CN219033271U - Well point pipe dewatering system for water treatment of foundation pit of unsealed investigation hole - Google Patents

Well point pipe dewatering system for water treatment of foundation pit of unsealed investigation hole Download PDF

Info

Publication number
CN219033271U
CN219033271U CN202320224146.9U CN202320224146U CN219033271U CN 219033271 U CN219033271 U CN 219033271U CN 202320224146 U CN202320224146 U CN 202320224146U CN 219033271 U CN219033271 U CN 219033271U
Authority
CN
China
Prior art keywords
well point
unsealed
point pipe
pipe
investigation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320224146.9U
Other languages
Chinese (zh)
Inventor
李玉灿
彭伟
董天林
石军
张阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shipbuilding Industry Institute Of Engineering Investigation & Design Co ltd
Original Assignee
China Shipbuilding Industry Institute Of Engineering Investigation & Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shipbuilding Industry Institute Of Engineering Investigation & Design Co ltd filed Critical China Shipbuilding Industry Institute Of Engineering Investigation & Design Co ltd
Priority to CN202320224146.9U priority Critical patent/CN219033271U/en
Application granted granted Critical
Publication of CN219033271U publication Critical patent/CN219033271U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a well point pipe dewatering system for water treatment of foundation pit water burst of unsealed investigation hole, which is characterized by comprising the following components: the system comprises an A well point pipe arranged in an unsealed investigation hole and a B well point pipe arranged in soil surrounding the unsealed investigation hole, wherein the B well point pipe and the A well point pipe are connected to a drainage main pipe provided with a vacuum pump through drainage branch pipes, so that local drainage and drainage of the unsealed investigation Kong Jikeng water burst are realized; the four B well point pipes are arranged on four corners of a square with an unsealed investigation hole as the center and the side length of 1.5 m; the A well point pipe is arranged at the center of the unsealed investigation hole. Compared with the prior art, the method has the advantages of convenient construction, quick precipitation, good treatment effect, capability of realizing well point precipitation quickly, solving the potential safety hazard, strong auxiliary precipitation method for foundation pit precipitation with potential upper and lower hydraulic connection channels, and certain popularization and application prospect.

Description

Well point pipe dewatering system for water treatment of foundation pit of unsealed investigation hole
Technical Field
The utility model relates to the technical field of foundation pit well point dewatering, in particular to a well point pipe dewatering system for foundation pit water treatment of an unsealed investigation hole.
Background
In the foundation pit engineering of a soft soil area with rich underground water, in order to facilitate earthwork excavation and anti-surging safety of the bottom of the foundation pit, dewatering design is often carried out, such as water-stop curtains, dry dredging wells, relief wells and the like, and dewatering is carried out according to requirements. When the design of the relief well is carried out, the pressure weight effect of the weakly permeable layer at the bottom of the foundation pit on the pressure-bearing water can be fully considered by the design party, and the requirement of the relief well for precipitation is based on the principle that the top plate of the weakly permeable layer is not broken down and precipitation is carried out as required. The underlying premise of the principle is that the weak water permeable roof is complete, and a potential hydraulic connection channel does not exist between the pressure-bearing water layer and the bottom of the foundation pit. If the missed unblocked or unblocked investigation holes exist in the field, the unblocked or unblocked investigation holes can be used as potential hydraulic communication channels between the bottom of the foundation pit and the bearing water layer, so that the potential safety hazard of foundation pit excavation is formed, and the potential safety hazard is sudden and is not enough to be worry.
Disclosure of Invention
The utility model aims to provide a well point pipe dewatering system for treating water gushing of an unsealed investigation hole foundation pit, which is designed aiming at the defects of the prior art, and adopts a mode that a reverse filtering layer is matched with local well point pipe dewatering to realize local drainage of water gushing of pressure-bearing water in a certain range and depth of the periphery of the unsealed investigation hole foundation pit, and the method specifically comprises the following steps: the hidden affected part is excavated and temporarily drained, the well point pipe is buried, the inverted filter is arranged and well point auxiliary precipitation is carried out, potential safety hazards can be rapidly solved, the method is a powerful auxiliary precipitation method for foundation pit precipitation of a submerged hydraulic connection channel and a submerged hydraulic connection channel, the construction is convenient, the precipitation is rapid, the treatment effect is good, and the method has a certain popularization and application prospect.
The specific technical scheme for realizing the utility model is as follows: the well point pipe dewatering system for the foundation pit water treatment of the unsealed investigation hole is characterized by comprising: the system comprises an A well point pipe arranged in an unsealed investigation hole and a B well point pipe arranged in soil surrounding the unsealed investigation hole, wherein the B well point pipe and the A well point pipe are connected to a drainage main pipe provided with a vacuum pump through drainage branch pipes, and water burst is discharged out of a foundation pit to realize local drainage and drainage of the water burst of the unsealed investigation Kong Jikeng; the four B well point pipes are arranged on four corners of a square with an unsealed investigation hole as the center and the side length of 1.5 m; the A well point pipe is arranged at the center of the unsealed investigation hole.
And the lower parts of the B well point pipe and the A well point pipe are provided with filter pipe sections wrapped by 80-mesh copper wire meshes.
Compared with the prior art, the utility model has the advantages of convenient construction, quick dewatering and good treatment effect, the well point pipe flower pipe filter head for well point dewatering adopts the long and short filter pipes, the top end of the well point pipe does not need to adopt clay or other sealing means, the utility model mainly dries the reverse filter layer to gather clear water, and takes into account the dewatering of soil in a certain depth range below the reverse filter layer, the reverse filter layer mainly plays a role in preventing the soil loss of a top plate, plays roles in pressing weight and catchment, can realize well point dewatering faster, solves the potential safety hazard, is a powerful auxiliary dewatering method for foundation pit dewatering with potential upper and lower hydraulic connection channels, and has a certain popularization and application prospect.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a cross-sectional view A-A of FIG. 1;
fig. 3 is a schematic plan layout of embodiment 1;
fig. 4 is a sectional view of B-B of fig. 3.
Detailed Description
Referring to fig. 1 to 2, the present utility model includes: an A well point pipe 7 arranged in the unsealed investigation hole and a B well point pipe 5 arranged in soil surrounding the unsealed investigation hole, wherein the B well point pipe 5 and the A well point pipe 7 are connected to a drainage main pipe 10 provided with a vacuum pump 9 through a drainage branch pipe 11 to realize local drainage and drainage of water burst of the unsealed investigation Kong Jikeng; the A well point pipe 7 is arranged in the center of the unsealed investigation hole; the lower parts of the B well point pipe 5 and the A well point pipe 7 are provided with filter pipe sections 6 wrapped by 80-mesh copper wire meshes.
Referring to fig. 1, the four B-well point pipes 5 are arranged at four corners of a square with an unsealed survey hole as the center and a side length of 1.5 m.
The present utility model will be further described in detail by the following specific examples.
Example 1
Referring to fig. 3 to 4, the utility model adopts a square of a reverse filtering layer matched with partial well point pipe dewatering to realize partial drainage and drainage of unsealed investigation Kong Jikeng water burst, and specifically comprises the following steps:
a step: in the excavation process, when water burst begins to occur when the unsealed investigation hole 4 is encountered, the earth excavation of the foundation pit 1 at the position is suspended, and the burying of the well point pipe is immediately organized.
b, step b: an A well point pipe 7 is arranged in the unsealed investigation hole 4 for draining open water, and four B well point pipes 5 are arranged in the soil body 2 around the unsealed investigation hole 4 for draining the soil body.
Referring to fig. 3, the B-well point pipe 5 is arranged at four corners of a square with an unsealed survey hole 4 as a center and a side length of 1.5 m; the A well point pipe 7 is arranged in the center of the unsealed investigation hole 4; the lengths of the well point pipe 7 and the well point pipe 5 are 5m, the pipe is phi 57 x 3.5 steel pipe, the top of the well point pipe is exposed to the excavation surface by 30cm, the well point pipe 5 is arranged from 70cm below the excavation surface to the bottom of the pipe to be a filter pipe section 6, and the well point pipe 7 is provided with the filter pipe section 6 within the range of 1m at the bottom; the filter tube section 6 is wrapped by an 80-mesh copper wire mesh.
c, step c: the B-well point pipe 5 and the a-well point pipe 7 are connected to a drain manifold 10 provided with a vacuum pump 9 by drain branch pipes 11.
d, step d: and starting a vacuum pump 9 to pre-dewatering the soil body 2 within the range of 2m x 2m around the unsealed investigation hole 4.
And e, step e: when the water level is reduced to 1m below the excavation surface, adopting a small-sized excavating machine, taking an unsealed investigation hole 4 as a center, excavating a reverse-filtering water collecting pit 8 with the depth of 50cm according to a soil body 2 with a square range with the side length of 2.0m, and rapidly backfilling bagged graded broken stone in the reverse-filtering water collecting pit to the excavation surface.
f, step f: and continuing to carry out precipitation on the soil body 2 with the range of 2m x 2m around the unsealed investigation hole 4 until the water level falls to 3m below the original excavation surface.
g, the step: restoring the earth excavation of the foundation pit 1 until the existing water level of the unsealed investigation hole 4 is 1m above.
And h, step h: and d, removing the B well point pipe 5 and the A well point pipe 7, re-burying the B well point pipe 5 and the A well point pipe 7 in the unsealed investigation hole 4 according to the step a, and repeating the steps B-g until the water level in the soil body 2 in the range of 2 x 2m around the unsealed investigation hole 4 falls below the foundation pit 1 for 2m.
i, step: and a small-sized excavating machine is adopted, an unsealed investigation hole 4 is taken as the center, a concrete plugging pit is excavated according to a square with the side length of 2.0m, the depth of the concrete plugging pit is calculated by the water pressure balance of the pressure-bearing water, a B well point pipe 5 and an A well point pipe 7 are quickly pulled out, the water head condition of the aquifer 3 of the foundation pit 1 is combined, and quick setting micro-expansion concrete is filled in time for plugging.
The above embodiments are further illustrative of the present utility model and are not intended to limit the present utility model, but all equivalent embodiments are intended to be included within the scope of the appended claims.

Claims (2)

1. The utility model provides a well point pipe precipitation system of unblocked investigation hole foundation ditch gushing water treatment which characterized in that, this well point pipe precipitation system includes: an A well point pipe (7) arranged in the unsealed investigation hole and a B well point pipe (5) arranged in soil surrounding the unsealed investigation hole, wherein the B well point pipe (5) and the A well point pipe (7) are connected to a drainage main pipe (10) provided with a vacuum pump (9) through a drainage branch pipe (11) to realize local drainage and drainage of water burst of the unsealed investigation Kong Jikeng; four B well point pipes (5) are arranged at four corners of a square with an unsealed investigation hole as the center and the side length of 1.5 m; the A well point pipe (7) is arranged in the center of the unsealed investigation hole.
2. The well point pipe dewatering system for the water treatment of the foundation pit with the open investigation holes according to claim 1, wherein the lower parts of the B well point pipe (5) and the A well point pipe (7) are provided with filter pipe sections (6) wrapped by 80-mesh copper wire meshes.
CN202320224146.9U 2023-02-14 2023-02-14 Well point pipe dewatering system for water treatment of foundation pit of unsealed investigation hole Active CN219033271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320224146.9U CN219033271U (en) 2023-02-14 2023-02-14 Well point pipe dewatering system for water treatment of foundation pit of unsealed investigation hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320224146.9U CN219033271U (en) 2023-02-14 2023-02-14 Well point pipe dewatering system for water treatment of foundation pit of unsealed investigation hole

Publications (1)

Publication Number Publication Date
CN219033271U true CN219033271U (en) 2023-05-16

Family

ID=86275626

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320224146.9U Active CN219033271U (en) 2023-02-14 2023-02-14 Well point pipe dewatering system for water treatment of foundation pit of unsealed investigation hole

Country Status (1)

Country Link
CN (1) CN219033271U (en)

Similar Documents

Publication Publication Date Title
CN105064383B (en) Pipe-inserting negative pressure air jet deep-well dewatering device
CN210066791U (en) A precipitation combined system that is used for foundation ditch pressure release precipitation and dredges precipitation
CN103628915A (en) Dewatering and drainage method for large-section water-rich saturation fine-silt tunnel
CN113279421B (en) Vacuum dewatering process for deep foundation pit
CN110847199A (en) Construction method for drainage of underground water of deep foundation pit
CN110984200B (en) Method for draining water of foundation pit of binary geological structure layer
CN109577380B (en) Construction method for basement bottom plate water seepage under karst landform condition
CN113668582B (en) Grouting type double-wall pressure-bearing water-reducing pipe well device and construction method thereof
CN214194602U (en) Precipitation structure suitable for deep foundation pit of high-pressure-bearing water-rich karst stratum
CN219033271U (en) Well point pipe dewatering system for water treatment of foundation pit of unsealed investigation hole
CN204690767U (en) A kind of Novel water collection sleeve pipe for deep foundation ditch and water feeding and draining device
CN116290045A (en) Unsealed investigation Kong Jikeng water gushing treatment method
CN105970910B (en) Well point plastic strip overlay film vacuum pre-pressed joint precipitating, pre-pressing dynamic consolidation method
CN105862716B (en) Integral type well point plastic strip pipe
CN204982856U (en) Ground precipitation reinforcing system
CN105970909B (en) Well point plastic strip vacuum preloading seepage consolidation joint precipitating, pre-pressing dynamic consolidation method
CN211006723U (en) Drainage structures of precipitation well
CN112814735A (en) Waterproof and drainage construction method for suspension bridge tunnel type anchorage cavern
CN214574065U (en) Pre-installed sand bag dewatering device
CN111287205A (en) Deep multi-stage dynamic foundation pit dewatering system and dewatering method thereof
CN211498899U (en) Foundation pit dewatering arrangement structure
CN105862713B (en) Soft soil foundation integral type well point plastic strip vacuum system
CN104234027A (en) Embedded blow-filled vibroflotation soft foundation processing method
CN214194490U (en) Water conservancy system suitable for soil improvement
CN203514331U (en) Large-aperture deep well point precipitation system arranged outside foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant