SU1158761A1 - Method of shoring mine workings - Google Patents
Method of shoring mine workings Download PDFInfo
- Publication number
- SU1158761A1 SU1158761A1 SU833589508A SU3589508A SU1158761A1 SU 1158761 A1 SU1158761 A1 SU 1158761A1 SU 833589508 A SU833589508 A SU 833589508A SU 3589508 A SU3589508 A SU 3589508A SU 1158761 A1 SU1158761 A1 SU 1158761A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- zones
- wells
- rocks
- anchors
- contour
- Prior art date
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
СПОСОБ ПОДДЕРЖАНИЯ ГОРНЫХ ВЫРАБОТОК, включающий бурение скважин , установку анкеров и опорной крепи, отличающийс тем, что, с целью повышени надежности поддержани выработок, после бурени скважин определ ют зоны разрушенных вокруг выработки пород, а установку . анкеров производ т между разуплотненными зонами, контуром выработки и ближайшей к контуру разуплотненной зоной.METHOD OF SUPPORTING MINING DEVELOPMENTS, including drilling wells, installing anchors and supporting lining, characterized in that, in order to increase the reliability of maintaining workings, after drilling the wells, the areas destroyed around the excavation of rocks are determined, and the installation. the anchors are produced between the decompressed zones, the contour of the excavation and the decompacted zone closest to the contour.
Description
Изобретение относится к горнодобывающей промышленности и предназначено для обеспечения устойчивости выработок, поддерживаемых в сложных горно-геологических условиях, прайму-5 щественно в прочных трещиноватых породах на больших глубинах в поле действия повышенных напряжений.The invention relates to the mining industry and is intended to ensure the stability of workings maintained in difficult mining and geological conditions, primarily in strong fractured rocks at great depths in the field of increased stress.
Целью изобретения является повьвпение надежности поддержания выработки.*0 The aim of the invention is to increase the reliability of maintaining production. * 0
На чертеже показана выработка, закрепляемая предлагаемым способом, поперечный разрез.The drawing shows the development, fixed by the proposed method, a cross section.
Способ основан на том принципе, что при проведении выработок буровзрывным способом вокруг их контура образуются закономерно чередующиеся зоны пород повышенной и пониженной прочности. Характер образования зон кольцевых искусственных трещин, ко- 20 торые разделяют массив на отдельные слои, в породах вблизи выработок зависит от большого Количества трудноучйтываемых факторов, например от буровзрывных работ, от действия 25 неоднородного статического поля напряжений, вызванного гравитационными и тектоническими сипами и т.д. Используя сложившееся фактическое состояние пород вблизи выработки - зо чередование зон разуплотненных пород с нетрещиноватыми, создают многослойную крепь из упрочненных анкерами слоев пород с пониженной трещиноватостью и демпферных слоев - зон с раздробленными породами, а также из слоя крепи.The method is based on the principle that when conducting workings by a blasting method, regularly alternating zones of rocks of increased and reduced strength are formed around their contour. The nature of the formation of zones of annular artificial cracks that divide the massif into separate layers in the rocks near the workings depends on a large number of hard to consider factors, for example, drilling and blasting operations, the action of 25 non-uniform static stress fields caused by gravitational and tectonic sipes, etc. . Using the prevailing actual state of the rocks near the excavation — alternating zones of unconsolidated rocks with non-fractured ones, they create a multilayer support from rock layers hardened with anchors with reduced fracture and damper layers — zones with fragmented rocks, as well as from a support layer.
На чертеже позицией 1 обозначена выработка, из которой пробурены скважины 2. В скважинах установлены анке-дд ры 3. Разуплотненные зоны 4 чередуются с крепкими несущими слоями 5. Скважины 2 на границах с зонами 4 изолированы пробками 6с манжетами 7. В выработке 1 возведена крепь 8. 45 In the drawing, reference numeral 1 denotes a well from which wells 2 are drilled. Anke-ddra are installed in the wells. 3. Unconsolidated zones 4 alternate with strong bearing layers 5. Wells 2 at the boundaries with zones 4 are isolated with plugs 6 with cuffs 7. A support was erected in development 1 8. 45
Способ осуществляют следующим образом.The method is as follows.
Из выработки 1 при ее проходке бурят скважины 2 и устанавливают в них анкеры 3. Предварительно перед установкой анкеров по одной или несколькими скважинами по керну или любым известным геофизическим методом определяют для конкретных условий расположения вблизи выработки зон и пород с пониженной прочностью. Анкерами 3, в основном железобетонными или сталеполимерными, упрочняют слои 5 пород между зонами 4, а также между первой зоной и контуром выработки 1, не затрагивая самих зон. Для этого в первую очередь упрочняют массив пород между зонами 4, самый дальний 15 от выработки 1, который намечают к упрочнению (на чертеже второй слой от выработки). В донной части скважин 2 перед зоной 4 устанавливают пробки би подают вяжущий состав, заполняя им примерно 2/3 части скважины в слое 5 между зонами 4 для того, чтобы при вводе, стержней анкеров 3 он не выдавливался в зону 4. Вяжущий состав подбирают такой консистенции, чтобы ок был пластичен и не вытекал из скважин; Вяжущий состав Может подаваться .в скважины 2 и в ампулах. Затем в скважины между зонами 4 устанавливают стержни анкеров с манжетами 7. Длина стержней соответствует длине скважины между зонами 4. Пробки би манжеты 7 препятствуют вытеканию вяжущего состава в зоны 4 при вводе скважины 2 стержней анкеров 3.Wells 2 are drilled from excavation 1 when it is drilled and anchors 3 are installed in them. Previously, before installing anchors in one or several wells, the core or by any known geophysical method is used to determine specific conditions for the location of zones and rocks with reduced strength near the excavation. Anchors 3, mainly reinforced concrete or steel-polymer, reinforce layers 5 of rocks between zones 4, as well as between the first zone and the output circuit 1, without affecting the zones themselves. To do this, first of all, reinforce the rock mass between zones 4, the farthest 15 from the excavation 1, which is planned for hardening (in the drawing, the second layer from the excavation). In the bottom of the wells 2 in front of zone 4, plugs are installed and biomaterial is fed, filling approximately 2/3 of the well in layer 5 between zones 4 so that when entering the anchor rods 3 it does not extrude into zone 4. The cementing composition is selected such consistency, so that it is plastic and does not leak out of the wells; Cementing agent Can be fed into wells 2 and ampoules. Then, anchor rods with cuffs 7 are installed in the wells between zones 4. The length of the rods corresponds to the length of the well between zones 4. The cuffs of the bi-cuff 7 prevent the cementitious compound from flowing into zones 4 when the well 2 of the anchor rods 3 are introduced.
Упрочнив самый дальний от выработки 1 слой 5 между зонами 4, приступают изложенным выше способом к упрочнению следующего слоя 5 ближе к выработке, и так до первого слоя, т.е. между первой зоной 4 и контуром выработки 1. Участки скважин 2 в пределах зон 4 благодаря пробкам би манжетам 7 остаются пустыми, ничем не заполненными. Внутри выработки 1 по контуру возводят крепь, например, металлическую сварную решетку из проволоки с покрытием набрызгбетоном или рамную крепь из спецпрофиля.Having strengthened the layer 5 farthest from the working 1 between zones 4, the method described above proceeds to hardening the next layer 5 closer to the working, and so on to the first layer, i.e. between the first zone 4 and the production circuit 1. The sections of the wells 2 within the zones 4, thanks to the bi-cuff plugs 7, remain empty, not filled with anything. Inside the excavation 1, a support is erected along the contour, for example, a metal welded grating made of wire coated with spray concrete or frame support from a special profile.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833589508A SU1158761A1 (en) | 1983-05-11 | 1983-05-11 | Method of shoring mine workings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833589508A SU1158761A1 (en) | 1983-05-11 | 1983-05-11 | Method of shoring mine workings |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1158761A1 true SU1158761A1 (en) | 1985-05-30 |
Family
ID=21062790
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833589508A SU1158761A1 (en) | 1983-05-11 | 1983-05-11 | Method of shoring mine workings |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1158761A1 (en) |
-
1983
- 1983-05-11 SU SU833589508A patent/SU1158761A1/en active
Non-Patent Citations (1)
Title |
---|
Максимов А.П. Тампонаж горных пород. М., Недра, 1978, с. 145-152. Заславский Ю.З. и др. Крепление подземных сооружений, М., Недра, 1979, с. 144, рис. 45 (прототип). * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2537711C1 (en) | Erection of tunnels in structurally unstable soils with karst phenomena and/or boil processes | |
US3690106A (en) | Method of treating permeable formations | |
CN109611146B (en) | Separation layer water drainage grouting method | |
Marlow et al. | Shotcrete ribs and cemented rock fill ground control methods for stoping in weak squeezing rock at Wattle Dam Gold Mine | |
SU1158761A1 (en) | Method of shoring mine workings | |
RU2128773C1 (en) | Method for supporting mining workings with loose roof rock by anchor support | |
US3527500A (en) | Method of mining relatively thick mineral deposits | |
Bekbergenov et al. | CURRENT CONDITION AND OUTLOOKS OF SUSTAINABLE DEVELOPMENT OF CHROMITE UNDERGROUND) MIINING, AT LOWER HORIZONS OF MINES OF THE DONSKOY MINING, AND PROCESSING, PLANT | |
RU2580124C1 (en) | Method of creating protective shield in roof of designed mine works (versions) | |
SU1710699A1 (en) | Drill hole plugging-back method | |
SU1606696A1 (en) | Method of producing underground voids | |
SU989083A1 (en) | Method of driving large-section workings | |
SU1273582A1 (en) | Method of of bolting rock without hole-drilling | |
SU1647203A1 (en) | Underground construction technique | |
SU1448053A1 (en) | Method of mining sloping ore bodies | |
SU1643718A1 (en) | Method for controlling hard-to-collapse roof | |
RU1770571C (en) | Method for making raise mine working | |
SU1070312A1 (en) | Method of constructing a plugging pad | |
RU1830417C (en) | Method of hydro-isolation and consolidation of mountain-mass while tunneling | |
MARIAN et al. | POSSIBILITIES TO CONSOLIDATE THE UNDERGROUND MINING EXCAVATIONS MARKED BY INSTABILITY AT THE SLANIC PRAHOVA SALT MINE. | |
RU2150002C1 (en) | Method of hydraulic borehole mining in hard rocks | |
RU2021518C1 (en) | Method for erection of wall of underground structure | |
SU901535A1 (en) | Method for driving mine shafts | |
SU1112125A1 (en) | Method for supporting rocks in workings | |
SU1092246A1 (en) | Method of consolidating slopes |