SU1087638A1 - Method of erecting structures by hoisting - Google Patents

Method of erecting structures by hoisting Download PDF

Info

Publication number
SU1087638A1
SU1087638A1 SU833567821A SU3567821A SU1087638A1 SU 1087638 A1 SU1087638 A1 SU 1087638A1 SU 833567821 A SU833567821 A SU 833567821A SU 3567821 A SU3567821 A SU 3567821A SU 1087638 A1 SU1087638 A1 SU 1087638A1
Authority
SU
USSR - Soviet Union
Prior art keywords
slab
floor
design
roofing
height
Prior art date
Application number
SU833567821A
Other languages
Russian (ru)
Inventor
Александр Оганесович Саакян
Рубен Оганесович Саакян
Сергей Христофорович Шахназарян
Карен Григорьевич Мовсесов
Original Assignee
Всесоюзный Проектно-Экспериментальный Конструкторский И Технологический Институт Министерства Промышленного Строительства Армсср
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Проектно-Экспериментальный Конструкторский И Технологический Институт Министерства Промышленного Строительства Армсср filed Critical Всесоюзный Проектно-Экспериментальный Конструкторский И Технологический Институт Министерства Промышленного Строительства Армсср
Priority to SU833567821A priority Critical patent/SU1087638A1/en
Application granted granted Critical
Publication of SU1087638A1 publication Critical patent/SU1087638A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

СПОСОБ ВОЗВЕДЕНИЯ СООРУЖЕНИЙ МЕТОДОМ ПОДЪЕМА, включающий установку колонн с подъемниками и грузовыми т гами, изготовление пакета плит перекрытий и кровёлъной плиты с последующим их подъемом на проектные отметки, отличающийс  тем, что, с целъю обеспечени  возможности возведени  сооружени  .в ограниченном по высоте пространстве, перед подъемом кровёлъной плиты и верхней плиты перекрыти  на проектные отметки.подъемники демонтируют и устанавливают под крэвелъной плитой , при этом между последней и верхней плитой перекрыти  с двух сторон каждой колонны устанавливают инвентарные стойки высотой на этаж, осуществл ют захват верхней е плиты перекрыти  и одновременно под1 (Л нимают ее и кровёлъную плиту на проектные отметки.METHOD OF CONSTRUCTION OF CONSTRUCTIONS BY THE RISING METHOD, including the installation of columns with lifts and cargo trails, the manufacture of a package of floor slabs and a roofing slab with their subsequent elevation to design marks, in order to ensure the construction of a structure in a height-limited area by lifting the roof slab and the upper slab to the design elevations. The lifters are dismantled and installed under the cradle slab, while between the last and the upper slab from two the sides of each column establish inventory racks with a height to the floor, grip the upper e slab and at the same time lift it up (take it and the roofing slab to the design marks.

Description

0000

||

а CADa CAD

0000

Изобретение относитс  к строителству , в частности к способам возведени  сооружении методом подъема в подземнсм пространстве.The invention relates to construction, in particular, to methods for erecting a structure by the method of lifting into underground space.

Известен способ возведени  сооружений , включакший изготовление  дра жесткости на всю высоту здани , установку колонн, бетонирование пакета плит перекрытий с последующим подьемс 4 на проектные отметки l .The known method of erection of structures, including the manufacture of core stiffness on the entire height of the building, installation of columns, concreting the package of floor slabs with the subsequent rise of 4 to design marks l.

Известен также способ возведени  сооружений методом подъема, включающий установку колонн с подъемниками и грузовыми т гами, изготовление пакета плит перекрытий и кровелъной плиты с послещуквдим их подьемс 4 на проектные отметки 2 .There is also known a method of erecting structures by the method of lifting, including the installation of columns with lifts and cargo mills, the manufacture of a package of floor slabs and a roofing slab with an elevation of 4 to design marks 2.

Недостатком известных ранений  вл етс  то, что возведение сооружений в подземных выработках .св зано с болъшими потер ми по высоте пространства, так как дл  подъема кровепъной плиты на проектную отметку необходимо на вершинах колонн мойтироватъ инвентарные (временные ) колонны, предназначенные дл  установки на них подъемников, ос-. вобожда  тем самым последнее отверстие в колонне дл  установки на проектную отметку кровельной плиты. КроМе того, подъемники, установленные на инвентарных колоннах, должны иметъ возможностъ свободного хода грузовых т г, что приводит к болъшим noTep.-iM застраиваемого подземного объема. A disadvantage of the known injuries is that the erection of structures in the underground workings is associated with large losses in height, since in order to lift the blood slab to the design elevation, it is necessary to take inventory (temporary) columns for the installation of elevators on the tops of the columns. , thereby thereby allowing the last hole in the column to be installed on the design elevation of the roofing slab. In addition, the lifts installed on the inventory columns must have a free-wheeling capacity of the cargo trucks, which leads to a large noTep.-iM of the built-up underground volume.

цель изобретени  - обеспечение возможности возведени  сооружени  в ограниченном по высоте пространстве.The purpose of the invention is to provide the possibility of erecting a structure in a space limited in height.

Целъ достигаетс  тем, что согласно способу возведени  сооружений методсмл подъема, включающему установку колонн с подъемниками и грузовыми т гами изготовление пакета плит перекрытий и кровелъной плиты с последующим их подъемом на проектные отметки перед подъемом кровелъной и верхней плиты перекрыти  на проектные отметки подъемники демонтируют и устанавливают под кровелъной плитой, при этом между последней и верхней плитой перекрыти  с двух сторон каждой колонны устанавливают инвентарные стойки высотой на этаж, Ьсуществл ют захват верхней плиты перекрыти  и одновременно поднимают ее и кровелъную плиту на проектные отметки.Purpose is achieved in that according to the method of erection of buildings, including the installation of columns with lifts and cargo trucks, the manufacture of a package of floor plates and a roof plate and their subsequent rise to design marks before lifting the roof and top floor slabs to the design marks the lifts are dismantled and installed roof slab, while between the last and the top slab on both sides of each column set the inventory rack height on the floor, b atm upper plate overlap and simultaneously raise it and krovelnuyu plate on design marks.

На фиг. 1 схематически изображено: установка колонн, изготовление пакета плит перекрытий и кровелъной плиты, установка подъемников с грузовыми т гами и осуществление захвата кровелъной и нижележащей плите; на фиг. 2 - подъем кровелъной и нижележащей плит на соответствующую отметку и захват следующих нижележащих плит; на фиг. 3 - плита перекрыти  первого этажа достигла своей проектной отметки; на фиг. 4 - плита перекрыти  второго этажа достигла . своей проектной отметки и кровельна  плита отделена р.т нижележащей плиты на высоту одного этажа, а подъемники демонтированы и установлены на колоннах под кровелъной плитой; на фиг.5 установка ме щу кровелъной и нижележщей плитой с двух сторон каждой колонны инвентарных стоек и захват нижележащей плиты; на фиг.6 - параллелъный подъет« с установкой на свои проектные отметки кровельной и нижележащей плит.FIG. 1 shows schematically: installation of columns, production of a package of floor plates and a roofing plate, installation of lifts with cargo weights and the capture of the roofing and underlying slab; in fig. 2 - the rise of the roofing and underlying slabs to the appropriate mark and the seizure of the following underlying slabs; in fig. 3 - the floor slab has reached its design level; in fig. 4 - the floor slab reached the second floor. of its design mark and roofing slab, the rt of the underlying slab is separated to the height of one floor, and the lifts are dismantled and mounted on columns under the roofing slab; Fig. 5 shows the installation of the roof of the roofing and underlying slab on both sides of each column of the inventory racks and the grip of the underlying slab; FIG. 6 shows a parallel lift with installation of the roofing and underlying slabs on their design marks.

Способ возведени  сооружени  методом подъема осуществл ют в следующей последовательности: после установки колонн 1 сооружени  и изготовлени  пак ета плит 2 перекрытий и кровелъной плиты 3 устанавливают подъемники 4 с грузовыми т гами 5. Далее осуществл ют подъем плит перекрытий обычным способс н, а перед установкой кровельной плиты 3 в проектное положение подъемники 4 демонтируют и устанавливают на колоннах под кровелъной плитой. Причем ыеж у. кровелъной 3 и нижележащей плитой 2 перекрыти  с двух сторон каждой колонны устанавливают инвентарные стойки б. Далее подъемниками 4 осуществл ют захват нижележащей плиты 2 и производ т параллельный подъем ее и кровелъной плиты 3 с у станов--J кой на свои проектные отметки. После чего инвентарные стойки 6 и подъемники 4 демонтируют.The method of erection of the building by the method of lifting is carried out in the following sequence: after the installation of columns 1, the construction and manufacture of a package of floor slabs 2 and roofing slab 3 install lifts 4 with cargo drafts 5. Next, the floor slabs are lifted by the usual The plates 3 into the design position of the lifts 4 are dismantled and installed on the columns under the roof slab. And yyezh at. roof 3 and the underlying slab 2 overlap on both sides of each column establish inventory counters b. Next, lifts 4 grip the underlying slab 2 and produce a parallel lifting of it and the roofing slab 3 with the mills - J koy to their design marks. Then inventory racks 6 and 4 lifts dismantled.

Такой способ позвол ет максимальн исполъзоватъ объем в подземных вырази ботках ввиду того, что подъемное оборудование устанавливаетс  под кровелъной плитой и по вл етс  возможность максимального подъема кровейьной плиты к потолку подземной выработки на величину необходимого проектного зазора .. .This method allows the maximum use of the volume in underground expressions due to the fact that the lifting equipment is installed under the roofing slab and it is possible to maximize the rise of the blood plate to the ceiling of the underground excavation by the amount of the required design clearance.

....

Claims (1)

СПОСОБ ВОЗВЕДЕНИЯ СООРУЖЕНИЙ МЕТОДОМ ПОДЪЕМА, включающий уста- новку колонн с подъемниками и грузовыми тягами, изготовление пакета плит перекрытий и кровельной плиты с последующим их подъемом на проектные отметки, отличающийся тем, что, с целью обеспечения возможности возведения сооружения в ограниченном по высоте пространстве, перед подъемом кровельной плиты и верхней плиты перекрытия на проектные отметки подъемники демонтируют и устанавливают под кровельной плитой, при этом между последней и верхней плитой перекрытия с двух сторон каждой колонны устанавлива ют инвентарные стойки высотой на этаж, осуществляют захват верхней плиты перекрытия и одновременно поднимают ее и кровельную плиту на проектные отметки.METHOD OF CONSTRUCTION OF CONSTRUCTIONS BY THE LIFTING METHOD, including the installation of columns with elevators and cargo rods, the manufacture of a package of floor slabs and roof slabs with their subsequent elevation to design elevations, characterized in that, in order to provide the possibility of erecting the structure in a space with limited height, before by lifting the roof plate and the top floor slab to the design elevations, the lifts are dismantled and installed under the roof plate, while between the last and top floor slabs on both sides azhdoy column setting dissolved inventory racks to floor height, grip a top slab and simultaneously raise it and the roof plate to project a mark. Фиг.1Figure 1 SU <...1087638>SU <... 1087638> 1 1087638 21 1087638 2
SU833567821A 1983-04-05 1983-04-05 Method of erecting structures by hoisting SU1087638A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833567821A SU1087638A1 (en) 1983-04-05 1983-04-05 Method of erecting structures by hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833567821A SU1087638A1 (en) 1983-04-05 1983-04-05 Method of erecting structures by hoisting

Publications (1)

Publication Number Publication Date
SU1087638A1 true SU1087638A1 (en) 1984-04-23

Family

ID=21054981

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833567821A SU1087638A1 (en) 1983-04-05 1983-04-05 Method of erecting structures by hoisting

Country Status (1)

Country Link
SU (1) SU1087638A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Шахнаэар н С.Х., Саак н P.O., Саак н А.О. Возведение зданий методом подъема этажей.и перекрытий. М., Стройиэдат, 1974, с. 98-102. 2. Саак н А.О., Саак н P.O. и Шахназар н С.Х. Возведение зданий и сооружений методом подъема. М., Строййздат, 1982, с.70-74 (прототип). *

Similar Documents

Publication Publication Date Title
GB1451611A (en) Building construction
US3254466A (en) Method of erecting a multi-story building structure
SU1087638A1 (en) Method of erecting structures by hoisting
US3552080A (en) Method for erecting multistory buildings
ES401546A1 (en) Climbing formwork assemblies for the erection of tower structures of reinforced concrete
RU93010838A (en) METHOD OF CONSTRUCTION OF MONOLITHIC BUILDING AND MOBILE FORMWORK FOR ITS IMPLEMENTATION
JPH1061193A (en) Method of building steel frame structure and device therefor
US3940902A (en) Fulcrum tilt building system
SU962549A1 (en) Method of erecting high-rise buildings by the lifting method
US3435583A (en) Method of forming buildings
SU730941A1 (en) Method of erecting the framework of building
SU552395A1 (en) The method of construction of high-rise buildings
RU2233953C2 (en) Method for erecting building frame without girders by means of floor lifting
RU2116414C1 (en) Method for erection of sectional-and-monolithic buildings
CN109469332A (en) A kind of multi-storey steel structure installation method
Luca Trombetta et al. Retrofit of buildings in Italy through seismic isolation
GB1293689A (en) Improvements in or relating to methods of building
RU2026941C1 (en) Method of the building erection by means of hoisting
RU1790653C (en) Method for erecting monolithic and sectional-monolithic buildings
SU1126676A1 (en) Method for erecting manystoried building by jacking-up floors
SU636355A1 (en) Multistoried building
GB1085316A (en) New or improved method of building construction
SU672303A1 (en) Method of erecting building and structures
RU2087650C1 (en) House-building combine
RU2055127C1 (en) Method of erection of monolithic buildings with load-bearing walls