SU1051282A1 - Method of strip mining of horizontal and gently-sloping mineral deposits - Google Patents
Method of strip mining of horizontal and gently-sloping mineral deposits Download PDFInfo
- Publication number
- SU1051282A1 SU1051282A1 SU823482084A SU3482084A SU1051282A1 SU 1051282 A1 SU1051282 A1 SU 1051282A1 SU 823482084 A SU823482084 A SU 823482084A SU 3482084 A SU3482084 A SU 3482084A SU 1051282 A1 SU1051282 A1 SU 1051282A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- rocks
- dump
- plastic
- overburden
- dumping
- Prior art date
Links
Landscapes
- Sewage (AREA)
Abstract
1. СПОСОБ ОТКРЫТОЙ РАЗРАБОТКИ ГОРИЗОНТАЛЬНЫХ И ПОЛОГИХ МЕСТОРОЖДЕНИЙ ПОЛЕЗНЫХ ИСКОПАЕМЫХ , включающий селективную выемку разноструктурных вскрышных пород , в том ччсле пластичных, отработку псрлезного ископаемого заходками с селективным размещением вскрышных пород ;в выработанном пространстве карьера от .вальными за ходка ми вдоль фронта горных , отличающийс , тем, что, с целью повышени безопасности ведени горных работ за счет уменьшени деформаций внутренних отвалов, снижени водопритока в рабочую зону карьера н создани благопри тных условий дл последующей рекультивации , в процессе отсыпки пород каждой очередной отвальной заходки сначала отсыпают пластичные вскрышные породы На откос пород предыдущей отвальной заходки , а затем отсыпают остальные вскрЫщные породы с последовательной подвалкой откоса пластичных пород в направлении от ос.новани отвала к его поверхности, при этом пластичные породы отсыпают до уровн , превышающего уровень подъема вод в теле отвала. 2. Способ по п. 1, отличающийс тем, что i перед-отсыпкой пород каждой очередной отвальной заходки у нижней бровки откоса (Л пород предыдущей отвальной заходки до почвы фильтрующего сло формируют тран;шею , а пластичные породы дополнительно .отсыпают в указанную траншею.1. OPEN DEVELOPMENT METHOD OF HORIZONTAL AND PROBLEM DEPOSITS OF THE USEFUL MINERALS, including selective extraction of different structural overburden rocks, including plastic, development of a mineral fossil by means of selective placement of overburden; by the fact that, in order to increase the safety of mining operations by reducing the deformations of the internal waste dumps, reducing the water inflow into the working area of the open-pit and creating For subsequent reclamation, in the process of dumping the rocks of each of the next dump dumps, plastic overburden rocks are first dumped onto the slope of the rocks of the previous dump strip, and then the rest of the surge rocks are poured in the direction of the dump of the dumps to the surface, at the same time, plastic rocks are poured to a level exceeding the level of water rise in the dump body. 2. The method according to claim 1, characterized in that i before dumping the rocks of each of the next dump dumps at the lower edge of the slope (L rocks of the previous dump dumps to the soil of the filter layer form a trench; the plastic rocks are additionally dumped into the said trench.
Description
2 у / 2 y /
ZIZZIZ
.f.f
сл tcsl tc
0000
//
VV
юYu
А - - 1 . Изобретение относите к горной промышленности и может быть использовано при открытой разработке горизонтальных и пологих fecтopoждeний полезных ископаемых, преимущественно в сложных гидрогеологических услови х. Известен способ открытой разработкиторизонтальных и пологих месторождений полезных ископаемых, включающий отработку вскрышных пород и полезного ископаемого заходками с внутренним отвалообразованием и проведение дренажных канав в оснований отвала вдоль фронта горных работ I.. . . Недостатком известного способа вл етс его неэффективность при значительном водопритоке и высоком уровне подъема вод в теле отвала. Его применение не предотвращает деформацию отвалов, что в свою очередь, приводит к прорывам значительно: ) количества в рабочую зону карьера . При наличии в основании отвала фильтрующего сло пород дренажные канавы не могут предотвратить фильтрацию вод че,рез указанный слой. Наиболее близким, к предлагаемому гто технической сущности и достигаемому результату вл етс способ открытой разработки горизонтальных и пологих, месторождений полезных ископаемых, включающий селективную выемку разноструктурных вскрышных пород, в том числе и пластичных , отработку полезного ископаемого заходками с селективным размещением вскрыщных пород в выработанном пространстве карьера отвальными заходками вдоль фронта горных работ (2J. : Однако данный способ не предусматривает специальных меропри тий по уменьшению деформаций отвала, св занных с гидродинамическими усили ми, И водопритока в рабочую зону карьрра, сЛ не обеспечивает благопри тные услови дл последующей рекультивации отвала с-точки зрени создани удовлетворительных параметров гидродинамического режима отвала . , .- -..,. Цель изобретени - повышение безопасности вед ей и горных работ за счет уменьшени /деформаций внутренних отвалов И снижени водопритока в рабочую зору карьера, а также создание благопри тных условий дл последующей рекультивации. Поставленна цель достигаетс тем, что согласно способу открытой разработки горизонтальных и пологих месторождений полезных ископаемых, включающуму селективную выемку разноструктурных вскрышных пород, в том чнсле пластичных, отработку полезного ископаемого заходками с селективным размещением вскрышных пород в выработанном пространстве карьера отвальными заходками вдоль фронта горных работ, в процессе отсыпки пород каж 2J дои очередной отвальной .заходкн сначала отсыпают пластичные вскры11И1ые породы на откос пород предыдущей отвальной заходкй , а затем отсыпают остальные вскрыш-. ные породы с последовательной подвалкой откоса пластичных пород в направлении от основани отвала к его поверхности, при этом пластичные породы отсыпают от уровн , превышающего уровень подъема вод в теле отвала. Кроме того, перед отсыпкой .пор.од каж-. дои очередной отвальной заходки у нижней бровки откоса пород предыдущей отвальной .заходки до почвы фильтрующего сло формируют траншею, а пластичные породы дополнительно отсыпают в указанн.ую траншею . . На фиг. 1 представлена схема отвалообразовани при разработке; на фиг. 2 - то же, при проведении траншей. Способ осуи1ествл ют следующим обра-зом . При разработке горизонтального или пологого пласта полезного ископаемого, например , фосфоритов, вскрышные породы которого представлены разноструктурными породами, в частности пластичными, отработку вскрыши осуществл ют Селективно заходками с применением драглайна. Полезное ископаемое отрабатывают тем же драггайном заходками, а вскрышные породы лереэкскавируют в выработанное пространство карьера отвальными заходками вдоль фронта горных работ. В процессе, отсыпки каждой очередной отвальной заходки сначала отсы.пают пластичные вскрышные породы на отКос 1 предыдущей отвальной заходки 2 с образОва-. ни.ем противофильтрацконной завесы 3 из указанных пород. Пластичные породы отсыпают -до уровн , ; превышающего уровень 4 подъема вод в теле отвала. Затем отсыпают остальные вскрышные породы 5. Дл предотвращени значительных деформаций противофильтрационной завесы 3 н разрыва ее сплошности остальные вскрышные породы отсыпают с последовательной подвалкой .откосапластичных пород в направлении от основани отвала его поверхности . Образованные таким образом завесы из пластичных пород предотвращают миграцию воды в теле отвала и поступление ее в рабочую зону карьера. С другой стороны уменьшаетс веро тность деформации пород отвала, а также по вл ютс благопри тные услови дл - последующей рекультивации за счет сохранени пресной воды Bi теле отвала и сглаж вани изменений гидродинамического режима. л В р де случаев при наличии в основании отвала сло 7 фильтрующих пород возможна миграци воды нз- тела отвала вA - - 1. The invention relates to the mining industry and can be used in the open development of horizontal and gentle mineral deposits, mainly in difficult hydrogeological conditions. There is a method of open development of horizontal and gentle mineral deposits, which includes mining of overburden and mineral mineral with bores with internal dumping and drainage ditches in the foundations of the dump along the mining front I .... . The disadvantage of this method is its inefficiency with a significant water inflow and a high level of water rise in the dump body. Its use does not prevent the deformation of the dumps, which in turn leads to significant breakthroughs:) quantities to the working area of the quarry. If there is a filtering layer of rocks in the bottom of the dump, drainage ditches cannot prevent water from filtering through the specified layer. The closest to the proposed technical essence and the achieved result is a method of open development of horizontal and gentle, mineral deposits, including the selective extraction of differently structured overburden rocks, including plastic, mining of mineral deposits with selective placement of overburden rocks in the open pit mine dumping along the mining front (2J.: However, this method does not provide for special measures to reduce dumps associated with hydrodynamic forces and water inflow into the working area of the open pit, SL does not provide favorable conditions for subsequent reclamation of the dump from the c-point of view of creating satisfactory parameters of the hydrodynamic regime of the blade., .- - ..,. safety of mining and mining due to reduction / deformation of internal dumps and reduction of water inflow into the working pit of the quarry, as well as creation of favorable conditions for subsequent recultivation. The goal is achieved by the fact that according to the method of opencast mining of horizontal and gentle mineral deposits, including the selective excavation of multi-structural overburden, including plastic, mining of minerals by selective entry of overburden in the developed quarry area with dump openings along the mining front, The process of dumping rocks each 2J before the next dump. Initially, plastic open rocks are poured onto the slope of the previous rocks from and then pour the remaining overburden. Rocks with successive filling of the slopes of ductile rocks in the direction from the bottom of the blade to its surface, while plastic rocks are poured from the level exceeding the level of water rise in the body of the blade. In addition, before dumping. Next to the next dump entry at the lower edge of the slope of the rocks of the previous dump, the entry to the soil of the filtering layer forms a trench, and plastic rocks are additionally poured into the specified trench. . FIG. Figure 1 shows the dumping scheme during development; in fig. 2 - the same, when conducting trenches. The method is described as follows. When developing a horizontal or flat reservoir of a mineral, for example, phosphate rock, the overburden rocks of which are represented by different structural rocks, in particular, plastic, the overburden mining is carried out using selective dragging using a dragline. The mineral resource is worked out with the same draggyn-shaped bores, and the overburden rocks are re-leveled into the quarry’s quarry by dumping bores along the mining front. In the process, the dumping of each of the next dump dumps first starts with the plastic overburden on the spacing 1 of the previous dump spacing 2 of the formation-. No protivofiltration curtain 3 of these breeds. Plastic rocks are poured to level,; exceeding level 4 of the water rise in the dump body. Then, the remaining overburden rocks are poured 5. To prevent significant deformations of the impervious 3 n curtain of its continuity, the remaining overburden is poured with a successive basement. Apoclastic rocks away from the base of the blade of its surface. The plastic rock curtains thus formed prevent the migration of water in the dump body and its entry into the working area of the quarry. On the other hand, the likelihood of deformation of the dump rock is reduced, and favorable conditions appear for subsequent recultivation due to the preservation of the fresh Bi water of the dump body and the smoothing out of changes in the hydrodynamic regime. l In a number of cases, if there is a layer of 7 filtering rocks at the base of the dump, it is possible that water from the dump body will migrate to
рабочую зону карьера через этот слой. Дл предотвращени подобного влени у нижней бровки 8 откоса нород предыдущей отвальной заходки предварительно формируют траншею 9. Последнюю могут проводить заранее с опережением в направлении, поперечном фронту, на ширину отвальной заходки, в частности путем взрывани скважин 10 в основании отвала. Траншею провод т глубиной до почвы фильтрующего сло . Пластичные породы дополнительно отсыпают в указанную траншею с образова нием противофильтрационной завесыII от почвы фильтрующего сло до уровн , превьчпаюпюго уровень подъема воды в теле отвала.working area of the quarry through this layer. To prevent this from occurring at the lower edge 8 of the slope, the previous dump dump pre-forms a trench 9. The latter can be carried out in advance ahead in the direction transverse to the front, the width of the dump entry, in particular by blasting wells 10 at the bottom of the blade. The trench is made deep into the soil of the filter bed. Plastic rocks are additionally poured into the said trench with the formation of an impervious curtain II from the soil of the filter layer to the level above the level of water rise in the dump body.
Использование изобретени позвол ет резко сократить водоприток в рабочую зону карьера, уменьшить деформацию отвалов и устранить возможность внезапного промыва воды из тела отвала, а .также создать благопри тные услови дл последующей рекультивации с точки-зрени гидродинамических режимов в теле отвала.The use of the invention makes it possible to drastically reduce water inflow into the working area of the pit, reduce the deformation of the dumps and eliminate the possibility of sudden flushing of water from the dump body, as well as create favorable conditions for subsequent recultivation from the point of view of hydrodynamic conditions in the dump body.
фи92fi92
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823482084A SU1051282A1 (en) | 1982-08-04 | 1982-08-04 | Method of strip mining of horizontal and gently-sloping mineral deposits |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823482084A SU1051282A1 (en) | 1982-08-04 | 1982-08-04 | Method of strip mining of horizontal and gently-sloping mineral deposits |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1051282A1 true SU1051282A1 (en) | 1983-10-30 |
Family
ID=21026199
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU823482084A SU1051282A1 (en) | 1982-08-04 | 1982-08-04 | Method of strip mining of horizontal and gently-sloping mineral deposits |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1051282A1 (en) |
-
1982
- 1982-08-04 SU SU823482084A patent/SU1051282A1/en active
Non-Patent Citations (1)
Title |
---|
1. Химсберг К. А. и др. Опыт работы разреза Нарвнский. М., 1975, с. 24-26. 2. Весилоо П. И. и др. Опыт работы разреза Вивиконд. М., 1975, с. 8-15 (прототип). * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2629187C1 (en) | Method for dredge work of placer deposits | |
Sobko et al. | Substantiation of rational mining method at the Motronivskyi titanium-zirconium ore deposit exploration | |
RU2674452C1 (en) | Reserves in the working sides dredging development method | |
SU1051282A1 (en) | Method of strip mining of horizontal and gently-sloping mineral deposits | |
RU2754754C1 (en) | Water disposal method in development of bedded deposits by uprising with internal dumping | |
SU960438A1 (en) | Method of strip mining of horizontal and gently-sloping beds of minerals | |
RU2700152C1 (en) | Method for artificial development of technogenic reserves | |
SU1507230A1 (en) | Method of recultivation in opencast mining of deposits of mineral resources | |
RU2107164C1 (en) | Method for development of deep placer deposits | |
RU2261331C2 (en) | Open-cast mining method | |
SU1700236A1 (en) | Method of combined development scheme for mineral deposits | |
RU2088760C1 (en) | Method for recultivation of slopes in opencast mining of mineral deposits | |
RU2798370C1 (en) | Method for reconstruction of a flooded mine mined by open-underground method | |
Zagibalov et al. | Resilience Analysis of Face Slopes and Internal Dumps and Causes of their Instability at “Mugunsky” Opencast Coal Mine | |
SU960437A1 (en) | Method of strip mining of horizontal and gently-sloping beds of minerals | |
SU1097793A1 (en) | Method of strip mining of horizontal and gently-sloping beds of minerals | |
RU2131037C1 (en) | Method of development of underwater placer deposit | |
RU2131035C1 (en) | Method of placer deposit development | |
SU953211A1 (en) | Method of open-cast mining of adjoining horizontal and gently-sloping seams of minerals | |
RU2131034C1 (en) | Method of placer deposit development | |
SU891924A1 (en) | Method of open-cast mining of bed-type mineral deposits | |
RU2584334C1 (en) | Method of developing bedded deposits with drag-lines | |
SU994733A1 (en) | Method of strip mining of horizontal and gently sloping seam deposits of minerals | |
SU1744256A1 (en) | Stripping method for horizontal and gently dipping deposits | |
SU1049662A1 (en) | Method of internal dumping of water-saturated rock |