | Earth-fill structure | |
SU953064A1 (en) | Method of construction of hydraulic engineering water-passing structures on sagging soils | |
SU1654418A1 (en) | Culvert | |
SU1629379A1 (en) | Backwater water development works | |
RU2028534C1 (en) | Method of construction of pipeline in complicated natural conditions | |
Arita et al. | Three dams, one reservoir | |
SU1004537A1 (en) | Method of constructing a structure in soil | |
SU1006844A1 (en) | Pipe-line construction method | |
RU97115800A (en) | BASIS OF EARTH STRUCTURE |