SU1104289A1 - Method of fighting ground swelling in development workings in pillarless working of strata - Google Patents

Method of fighting ground swelling in development workings in pillarless working of strata Download PDF

Info

Publication number
SU1104289A1
SU1104289A1 SU833579884A SU3579884A SU1104289A1 SU 1104289 A1 SU1104289 A1 SU 1104289A1 SU 833579884 A SU833579884 A SU 833579884A SU 3579884 A SU3579884 A SU 3579884A SU 1104289 A1 SU1104289 A1 SU 1104289A1
Authority
SU
USSR - Soviet Union
Prior art keywords
soil
lava
wells
working
pillarless
Prior art date
Application number
SU833579884A
Other languages
Russian (ru)
Inventor
Константин Аркадьевич Ардашев
Владимир Иванович Иевлев
Георгий Лаврентьевич Фисенко
Original Assignee
Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела filed Critical Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority to SU833579884A priority Critical patent/SU1104289A1/en
Application granted granted Critical
Publication of SU1104289A1 publication Critical patent/SU1104289A1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

СПОСОБ БОРЬБЫ С ПУЧЕНИЕМ ПОЧВЫ В ПОДГОТОВИТЕЛЬНЫХ ВЫРАБОТКАХ ПРИ БЕСЦЕЛИКРВОЙ РАЗРАБОТКЕ ПЛАСТОВ, включающий бурение скважин из выработки впереди лавы в почву пласта и взрывание в них зар дов ВВ, отличающийс  тем, что, с целью снижени - материальных затрат, скважины бур т в основную почву пласта под углом 65-70° в сторону отрабатываемой лавы, а зар ды ВВ взрывают в них после прохода лавой скважин на рассто ние 6-8 м. 4 to 00 соA METHOD FOR COMBATING SOIL IN PREPARATORY DEVELOPMENTS IN THE DIFFERENTIAL DEVELOPMENT OF PLASTES, including drilling wells from mining ahead of the lava into the soil of the reservoir and blasting explosive charges in them, in order to reduce the costs, they are not enough money, manners. at an angle of 65-70 ° towards the developed lava, and explosive charges explode in them after the passage of lava wells to a distance of 6-8 m. 4 to 00 with

Description

Изобретение относитс  к угольной промышленности и предназначено дл  использовани  в подготовительных выемочных выработках , в непосредственной почве которых залегают слабые пучащие породы, при бесцеликовой разработке угольных пластов дл  периода расположени  выработок на границе пласта с выработанным пространством . Известен способ борьбы с пучением, включающий упрочнение пучащих пород анкерами, в жущими 1. Недостатком данного способа  вл етс  больща  трудоемкость работ и затраты на крепление и поддержание. , Наиболее близким к изобретению по технической сущности и достигаемому результату  вл етс  способ борьбы с пучением почвы в подготовительных выработках при бесцеликовой разработке пластов, включающий бурение скважин из выработки впереди лавы в почву пласта и взрывание в них зар дов ВВ 2. Недостатком известного способа  вл етс  мала  его эффективность в подготовительных выработках на границе с выработанным пространством. Цель изобретени  - снижение материальных затрат. Указанна  цель достигаетс  тем, что согласно способу борьбы с пучением почвы в подготовительных выработках при бесце„1иковой разработке пластов, включающему бурение скважин из выработки впереди лавы в почву пласта и взрывание в них зар дов ВВ, скважины бур т в основную почву пласта под углом 65-70° в сторону отрабатываемой лавы, а зар ды ВВ взрывают в них после прохода лавой сквал ин на рассто ние 6-8 м. На фиг. 1 изображена технологическа  схема с проведенной впереди лавы и сохран емой дл  повторного использовани  на границе с эыработанным пространством выработкой; на фиг. 2 - разрез А-А на фиг. 1; на фиг. 3 - разрез Б-Б на фиг. 1. На схеме изображены выработка 1, залегающие в непосредственной почве 2 пласта пучащие породы, породы основной почвы 3 пласта, пробуренные из выработок 1 в основную почву пласта скважины 4 впереди лавы (фиг. 2) и позади лавы после взрывани  в них (фиг. 3), зона 5 разрущени  пород основной и непосредственной почвы пласта за пределами выработки после взрывани  ВВ в скважинах 4. Способ осуществл етс  следующим образом . Из выработки 1 впереди отрабатываемой лавы с помощью устанавливаемого в ней любого бурового станка в прочные породы основной почвы 3 пласта через залегающие -под пластом пучащие породы непосредственной почвы 2 бур т одну или две скважины 4 диаметром 80-100 мм под углом в сторону отрабатываемой лавы 65- 70°. Длину и угол наклона скважин принимают из услови , чтобы создать по лиНИИ скважин зону разрущени  почвы в выработанном пространстве за пределами выработки на рассто нии от нее 2-3 м. Количество скважин, рассто ние между ними и величину закладываемых в скважины зар дов ВВ определ ют расчетом или опытным путем в зависимости от мощности непосредственной почвы и мощности и прочности пород основной почвы. Например, в типичных услови х при мощности слабых пучащих пород непосредственной почвы 3- 5 м и основной почве пласта, состо щей из песчаника мощностью 8-10 м и прочностью 80-90 МПа, из выработки р дом на рассто нии до 1 м бур т одну скважину длиной 10 м под углом 65°, а другую длиной 15 м под углом 70°, а затем на рассто нии от них 4-5 м бур т другую пару таких же скважин. Закладку в скважины зар дов ВВ и их взрывание производ т по еле прохода каждой пары скважин лавой на рассто нии 6-8 м. При использовании в качестве зар дов ВВ торпедозар дов (отрезков полиэтиленовых труб, заполненных патронированным ВВ) в указанных услови х в скважину длиной 10 м закладывают торпедозар д длиной 4-5 м и массой ВВ 12-15 кг, а в скважину длиной 15 м - торпедозар д длиной 9-10 м и массой 25- 30 кг. Забойку скважин пород взрыванием ВВ производ т водой и дерев нной кой. Эффект борьбы с пучением почвы- в выработке , расположенной на границе с выработанным пространством, предлагаемым способом взрывани  ВВьскважинах, пробуренных в основную почву пласта, достигаетс  за счет снижени  напр жений опорного давлени , увеличени  несущей способности основной почвы под выработкой и переноса пучени  непосредственной почвы выработки за ее пределы в зону разрушенных пород. Таким образом, применение предлагаемого способа по сравнению с известным позвол ет значительно снизить затраты на крепление и поддержание выработок за счет большей эффективности борьбы с пучением.The invention relates to the coal industry and is intended for use in preparatory excavation workings, in the immediate soil of which weak weakening rocks are deposited, with purposeless mining of coal seams for a period of location of the workings at the boundary of the formation with the developed space. The known method of dealing with heaving, including hardening pulling rocks with anchors, is burning 1. The disadvantage of this method is the greater labor-intensiveness of the works and the cost of fixing and maintaining. The closest to the invention to the technical essence and the achieved result is a method of combating soil heaving in preparatory workings with purposeless reservoir development, including drilling wells from producing ahead of the lava into the soil of the reservoir and blasting explosives in them. 2. The disadvantage of the known method is its efficiency in the preparatory workings on the border with the developed space is low. The purpose of the invention is to reduce material costs. This goal is achieved by the fact that, according to the method of combating soil heaving in the preparatory workings, when reservoir mining works, including drilling wells from the mine ahead into the soil of the formation and blasting explosives into them, the wells are drilled into the main soil of the formation at an angle of 65 –70 ° towards the worked lava, and explosive charges explode in them after passing through the lava squallin at a distance of 6–8 m. In FIG. Figure 1 shows a flow chart with the lava held ahead of the surface and saved for reuse at the border with the excavated working space; in fig. 2 shows section A-A in FIG. one; in fig. 3 shows a section BB in FIG. 1. The diagram shows the production of puffed up rocks in the immediate soil 2 of the reservoir, the rocks of the main soil 3 of the reservoir drilled from the openings 1 into the main soil of the reservoir of well 4 in front of the lava (Fig. 2) and behind the lava after exploding in them (Fig. 3), zone 5 of destruction of the rocks of the main and immediate soil of the formation beyond the limits of production after blasting explosives in wells 4. The method is carried out as follows. From production 1 in front of the developed lava with the help of any drilling machine installed in it into the sturdy rocks of the main soil 3 of the reservoir through the submerged straying rocks of the direct soil 2 drill one or two wells 4 with a diameter of 80-100 mm at an angle to the worked lava 65 - 70 °. The length and angle of inclination of the wells is taken from the condition in order to create, through the line of wells, a zone of soil destruction in the developed space beyond the limits of generation at a distance of 2-3 m from it. The number of wells, the distance between them and the magnitude of explosive charges put into the wells by calculation or experimentally, depending on the thickness of the immediate soil and the thickness and strength of the rocks of the basic soil. For example, under typical conditions, when the thickness of weak pulling rocks of the direct soil is 3–5 m and the main soil of the formation, consisting of sandstone with a thickness of 8–10 m and strength of 80–90 MPa, one well with a length of 10 m at an angle of 65 °, and another with a length of 15 m at an angle of 70 °, and then another pair of the same wells is drilled 4-5 m from them. Laying explosive charges into wells and their blasting is performed on the passage of each pair of wells by lava at a distance of 6–8 m. When using explosive charges of torpedo charges (sections of polyethylene pipes filled with packaged explosives) under the specified conditions into the well 10 m long, torpedozar d 4-5 m long and weighing 12–15 kg in mass is laid, and a torpedozar d 9-10 m long and weighing 25–30 kg is inserted into a well 15 m long. The damming of rocks by explosive blasting is carried out with water and wooden coy. The effect of combating soil heaving in the mine located on the border with the depleted space, the proposed method of blasting in the boreholes drilled into the main soil of the reservoir, is achieved by reducing the stress of the reference pressure, increasing the bearing capacity of the main soil under working and transfer its limits to the zone of destroyed rocks. Thus, the application of the proposed method in comparison with the known method allows to significantly reduce the cost of fixing and maintaining workings due to the greater effectiveness of anti-heaving control.

22

JJ

Claims (1)

СПОСОБ БОРЬБЫ С ПУЧЕНИЕМ ПОЧВЫ В ПОДГОТОВИТЕЛЬНЫХ ВЫРАБОТКАХ ПРИ БЕСЦЕЛИКОВОЙ РАЗРАБОТКЕ ПЛАСТОВ, включающий бурение скважин из выработки впереди лавы в почву пласта и взрывание в них зарядов ВВ, отличающийся тем, что, с целью снижения- материальных затрат, скважины бурят в основную почву пласта под углом 65—70° в сторону отрабатываемой лавы, а заряды ВВ взрывают в них после прохода лавой скважин на расстояние 6—8 м.METHOD OF FIGHTING SOIL IN PREPARATORY WORKS DURING PURPOSE-FREE DEVELOPMENT OF LAYERS, including drilling wells from the front of the lava into the soil of the formation and blasting explosive charges in them, characterized in that, in order to reduce material costs, the wells are drilled into the soil at the base angle 65–70 ° in the direction of the worked-out lava, and explosive charges explode in them after passing the lava of the wells to a distance of 6–8 m.
SU833579884A 1983-04-15 1983-04-15 Method of fighting ground swelling in development workings in pillarless working of strata SU1104289A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833579884A SU1104289A1 (en) 1983-04-15 1983-04-15 Method of fighting ground swelling in development workings in pillarless working of strata

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833579884A SU1104289A1 (en) 1983-04-15 1983-04-15 Method of fighting ground swelling in development workings in pillarless working of strata

Publications (1)

Publication Number Publication Date
SU1104289A1 true SU1104289A1 (en) 1984-07-23

Family

ID=21059300

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833579884A SU1104289A1 (en) 1983-04-15 1983-04-15 Method of fighting ground swelling in development workings in pillarless working of strata

Country Status (1)

Country Link
SU (1) SU1104289A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Черн к И. Л. Предотвращение пучени почвы горных выработок. М., «Недра, 1978, с. 184-204. 2. Там же, с. 212-218 (прототип). *

Similar Documents

Publication Publication Date Title
US3688507A (en) Grouting
MX2012009756A (en) Underground mining.
CN109000525A (en) A kind of shield driving upper-soft lower-hard ground presplit blasting construction method
US3690106A (en) Method of treating permeable formations
SU1104289A1 (en) Method of fighting ground swelling in development workings in pillarless working of strata
RU2011822C1 (en) Method for roof control
RU2010953C1 (en) Method of determination of cracks spreading height in basic zone of working
RU2078927C1 (en) Method of relief of working marginal rock mass and shaped charge for formation of initial fissures
SU1263868A1 (en) Method of controlling the strained state of rock about mine working
SU1701938A1 (en) Method of prevention of rock and gas outbursts in driving openings
SU1710746A1 (en) Method of working protection
SU836364A1 (en) Method of preventing dynamic phenomena at working of coal beds
RU2215982C2 (en) Way to implement outline blasting
SU1125373A1 (en) Method of mining unstable ores
SU977836A1 (en) Method of erecting bridge in mine working
SU791975A1 (en) Method of driving preparatory working in beds prezenting coal and gas outburst hazard
RU2088759C1 (en) Method of rock mass mining by benches
RU2103516C1 (en) Method for degassing of coal-bearing mass
RU2012804C1 (en) Method for protection of workings from rock pressure
SU1500789A1 (en) Method of protecting coal seam against gas-dynamic manifestations
SU1506109A1 (en) Method of protecting development workings
RU2077674C1 (en) Method for finishing open-pits
SU1751348A1 (en) Method of preventing floor heaving of development workings
SU1553702A1 (en) Method of securing rock with bolts
SU1406396A2 (en) Method of preventing gas and gas-dynamic manifestations in wells