SU1064006A1 - Method of preparing mine working to its traversing by mine machinery set - Google Patents

Method of preparing mine working to its traversing by mine machinery set Download PDF

Info

Publication number
SU1064006A1
SU1064006A1 SU823457413A SU3457413A SU1064006A1 SU 1064006 A1 SU1064006 A1 SU 1064006A1 SU 823457413 A SU823457413 A SU 823457413A SU 3457413 A SU3457413 A SU 3457413A SU 1064006 A1 SU1064006 A1 SU 1064006A1
Authority
SU
USSR - Soviet Union
Prior art keywords
complex
excavation
transition
mine
leading
Prior art date
Application number
SU823457413A
Other languages
Russian (ru)
Inventor
Юрий Павлович Дубовский
Александр Иосифович Куракин
Геннадий Дмитриевич Потапенко
Вячеслав Алексеевич Потапенко
Федор Семенович Чендев
Original Assignee
Подмосковный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Подмосковный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт filed Critical Подмосковный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт
Priority to SU823457413A priority Critical patent/SU1064006A1/en
Application granted granted Critical
Publication of SU1064006A1 publication Critical patent/SU1064006A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

1,. СПОСОБ ПОДГОТОВКИ ГОРНОЙ ВЫРАБОТКИ X ПЕРЕХОДУ МЕХАНИЗИРО1 ВАННЫМ КОМПЛЕКСОМ, включающий предварительное усиление крепи горной выработки путем выкладки костров по всей длине ее, о т л и ч а ющ и и с   тем, что/ с целью уменьшени  снижени  нагрузки на очистной забой, повышени  скорости и безопасности работ при переходе выработки, по бокам выработки, до подхода к ней механизированного комплекса, на уровне верхн ков штрековой крепи производ т выемку полости на глубину не менее половины шага передвижки механизированного комплекса, в которую завод т и расклинивают опережающий веркн к, по другую сторону которого до возведени  кост (О ров устанавливают временную (Л стойку. 05 one,. THE METHOD OF PREPARATION OF THE MINING DEVELOPMENT X TRANSFER OF THE MECHANISYRO1 BATH COMPLEX, including pre-reinforcement of the lining of the mine working by laying out fires along the entire length of it, so as to reduce the reduction of the load on the working face, increase the speed and the safety of work during the transition of production, on the sides of production, before the mechanized complex approaches it, at the level of the top lining, the cavity is dredged to a depth of at least half a step of the movement of the mechanized complex Rui plant m and propped advancing verkn k, on the other side to which the upmixing cost (O moat set time (A rack. 05

Description

2. Способ по п. 1, отлича ющ и и с   тем, что, с целью подготовки к переходу механизированным комплексом горной выработки, пройденной с подрывкой пород почвы, выемку полостей в боках выработки и установку опережающих верхн ков производ т на высоте, обеспечивающей переход ее комплексом с подхватыванием опережающих верхн ков, причем опережающие верхн ки поддерживают путем установки дополнительных дерев нных стоек между ними и верхними элементами костров,2. The method according to claim 1, which is also distinguished by the fact that, in order to prepare for the transition with a mechanized complex of a mine working, passed with the undermining of soil rocks, the excavation of cavities in the sides of the working and installation of leading tops is carried out at its complex with picking up the advancing tops, and the advancing tops are supported by installing additional wooden racks between them and the upper elements of the fires,

3. Способ по п. 1, отличающийс  тем, что, с целью подготовки к переходу механизированным комплексом горной выработки пройденной с подрывкой пород кровли, выемку полостей в боках выработки и установку опережающих верхн ков производ т ниже верхн ков штрекового креплени , в верхней части угольного пласта.3. The method according to claim 1, characterized in that, in order to prepare for the transition by a mechanized complex of mine workings completed with undermining roof rocks, the excavation of cavities in the sides of the excavation and the installation of leading tops are made below the top of the drift fastener reservoir.

Изобретение относитс  к горной промышленности, а именно к подготовке горной выработки к переходу ее очистным забоем, оборудованным механизированным комплексом.The invention relates to the mining industry, in particular to the preparation of a mine working for its transition to a clearing face equipped with a mechanized complex.

Известен способ подготовки горно выработки к переходу ее механизированным комплексом, когда до подхода комплекса крепь выработки усиливают путем установки продольных прогонов с постановкой под верхн ки дерев нных стоек по всей длине выработки l .There is a known method of preparing a mine workout for its transition by a mechanized complex, when, before the approach of the complex, the lining is strengthened by installing longitudinal runs with the installation under the upper wooden posts along the entire length of the mine l.

Известен способ подготовки выработки к переходу механизированным комплексом, включающий предварительное усилениекрепи горной выработки путем выкладки костров по всей длине выработки 2 .There is a method of preparing the excavation for the transition by a mechanized complex, including the preliminary strengthening of the reinforcement of the excavation by laying fires along the entire length of the excavation 2.

Недостатком известных способов  вл етс  трудность перехода выработки механизированнЕзМ комплексом ввиду большой деформации выработки при нахождении ее в зоне опорного давлени  впереди очистного забо . Цель изобретени  - уменьшение снижени  нагрузки на очистной забой повышение скорости и безопасности работ при переходе выработки.A disadvantage of the known methods is the difficulty of transferring the output of the mechanized complex due to the large deformation of the excavation when it is in the reference pressure zone ahead of the clearing face. The purpose of the invention is to reduce the reduction of the load on the working face, increasing the speed and safety of work during the transition of production.

Указанна  цель достигаетс  тем, что в способе подготовки горной выработки к переходу механизированным комплексом, включающем предварительное усиление крепи горной выработки путем выкладки костров по всей длине ее, по бокам выработки,цо подхода к ней механизированного комплекса на уровне верхн ков штрековой крепи производ т выемку полости на глубину не менее половины шага пере вижки механизированного комплекса, в которую завод т и расклинивают опережающий верхн к, по другую сторону которого до возведени  костров устанавливают временную стойку.This goal is achieved by the fact that in the method of preparing a mine workout for the transition by a mechanized complex, including pre-reinforcement of mine workings by laying fires along its entire length, on each side of the mine, the approach to it of the mechanized complex is at the level of the upper liner producing the cavity at a depth of not less than half the step of re-sinking the mechanized complex, in which the plant and wedges the advancing top, on the other side of which, before making campfires, set variable rack.

В выработке, пройденной с подрывкой пород почвы, выемку полостей вIn the development, passed with the undermining of rocks of the soil, excavation of cavities

боках выработки и установку опережающих верхн ков производ т на высоте , обеспечивающей переход ее комплексом с подхватыванием опережающих верхн ков, причем опережающие верхн ки поддерживают путем установки дополнительных дерев нных стоек между ними и верхними элементами костров,the sides of the excavation and installation of leading tops is made at a height that ensures its transition with a complex with pick up of leading tops, and the leading tops are supported by installing additional wooden racks between them and the upper elements of fires,

В выработке, пройденной с подрывкой пород кровли, выемку полостей в боках выработки и установку опережающих верхн ков производ т ниже верхн ков штрекового креплени , в верхней части угольного пласта.In excavated roofing, the cavities in the sides of the excavation and installation of leading tops are made below the top of the drift fastener in the upper part of the coal seam.

На фиг. 1 показаны приближающийс  к переходимой выработке очистной механизированный комплекс и подготавливаема  к переходу выработка, вид в плане; на фиг. 2 - разрез А-А на фиг. 1 (подготавливаема  выработка , когда в полость с одной стороны (бока) выработки заведен опережающий верхн к и под ним установлена стойка); на фиг. 3 - разрез Б-Б на фиг. 1 (то же, но опережающие верхн ки заведены с обеих сторон выработки и под ними установлены стойки); на фиг. 4 - разрез В-В на фиг. 1 (то же, но произведено последующее возведение костра и стойки из-под опережающих верхн ков убраны); на фиг. 5 - разрез Г-Г на фиг. 1 (участок выработки пройден с подрывкой пород почвы и опережающие верхн ки размещены выше штрекового креплени , так как произведена подрывка кровли, выложен костер и установлены дополнительные стойки между опережающими верхн ками и верхними элементами костров); на фиг. 6 - вид по стрелке Д на фиг, 5; на фиг. 7 разрез Е-Е на фиг, 1 (крепление участка выработки, пройденного с подрывкой пород кровли, опережающие верхн ки размещены в полости, пройденной в угольном пласте, соответственно выложен костер); на фиг. 8 по казан пример входа крепи комплекса в выработку с подхватыванием козырь ком секции крепи опережающего верхн ка . Способ подготовки горной выработ ки дл  перехода механизированным комплексом осуществл етс  следующим образом. До подхода очистного забо , оборудованного механизированным комплексом 1, к переходимой выработке 2 на рассто ние, составл ющее не мене величины зоны опорного давлени  впе реди очистного забо  (обычно 30-50м плюс рассто ние, на которое подвинетс  очистной забой за врем  подго товки выработки к переходу, начинаю подготовку последней, путем усилени крепи выработки. Выработка 2 пройде на таким образом, что участок ее а пройден по пласту, участок б с подрывкой почвы, а участок в с подрывкой кровли. Усиление крепи выработки на участке а выработки 2 ведут в следующе последовательности, В выработке 2 по ее углам на уровне верхн ков 3 штрековой крепи между верхн ками 3 производ т выемку полостей в боках выработки на глубину не менее половины шага передвижени  механизированного комплекса с тем, чтобы при его подходе обеспечить гарантирован ное подхватывание опережающих верхн ков 4. Выемку полостей в боках выработки 2 возможно производить о помощью отбойных молотков, с применением бу ровзрывных работ, бурением или вруч ную. Выемку полостей ведут последовательно с заводкой в нее опережающих верхн ков 4 и 5, вначале с одного бока выработки под один опережающий верхн   5, который завод т в полость и расклинивают дерев нным клином б, после чего подставл ют под свободный конец верхн ка 4 временную стойку 7. Затем производ т выемку полости с другого ббка выработки, в которую завод т опережающий зерхн к 5, который расклинивают дерев нным клином 8, а под конец верхн ка 5 подставл ют временную стойку 9. Интенсивность установки опережающих верхн ков 4 и 5 определ ют в зависимости от т жести пород кровли и про влени  горного давлени . По окончании возведени  верхн ков 4 и 5 с расклинкой клинами 6 и 8 и установкой стоек 7 и 9 в выработке 2, равной не менее длины стороныг, производ т возведение костра 10 из рудничной стойки или обрезного бруса 11. Перед окончанием возведени  костра 10 временные стойки 7 и 9 убирают и используют дл  окончани  возведени  костра. Далее операции по выемке полостей, заводке и расклинке верхн ков, постановке временных стоек и их последующего использовани  дл  окончани  возведени  костров повтор ют до окончани  подготовки выработки (участка а) к переходу по всей длине. В случае, если участокб или вс  выработка 2 пройдена с подрывкой пород почвы, то, кроме выемки полостей в боках выработки, производ т и подрывку кровли. Высоту подрывки кровли выбирают, исход  из мощности угольного пласта и раздвижки крепи механизированного комплекса, с тем, чтобы обеспечить переход выработки комплексом с подхватыванием его крепью опережающих верхн ков 4 и 5. Аналогичный вариант способа перехода сбойки возможен и в случае сильной деформации (поломок) элементов штрековой крепи выработки 2 на ее участке ( например б) или по всей длине выработки. Операцию подрывки кровли производ т тем же способом, что и выемку полостей в боках выработки , т.е. с помощью отбойных молотков , с применением БВР, бурением или вручную. Установку опережающих верхн ков 4 .и 5, их расклинку клинь ми 6 и В, установку под их концы стоек 7 и 9 и их уборку с использованием в качестве элементов костров 10 производ т аналогично предыдущему варианту ведени  работ на участке а выработки 2. По окончании возведени  костра 10 между опережающими верхн ками 4 и 5 и элементами костра 10 устанавливают дополнительные дерев нные стойки 12 и 13, В случае, если участок в или вс  выработка 2 пройдены с подрывкой кровли, то выемку полостей в боках выработки и установку опережающих верхн ков производ т ниже верхн ков 3 штрекового креплени  в верхней части угольного пласта, таким образом, чтобы обеспечить подхватывание опережающих верхн ков 4 и 5 комплексом при входе и выходе комплекса из выработки 2. Все операции по выемке полостей, установке опережающих верхн ков, их расклинке, установке временных стоек под опережающие верхн ки и их последующее использование дл  окончани  выкладки костра аналогичны таковым при подготовке к переходу участка а выработки 2, за исключением выкладки костра, который выкладывают вначале между почвой выработки и опережающими верхн ками, а затем между опережающими верхн ками и верхн ками штрекового креплени . В этом случае опережающие верхн ки 4 и 5 располагаютс  внутри костра 10,  вл  сь его составными элементами, На фиг, 8 показан пример входа секции 14 крепи комплекса 1 под one режающий верхн к 4 усиленной крепи выработки 2 на участке а. Благодар  выступающей консольной части опережающего верхн ка 4, равной не менее половины шага передвижки комплекса, обеспечено подхватывание козырькомFIG. Figure 1 shows a mechanized cleaning complex approaching a transfer development and a production plan is prepared for the transition, a plan view; in fig. 2 shows section A-A in FIG. 1 (production is prepared, when a leading top is inserted into the cavity from one side (side) of the working) and a rack is installed under it); in fig. 3 shows a section BB in FIG. 1 (the same, but leading tops are set on both sides of the mine, and racks are installed under them); in fig. 4 shows a section B-B in FIG. 1 (the same, but the subsequent construction of the fire was made and the pillars were removed from under the leading heads); in fig. 5 is a section of YYD in FIG. 1 (the excavation section was crossed with demolition of the soil rocks and the advanced gates are located above the drift fastening, since the demolition of the roof was made, a fire was laid out and additional racks were installed between the leading upper edges and upper elements of the fires); in fig. 6 is a view along arrow D in FIG. 5; in fig. 7, section EE in FIG. 1 (the fastening of the section of the excavation, traversed with undermining of the roof rocks, the advancing tops are placed in the cavity, traversed in the coal seam, respectively, a bonfire is lined); in fig. 8 shows an example of the entry of the complex into the production with pick-up by the hood of the section of the support of the leading top. The method of preparing a mine for the transition by a mechanized complex is carried out as follows. Before the approach of the clearing slab, equipped with the mechanized complex 1, to the converted excavation 2, the distance is not less than the size of the reference pressure zone ahead of the clearing slab (usually 30-50m plus the distance that the excavation face will move to transition, I start preparing the latter, by strengthening the lining of development.Enginement 2 is passed on in such a way that its section a is passed through the seam, section 6 with soil undermining, and section 6 with undermining of the roof. 2 are led in the following sequence. In the development 2 at its corners at the level of the tops 3 of the lintel between the tops 3, cavities in the sides of the excavation are dredged to a depth of not less than half the step of movement of the mechanized complex in order to ensure guaranteed pickup. advanced upper heads 4. It is possible to excavate cavities in the sides of the mine 2 with the help of jackhammers, using drilling and blasting, drilling or manually. The cavities are excavated sequentially, with leading heads 4 and 5 being fed into it, first from one side of the workout under one leading top 5, which is led into the cavity and wedged with a wooden wedge b, after which the top 4 is placed under the free end 7. Then, a cavity is dredged from another lining of the excavation, into which a leading surface mill is brought to 5, which is wedged with a wooden wedge 8, and a temporary stand is inserted at the end of the top 5 9. The intensity of the installation of the leading upper 4 and 5 is determined in s depending on the gravity of the roof rocks and the occurrence of rock pressure. At the end of the construction of the tops 4 and 5 with the wedges 6 and 8 and the installation of racks 7 and 9 in the excavation 2, which is not less than the length of the sides, the fire 10 is erected from the mine rack or the cut timber 11. Before the end of the construction of the fire 10 temporary racks 7 and 9 are removed and used to terminate the erection of a fire. Further, the operations on excavation of cavities, winding up and racking out the tops, setting up temporary stands and their subsequent use to complete the erection of fires are repeated until the end of the preparation of the excavation (section a) for the transition along the entire length. In case the area 2 or the whole production 2 is completed with the demolition of soil rocks, then, in addition to the excavation of cavities in the sides of the excavation, the demolition of the roof is also performed. The height of the undermining of the roof is chosen based on the thickness of the coal seam and the expansion of the mechanized complex, in order to ensure the transfer of production by the complex with the lifting of the leading upper 4 and 5 with the lining. A similar variant of the transition mode is possible roadway lining 2 on its site (for example b) or along the entire length of the mine. The operation of undermining the roof was carried out in the same way as the excavation of cavities in the sides of the excavation, i.e. using jackhammers, using drilling and drilling, drilling or manually. The installation of the leading upper plates 4. And 5, their wedging of the wedges 6 and B, the installation under their ends of the pillars 7 and 9 and their cleaning using fire elements 10 as the elements of the fires 10 is carried out similarly to the previous version of conducting work on the section a of production 2. At the end erection of the fire 10 between the advanced heads 4 and 5 and the elements of the fire 10, additional wooden posts 12 and 13 are installed. In case the section in or the entire production 2 is passed with a roof undercut, the excavation of the cavities in the sides of the production and installation of the leading tops t Below the top 3 of the drift fasteners in the upper part of the coal seam, in such a way as to ensure that the leading tops 4 and 5 are picked up by the complex as the complex enters and leaves the mine 2. All operations on excavation of cavities, installation of the leading tops stands under the leading tops and their subsequent use for the termination of the laying of the fire are similar to those in preparation for the transition of section a of excavation 2, except for the laying of the fire, which is laid out first between the soil taps and leading tops, and then between the leading tops and to the top of the drift fastener. In this case, the leading top 4 and 5 are located inside the fire 10, being its constituent elements. FIG. 8 shows an example of the entrance of the section 14 of the complex 1 for one’s cutting upper to 4 of the reinforced lining 2 at section a. Thanks to the protruding cantilever part of the leading top 4, equal to not less than half the step of shifting the complex, a pick-up is ensured

фиг. 2 фигЛFIG. 2 figl

ФигЗ 15 секции 14 крепи комплекса 1 опережающего верхн ка 4, а значит и поддержание кровли при подходе комплекса к переходимой выработке. Кроме того, обеспечен переход выработки с подхватом верхн ков 4 и 5 без опускани  секции 14 крепи комплекса 1, и, соответственно, выход комплекса из выработки в угольный целик под защитой консолей опережающих верхн ков . 5 73 /X y/AV/XV // /XV/XN/// // Фиг5FigZ 15, section 14, supports complex 1, the leading top 4, and hence maintenance of the roof when the complex approaches the transitional working. In addition, the transition of the excavation with pickups of the tops 4 and 5 without lowering section 14 of the lining of complex 1, and, accordingly, the output of the complex from the output to the coal pillar under the protection of the advancing upper consoles. 5 73 / X y / AV / XV // / XV / XN /// // Fig5

Е-ЕHER

фиг.77

1515

Фиг. 8FIG. eight

Claims (3)

1,. СПОСОБ ПОДГОТОВКИ ГОРНОЙ ВЫРАБОТКИ К ПЕРЕХОДУ МЕХАНИЗИРО-1,. METHOD FOR PREPARING MINING OPERATION FOR THE TRANSITION OF THE MECHANICAL ВАННЫМ КОМПЛЕКСОМ, включающий предварительное усиление крепи горной выработки путем выкладки костров по всей длине ее, отличающийся тем, что; с целью уменьшения снижения нагрузки на очистной забой, повышения скорости и безопасности работ при переходе выработки, по бокам выработки, до подхода к ней механизированного комплекса, на уровне верхняков штрековой крепи производят выемку полости на глубину не менее половины шага передвижки механизированного комплекса, в которую заводят и расклинивают опережающий верхняк, по другую сторону которого до возведения кост- § ров устанавливают временную стойку.BATHING COMPLEX, including the preliminary strengthening of the lining of the mine by laying fires along its entire length, characterized in that; in order to reduce the load on the working face, increase the speed and safety of work during the transition of the mine, on the sides of the mine, until the mechanized complex approaches it, at the level of the roof supports, excavate a cavity to a depth of at least half the step of moving the mechanized complex into which and wedge ahead of the upper, on the other side of which, before the construction of fires, establish a temporary stand. >> 2. Способ по π. 1, отличающийся тем, что, с целью подготовки к переходу механизированным комплексом горной выработки, пройденной с подрывкой пород почвы, выемку полостей в боках выработки и установку опережающих верхняков производят на высоте, обеспечивающей переход ее комплексом с подхватыванием опережающих верхняков, причем опережающие верхияки поддерживают путем установки дополнительных дере вянных стоек между ними и верхними элементами костров.2. The method according to π. 1, characterized in that, in order to prepare for the transition by a mechanized complex of mining excavated with soil blasting, excavation of cavities in the sides of the excavation and installation of leading upper are performed at a height that ensures its transition with the catching of leading upper, and the leading upper are supported by installation of additional wooden racks between them and the upper elements of bonfires. 3. Способ поп. 1, отличающийся тем, что, с целью подготовки к переходу механизированным комплексом горной выработки пройденной с подрывкой пород кровли, выемку полостей в боках выработки и установку опережающих верхняков производят ниже верхняков штрекового крепления, в верхней части угольного пласта.3. The method of pop. 1, characterized in that, in order to prepare for the transition by a mechanized mining complex, the roof passed with blasting, excavation of cavities in the sides of the excavation and installation of leading elevators is carried out below the elevations of the drift mount, in the upper part of the coal seam.
SU823457413A 1982-06-21 1982-06-21 Method of preparing mine working to its traversing by mine machinery set SU1064006A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823457413A SU1064006A1 (en) 1982-06-21 1982-06-21 Method of preparing mine working to its traversing by mine machinery set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823457413A SU1064006A1 (en) 1982-06-21 1982-06-21 Method of preparing mine working to its traversing by mine machinery set

Publications (1)

Publication Number Publication Date
SU1064006A1 true SU1064006A1 (en) 1983-12-30

Family

ID=21018125

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823457413A SU1064006A1 (en) 1982-06-21 1982-06-21 Method of preparing mine working to its traversing by mine machinery set

Country Status (1)

Country Link
SU (1) SU1064006A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2472934C1 (en) * 2011-07-29 2013-01-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Method of crossover with working face of development passed with formation roof slashing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Временна инструкци по переходу сбоек механизированными комплексами . Подмосковный научно-исследовательский и проектно-конструкторский угольный институт (ПНИУИ) Минуглепрома СССР, Новомосковск, 1971, с. 4-5, 11-17. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2472934C1 (en) * 2011-07-29 2013-01-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Method of crossover with working face of development passed with formation roof slashing

Similar Documents

Publication Publication Date Title
CN108661646A (en) A kind of false top house column type shrink afterwards filling mining method
CN107339104A (en) Security personnel's curtain wall recovery method
CN101302933B (en) Method for developing rock lane comprehensive mechanization developing operation
CN110778320A (en) Synchronous excavation supporting construction method for three-step inverted arch of weak surrounding rock tunnel
CN111997616B (en) Method for continuously recycling residual top-bottom column by adopting large section
CN115853514A (en) Reserved interval type ore pillar downward access filling mining method
CN110230495A (en) A kind of subway station double -side approach construction Core Soil excavation method
CN110219650B (en) Deep hole subsequent filling mining method in environment reconstruction stage
CN103982186A (en) Bottom-pillar-free retreating vertical inclined strip sublevel caving mining method
CN102926754B (en) Two-tunneling bidirectional stripping two-step pre-support mining method
CN111042816B (en) Mine section hole-cutting roadway-forming tunneling method
SU1064006A1 (en) Method of preparing mine working to its traversing by mine machinery set
CN115653602A (en) Reserved interval type pillar upward access filling mining method
RU2743162C1 (en) Method for forming a dismantling chamber when developing slim coal beds
RU2315867C2 (en) Method for thick steeply inclined coal seam excavation
CN108397196B (en) A kind of gently inclined orebody open air trestle mining methods based on lattice guest's artificial ore pillar
RU2215147C2 (en) Method of mining of inclined ore deposits
RU2144139C1 (en) System for tunneling machines
SU1458574A1 (en) Method of mining ore bodies
CN110700832B (en) Mining method under complex condition of panel coal pillar working surface
SU1719638A1 (en) Method for working of flat-seam useful mineral deposits
CN106761749A (en) Large-inclination-angle coal bed breaking roof big gun is adopted and turns fully mechanized mining
RU2083833C1 (en) Method for development of steep coal seams with backing worked-out area
SU909173A1 (en) Method of directing artificial pillars
SU1728488A1 (en) Method of mining coal seams