SU1110908A1 - Method for driving workings in burst-hazardous seams by shaking explosions - Google Patents

Method for driving workings in burst-hazardous seams by shaking explosions Download PDF

Info

Publication number
SU1110908A1
SU1110908A1 SU833544580A SU3544580A SU1110908A1 SU 1110908 A1 SU1110908 A1 SU 1110908A1 SU 833544580 A SU833544580 A SU 833544580A SU 3544580 A SU3544580 A SU 3544580A SU 1110908 A1 SU1110908 A1 SU 1110908A1
Authority
SU
USSR - Soviet Union
Prior art keywords
zone
holes
deep
drilling
coal
Prior art date
Application number
SU833544580A
Other languages
Russian (ru)
Inventor
Матвей Иосифович Большинский
Григорий Абрамович Поляк
Василий Иосифович Стикачев
Леонид Абрамович Вайнштейн
Анатолий Александрович Нахатович
Original Assignee
Государственный Макеевский Ордена Октябрьской Революции Научно-Исследовательский Институт По Безопасности Работ В Горной Промышленности
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственный Макеевский Ордена Октябрьской Революции Научно-Исследовательский Институт По Безопасности Работ В Горной Промышленности filed Critical Государственный Макеевский Ордена Октябрьской Революции Научно-Исследовательский Институт По Безопасности Работ В Горной Промышленности
Priority to SU833544580A priority Critical patent/SU1110908A1/en
Application granted granted Critical
Publication of SU1110908A1 publication Critical patent/SU1110908A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Earth Drilling (AREA)

Abstract

СПОСОБ ПРОВЕДЕНИЯ ВЫРАБОТОК НА ВЬШРОСООПАСНЫХ.ПЛАСТАХ СОТРЯСАТЕЛЬНЫМ ВЗРЫВАНИЕМ, включающий бурение глубоких шпуров, размещение в них :зар дов взрывчатых веществ в зоне пониженных напр жений, оставление в зоне повышенныхнапр жений воздушной полости, бурение по породам и угольному пласту шпуров, предназначенных дл  отбойки породы и угл  за цикл, короткозамедленное взрывание зар дов взрывчатых веществ, отличающийс  тем, что, с целью повышени  эффективности и безопасности работ ПОпроведению выработок на выбросоопасных пластах путем образовани  опережающей зоны разгрузки, глубокие щпуры бур т по выбросоопасной пачке пласта за зону повьшенных напр жений с рассто нием между ними, определ емом по формуле R-rpMETHOD OF WORKING FOR VSHROSOOPASNYH.PLASTAH SOTRYASATELNYM blasting comprising a deep drilling of holes, placing them: charge explosives in a zone of reduced stress, leaving a povyshennyhnapr zheny air cavity area, a rock drilling and drilling coal seam designed for breaking rock and coal per cycle, short-delay blasting of explosives charges, characterized in that, in order to increase the efficiency and safety of work, to maintain excavations in outburst-hazardous formations Uteem form advanced unloading zone schpury deep drilled by outburst stack formation zone for povshennyh voltages with a distance therebetween defining emom the formula R-rp

Description

Изобретение относитс  к горной промышленности и может быть использовано при разработке угольных пластов , склонных к внезапным выбросам угл  и газа. Известен способ уменьшени  плотности и силы выбросов угл  и газа при сотр сательном взрьшании путем регулировани  длины шпуров дл  взрыв ных работ в зависимости от зоны раз грузки , при этом взрывные работы про вод т в зоне разгрузки, образованной горного давлени  CiTОднако данный способ не позвол ет существенно снижать силу и плотность выбросов, так как проведение взрывани  в зоне разгрузки недостаточно снижает напр жение в зоне опор ного давлени  пласта, в которой возн кает опасность выброса. Наиболее близким по технической сущности и достигаемому результату к изобретению  вл етс  способ проведени  выработок на выбросоопасных пластах сотр сательным взрьшанием, включающий бурение глубоких шпуров, размещение в них зар дов взрывчатьк веществ в зоне понижений, оставление в зоне повьш1енных напр жений воздушной полости, бурение по породам и угольному пласту шпуров, предназна ченных дл  отбойки породы и угл  за цикл, короткозамедленное взрьюание зар дов взрывчатых веществ 2. Известный способ характеризуетс  отсутствием возможности создавать на выбросоопасных угольных пластах зону пониженных напр жений горного массива , (зону разгрузки) впереди забо  и за пределами проектного сечени  выра ботки, необходимую дл  предотвращени  выбросов в последующем цикле бур взрывных работ, так как воздушна  по лость в конце шпура уменьшает действие взрыва на окружающий массив за счет потерь энергии в ударной волне и продуктах детонации зар да взрьюча того вещества, и ее остаточной энергии уже недостаточно дл  образовани  новой сетки трещин, которые способствовали бы дегазации и снижению нап р жений в угольном массиве, Целью изобретени   вл етс  повыше ние эффективности и безопасности работ по проведению выработок на выбро соопасных пластах путем образовани  опережающей зоны разгрузки. Поставленна  цель достигаетс  тем, что согласно способу, включающе му бурение глубоких шпуров, размещение в них зар дов взрьючатых веществ в зоне пониженных напр жений, оставление в зоне повьш1енных напр жений воздушной полости, бурение по породам и угольному пласту шпуров, предназначенных дл  отбойки породы и угл  за цикл, короткозамедленное взрывание зар дов взрьгочатых веществ,глубокие шпуры бур т по выбросоопаснрй пачке пласта за зону повьш1енных нап- р жений с рассто нием между ними .определ емом по формуле Ктр(9.5-19,0)й,, .где RTP удвоенный радиус радиальных трещин в угольном пласте,м; (Зщп - диаметр глубокого щпура, м, воздушную полость, расположенную в зоне повьш1енных напр жений, заполн ют ампулами с жидкостью на длину, котора  составл ет (0,2-0,42)Р - длина глубокого шпура, м. и производ т взрьшание зар дов взрывчатых веществ во всех шпурах в один прием, начина  с глубоких шпуров, расположенных в наиболее опасных углах контура выработки. Способ осуществл етс  следующим образом. По сечению выработки дл  отбойки угл  и породы-бур т шпуры. Затем по выбросоопасной пачке угольного пласта в наиболее опасных зонах, т.е. в углах выработки, бур т глубокие шпуры. Длину шпура определ ют как сумму длины донной части, в которую затем вставл ют ампулу с жидкостью, и активной части, в которой размещают зар ды ВВ, при этом длина данной части составл ет (0,2-0,42), где Aiun длина глубокого шпура, м. Глубокие шпуры бур т длиной не менее 6 м таким образом, чтобы они пересекли зону повьш1енных напр жений. Рассто ние между глубокими шпурами определ ют по формуле (9,5-19)3u,n, где 3ц,п - диаметр глубокого шпура; - удвоенный радиус радиальных трещин в угольном пласте, м. Производ т зар жение глубоких шпуров и шпуров дл  отбойки угл  и породы и короткозамедленное взрьгоание в них зар дов ВВ в один прием, начина  с глубоких шпуров, расположенных в наиболее опасных углах контура выработки .The invention relates to the mining industry and can be used in the development of coal seams prone to sudden outbursts of coal and gas. There is a known method for reducing the density and strength of coal and gas emissions at a costly explosion by adjusting the length of holes for blasting depending on the discharge zone, while the blasting works in the discharge zone formed by the mountain pressure CiT. However, this method does not significantly reduce the strength and density of emissions, since conducting a blast in the unloading zone does not sufficiently reduce the stress in the zone of the reservoir bearing pressure, in which there is a risk of spike. The closest in technical essence and the achieved result to the invention is a method of carrying out workings on outburst-hazardous formations by complacent banging, including drilling deep holes, placing charges of explosives in them in the zone of depressions, leaving in the zone of increased stresses of the air cavity, drilling according to rocks and the coal seam of holes, destined for breaking rock and coal per cycle, short-delay charging of explosives 2. The known method is characterized by the absence of on outburst coal seams, create a zone of lowered stresses in the rock mass (unloading zone) in front of the slaughter and beyond the design section of the development, necessary to prevent emissions in the subsequent blasting cycle, since the air cavity at the end of the hole reduces the effect of the explosion on the surrounding massif due to the energy losses in the shock wave and detonation products of the charge of an explosive substance, and its residual energy is not enough to form a new grid of cracks that would contribute to The aim of the invention is to increase the efficiency and safety of work on carrying out workings in the outburst of hazardous formations by forming a leading discharge zone. The goal is achieved in that according to the method, which includes drilling deep bore-holes, placing charges of blasted substances in them in a zone of reduced stresses, leaving in the zone of increased stresses of the air cavity, drilling rocks and a coal seam of bore-holes for breaking rocks and coal per cycle, short-delay blasting of charges of volatile substances, deep holes are drilled along the outburst package of the reservoir beyond the zone of overvoltage stresses with a distance between them. Determined by the formula Ktr (9.5-19.0), where RTP at military radius of the radial fractures in the coal seam, m; (Cfp - diameter of deep chip, m, the air cavity located in the zone of higher stresses, is filled with ampoules with liquid for a length that is (0.2-0.42) P - length of deep hole, m. blasting explosives charges in all boreholes at once, starting with deep boreholes located in the most dangerous corners of the production contour. The method is carried out as follows: Cut by section for blasting coal and borehole rock formation. in the most dangerous zones, i.e. in the corners The holes are drilled deep. The length of the hole is defined as the sum of the length of the bottom part, into which the ampoule with the liquid is then inserted, and the active part in which explosive charges are placed, the length of this part being (0.2-0 , 42), where Aiun is the length of the deep hole, m. Deep holes are drilled with a length of at least 6 m so that they cross the zone of heaving stresses. The distance between the deep holes is determined by the formula (9.5-19) 3u, n, where 3c, n - the diameter of the deep hole; - double radius of radial cracks in the coal seam, m. Deep holes and holes are drilled for coal and rock blasting and short-term exploding of explosive charges in one time in them, starting from deep holes located in the most dangerous corners of the production contour.

3 . 111090843 11109084

При этом зар д ВВ в глубоких шпу-изменени  длины колонки зар да в ,шпурах не служит дл  отбойки угл  (этуpax.In this case, the explosive charge in deep boreholes of the change in the length of the charge column in the bore-holes, does not serve for the breaking of coal (this.

функцию вьшолн ют зар ды в обычных Преимущество предложенного способаthe function is performed by charges in the usual advantages of the proposed method

шпурах), а предназначен только дл  .состоит в том, что при его использовоздействи  через жидкость на уголь- 5вании образуетс  зона разгрузки впеный пласт с целью образовани  опере- реди контура вьфаботки до ведени  ражающей зоны разгрузки. Поэтому per-бот по проведению выработки в выбламентированные безопасные рассто ни росоопасном слое, что позвол етboreholes), and is intended only for the fact that when it is used through a fluid on the coal, a discharge zone is formed in the reservoir to form a leading edge of the working loop before the leading unloading zone. Therefore, the per-bot to carry out the development of the enlarged safe distances of the depressive layer, which allows

между зар дами в глубоких шпурах иснизить частоту и силу выбросов вbetween charges in deep holes and reduce the frequency and strength of emissions

смежных с ними шпуровых зар дах дл  10сложных горно-геологических услоотбойки угл  образуют только за счетви х.The adjacent blast-hole charges for complex mining and geological conditions are coal only by account.

Claims (1)

СПОСОБ ПРОВЕДЕНИЯ ВЫРАБОТОК НА ВЫБРОСООПАСНЫХ.ПЛАСТАХ СОТРЯСА•ТЕЛЬНЫМ ВЗРЫВАНИЕМ, включающий бурение глубоких шпуров, размещение в них зарядов взрывчатых веществ в зоне пониженных напряжений, оставление в зоне повышенных напряжений воздушной полости, бурение по породам и угольному пласту шпуров, предназна ченных для отбойки породы и угля за цикл, короткозамедленное взрывание зарядов взрывчатых веществ, отличающийся тем, что, с целью повышения эффективности и безопасности работ попроведению выработок на выбросоопасных пластах путем образования опережающей зоны разгрузки, · глубокие шпуры бурят по выбросоопасной пачке пласта за зону повышенных напряжений с расстоянием между ними, определяемом по формуле %,<(9,5-19,0)аип, где RTp - удвоенный радиус радиальных трещин в угольном пласте, м;METHOD FOR CARRYING OUT PRODUCTS ON EMISSIONING.CONTINUATION LAYERS • BY EXPLOSIVE EXPLOSION, which includes drilling deep holes, placing explosive charges in them in the zone of low stresses, leaving in the zone of high air pressure stresses, drilling over rocks and a coal seam for drilling holes coal per cycle, short-blown explosive explosive charges, characterized in that, in order to improve the efficiency and safety of work conducting workings on outburst hazardous seams by the formation of the leading discharge zone, · deep holes are drilled along the outburst hazardous pack of the formation beyond the zone of increased stress with the distance between them, determined by the formula%, <(9.5-19.0) a un , where R Tp is the doubled radius of radial cracks in the coal formation, m; 0ШП - диаметр глубокого шпура,м, воздушную полость, расположенную в зоне повышенных напряжений, заполняют ампулами с жидкостью на длину, которая составляет (0,2-0,42)КДшп , где - длина глубокого шпура, м, и производят взрывание зарядов взрывчатых веществ во всех шпурах в один прием, начиная с глубоких шпуров, расположенных в наиболее опасных углах контура выработки.0 ШП - diameter of a deep hole, m, the air cavity located in the zone of increased stress is filled with ampoules with liquid to a length that is (0.2-0.42) К Дшп , where is the length of a deep hole, m, and blast explosive charges in all holes in one step, starting with deep holes located in the most dangerous corners of the output circuit. SU „..1110908 >SU „..1110908> 1 1110908 21 1110908 2
SU833544580A 1983-01-26 1983-01-26 Method for driving workings in burst-hazardous seams by shaking explosions SU1110908A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833544580A SU1110908A1 (en) 1983-01-26 1983-01-26 Method for driving workings in burst-hazardous seams by shaking explosions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833544580A SU1110908A1 (en) 1983-01-26 1983-01-26 Method for driving workings in burst-hazardous seams by shaking explosions

Publications (1)

Publication Number Publication Date
SU1110908A1 true SU1110908A1 (en) 1984-08-30

Family

ID=21046963

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833544580A SU1110908A1 (en) 1983-01-26 1983-01-26 Method for driving workings in burst-hazardous seams by shaking explosions

Country Status (1)

Country Link
SU (1) SU1110908A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Николин В.И., Шаталов B.C., Пол к Г.А. Уменьшение плотности и силы выбросов угл и газа. - Безопасность труда в промьшшенцости, 1977, № 9 2. Авторское свидетельство СССР № 730%5, кл. Е 21 С 37/00, 1979.. *

Similar Documents

Publication Publication Date Title
CN105735993B (en) A kind of method of the preventing and treating tight roof type bump based on carbon dioxide explosion
RU2081313C1 (en) Method and device for crushing hard rock and materials
CN107328327A (en) The soft or hard blast hole loading structure and its method for being mingled with beded rock mass Long-hole Bench Blasting
CN110307762A (en) A kind of courtyard quick well formation method based on deep hole hole by hole initiation technique
CN108362179A (en) A kind of energy saving cut shot method of star
CN113513954A (en) Boundary control blasting method for underground mine deep hole stope
CN109372509A (en) Arrangement method for double-hollow-hole rhombic cut holes in access filling mining
CN102787843A (en) Dirt band-containing coal seam working surface mining process
CN108548460A (en) A kind of method of blast hole and large diameter borehole coupling release prevention bump
SU1110908A1 (en) Method for driving workings in burst-hazardous seams by shaking explosions
US3611933A (en) Nuclear cavity configuration control
AU784685B2 (en) A method of blasting
CN113107583A (en) Thick and hard roof high-gas coal seam gas extraction system and extraction method
CN207797897U (en) The soft or hard blast hole loading structure for being mingled with beded rock mass Long-hole Bench Blasting
SU1263868A1 (en) Method of controlling the strained state of rock about mine working
SU1116177A1 (en) Method of driving a mine working in rock body with gas-dynamic hazard
CN219387882U (en) Coal seam floor burst protection lane and high-efficient drainage collaborative construction structure of gas
RU2059070C1 (en) Method for making kerf cavity
SU1490288A1 (en) Method of supporting and safeguarding mine workings in shock-hazardous deposits
SU1427076A1 (en) Method of driving a mine working
RU2203419C2 (en) Process of underground development of thick ore deposits
RU2713833C1 (en) Suspended well stem
RU94028321A (en) Method for unloading marginal mine working and cumulative explosive charge for forming initial fractures
SU1384793A1 (en) Method of driving workings in outburst-hazardous rock
SU1490419A1 (en) Method of moving rock by explosion