SU1129361A1 - Matching unit for mine workings - Google Patents

Matching unit for mine workings Download PDF

Info

Publication number
SU1129361A1
SU1129361A1 SU833641881A SU3641881A SU1129361A1 SU 1129361 A1 SU1129361 A1 SU 1129361A1 SU 833641881 A SU833641881 A SU 833641881A SU 3641881 A SU3641881 A SU 3641881A SU 1129361 A1 SU1129361 A1 SU 1129361A1
Authority
SU
USSR - Soviet Union
Prior art keywords
lining
mine workings
mine
trunk
matching unit
Prior art date
Application number
SU833641881A
Other languages
Russian (ru)
Inventor
Владимир Михайлович Барковский
Анатолий Александрович Репко
Николай Антонинович Филатов
Атом Михайлович Козел
Original Assignee
Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела filed Critical Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority to SU833641881A priority Critical patent/SU1129361A1/en
Application granted granted Critical
Publication of SU1129361A1 publication Critical patent/SU1129361A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

УЗЕЛ СОПРЯЖЕНИЯ ГОРНЫХ ВЫРАБОТОК, включающий вертикальный и горизонтальный участки крепи, о тличающийс  тем, что, с целью снижени  расходов материалов на крепь, узел снабжен щелевыми выработками , примыкающими к крепи, причем противоположные щелевые выработки образую: контур эллипса с большей осью, направленной вдоль направлени  действи  максимального 1лавного напр жени  в закрепном пространстве.MINE OF OPTIMIZATION OF MINING WORKS, including vertical and horizontal lining areas, differing in that, in order to reduce material costs for lining, the assembly is provided with slotted mine workings adjacent to the lining, and the opposite slot minements form: an ellipse contour with a larger axis, directed along the direction action of the maximum one voltage in the fixed space.

Description

toto

со соwith so

Од t Изобретение относитс  к горной промьшшенности и предназначено дл  сооружени  сопр жений стволов с приствольными выработками и защиты его от горного давлени  в услови х подземного строительства и эксплуатации . Известен узел сопр жени , включающий часть вертикального ствола и приствольные вьцэаботки, выпол- . ненные и поддерживаемые посто нной крепью раздельно и независимо друг от друга to. Однако данный узел не обеспечивает достаточной устойчивости крепи Наиболее близким к предлагаемому по достигаемому результату и технической сущности  вл етс  узел сопр  жени  горных выработок, включающий вертикальный и горизонтальный участ ки крепи С2 3. Недостатком известного узла  вл етс  большой расход материалов на крепь в местах сопр жений. Цель изобретени  - снижение расхода материалов на крепь. Поставленна  цель достигаетс  тем, что узел сопр жени  горных выработок , включающий вертикальный и горизонтальный участки крепи, снабжен щелевыми выработками, примыкающ ми к крепи, причем противоположные щелевые выработки образуют контур эллипса с большей ocW, направленной вдоль направлени  действи  максимального главного напр жени  в закрепном пространстве. На фиг.1 показан узел сопр жени общий ВИД5 на фиг.2 - схема проекций расположени  щелей дл  случа , если направление максимального главного напр жени  совпадает с направлешг-гм оси ствола, разрезы А-А и Б-Б. I. Узел сопр жени  включает ствол 1, приствольные выработки 2, посто нную крепь 3 такого же профи л , как за пределами сопр жени , закрепное пространство 4, заполненное податливым материалом. В массиве стенок ствола вдоль его оси в плоскост х, проход щих через -ОСИ приствольных выработок, и в промежутке между ними проведены щели 5. Щелевые выработки 5 выпол нены в виде р да прИ Лз1кающих друг к другу параллельных скважин 6, которые выбурены по мере прибли 1 .2 жени  к центру сопр жени  переменной глубины Так, что контур 7 двух противоположных щелей в глубине массива имеет форму эллипса с размерами осей 3d и 2d. Промежутки 8 между скважинами разрушены, например,путем взрывани  небольших разр дов. Оси эллипса контуров щелей ориенти-, рованы таким образом, что больша  ось направлена вдоль максимального главного напр жени  в массиве горных . Данные о направлении главных напр жений берутс  по результатам тектонофиэических исследований данного региона. Узел сопр жени  работает следующим образом. В результате проведени  разгрузочных щелей в стенках ствола в местах наибольших концентраций напр жений и создани  условий проскальзывани  крепи и породы благодар  заполнению закрепного пространства податливым материалом массив пород в объеме, оконтуренным эллиптическим профилем щелей, деформируетс  без передачи всей величины давлени  на крепь. Крепь при этом воспринимает только часть напр жений , а основна  величина напр жений с контура вьфаботки переноситс  в массив на глубину торца щелей и воспринимаетс  массивом, который находитс  в объемном напр женном состо нии и может вьщержать без разрушени  значительно большие напр жени . В результате такой конструкции узла сопр жени  значительно повьш1аетс  устойчивость крепи сопр жени  без разделки больших куполообразных полостей. Организаци  работ по проходке предлагаемого узла сопр жени  может быть осуществлена по следующей схеме. После возведени  последнего (перед сопр жением) звена посто нной крепи 9 и верхнего опорного башмака 10 проход д- заходками ствол 1 до почвы приствольной вьфаботки 2 сопр жени . Ствол проход т таким же сечением, что и до сопр жени . Одновременно бзф т пмуры в забое ствола и горизонтальные скважины 6 в стенках ствола дл  образовани  разгрузочных щелей . По мере приближени  забо  к центру сопр жени  глубину горизонтальных скважин увеличивают так, что по контуру 7 двух противоположJ 1Od t The invention relates to the mining industry and is intended for the construction of the junction of shafts with shaft workings and its protection from rock pressure in conditions of underground construction and operation. A known conjugation node, comprising a part of the vertical shaft and stem trunking, is performed. sustained separately and independently of each other to. However, this unit does not provide sufficient stability of the lining. The closest to the proposed result and technical essence is the junction of mine workings, including the vertical and horizontal sections of the C2 3 lining. A disadvantage of the known assembly is the high consumption of materials on the lining at the junction points. . The purpose of the invention is to reduce the consumption of materials for lining. The goal is achieved by the fact that the junction of the mine workings, including the vertical and horizontal parts of the lining, is provided with slotted mine workings adjacent to the lining, and the opposite slotted mine workings form an ellipse contour with a greater ocW, directed along the direction of the maximum main stress in the fixed space . Figure 1 shows the common VID5 junction node in Figure 2 - a diagram of the projections of the arrangement of the slots for the case if the direction of the maximum principal voltage coincides with the direction of the trunk axis, sections A-A and B-B. I. The mating unit includes the trunk 1, the trunk shaft 2, the permanent support 3 of the same profile as outside the interface, the fixed space 4, filled with malleable material. In the massif of the walls of the trunk along its axis in the planes passing through the OSII near-mine workings, slits 5 are made in the gap between them. Slotted workings 5 are made in the form of a series of parallel wells 6, which are selected as approximations of 1.2 to the center of the junction of variable depth. So that the contour 7 of two opposite slits deep in the array has the shape of an ellipse with the dimensions of the axes 3d and 2d. The gaps 8 between the wells are destroyed, for example, by blasting small discharges. The ellipse axes of the contours of the slots are oriented in such a way that the major axis is directed along the maximum principal stress in the mountain range. Data on the direction of main stresses is taken from the results of tectonophysical studies of the region. The gateway operates as follows. As a result of unloading slots in the walls of the trunk in places of greatest stress concentrations and creating conditions for lining and rock slip, the array of rocks in the volume contoured by the elliptical profile of the cracks is deformed without fixing the entire pressure value on the support. The support thus perceives only a part of the stresses, and the main magnitude of the stresses from the loop of the windings is transferred to the array to the depth of the end of the slits and is perceived by the array, which is in a volumetric stress state and can hold much larger stresses without destruction. As a result of this design of the interface, the stability of the support mats is significantly increased without cutting large dome-shaped cavities. The organization of the work on sinking the proposed gateway can be carried out according to the following scheme. After the construction of the last (before the mating) link of the permanent lining 9 and the upper support shoe 10 aisle d, by stopping the trunk 1 up to the soil of the pristolny working method 2 of the mating. The barrel is the same section as before mating. At the same time, bmf t pmura in the bottom of the barrel and horizontal wells 6 in the walls of the barrel to form relief slots. As the bottom center approaches, the depth of the horizontal wells is increased so that along contour 7 there are two oppositesJ 1

ных щелей в глубине массива образуетс  эллиптический профиль с размерами осей 3d и 2d.In the depths of the array, an elliptical profile with 3d and 2d axes is formed.

Разрушение оставшихс  между горизонтальными скважинами целиков 8 дл  окончательного оформлени  ще-лей выполн ют, например, при помощи взрьюани  их рассредоточенными небольшими зар дами. После отбойки породы и ее уборки возвод т временную крепь. Описанные операции повтор ют во всех циклах работ пока не дойдут до уровн  почвы приствольной выработки. Затем произ вод т проходку горизонтальной части сопр жени  с возведением временной крепи. После завершени  рассечки возвод т посто нную крепь 3 как в стволе, так и в приствольных выработках узла сопр жени . Завершив эти работы, возобновл ют проходку ствола ниже почвы приствольной выработки . Все работы ведутс  так же.The destruction of the remaining between the horizontal wells of the pillars 8 for final clearance of the deposits is carried out, for example, by spraying them with dispersed small charges. After breaking the rock and cleaning it, a temporary support was built. The described operations are repeated in all work cycles until they reach the level of the soil near the tree trunk. Then, the horizontal part of the interface is penetrated with the erection of temporary support. After completion of the dissection, permanent support 3 is erected both in the trunk and in the trunk workings of the interface unit. Having completed these works, they resume the sinking of the trunk below the soil of the stump production. All work is carried out in the same way.

293614293614

как и в верхней части узла сопр жени  за исключением того, что глубину горизонтальных скважин дл  образовани  щелей уменьшают по мере прибли5 жени  к нижнему опорному башмаку 11.as in the upper part of the junction assembly, except that the depth of the horizontal wells to form gaps is reduced as it approaches the lower support shoe 11.

Использование предлагаемого узла сопр жени  обеспечивает по сравнению с прототипом значительное сни10 жение металлоемкости за счет уменьшени  сечени  выработок в районе узла сопр жени J увеличение производительности и скорости сооружени  благодар  Уменьшению объемов работThe use of the proposed junction provides, in comparison with the prototype, a significant decrease in metal consumption due to a reduction in the cross section of the workings in the junction area J and an increase in productivity and construction speed due to a decrease in the amount of work.

15 по разделке и креплению} улучшение условий труда и эксплуатации узла сопр жени , так как размеры вьфаботок значительно меньше. При этом нагрузка на крепь сопр жени  из-за15 for cutting and fastening} improvement of working conditions and operation of the junction node, since the dimensions of the plants are much smaller. In this case, the load on the support mate

20 проведени  щелей в указанных местах сопр жени  и их конфигураци  значительно уменьшаетс , что увеличивает устойчивость узла сопр жени .20, the gaps are drawn at the indicated interfaces and their configuration is significantly reduced, which increases the stability of the interface.

10ten

6 -б6-b

77

Claims (1)

УЗЕЛ СОПРЯЖЕНИЯ ГОРНЫХ ВЫРАБОТОК, включающий вертикальный и горизонтальный участки крепи, о тличающийся тем, что, с целью снижения расходов материалов на крепь, узел снабжен щелевыми выработками, примыкающими к крепи, причем противоположные щелевые выработки образую?* контур эллипса с большей осью, направленной Вдоль направления действия максимального главного напряжения в закрепном пространстве.MINING JOINT NODE, including vertical and horizontal sections of the lining, characterized in that, in order to reduce the cost of materials for the lining, the node is equipped with slotted openings adjacent to the lining, and the opposite slotted openings form? * An ellipse contour with a larger axis directed along the direction of action of the maximum main voltage in the fixed space. § ω с £3 ю С© со§ ω с £ 3 й С © со О >Oh>
SU833641881A 1983-09-15 1983-09-15 Matching unit for mine workings SU1129361A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833641881A SU1129361A1 (en) 1983-09-15 1983-09-15 Matching unit for mine workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833641881A SU1129361A1 (en) 1983-09-15 1983-09-15 Matching unit for mine workings

Publications (1)

Publication Number Publication Date
SU1129361A1 true SU1129361A1 (en) 1984-12-15

Family

ID=21081613

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833641881A SU1129361A1 (en) 1983-09-15 1983-09-15 Matching unit for mine workings

Country Status (1)

Country Link
SU (1) SU1129361A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Стоев И.С. Проведение выработок, сопр гающихс со стволами. М., Недра, 1967. 2. Справочник инженера-шахтостроител . М., Недра, 1968, с. 462 (прототип). *

Similar Documents

Publication Publication Date Title
CN104863592B (en) A kind of big structure sublevel drill and benching ore removal afterwards filling mining method
CN106194200A (en) A kind of efficient construction of hard rock tunnel
GB1444068A (en) Method of blasting and reinforcing rock cavities
SU1129361A1 (en) Matching unit for mine workings
CN103375169A (en) Method for applying diamond wire saw to large-section underground rock project
SU1668667A1 (en) Method for combination mining of gently sloping seams
SU1469137A1 (en) Roof control method
SU1580014A1 (en) Method of guarding mine working
RU2006581C1 (en) Process of destruction of rocks with driving of working in them
CN113047835B (en) Deep well thick and large ore body mining method integrating emptying, caving and filling
RU2017961C1 (en) Method for mining of mineral gently sloping beds
SU127217A1 (en) Sub-collapse development system
SU983273A1 (en) Method of protecting a preparatory working
SU1167343A1 (en) Method of relieving strain of mining contour
SU992740A1 (en) Method of working deposits of minerals in unsteady master rock
SU1479663A1 (en) Method of safeguarding mineral-bed working
SU1384752A1 (en) Method of mining gently-sloping and sloping mineral beds
Cheskidov et al. Methodological basis for calculating parameters of direct dumping flowsheets in open pit mining of gently dipping coal beds
RU2179638C1 (en) System of exploitation of gently dipping seams
SU641109A1 (en) Method of relieving mine contour
SU1234629A1 (en) Method of caving-in inter-chamber pillars
SU976071A1 (en) Method of forming an undercutting space
SU1237772A1 (en) Method of protecting mine workings
SU1624154A1 (en) Method of preparing panel base
RU2018673C1 (en) Method for mining of gently dipping coal seams