SU1176083A1 - Method of supporting vertical mine working by stohtcreting - Google Patents
Method of supporting vertical mine working by stohtcreting Download PDFInfo
- Publication number
- SU1176083A1 SU1176083A1 SU833703727A SU3703727A SU1176083A1 SU 1176083 A1 SU1176083 A1 SU 1176083A1 SU 833703727 A SU833703727 A SU 833703727A SU 3703727 A SU3703727 A SU 3703727A SU 1176083 A1 SU1176083 A1 SU 1176083A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- charge
- shell
- mixture
- stohtcreting
- supporting vertical
- Prior art date
Links
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
СПОСОБ КРЕПЛЕНИЯ ВЕРТИКАЛЬНОЙ ГОРНОЙ ВЫРАБОТКИ НАБРЫЗГБЕТОНОМ, включающий установку зар да взрывчатого вещества, размещение в выработке вокруг зар да твердеющей смеси и последующее взрывание зар да, отличающийс , тем, что, с целью повышени качества креплени путем обеспечени армировани смеси перед размещением в .выработкетвердеющую смесь помещают в оболочку, которую образуют из волокнистого легкоразрушаемого материала, при этом оболочке придают форму, подобную форме поверхности выработки.A METHOD FOR FIXING A VERTICAL MINING PRODUCTION BY NABRIZHBETONOM, including setting an explosive charge, placing a hardening mixture in the mine around the charge and subsequent charging of the charge, in order to improve the quality of the fixture by providing reinforcement of the mixture before placing into the hardening mixture. in the shell, which is formed from a fibrous, easily destructive material, while the shell is given a shape similar to the shape of the working surface.
Description
Изобретение относитс к горному делу, а именно к строительству прдэемных сооружений в устойчивых грунтах , и может быть использовано преимущественно при временном креплении вертикальных горных выработок, предварительно пройденных до полного сечени в устойчивых грунтах. Целью изобретени вл етс повышение качества креплени путем обеспечени армировани смеси. На фиг. 1 изображено устройство дл осуществлени способа, продольны разрез; на фиг.2 - снар д перед взрыванием зар да взрывчатого вещест ва, общий вид.. Способ реализуют следующим образом . Зар д взрывчатого вещества 1 и твердеющую бетонную смесь 2 размещаю на поддоне 3, н-а котором предварительно монтируют оболочку 4 из легко разрушаемого волокнистого материала Зар д взрывчатого вещества 1 устанав 832 . ливают вертикально по центральной оси поддона 3. После заполнени посредством пространства между зар дом 1 и оболочкой 4 твердеющей смесью 2 дл исключени деформировани верхней части оболочки 4 в верхней части ее устанавливают распорное кольцо 5. Верхний край оболочки-мешка зав зывают и сжимают хомутиком 6 .со строповочным приспособлением 7. Готовый снар д опускают к месту производства работ по креплению и взрывают. В результате взрьша волокниста оболочка 4 разрушаетс и совместно с бетонной смесью 2 перемещаетс к контуру выработки. В процессе перемещени бетонна смесь 2, обладающа значительно большей.плотностью по сравнению с плотностью разрушенной оболочки 4, обгон ет и окружает волокнистые элементы.. Совместно с бетонной смесью 2 элементы разрушенной оболочки 4, оказыва сь в набрызгбетонном слое обделки, выполн ют функцию армирующих элементов.The invention relates to mining, in particular to the construction of industrial facilities in stable soils, and can be used mainly for temporary fixing of vertical mine workings, previously passed to full section in stable soils. The aim of the invention is to improve the quality of fastening by providing a reinforcement of the mixture. FIG. 1 shows a device for carrying out the method, longitudinal section; Fig. 2 shows a shot before the explosive charge of an explosive substance, a general view. The method is implemented as follows. The explosive charge 1 and the hardening concrete mix 2 are placed on the pallet 3, and the shell 4 is pre-assembled from easily destructible fibrous material. The charge of the explosive 1 is set at 832. After filling the space between the charge 1 and the shell 4 with a hardening mixture 2 to prevent the upper part of the shell 4 from deforming, the spacer ring 5 is installed in its upper part. The upper edge of the bag shell is tied up and compressed with a collar 6. with slinging device 7. The finished projectile is lowered to the place of production of work on the mount and blow up. As a result of the fibrous fibril sheath 4 is destroyed and, together with the concrete mix 2, moves to the production contour. In the process of moving, concrete mix 2, which has a much greater density as compared with the density of the destroyed shell 4, overtakes and surrounds the fibrous elements. .
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833703727A SU1176083A1 (en) | 1983-12-29 | 1983-12-29 | Method of supporting vertical mine working by stohtcreting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833703727A SU1176083A1 (en) | 1983-12-29 | 1983-12-29 | Method of supporting vertical mine working by stohtcreting |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1176083A1 true SU1176083A1 (en) | 1985-08-30 |
Family
ID=21104676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833703727A SU1176083A1 (en) | 1983-12-29 | 1983-12-29 | Method of supporting vertical mine working by stohtcreting |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1176083A1 (en) |
-
1983
- 1983-12-29 SU SU833703727A patent/SU1176083A1/en active
Non-Patent Citations (1)
Title |
---|
Воронин B.C. Набрызгбетонна крепь. М., Недра, 1980, с. 65-82 Заславский Ю.З. Лысенко И.Т. Сооружение подземных полостей взры с одновременным формованием бетонн крепи. - Шахтное строительство, 1978, № 8, с. 16-18. иеЛ (54) * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1060248C (en) | Method for excavating a working face | |
RU93005118A (en) | METHOD OF DESTRUCTION OF MATERIALS OF SOLID DENSITY SCLNY BREEDS AND CONCRETE AND DEVICE FOR ITS IMPLEMENTATION | |
ES438673A1 (en) | Method and means of extracting a soil anchor consisting of a prestressed steel tendon | |
SU1176083A1 (en) | Method of supporting vertical mine working by stohtcreting | |
GB1506868A (en) | Method of securing roof bolts in a mine roof | |
SU1615370A1 (en) | Method of supporting mine working by shotcreting | |
ATE147131T1 (en) | TUNNEL EXPANSION METHOD AND SUITABLE EQUIPMENT | |
JP2019167690A (en) | Pile head processing method | |
SU629347A1 (en) | Mine working roof support | |
RU2148712C1 (en) | Method for underground development of ore deposits | |
SU1294996A1 (en) | Method of protecting mine workings in weak rock | |
SU1654582A1 (en) | Method for supporting openings | |
SU1146478A1 (en) | Method of conducting filling work | |
SU775319A1 (en) | Method of working ore bodies | |
SU1652593A1 (en) | Method for fixing anchor in rocks | |
RU2024751C1 (en) | Method for ore underground mining | |
SU796448A1 (en) | Method of placing a tubular anchor | |
SU1612083A1 (en) | Method of sinking mine shaft | |
RU2055207C1 (en) | Method for creating vertical mining shafts | |
RU94014762A (en) | METHOD OF EXPLOSIVE SEPARATION OF CONCRETE AND REINFORCED CONSTRUCTION STRUCTURES FOR THEIR DISMANTLING | |
SU1716137A2 (en) | Method for extraction of interchamber pillars | |
SU1350264A1 (en) | Method of protecting building against adverse effect of underground mine workings | |
ES8305877A1 (en) | Mining excavating process using the bord and pillar method. | |
SU1527413A1 (en) | Arrangement for applying setting composition by explosion | |
SU823588A1 (en) | Method of erecting roof support in durable mine workings |