SU1102954A1 - Method of working coal-bearing formations in complicated geological conditions - Google Patents
Method of working coal-bearing formations in complicated geological conditions Download PDFInfo
- Publication number
- SU1102954A1 SU1102954A1 SU833544811A SU3544811A SU1102954A1 SU 1102954 A1 SU1102954 A1 SU 1102954A1 SU 833544811 A SU833544811 A SU 833544811A SU 3544811 A SU3544811 A SU 3544811A SU 1102954 A1 SU1102954 A1 SU 1102954A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- coal
- design
- development
- mining
- unloading
- Prior art date
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
СПОСОБ РАЗРАБОТКИ СВИТЫ УГОЛЬНЫХ ПЛАСТОВ, ЗАЛЕГАЮЩИХ В СЛОЖНЫХ ГОРНОГЕОЛОГИЧЕСКИХ УСЛОВИЯХ, включающий разгрузку пластов , подготовку выемочного участка, профилактическую обработку пластов и очистную выемку угл на каждом пласте, отличающийс тем, что, с целью повышени эффективности разработки за счет снижени опасности ведени горных работ, профилактическую обработку производ т после разгрузки пластов, совмеща их с подготовкой выемочного участка, а затем производ т очистную выемку угл , причем разгрузку разрабатываемого пласта осуществл ют отработкой смежного пласта в ранее разгруженном массиве, а очистную выемку угл и профилактическую обработку ведут одновременно в различных выемочных участках.METHOD OF DEVELOPMENT OF THE SUITES OF COAL PLASTS MOLDS IN COMPLEX MINING AND GEOLOGICAL CONDITIONS, including the unloading of formations, preparation of the excavation site, preventive treatment of formations of the design of the development of the design of the development of the design of the development of the reservoirs and the clearing of coal on each layer, in order to improve the efficiency of the development of the design of the development of the design of the design of the design of the development of the reservoirs and the clearing of coal on each layer, in order to improve the efficiency of the design of the design of the application, the treatment is carried out after unloading the formations, combining them with the preparation of the excavation site, and then cleaning the coal, and unloading the developed area hundred performed perfecting adjacent seam in the previously unloaded array, and a cleaning and preventive recess carbon treatment is carried out simultaneously in different working areas.
Description
NDND
СО СЛ 4 Изобретение относитс к горной промышлеппостн и предназначено дл разработки CRUTij угольных пластов, залегающих в сложных горногеологических услови х, например на большой глубине, опасным по ииезанным выбросам угл и газа или горным ударам. Известен способ разработки свиты угольных пластов, залегающих в сложных горногеологических услови х, включающий разгрузку пластов, подготовку выемочного участка, профилактическую обработку пластов и очистную выемку угл на каждом плас те 1. Однако данный способ не достаточно эффективен из-за низкой безопасности ведени горных работ. Целью изобретени вл етс повыщение эффективности разработки за счет снижени опасности ведени горных работ. Поставленна цель достигаетс тем, что согласно способу разработки свиты угольных пластов, залегающих в сложных горногеологических услови х, включающему разгрузку пластов, подготовку выемочного участка, профилактическую обработку пластов и очистную выемку угл на каждом пласте, профилактическую обработку производ т после разгрузки пластов, совмеща их с подготовкой выемочного участка, а затем производ т очистную выемку угл , причем разгрузку разрабатываемого пласта осуществл ют отработкой смежного пласта в ранее разгруженном массиве, а очистную выемку угл и профилактическую обработку ведут одновременно в различных выемочных участках. Способ осуществл етс следующим образом . Перед разработкой свиты угольных пластов , залегающих в сложных горногеологических услови х, производ т последовательную разгрузку каждого разрабатываемого пласта путем отработки смежного пласта в ранее разгруженном массиве.:Затем одновременно с подготовкой выемочного участка производ т профилактическую обработку пласта на данном участке, а затем производ т очистную выемку угл , причем очистную выемку угл и профилактическую обработку ведут независимо и одновременно в различных выемочиых участках. Предлагаемый способ позвол ет значительно повысить эффективность разработки .за счет снижени опасности ведени горных работ.CO SL 4 The invention relates to the mining industry and is intended to develop CRUTij coal seams occurring in difficult geological conditions, such as at great depth, hazardous emissions of coal and gas or rock bursts. A known method of developing a suite of coal seams occurring in difficult mining and geological conditions includes the unloading of layers, preparation of the excavation section, preventive treatment of layers and cleaning coal extraction at each plate 1. However, this method is not sufficiently effective due to low safety of mining operations. The aim of the invention is to increase development efficiency by reducing the risk of mining operations. The goal is achieved by the fact that, according to the method of developing a suite of coal seams occurring in difficult geological conditions, including the unloading of layers, preparation of the excavation section, preventive treatment of layers and coal cleaning on each layer, preventive treatment is performed after unloading layers, combining them with preparation of the excavation area, and then coal cleaning is carried out, and the reservoir under development is unloaded by working the adjacent formation in the previously unloaded mine file of parameters, and a cleaning and preventive recess carbon treatment is carried out simultaneously in different working areas. The method is carried out as follows. Before the development of coal formations occurring in complex mining and geological conditions, each seam being developed is unloaded by mining an adjacent formation in a previously unloaded mass.: Then, simultaneously with the preparation of the excavation section, the formation is preventively processed and then coal extraction, with coal cleaning and prophylactic treatment being carried out independently and simultaneously in various excavation sites. The proposed method allows a significant increase in the development efficiency due to the reduction of the risk of mining operations.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833544811A SU1102954A1 (en) | 1983-01-28 | 1983-01-28 | Method of working coal-bearing formations in complicated geological conditions |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833544811A SU1102954A1 (en) | 1983-01-28 | 1983-01-28 | Method of working coal-bearing formations in complicated geological conditions |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1102954A1 true SU1102954A1 (en) | 1984-07-15 |
Family
ID=21047046
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833544811A SU1102954A1 (en) | 1983-01-28 | 1983-01-28 | Method of working coal-bearing formations in complicated geological conditions |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1102954A1 (en) |
-
1983
- 1983-01-28 SU SU833544811A patent/SU1102954A1/en active
Non-Patent Citations (1)
Title |
---|
1. Технологические схемь подготовительных и очистных работ на угольных пластах, склонных к внутренним выбросам угл и газа. М., Минуглепром СССР, 1976, схемы 1, 13 (прототип). * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1102954A1 (en) | Method of working coal-bearing formations in complicated geological conditions | |
SU1151673A1 (en) | Method of mining adjoining coal seams | |
SU1082953A1 (en) | Method of mining gently-sloping coal seams | |
SU829950A1 (en) | Method of working adjacent sloping beds of minerals | |
SU620603A1 (en) | Method of bis-development of steep orebodies | |
SU1209894A1 (en) | Method of preventing spontaneous outbursts in elevated rock pressure zones | |
SU825962A1 (en) | Method of controlling hard-to-cave roofs | |
RU96109970A (en) | COMBINED METHOD FOR DEVELOPING STEPS OF STEEP COAL COAST | |
RU1774024C (en) | Method of preventing sudden outcrops in preliminary drifts | |
SU773273A1 (en) | Method of working the erection layer | |
SU934005A1 (en) | Method of working outburst-hazardous coal beds | |
SU1624159A1 (en) | Method of mining bed deposits | |
SU1751332A1 (en) | Method of mining steep coal seams prone to gas-dynamic effects | |
SU796428A1 (en) | Method of working gently sloping and sloping adjoining coal beds | |
SU1097793A1 (en) | Method of strip mining of horizontal and gently-sloping beds of minerals | |
SU968477A1 (en) | Method of fighting gas-dynamic phenomena | |
SU914773A1 (en) | Method of filling an excavated space | |
SU994735A1 (en) | Method of working coal seams with long stoping longwalls | |
SU1610015A1 (en) | Method of mining steep outburst-prone coal seam | |
SU1710752A1 (en) | Method of preparing coal seams | |
SU1461941A1 (en) | Method of mining steep ore bodies | |
SU1006753A1 (en) | Method for working thick ore deposits | |
SU1024596A1 (en) | Method of carrying-out along-seam mine workings on seams inclined to sudden outbursts of coal and gas | |
SU1028845A1 (en) | Method of working thick steep coal seams | |
SU1696703A2 (en) | Method of roof control in mining flat coal seams |