SU109958A1 - A method of manufacturing a pre-stressed tunnel lining, passable by a mechanized shield - Google Patents

A method of manufacturing a pre-stressed tunnel lining, passable by a mechanized shield

Info

Publication number
SU109958A1
SU109958A1 SU569226A SU569226A SU109958A1 SU 109958 A1 SU109958 A1 SU 109958A1 SU 569226 A SU569226 A SU 569226A SU 569226 A SU569226 A SU 569226A SU 109958 A1 SU109958 A1 SU 109958A1
Authority
SU
USSR - Soviet Union
Prior art keywords
lining
passable
manufacturing
tunnel lining
ring
Prior art date
Application number
SU569226A
Other languages
Russian (ru)
Inventor
С.А. Орлов
Original Assignee
С.А. Орлов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by С.А. Орлов filed Critical С.А. Орлов
Priority to SU569226A priority Critical patent/SU109958A1/en
Application granted granted Critical
Publication of SU109958A1 publication Critical patent/SU109958A1/en

Links

Description

Изобретение относитс  к С1;особам изготовлени  предварительно-напр женной обделкн тоине,1 , проходимого л еханизированным 1иитом, кольца которой составлены гл отдельных блоког с применением замкового блока клинообразной формы, вводимого 5 кольцо дл  увеличени  его диаметра, с целью, например, нат жени  арматуры, наложенной на кольцо.The invention relates to C1; it is special to manufacture a prestressed lining, 1, traversed by mechanized 1, its rings are composed of individual blocks using a wedge-shaped locking block, inserted 5 ring to increase its diameter, for example, to tension the reinforcement superimposed on the ring.

Накладывание арматуры на кольцо предетавл ет затруднение ири изготовлении , предварительно - напр женной обделки тонне.т , кроме того при таком сис)собе ие исключено нагнетание раствора за обде.тку.Overlaying the reinforcement on the ring implies difficulty in manufacturing, a pre-stressed lining of tonnes, moreover, with such a system, the injection of the solution over the lining is ruled out.

Соглаеио о игсываел;ом сиособу, введением ютннового блока кольцо обделки вдавливают в окружающую породу,с целью создани  предварительного напр жени  сжати  в блоках кольца и HCKJH04eHHH ||агнетани  р-аствора за обделку.According to the agreement, with the introduction of a new unit, the lining ring is pressed into the surrounding rock in order to create a preliminary compressive stress in the ring units and HCKJH04eHHH ||

На фиг-. 1 .блоки показаны в п.тане; щ фиг. 2-разрез ло АА на фиг. J. Стрелка / показывает напрашк нйеIn fig-. 1. The blocks are shown in p. ni fig. 2-section lo AA in FIG. J. Arrow / shows naprashka

движени  относительно расположени  б.покор, на фнг. 1.movement relative to the location of the pole, fng. one.

Обделк;; 10))нел , изготовл ема  согласно С 7исываемому способу, состоит 1г; отдельных колец 2 н 3, составл ел;ь;;ч из обычных блоков 4, блоков 5, смежных с замковым блоком , и замк.овых блоков 6 клинообразной форчь.Lining ;; 10)) Nel, manufactured according to C 7 C, is composed of 1d; individual rings 2 n 3, consisting of; ь ;; h from ordinary blocks 4, blocks 5 adjacent to the castle block, and lock blocks of 6 wedge-shaped forch.

Б„шки 4 к 5 собирают в кольцо по контур} / выработки, после чего, ввод  на место клиновой замковый блок 6, ко.льи.о обделки увеличивают в диаметре;- и тем самым в.д.авливают в ()кружак);1г.) породу за контур 7 выработка. Ори )5давлнван11И кольца обделки li породу последн   обжимает ко.тьцс. создава  в блоках кольца предварит&,1ьное напр жение сжати , при этом нагнетание раствора за обделку иск.1ючаетс .B 'shki 4 to 5 are assembled into a ring along the}} line of development, after which the wedge block block 6 is put in place, the coil-lining is increased in diameter - and thereby the pressure is () circled) ; 1d.) Breed for contour 7 generation. Ory) 5davlvan11I lining rings li breed last compresses short. creating a ring in the blocks precedes & 1 compressive stress, while injecting solution for lining is sought.

П р е л V, т и 3 о б р е т е н н  P r el V, t and 3 o bre n e n n

Способ  зготовлени  тредварительно-напр жеиной обделки тоннел , проходимого механизированнымThe method of preparation of the pre-spring lining of the tunnel, passable by mechanized

щитом, кольца- которой составлены из отдельных блокр с,применением замкового блока клийоЬбразрой формы , вводимогов кольцо д,л  увеличени  его. диаметра,, о т л и ч а ю щ и и с   тем, чтовведением клинового блока кольце обделки вдавливают в окружающую породу, с целью создани  предварительного напр жени  сжати  в блоках кольца и исключени  нагнетани  раствора за обделку.a shield, the rings of which are made up of individual blocks, using a lock block of a KlioBrazy form, inserting a ring d, l increase it. diameter, with the help of which, with the introduction of the wedge block, the lining ring is pressed into the surrounding rock in order to prestress the compression in the ring blocks and to exclude the injection of the solution for the lining.

хх:xx:

SU569226A 1957-03-12 1957-03-12 A method of manufacturing a pre-stressed tunnel lining, passable by a mechanized shield SU109958A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU569226A SU109958A1 (en) 1957-03-12 1957-03-12 A method of manufacturing a pre-stressed tunnel lining, passable by a mechanized shield

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU569226A SU109958A1 (en) 1957-03-12 1957-03-12 A method of manufacturing a pre-stressed tunnel lining, passable by a mechanized shield

Publications (1)

Publication Number Publication Date
SU109958A1 true SU109958A1 (en) 1957-11-30

Family

ID=48382948

Family Applications (1)

Application Number Title Priority Date Filing Date
SU569226A SU109958A1 (en) 1957-03-12 1957-03-12 A method of manufacturing a pre-stressed tunnel lining, passable by a mechanized shield

Country Status (1)

Country Link
SU (1) SU109958A1 (en)

Similar Documents

Publication Publication Date Title
SU109958A1 (en) A method of manufacturing a pre-stressed tunnel lining, passable by a mechanized shield
EP0034224A3 (en) Process for reinforcing wooden beams, and beams so obtained
GB1384744A (en) Method and elements for anchoring stays and stay anchorages thus produced
FR2435599A1 (en) Helicoidal mine tunnel lining - uses arch blocks assembled by cylindrical shield and held together by rods and ties cemented to ground
CN104005519A (en) Anchor head locking piece
ITTO910805A1 (en) IMPROVEMENTS TO THE PROCEDURE FOR THE EXECUTION OF THE COVERING OF A GALLERY AND EQUIPMENT SUITABLE FOR THE PURPOSE.
ES257476A3 (en) A method for the manufacture of pretensed concrete tubular structures (Machine-translation by Google Translate, not legally binding)
SU97870A1 (en) Concrete tunnel lining
SU49135A1 (en) The method of manufacturing reinforced concrete beams and the message to the reinforcement of its preliminary stresses
GB135942A (en) Improvements in and relating to Props, Struts, Columns, or Posts used in Mining or for other purposes.
SU887724A1 (en) Injector of cementing compositions
SU60421A1 (en) A method of making lining of mines and tunnels in hard rock
SU110692A1 (en) Lining of metropolitan distillation tunnels, made up of rectangular reinforced concrete blocks
SU934012A1 (en) Method of winning limestone blocks
FR1228331A (en) Process for the construction of underground galleries in difficult terrain, using prefabricated and assembled reinforced concrete segments, and equipment for implementing this process
SU69489A1 (en) Lining of metro stations
GB715719A (en) Improvements in prestressed concrete piles
SU126086A1 (en) Method of cementing wells under pressure
SU135445A1 (en) Method of hydraulic fracturing
SU1158685A1 (en) Method of making a pile
SU118520A1 (en) Insertion nozzle for butt joining of channels in blocks of precast pre-stressed concrete structures
SU90830A1 (en) The method of construction of prestressed concrete or iron-stone arches and arches
SU399589A1 (en) GROUND BANKET PROTECTIVE SHELL
SU793030A1 (en) Method for making mining workings