SU1055884A2 - Apparatus for supporting dome-roof mine working with roof bolts - Google Patents

Apparatus for supporting dome-roof mine working with roof bolts Download PDF

Info

Publication number
SU1055884A2
SU1055884A2 SU802970337A SU2970337A SU1055884A2 SU 1055884 A2 SU1055884 A2 SU 1055884A2 SU 802970337 A SU802970337 A SU 802970337A SU 2970337 A SU2970337 A SU 2970337A SU 1055884 A2 SU1055884 A2 SU 1055884A2
Authority
SU
USSR - Soviet Union
Prior art keywords
roof
frame
additional
racks
axis
Prior art date
Application number
SU802970337A
Other languages
Russian (ru)
Inventor
Валерий Федорович Горбунов
Владимир Михайлович Скоморохов
Михаил Ефимович Рыжевский
Original Assignee
Комплексный Отдел Института Горного Дела Со Ан Ссср
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Комплексный Отдел Института Горного Дела Со Ан Ссср filed Critical Комплексный Отдел Института Горного Дела Со Ан Ссср
Priority to SU802970337A priority Critical patent/SU1055884A2/en
Application granted granted Critical
Publication of SU1055884A2 publication Critical patent/SU1055884A2/en

Links

Abstract

УСТРОЙСТВО ДЛЯ КРЕПЛЕНИЯ АНКЕРАМИ КРОВЛИ ВЫРАБОТКИ СВОДЧАТОЙ ФОРМЫ по авт. св. № 846742, отличающеес  тем, что, с целью снижени  времени на крепление выработки , а также повышени  производительности труда, оно снабжено дополнительной П-образной рамой с анкероустановочными механизмами, установленными вдоль ее стоек, и поперечным гидродомкратом, при этом дополнительна  рама своими стойками установлена на оси основной рамы и размещена относительно нее под углом, причем обе рамы св заны между собой поперечйым гидродомкратом. (П ел СП 00 00 4;: ( (; ; х//б; Фиг.1DEVICE FOR FASTENING BY ANCHORING OF THE ROOF OF DEVELOPING A CONSOLIDATED FORM on author. St. No. 846742, characterized in that, in order to reduce the time for fixing production, as well as to increase labor productivity, it is equipped with an additional U-shaped frame with anchorage mechanisms installed along its racks and a transverse hydraulic jack, while the additional frame is installed on its racks the axis of the main frame and is positioned relative to it at an angle, with both frames being connected to each other by a cross hydraulic jack. (Pel SP 00 00 4 ;: ((;; x // b; Figure 1

Description

Изобретение относитс  к горнопроходческому оборудованию, в частности, к средствам механизации возведени  анкерной крепи. По основному авт. св. № 846742 известно устройство дл  креплени  анкерами кровли выработки сводчатой формы, включающее ходовую тележку, стрелу из П-образной телескопической рамы с бурильными машинами, имеющую две стойки из гидродомкратов , щтоки которых соединены поперечной св зью, а основани  стоек - с продольной осью, параллельной выработке, установленной на ходовой тележке с возможностью поворота рамы вместе с осью в плоскости поперечного сечени  выработки на угол до 180 ° посредством механизма поворота, при этом на концах щтоков закреплен рулон зат жки, а вдоль стоек - бурильные мащины 1. Недостаток устройства заключаетс  в неполной механизации процесса возведени  анкерной крепи вследствие отсутстви  у него механизмов установки анкеров, что увеличивает врем  на крепление выработки и снижает производительность труда. Цель изобретени  - снижение времени на крепление выработки, а также повыщение производительности труда. Поставленна  цель достигаетс  тем, что устройство дл  креплени  анкерами кровли выработки сводчатой формы снабжено дополнительной П-образной рамой с анкеррустановочньши механизмами, установленными вдоль ее стоек, и поперечным гидродомкратом , при этом дополнительна  рама своими стойками установлена на оси основной рамы и размещена относительно нее под углом, причем обе рамы св заны между собой поперечным гидродомкратом. На фиг. 1 изображена выработка с размещенным в ней устройством дл  креплени  анкерами ее кровли, поперечное сечение; на фиг. 2 - вид А на фиг. 1. Устройство состоит из ходовой тележки 1, перемещающейс  по рельсовому пути 2, и поворотной стрелы с механизмом ее поворота . Поворотна  стрела выполнена в виде двух телескопических П-образных рамосновной и дополнительной, расположенных под углом друг к другу и в нижней части имеющих общую ось 3. Кажда  из двух П-образных рам образована двум  гйдродомкратами 4, щтоки которых соединены поперечными св з ми, В верхней части основной рамы на штоках гидродомкратов 4 прикреплена кассета с сеткой 5, а вдоль . гидродомкратов 4 расположены две бурильные мащины 6, которые прикреплены к поперечной балке основной рамы. Вдоль гидродомкратов 4 дополнительной рамы расположены два анкеррустановочных механизма 7. Каждый анкероуста овочный механизм 7 включает вращатель, расположенный на направл ющей балке, механизм подачи вращател  и анкерный стержень 8, например, винтового типа. Одним концом анкерный стержень установлен в гнездо вращател , другим - в специальном поворотном кронщтейне 9, что дает ввзможность фиксировать анкерный стержень 8 в данном положении и направл ть его в щпур при закреплении. В нижней части гидродомкраты 4 основной рамы жестко соединены с осью 3 поворотного механизма, состо щего из черв чного редуктора 10, черв чное колесо которого соединено с осью 3, и гидродвигател  11. Ось 3 поворотного механизма с обеих сторон поворотной стрелы шарнирно закреплена в опорах 12, смонтированных на ходовой тележке 1. Гидродомкраты 4 дополнительной рамы щарнирно установлены на оси 3. Основна  и дополнительна  рамы в средней части соединены посредством поперечного гидродомкрата 13, обеспечивающего изменение угла между ними, Устройство работает следующим образом . В транспортном положении с вертикально расположенной поворотной стрелой с максимально сведенными первой и второй рамами и вдвинутыми щтоками гидродомкратов 4 устройство на ходовой тележке 1 по рельсовому пути 2 подают к месту креплени . Поворотную стрелу устанавливают в горизонтальное положение, сматывают немного сетку 5 с кассеты и производ т бурение шпуров сквозь  чейки сетки бурильными мащинами 6. Затем включают гидродвигатель 11 механизма поворота, который посредством черв чного редуктора 10 вращает ось 3 в шарнирных опорах 12, вследствие ,чего перемещаетс  поворотна  стрела , разматыва  сетку с кассет 5 и основна  рама поворотной стрелы подводитс  к следующему месту бурени . .Дополнительную раму, щарнирно установленную на оси 3, гидродомкратом 13 подвод т к ранее пробурённым щпурам. Включают вращатель ц механизм его подачи айкероустайовочйого 41еханизма 7 и производ т ввинчивание винтового анкерного стержн  8 в ранее пррбурённый щпур. Поворотный кронщтейн 9 при подходе к нему вращател  поворачиваетс , освобожда  анкерный стержень 8 и не меша  проходу вращател  дл  окончательного ввинчивани  анкерного стержн  8. В то врем  как с помощью дополнительной рамы производ т закрепление анкерных стержней 8 двум  анкероустановочными механизмами 7, с помощью основной рамы одновременно производ т бурение бурильными машинами 6 следующей пары шпуров. Затем вращатели анкероустановочных механизмов 7 и бурильные машины 6 отвод т в исходное положение, включают механизм поворота и поворотную стрелу подвод т к новому месту бурени , а также к новому месту установки анкеров.The invention relates to mining equipment, in particular, to the means of mechanization of the construction of anchor bolts. According to the main author. St. No. 846742, a device for attaching roof-shaped vaulting to anchors is known, including a chassis carriage, an U-shaped telescopic frame boom with boring machines, having two racks of hydraulic jacks, which are cross-connected with rods, and the base of racks with a longitudinal axis parallel to the workings mounted on the undercarriage with the possibility of rotation of the frame together with the axis in the plane of the cross-section of the excavation at an angle of up to 180 ° by means of the rotation mechanism, while at the ends of the rods the pulling roll is fixed, along the uprights - 1. Lack maschiny drilling device comprises a partial mechanization erecting roof bolting it due to the absence of mechanisms anchor installation, which increases the time for developing and fixing reduces productivity. The purpose of the invention is to reduce the time for fixing production, as well as increase productivity. The goal is achieved by the fact that the device for fastening roof anchors with a vaulted shape is provided with an additional U-shaped frame with anchoring mechanisms installed along its pillars and a transverse hydraulic jack, while the additional frame is mounted on the axis of the main frame and placed relative to it at an angle , with both frames connected to each other by a transverse hydrojack. FIG. 1 shows the production with a device for fastening its roof with anchors placed in it, cross section; in fig. 2 is a view A of FIG. 1. The device consists of a undercarriage 1 moving along the track 2 and a swinging boom with a mechanism for its rotation. The swivel boom is made in the form of two telescopic U-shaped frames and an additional one located at an angle to each other and in the lower part having a common axis 3. Each of the two U-shaped frames is formed by two hygrodoms 4, the rods of which are cross-linked, B the top of the main frame on the rods of the hydraulic jacks 4 is attached to the cassette with a grid of 5, and along. hydraulic jacks 4 are located two drill maschine 6, which are attached to the transverse beam of the main frame. Along the jacks 4 of the additional frame, there are two anchor mechanisms 7. Each ankerustaste mechanism 7 includes a rotator located on the guide beam, a rotator feeding mechanism and anchor rod 8, for example, of a screw type. One end of the anchor rod is installed in the rotator socket, the other in a special swivel arm 9, which allows you to fix the anchor rod 8 in this position and guide it to the clamp when it is attached. In the lower part, the hydraulic jacks 4 of the main frame are rigidly connected to the axis 3 of the rotary mechanism, consisting of a worm gear 10, the worm wheel of which is connected to the axis 3, and the hydraulic motor 11. The axis 3 of the rotary mechanism on both sides of the swivel boom is hinged in bearings 12 mounted on the undercarriage 1. Hydrojacks 4 of the additional frame are pivotally mounted on the axis 3. The main and additional frames in the middle part are connected by means of a transverse hydrojack 13 providing the angle between them, the Device The structure works as follows. In the transport position with a vertically located pivoting boom with the first and second frames maximally flattened and the hydraulic tappers 4 pushed in, the device on the undercarriage 1 along the track 2 is fed to the attachment point. The pivot boom is placed in a horizontal position, the grid 5 is slightly rewound from the cassette and drilling holes are drilled through the grid cells by drilling masks 6. Then the hydraulic motor 11 of the rotation mechanism is turned, which rotates the axis 3 in the hinge bearings 12, thereby moving the boom, unwinding the net from the cassettes 5 and the main frame of the boom, leads to the next drilling position. An additional frame, which is hinged on axis 3, is connected with hydrojack 13 to previously drilled axles. The rotator and the mechanism for feeding the aikero-forging mechanism 7 are turned on and the screw anchor rod 8 is screwed into the previously drilled shaft. The rotating arm 9, when approached, the rotator rotates, releasing the anchor rod 8 and not interfering with the rotation of the rotator for final screwing of the anchor rod 8. While using an additional frame, the anchor rods 8 are fixed by two anchor-setting mechanisms 7, simultaneously Drilling machines 6 are drilled for the next pair of holes. Then, the rotators of the anchorage mechanisms 7 and the boring machines 6 are retracted to the initial position, include a turning mechanism and a rotary boom leading to a new drilling site, as well as to a new installation site of anchors.

После того, как закреплена полоса выработки по всему своду, устройство по рельсовому пути 2 на ходовой тележке 1 передвигают к забою на ширину сетки и процесс креплени  повтор етс . Расположение анкеров следующей полосы креплени  выработки по отношению к соседней - шахматное .After the production strip is fixed throughout the arch, the device is moved along the track 2 on the undercarriage 1 to the face by a grid width and the mounting process is repeated. The location of the anchors of the next fastening strip in relation to the neighboring strip is chess.

Использование предложенного устройства обеспечивает совмеш,ение во времени операций по бурению шпуров и установки анкеров, за счет чего сокрашаетс  врем  на установку анкерной крепи в 2-2,5 раза, а также повышение производительности труда при проходке горных выработок на 15-20%.The use of the proposed device makes it possible to combine drilling operations and installing anchors in time, thereby reducing the time for installing anchor bolts by 2-2.5 times, as well as increasing labor productivity during mining operations by 15-20%.

13 8 3 13 8 3

Claims (1)

УСТРОЙСТВО ДЛЯ КРЕПЛЕНИЯ АНКЕРАМИ КРОВЛИ ВЫРАБОТDEVICE FOR ATTACHING ROOF ANCHORS КИ СВОДЧАТОЙ ФОРМЫ по авт. св. № 846742, отличающееся тем, что, с целью снижения времени на крепление выработки, а также повышения производительности труда, оно снабжено дополнительной П-образной рамой с анкероустановочными механизмами, установленными вдоль ее стоек, и поперечным гидродомкратом, при этом дополнительная рама своими стойками установлена на оси основной рамы и размещена относительно нее под углом, причем обе рамы связаны между собой поперечным гидродомкратом.KI VALVE FORM by ed. St. No. 846742, characterized in that, in order to reduce the time for securing the mine, as well as increase labor productivity, it is equipped with an additional U-shaped frame with anchor mechanisms installed along its racks, and a transverse hydraulic jack, while the additional frame with its racks is mounted on axis of the main frame and placed relative to it at an angle, and both frames are interconnected by a transverse hydraulic jack.
SU802970337A 1980-06-11 1980-06-11 Apparatus for supporting dome-roof mine working with roof bolts SU1055884A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802970337A SU1055884A2 (en) 1980-06-11 1980-06-11 Apparatus for supporting dome-roof mine working with roof bolts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802970337A SU1055884A2 (en) 1980-06-11 1980-06-11 Apparatus for supporting dome-roof mine working with roof bolts

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
SU846742 Addition

Publications (1)

Publication Number Publication Date
SU1055884A2 true SU1055884A2 (en) 1983-11-23

Family

ID=20913467

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802970337A SU1055884A2 (en) 1980-06-11 1980-06-11 Apparatus for supporting dome-roof mine working with roof bolts

Country Status (1)

Country Link
SU (1) SU1055884A2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012109700A1 (en) * 2011-02-16 2012-08-23 Rambor Pty Limited A mine bolter
CN102784945A (en) * 2012-08-29 2012-11-21 济南华北升降平台制造有限公司 Full-automatic drilling manipulator
US8662796B2 (en) 2008-08-08 2014-03-04 Geobrugg Ag Method and apparatus for lining tunnel walls or tunnel ceilings with protective nets
CN103628903A (en) * 2013-11-27 2014-03-12 郑东风 Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device
EP2885500A4 (en) * 2012-08-17 2016-06-15 J H Fletcher & Co Mesh handling apparatus and related methods
RU185266U1 (en) * 2017-07-28 2018-11-29 Общество С Ограниченной Ответственностью "Корум Майнинг" (Ооо "Корум Майнинг") MINING MACHINE WITH ANCHOR INSTALLER

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР № 846742, кл. Е 21 D 20/00,1979. *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8662796B2 (en) 2008-08-08 2014-03-04 Geobrugg Ag Method and apparatus for lining tunnel walls or tunnel ceilings with protective nets
RU2521007C2 (en) * 2008-08-08 2014-06-27 Геобругг Аг Method and device for mounting protective nets on tunnel walls or ceilings
WO2012109700A1 (en) * 2011-02-16 2012-08-23 Rambor Pty Limited A mine bolter
CN103562498A (en) * 2011-02-16 2014-02-05 兰博有限公司 A mine bolter
EP2885500A4 (en) * 2012-08-17 2016-06-15 J H Fletcher & Co Mesh handling apparatus and related methods
CN102784945A (en) * 2012-08-29 2012-11-21 济南华北升降平台制造有限公司 Full-automatic drilling manipulator
CN103628903A (en) * 2013-11-27 2014-03-12 郑东风 Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device
CN103628903B (en) * 2013-11-27 2015-05-27 郑东风 Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device
RU185266U1 (en) * 2017-07-28 2018-11-29 Общество С Ограниченной Ответственностью "Корум Майнинг" (Ооо "Корум Майнинг") MINING MACHINE WITH ANCHOR INSTALLER

Similar Documents

Publication Publication Date Title
US20100119310A1 (en) crawler-type and height adjustment drilling machine for setting roof and side wall anchor bolts and anchor cables
CN107060749A (en) Using the pick anchoring integral fully-mechanized digging machine of 4 advanced Anchor Cares of jumbolter
SU1055884A2 (en) Apparatus for supporting dome-roof mine working with roof bolts
DE2437669B2 (en) DRIVING DEVICE FOR DRIVING TUNNELS, ADAPTERS AND ROUTES
CN206957709U (en) Using the pick anchoring integral fully-mechanized digging machine of 4 advanced Anchor Cares of jumbolter
CA1136871A (en) Roof supports
CN210768786U (en) Rocker arm type tunneling machine
JPH07217392A (en) Working apparatus for tunnel construction
RU2026982C1 (en) Shaft-sinking set
RU2708130C1 (en) Platform-lining jack system
DE202017000916U1 (en) Device for expanding a tunnel, in particular a railway tunnel
SU846742A1 (en) Device for securing with anchors a vault-shaped mine working roof
CN114687776A (en) Roofbolter's stock is adjusted structure and roofbolter
RU2302529C1 (en) Complex for tunnel excavation in weak ground
CN216240412U (en) Gantry type jumbolter device
RU2205957C2 (en) Method of construction of middle tunnel of deep-seated column station in loose grounds
JPH0352879Y2 (en)
SU1712597A1 (en) Heading complex for driving horizontal and slightly inclined workings
SU1599557A1 (en) Power entry-driving support
JP3486025B2 (en) Rock bolt driving machine and rock bolt driving method using the same
SU1484940A1 (en) Entry-driving machine
JP2005139734A (en) Drilling machine available in drift, and movable drilling machine available in drift, using the same
SU393455A1 (en) VPTB
CN113356914B (en) Shield support for thin-layer inclined ore body mining support and construction method
CN219299343U (en) Supporting device for underground coal mine roadway