SU1180503A1 - Method of driving entry mine workings - Google Patents
Method of driving entry mine workings Download PDFInfo
- Publication number
- SU1180503A1 SU1180503A1 SU802934963A SU2934963A SU1180503A1 SU 1180503 A1 SU1180503 A1 SU 1180503A1 SU 802934963 A SU802934963 A SU 802934963A SU 2934963 A SU2934963 A SU 2934963A SU 1180503 A1 SU1180503 A1 SU 1180503A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- mineral
- workings
- roof
- preparatory
- bridge
- Prior art date
Links
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
СПОСОБ ПРОВЕДЕНИЯ ПОДГОТОВИТЕЛЬНЫХ ГОРНЫХ ВЫРАБОТОК , преимушественно при отработке пологих и наклонных угольных пластов с труднообрушаемой кровлей и с оставлением целика полезного ископаемого между проводимой параллельно очистному пространству в зоне опорного давлени подготовительной и очистной выработками, отличающийс тем, что,с целью сокращени потерь полезного ископаемого в целиках при сохранении неизменной устойчивости выработок, проведение подготовительной выработки осуществл ют на участке пониженных напр жений зоны опорного давлени , причем рассто ние / оси выработки от прилегающего к ней кра очистного пространства определ ют из выражени , где hk, гПу - мощности соответственно «по (Q роды-моста кровли и пласта по (Л лезного ископаемого, м; Rk, Ry - прочности на сжатие пород кровли и пласта полезного ископаемого , МПа.THE METHOD OF CARRYING OUT THE PREPARATORY MINING OPERATIONS, mainly during the mining of flat and inclined coal seams with a hard-to-damage roof and leaving the pillar of the mineral between the clearing space held parallel to the clearing space in the reference pressure zone, preparatory and clearing mine workings, in order to reduce the loss, there is a useful value for reducing the usefulness of a useful mineral. while maintaining the stability of the workings, the preparatory workings are carried out at the site of low stress They are the reference pressure, and the distance / axis of generation from the edge of the cleaning space adjacent to it is determined from the expression, where hk, hPu is the power, respectively, (Q is the roof bridge and the seam of the bridge (L mineral, m; Rk, Ry - compressive strength of the roof rocks and mineral formation, MPa.
Description
Изобретение относитс к горному делу, а именно к способам проведени подготовительных горных выработок с оставлением целиков полезного ископаемого в услови х труднообрушаемых кровель при отработке пологих и наклонных угольных пластов. Цель изобретени - сокращение потерь полезного ископаемого в целиках при сохранении неизменной устойчивости выработок. На чертеже представлен характер распространени волны давлени и распределени напр жений по целику полезного ископаемого , охран ющего горную выработку, подверженную опорному давлению от воздействи очистных работ. При выемке полезного ископаемого в массиве пород и пласта, особенно при труднообрушаемых кровл х, по вл ютс волны 1 давлени , образующие в целике 2 области повышенных 3 и пониженных 4 вертикальных напр жений по направлению от выработанного пространства 5 в глубь массива. В краевой части пласта образуетс зона 6 отжима, напр жени в которой меньше уН. Волна давлени с удалением от очистного пространства затухает, и на рассто нии L напр жени соответствуют напр жени м в нетронутом массиве, т.е. приближаютс к 7Н. Согласно предлагаемому способу определ ют рассто ние J от выработанного пространства 5 до первой плоскости с минимальными пониженными вертикальными напр жени ми в зависимости от мощности «породы-моста кровли h/, и пласта т,, и прочности на сжатие пород кровли R и пласта R, по формуле t-W и провод т выработку 7 в этой области параллельно очистному пространству, совмеща ее продольную ось 8 с плоскостью минимальных вертикальных напр жений. , Таким образом, выработка 7 охран етс целиком полезного ископаемого с минимальным размером и поддерживаетс в зоне минимальных напр жений, меньших уН, чем достигаетс устойчивость выработки и снижение потерь полезного ископаемого .The invention relates to mining, in particular, to methods for conducting preparatory mine workings, leaving the pillars of the mineral resource under conditions of hard-to-break roofing when mining flat and inclined coal seams. The purpose of the invention is to reduce the loss of mineral in pillars while maintaining the stability of the workings. The drawing shows the nature of the propagation of the pressure wave and the distribution of stresses over the pillar of the mineral that protects the mine workings, which are subject to the reference pressure from the impact of the cleaning works. When a mineral is excavated in a rock mass and a seam, especially when roofs are hard to break, pressure waves of 1 appear, forming 2 high and low 3 vertical stresses in the pillar from the developed space 5 deep into the massif. In the marginal part of the formation, an extraction zone 6 is formed, the stress in which is less than yN. The pressure wave decreases with distance from the cleaning space, and at a distance L, the voltages correspond to the voltages in an intact array, i.e. approaching 7H. According to the proposed method, the distance J from the worked-out space 5 to the first plane is determined with minimum reduced vertical stresses depending on the thickness of the rock-bridge h /, and the formation t ,, and the compressive strength of the roof rocks R and the formation R, according to the formula tW, and the generation of 7 in this area is parallel to the cleaning space, combining its longitudinal axis 8 with the plane of minimum vertical stresses. Thus, production 7 is protected as a whole mineral with a minimum size and is maintained in the zone of minimum stresses, less yN, than the stability of production and reduction of mineral losses is achieved.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802934963A SU1180503A1 (en) | 1980-05-30 | 1980-05-30 | Method of driving entry mine workings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802934963A SU1180503A1 (en) | 1980-05-30 | 1980-05-30 | Method of driving entry mine workings |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1180503A1 true SU1180503A1 (en) | 1985-09-23 |
Family
ID=20899844
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802934963A SU1180503A1 (en) | 1980-05-30 | 1980-05-30 | Method of driving entry mine workings |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1180503A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106761753A (en) * | 2017-03-15 | 2017-05-31 | 河南理工大学 | A kind of thick seam slicing system lower leaf face layout of actual mining roadway method |
-
1980
- 1980-05-30 SU SU802934963A patent/SU1180503A1/en active
Non-Patent Citations (1)
Title |
---|
Указани по рациональному расположению, охране и поддержанию горных выработок на угольных шахтах СССР. Л.: ВНИМИ,1978, с. 77-79. Там же, с. 51.. * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106761753A (en) * | 2017-03-15 | 2017-05-31 | 河南理工大学 | A kind of thick seam slicing system lower leaf face layout of actual mining roadway method |
CN106761753B (en) * | 2017-03-15 | 2018-08-14 | 河南理工大学 | A kind of thick seam slicing system lower leaf face layout of actual mining roadway method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103147761B (en) | Filling mining method of gently inclined thin mineral deposit with soft roof | |
CN106499395B (en) | The quick-fried power of shallow bore hole rock drilling-scraper cooperates with haulage Sublevel room mining | |
CN105569659B (en) | A kind of tunnel hydraulic slotted liner technique directional blasting cuts top pressure relief method | |
CN109339786A (en) | A kind of prefabricated Fracture orientation hydraulic fracturing cracking method | |
CN103278055A (en) | Roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting | |
CN103498680B (en) | Improve the method for fully mechanized coal face period of beginning mining top-coal recovery rate | |
CN105626073B (en) | A kind of mining methods for reserving cutting groove based on the method for mining by the way of filling | |
CN107975373B (en) | A kind of lower continuous digging hard-rock mine method of mechanization of liquid-gas phase transition induction | |
CN102778182A (en) | Beside-roadway escribing pressure relief method of roadway driving along gob of small coal pillar influenced by dynamic pressure | |
CN102587960A (en) | Arrangement method of high gas coal seam extraction working face roadway | |
CN109826628A (en) | Presplitting arching without pillar mining method under the conditions of a kind of tight roof | |
CN110410076A (en) | A kind of filling mining method for leaving Pillar Recovery for old pillars of a house goaf | |
SU1180503A1 (en) | Method of driving entry mine workings | |
CN109025999B (en) | One-field three-purpose top coal weakening method | |
CN108316925A (en) | A kind of thick disconnected simple gob-side entry retaining method in top of directly top working face drilling of three-soft seam | |
CN106014411B (en) | Deep fractures, which are cut to split, adopts integrated process for stoping | |
RU2215147C2 (en) | Method of mining of inclined ore deposits | |
CN105370283A (en) | Mechanical precut slot blasting mining method of slightly inclined thin jade ores | |
CN208073477U (en) | A kind of thick disconnected simple gob side entry retaining structure in top of directly top working face drilling of three-soft seam | |
CN113803075B (en) | Efficient and environment-friendly tunnel excavation construction method | |
CN111456742B (en) | High-grade common mining opposite-drawing working face roadway of thin coal seam and forming method thereof | |
RU2540125C2 (en) | Relief opening formation | |
RU2471990C1 (en) | Method to mine sloping and inclined coal beds of average capacity | |
SU889853A1 (en) | Pillar excavating method | |
RU2179243C1 (en) | Method of driving of mine workings in mining of thin deposits of hard ores by shearer under conditions of high rock pressure |