SU1054543A1 - Method of working ore deposits - Google Patents

Method of working ore deposits Download PDF

Info

Publication number
SU1054543A1
SU1054543A1 SU823385983A SU3385983A SU1054543A1 SU 1054543 A1 SU1054543 A1 SU 1054543A1 SU 823385983 A SU823385983 A SU 823385983A SU 3385983 A SU3385983 A SU 3385983A SU 1054543 A1 SU1054543 A1 SU 1054543A1
Authority
SU
USSR - Soviet Union
Prior art keywords
ore
deposits
congress
formation
excavation
Prior art date
Application number
SU823385983A
Other languages
Russian (ru)
Inventor
Юрий Георгиевич Скорняков
Original Assignee
Государственный Ордена Трудового Красного Знамени Институт По Проектированию Предприятий Цветной Металлургии
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственный Ордена Трудового Красного Знамени Институт По Проектированию Предприятий Цветной Металлургии filed Critical Государственный Ордена Трудового Красного Знамени Институт По Проектированию Предприятий Цветной Металлургии
Priority to SU823385983A priority Critical patent/SU1054543A1/en
Application granted granted Critical
Publication of SU1054543A1 publication Critical patent/SU1054543A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

t10 Изобретение относитс  к горной промьшпенности и может быть использовано при подземной разработке месторождений предсташшемьк свитой рудных залежей. Известен способ разработки сближенны ншшонных залежей средней мощности, разделенных безрудными просло ми, вклю чающий закладку выработанного пространства , применение самоходного обо рудовани , подготовку параллельной залежи фланговыми наклонными съездами и ортам и-ваездами из отрабатываемой камеры основной залежи Cljl. Недостатком известногх способа  вл етс  необходимость жесткой ув зки во времени и пространстве очистных работ в обеих рудных залежах, что значительно осложн ет проведение работ. Наиболее близким по технической сущности и достигаемому результату  вл етс  способ разработки рудных залежей, включающий проведение транспсфтных штреков, наклонного диагонального съезда по полезному ископаемому, ортов-заез дов из этого съезда и рудоспусков, выем ку и транспорт отбитой руды Недостатками данного спосбба  вл ютс  относительно высокие объемы подготовительных работ и невысока  интенсивность выемки руды при разработке свит рудных залежей. Цепь изобретени  - повъииение эффективности разработки свиты рудных залежей путем сокращени  объема подготовительных работ и интенсификации выемки РУДЫ., Поставленна  цель достигаетс  тем, что согласно способу разработки рудных залежей, вютючающему проведение транспортнь1х штреков, наклонного диагонального съезда по полезному ископаемому. 43 ортов-заездов из этого съезда и рудоспусков , выемку и транспорт отбитой руды, наклонный диагональный съезд проход т в нижней залежи свиты, ортамизаездами вскрывают и дел т все залежи свиты на подэтажи, в каждой , залежи проход т подэтажнъге рудные штреки, на которые ведут отбойку полезного ископаемого с опережением разработки вышележащих залежей, при этом ра 3работку подэтажей в каждой залежи осуществл ют независимо друг от друга и оставл ют породные толщи между залежами свиты, а выемку нижней залежи свиты осуществл ют из наклонного диагонального съезда в последнюю очередь. На фиг. 1 показана продольна  проекци  отрабатываемого участка; на фиг.2 разрез А-Л ва фиг.1; на фиг.З - paqpeis Б-Б на фиг.1. ОфабатываемьШ участок свиты рудных залежей ограничивают этажными 1ранспортш 1М11 впреками 1 между которыми проход т Щ)омежу очнъ1й безреш совый шорек 2, н в каждой залежи свиты 3 проход т диазгональный наклонный съезд 4. По высоте залежи дел т на подэтажи ортамЕ-заезДами 5 и рудвыми штреками 6, и Kcxrqpbix осуществл ют добычу и ipaacnqpT руды к рудоспуску Т Выемку залежй В ведут с опережением по отношению к залежи 9, причем очистные работы осуществл ютс  независимо во времени и в разных част х отрабатываемого участка без обрушени  межрудной толщи пород, а нижнюю залежь свиты отрабатывают из наклонного съезда в последнюю очередь. Предлагаемое изобретенЕе позвол ет повысить эффективностьразработки свит рудных залежей без обрушени  безрудньис толщ .t10 The invention relates to the mining industry and can be used in the underground mining of deposits of the pre-rolled ore deposits. There is a method of developing close-coupled deposits of medium thickness, separated by barren ridges, including laying the developed space, using self-propelled equipment, preparing a parallel deposit with flanking inclined congresses and orts and bridges from the developed chamber of the main reservoir Cljl. A disadvantage of the known method is the need for a hard connection in time and space of refining work in both ore deposits, which significantly complicates the work. The closest in technical essence and the achieved result is a method of developing ore deposits, including transpsft drifts, an inclined diagonal congress on the mineral, orths from this congress and ore passes, excavation and transport of broken ore. The disadvantages of this sposbba are relatively high the volume of preparatory work and the low intensity of ore excavation during the development of the ore deposits. The chain of the invention is to improve the efficiency of development of the suite of ore deposits by reducing the amount of preparatory work and intensifying the excavation of ore. The goal is achieved by the method of developing ore deposits, which involves carrying out an inclined diagonal exit over mineral resources. 43 orts-races from this congress and ore passes, excavation and transportation of broken ore, an inclined diagonal congress passes in the lower reservoir of the suite, orthorisable runs open and divide all the deposits of the suite into the sub-floor, each of the deposits undergo the sub-floor ore plumes that lead the mining of minerals ahead of the development of the overlying deposits, at the same time, the development of sublevels in each deposit is carried out independently of each other and the rock strata between the deposits of the suite are retained, and the lower pool of the suite is excavated from sloping Diagonal Congress last. FIG. 1 shows a longitudinal projection of the section to be worked; in Fig.2 a section A-L VA of Fig.1; on fig.Z - paqpeis bb in figure 1. OfabatyvaemSh site of the retinue of ore deposits is limited by storey 1M111 transport in the tracks 1 between which we pass), and without each other, 3 diagonal inclined exit 4 is carried out. using drifts 6, and Kcxrqpbix carry out mining and ipaacnqpT ores to the ore pass T Trenching deposit B is advanced ahead of reservoir 9, and the cleaning work is carried out independently in time and in different parts of the section to be worked without breaking the oreflash genus, and the lower pool of the suite work out of the inclined congress last. The proposed invention allows to increase the efficiency of the development of the formations of ore deposits without collapsing without the use of strata.

Claims (1)

( 54) СПОСОБ РАЗРАБОТКИ РУДНЫХ ЗАЛЕЖЕЙ включающий проведение транс,- , дрртных штреков, наклонного диагональ- .(54) METHOD FOR DEVELOPING ORE DEPOSITS, including trans-drift drifts, inclined diagonal -. ортов-заездов из этого съезда и рудоспусков, выемку и транспорт отбитой руды, отличающийся тем, что, с целью повышения эффективности разработки рудных залежей за счет сокращения объема подготовительных работ и интенсификации выемки руды, наклонный диагональный съезд проходит в нижней залежи свиты, ортами-заездами вскрывают и делят все залежи свиты на подэтажи, в каждой залежи проходят под— этажные рудные штреки, да которые ведут отбойку полезного ископаемого с one—режением разработки вышележащих залежей, при этом разработку подэтажей в каждой залежи осуществляют независимо g друг от друга и оставляют породные “ толщи между залежами свиты, а выемку нижней залежи свиты осуществляют из наклонного диагонального съезда в пойдго съезда по полезному ископаемому, следнюю очередь.of ore-entrances from this congress and ore passages, excavation and transport of broken ore, characterized in that, in order to increase the efficiency of mining ore deposits by reducing the amount of preparatory work and intensification of ore excavation, an inclined diagonal exit takes place in the lower formation of the suite, orts-arrivals all suites are opened and divided into sub-floors, in each of the deposits pass under-floor ore drifts, which lead to the breaking of minerals with one-cutting development of overlying deposits, while the development of sub-floors in each deposit is carried out independently g from each other and the rock strata are left between the deposits of the formation, and the extraction of the lower deposit of the formation is carried out from an inclined diagonal congress to the poigdo congress on minerals, the last stage. SU.....1054543SU ..... 1054543
SU823385983A 1982-01-22 1982-01-22 Method of working ore deposits SU1054543A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823385983A SU1054543A1 (en) 1982-01-22 1982-01-22 Method of working ore deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823385983A SU1054543A1 (en) 1982-01-22 1982-01-22 Method of working ore deposits

Publications (1)

Publication Number Publication Date
SU1054543A1 true SU1054543A1 (en) 1983-11-15

Family

ID=20993784

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823385983A SU1054543A1 (en) 1982-01-22 1982-01-22 Method of working ore deposits

Country Status (1)

Country Link
SU (1) SU1054543A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Коган И. Ш. Сов щенствование: систем разработки Миргалимсайского мест(ч5ождени .Т рный журнал, 1977, № 7, с. 17. . 2. Именитм В. Р.Процессы подземнык . tX)pHbix работ при разработке рудных 1 сторождений, М., Недра, 1978, 454-457 (прототип). *

Similar Documents

Publication Publication Date Title
SU1054543A1 (en) Method of working ore deposits
SU1155757A1 (en) Method of mining mineral deposits
SU987103A1 (en) Method of working thick horizontal and gently sloping deposits
SU899959A1 (en) Method of mining mineral deposits
SU891925A1 (en) Method of mining thick sloping coal beds
SU887809A1 (en) Method of mining sloping and gently sloping coal beds
SU903566A1 (en) Method of working thick gently-sloping coal beds
SU898067A1 (en) Method of working thick coal beds
SU898074A1 (en) Method of working gently sloping ore deposits
SU881323A1 (en) Method of working ore bodies
SU827789A1 (en) Method of working thick sloping coal seams
RU2202041C2 (en) Process of development of reserves of thick steeply deepening deposits of ore located under pits
SU866191A1 (en) Mineral excavator method
SU949182A1 (en) Method for working gently sloping mineral seams
SU1004639A1 (en) Method of mining thick gently-sloping beds
SU1020580A1 (en) Method of mining thick ore bodies
SU748005A1 (en) Method of mining thick sloping beds of minerals
SU1566024A1 (en) Method of working series of thin coal strata and strata of middle capacity
SU870713A1 (en) Method of opening suites of steeply deeping and inclined seams
SU763596A1 (en) Method of working thick steep coal seams
SU829950A1 (en) Method of working adjacent sloping beds of minerals
SU1751332A1 (en) Method of mining steep coal seams prone to gas-dynamic effects
SU690181A1 (en) Method of combined mining of mineral fields
SU855209A1 (en) Method of caving overlapping rocks
SU649845A1 (en) Method of excavating slightly inclined seams of minerals