SU1040157A1 - Multilayer support of mine working - Google Patents

Multilayer support of mine working Download PDF

Info

Publication number
SU1040157A1
SU1040157A1 SU823397055A SU3397055A SU1040157A1 SU 1040157 A1 SU1040157 A1 SU 1040157A1 SU 823397055 A SU823397055 A SU 823397055A SU 3397055 A SU3397055 A SU 3397055A SU 1040157 A1 SU1040157 A1 SU 1040157A1
Authority
SU
USSR - Soviet Union
Prior art keywords
concrete
lining
layer
anchor
pressure
Prior art date
Application number
SU823397055A
Other languages
Russian (ru)
Inventor
Олег Иванович Мельников
Владимир Николаевич Рева
Леонид Когосович Нейман
Владимир Александрович Борисовец
Анатолий Данилович Мишедченко
Original Assignee
Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела filed Critical Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority to SU823397055A priority Critical patent/SU1040157A1/en
Application granted granted Critical
Publication of SU1040157A1 publication Critical patent/SU1040157A1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

МНОГОСЛОЙНАЯ КРЕПЬ ГОРНОЙ ВЫРАБОТКИ, включающа  внутреннюю водонепроницаемую оболочку, наружный слой из монолитного бетона и соедин ющие эти длои анкера,замковые части которых размещены в слое монолитного бетона, отличающа с   тем, что, с целью повышени  надежности крепи путем предотвра11ени  нарушений крепи на контакте сло  монолитного бетона с водонепроницаемой оболочкой, анкера выполнены пустотелыми с перфорацией и снабжены предохранительными клапанами, размещенными в местах их соединени  с внутренйей водонепроницаемой оболочкой. (Л СП MULTI-LAYER MINING MECHANISM, including the inner waterproof shell, the outer layer of monolithic concrete and connecting these anchors, the locking parts of which are placed in a layer of monolithic concrete, in order to improve the reliability of the lining by preventing the lining of the lining on the contact of the monolithic concrete with a waterproof shell, anchors are made hollow with perforations and equipped with safety valves placed at the points of their connection with the internal waterproof bolochkoy. (L SP

Description

Изобретение относитс  к горнодоб вающим отрасл м промышленности и предназначено дл  креплени  капитальных горных выработок, преимущес венно вертикальных шахтных стволов, в т желых горногеологических и гидрологических услови х. Дл  поддержани  выработок в т же лых горногеологических услови х известны многослойные чугунобетонные и сталебетонные крепи, состо щие из одного или нескольких слоев бетона и чугунных тюбингов или стальных обечаек 1 . Недостатком этих крепей  вл етс  трудность обеспечени  совместной ра боты отдельных слоев. Наиболее близкой к изобретению  вл етс  многослойна  крепь горной выработки, включающа  внутреннюю во донепроницаемую оболочку, наружный слой из монолитного бетона и соедин ющие эти слои анкера, замковые части которых р.азме1даны в слое моно литного бетона С2. Недостатком этой крепи  вл етс  недостаточна  ее надежность при бол шом напоре грунтовых вод, так как в этом случае может произойти наруи ение крепи на контакте сло  монолитного бетона с водонепроницаемой обо лоч кой. Цель изобретени  - повышеь ие надежности крепи путем предотвращени  нарушений крепи на контакте сло  монолитного бетона с водонепроницаемой оболочкой . Поставленна  цель достигаетс  тем что в многослойной крепи горной выработки , включающей внутреннюю водонепроницаемую оболочку, наружный слой из монолитного бетона и соедин ющие эти слои анкера, замковые части которых размещены в слое монолитного бетона, анкера выполнены пустотелыми q перфорацией и снабжены предохранительными клапанами, размещенными в местах их соединени  с внутренней водонепроницаемой оболочкой . На чертеже изображена конструкци5 предлагаемой многослойной крепи. многослойна  крепь горной выработ ки включает чугунные (, железобетонны тюбинги или стальные обечайки 1, пус тотелые анкерд 2 с перфорацией, соединенные с тюбингами 1, защитную сет куЧфильтр 3, служащую дл  предотвр щени закупорки перфорации анкера 2 бетоном при возведении крепи, моноли ный бетон 4 и предохранительный клапан 5. Технологи  возведени  крепи следу юща . При продвигании забо  горной выра ботки в обводненных породах на одну заходку устанавливают тюбинги или обечайки 1 и пустотелые анкера 2 с перфорацией и защитной сеткой 3. Анкер 2 устанавливают в отверстие тюбинга 1, соедин   анкер 2 с последним. Отверсти  предусмотрены стандартом в каждом тюбинге (обечайке ) 1. Защитна  сетка 3 служит дл  предотвращени  закупорки перфорации анкера 2 бетоном при возведении крепи. После установки тюбингов ( обечаек у 1 между ними и породным массивом обт разуетс  зазор, равный проектной толщине бетона 4. в этот заэор укладывают монолитный бетон 4, который отвержда сь схватываетс  с одной стороны с породным масси-вом, а с другой стороны- с тюбингом 1 и анкерами 2. Така  схема возведени  Ь1ногослойной крепи обеспечивает плотный контакт бетона 4 с породным массивом и тюбингами 1. Анкера 2 в месте соединени  их с тюбингами 1 оборудуют предохранительным клапаном 5. Крепь работает следующим образом, Вода в обводнённых породах оказывает всестороннее, давление на бетон 4 и благодар  фильтраций проникает через бетон 4 по направлению к тюбингам 1. Встреча  на своем пути пустотелый анкер 2 с перфорацией, вода в первую очередь поступает внутрь анкера 2, поскольку перфораци  находитс  ближе к обводненным породам, чем тюбинги 1. В месте соединени  с тюбингами 1 перфораци  отсутствует, поэтому, собира сь в анкере 2, вода воздействует непосредственно на предохранительный клапан 5, который рассчитан на меньщее давление, чем несуща  способность крепи, поэтому он срабатывает при давлении воды, недопускакндем разрушение крепи, и, что самое главное, не допускает отрыва тюби-нгов 1 от бетона 4. Вылива сь из клапана 5, вода попадает в водоулав1ли .вающие кольца или по трубкам отводитс  в водосборник. Таким образом, срабатывание клапана 5 зависит от величины гидростатического , напора в обводненных породах (в случае, если напор превышает давление клапана , свойств бетона 4 ( наличие пустот, плотность укладки, качества и т.п.) и кратчайшего пути проникновени  воды от обводненных пород до перфорации анкера 2. Заполн   пустоты бетона 4, вода попадает через перфорацию внутрь анкера 2 и напор начинает возрастать до давлени  клапана 5. Клапан 5 открываетс , вода сбрасываетс  и давление понижаетс . В бетоне 4 образуетс  депрессионна  воронка. Со временем, в зайисимости от коэффициента фильтрации бетона 4, давление воды на клапан 5 снова восстанавливаетс  до величины его срабатывгюи  и цикл повтор етс .The invention relates to mining industries and is intended for mounting capital mine workings, mainly vertical shafts, in severe mining and geological and hydrological conditions. In order to maintain the workings in the same mining conditions, multi-layer cast-iron and steel-concrete lining, consisting of one or more layers of concrete and cast-iron tubings or steel shells 1, are known. The disadvantage of these supports is the difficulty of ensuring the joint operation of the individual layers. Closest to the invention is a multi-layer support for mine workings, which includes an inner layer in the impermeable sheath, an outer layer of monolithic concrete and connecting these anchor layers, the locking parts of which are centered in the monolithic concrete layer C2. The disadvantage of this support is its inadequate reliability with a greater pressure of groundwater, since in this case, the support may be damaged by the contact of the layer of monolithic concrete with a waterproof sheath. The purpose of the invention is to increase the reliability of the lining by preventing violations of the lining on the contact of the layer of monolithic concrete with a waterproof sheath. The goal is achieved by the fact that in multi-layer lining of mine workings, including an inner waterproof shell, an outer layer of monolithic concrete and connecting these layers of an anchor, whose locking parts are placed in a layer of monolithic concrete, the anchor is made with hollow q perforations and equipped with safety valves located in places their connections to the inner waterproof shell. The drawing shows the design of the proposed multi-layer lining. Mining multilayered supports include cast iron (, reinforced concrete tubing or steel shells 1, empty perforated full anchors 2 connected to tubing 1, a protective filter set 3 that serves to prevent the perforation of the anchor 2 from being blocked with concrete during the erection of concrete, monolithic and a safety valve 5. Fence mounting technology follows. When advancing a mining site in watered rocks, tubing or shell 1 and hollow anchors 2 with perforation and protective mesh 3 are installed at one inlet. 3. Anchor 2 is installed in the opening of the tubing 1, connecting the anchor 2 with the latter. The holes are provided by the standard in each tubing (shell) 1. The protective grid 3 serves to prevent concrete from being poured into the anchor 2 during the installation of the lining. After installing the tubing (the shells of 1 between them and the rock An array is formed around the gap equal to the design thickness of concrete 4. Monolithic concrete 4 is laid into this zaeor, which is cured on one side with a rock mass, and on the other side with tubing 1 and anchors 2. Such an e1 construction scheme ogolite lining provides a close contact of concrete 4 with rock mass and tubing 1. Anchor 2 at the junction with tubing 1 is equipped with a safety valve 5. The support works as follows. Water in the water-bearing rocks exerts all-round pressure on the concrete 4 and penetrates through the concrete due to filtration 4 towards the tubings 1. The perforated hollow anchor 2 encounters on its way, the water first flows into the anchor 2, since the perforations are closer to the flooded rocks than the tubing 1. At There is no perforation with tubing 1, therefore, collecting in the anchor 2, water acts directly on the safety valve 5, which is designed for less pressure than the bearing capacity of the lining, so it works with water pressure, without allowing the lining to fail, and, most importantly does not allow detachment of tubi-ng 1 from concrete 4. Pouring out valve 5, water enters the water-bearing rings or is discharged through the pipes into the catchment basin. Thus, the actuation of valve 5 depends on the size of the hydrostatic pressure in the flooded rocks (if the pressure exceeds the valve pressure, the properties of concrete 4 (voids, laying density, quality, etc.) and the shortest water penetration path from the flooded rocks before the perforation of the anchor 2. Filling the emptiness of concrete 4, water flows through the perforations inside the anchor 2 and the pressure starts to increase to the pressure of the valve 5. The valve 5 opens, the water is released and the pressure decreases. In concrete 4 a depression funnel is formed. Menem in zayisimosti filtering coefficient from concrete 4, the water pressure on the valve 5 is again reduced to a value srabatyvgyui and its cycle is repeated.

310401574310401574

образом, клапан 5 регулируетдосборник. Цикл вновь повторитс , гидростатическое давление на крепьгидростатический напор вновь уменьдотех пор, пока давление воды в ito-шитс  и давление на крепь снизитс , родах не станет меньшим давлени Применение предлагаемой многослойсрабатывани  клапана 5. С течениемной крепи позволит решить задачу повремени в результате либо внешнехх) 5вышени  устойчивости многослойной притока водц, либо объединени  несколь-крепи путем автоматического регулироких водоносных горизонтов гидроста-ванй  гидростатического напора на тический напор .в бетоне 4 можеткрепь на необходимом уровнеj и исвновь возрасти до -величиИы, при ко-ключить веро тность отрыва металлигорой .вода в пустотелом анкере 2 сво-10ческой колонны Из тюбингов (обечаек им давлением откроет предохранитель- -от бетона при увеличении внешнего наный Клапан 5 и будет сброшена в во-пора. Thus, valve 5 regulates the collector. The cycle is repeated again, the hydrostatic pressure on the hydrostatic pressure again decreases until the pressure of water in ito-shits and the pressure on the lining decreases, the delivery will not decrease the pressure Apply the multi-valve development 5. With current lining, you can solve the task of waiting time either external) 5 the stability of a multilayer inflow of vods, or the combination of several supports by automatic regulating aquifers of hydrostatic pressure of hydrostatic pressure in a concrete pressure 4 can hold at the required level j and again increase the magnitude, with the possibility of metal tag breaking off. Water in the hollow anchor 2 of its 10th column. From the tubings (shells with pressure will open the safety valve from concrete when the outer valve is increased. Valve 5 will dumped in time.

Claims (1)

МНОГОСЛОЙНАЯ КРЕПЬ ГОРНОЙ ВЫРАБОТКИ, включающая внутреннюю водонепроницаемую оболочку, наружный • .слой из монолитного бетона и соединяющие эти слои анкера,’замковые части которых размещены в слое монолитного бетона, отличающаяс я тем, что, с целью повышения надежности крепи путем предотвращения нарушений крепи на контакте слоя монолитного бетона с водонепроницаемой оболочкой, анкера выполнены пустотелыми с перфорацией и снабжены предохранительными клапанами, размещенными в местах их соединения с внутренней водонепроницаемой оболочкой. .MULTILAYER MOUNTING MOUNTING FASTENERS, including an internal waterproof shell, an outer • layer of cast concrete and connecting these layers of anchor, 'locking parts of which are placed in a layer of cast concrete, characterized in that, in order to increase the reliability of the lining by preventing damage to the lining on the contact a layer of monolithic concrete with a waterproof shell, the anchors are hollow with perforation and equipped with safety valves located at their junctions with the inner waterproof shell chkoy. . (П)(P) СП м .1040157SP m. 1040157
SU823397055A 1982-02-09 1982-02-09 Multilayer support of mine working SU1040157A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823397055A SU1040157A1 (en) 1982-02-09 1982-02-09 Multilayer support of mine working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823397055A SU1040157A1 (en) 1982-02-09 1982-02-09 Multilayer support of mine working

Publications (1)

Publication Number Publication Date
SU1040157A1 true SU1040157A1 (en) 1983-09-07

Family

ID=20997582

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823397055A SU1040157A1 (en) 1982-02-09 1982-02-09 Multilayer support of mine working

Country Status (1)

Country Link
SU (1) SU1040157A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2519279C1 (en) * 2013-03-05 2014-06-10 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Lining of vertical well bore
RU2521105C1 (en) * 2013-03-04 2014-06-27 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Vertical stem lining
RU2524082C1 (en) * 2012-12-04 2014-07-27 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Lining of vertical shaft with controlled operating conditions
RU2583800C1 (en) * 2015-02-05 2016-05-10 Федеральное Государственное Бюджетное Образовательное Учреждение Высшего Профессионального Образования "Донской Государственный Технический Университет" (Дгту) Support of underground structure
CN109751053A (en) * 2018-12-21 2019-05-14 中国矿业大学 A kind of double-layer wall of well and construction technology of the radially connected component of band
RU2748790C1 (en) * 2020-10-30 2021-05-31 федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" Method for ensuring pliability of support of vertical trunk located in salt rocks

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Федюкин В.А. Прохойка стволов шахт способом замораживани . М., Недра, 1968, с. 220-233. 2. Справочник инженера-шахтостроител . Ред. кол.: Бессмертный А.С. идр. Т.2, м., Недра, 1972, (прототип). вЯвЛпоп *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2524082C1 (en) * 2012-12-04 2014-07-27 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Lining of vertical shaft with controlled operating conditions
RU2521105C1 (en) * 2013-03-04 2014-06-27 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Vertical stem lining
RU2519279C1 (en) * 2013-03-05 2014-06-10 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Lining of vertical well bore
RU2583800C1 (en) * 2015-02-05 2016-05-10 Федеральное Государственное Бюджетное Образовательное Учреждение Высшего Профессионального Образования "Донской Государственный Технический Университет" (Дгту) Support of underground structure
CN109751053A (en) * 2018-12-21 2019-05-14 中国矿业大学 A kind of double-layer wall of well and construction technology of the radially connected component of band
RU2748790C1 (en) * 2020-10-30 2021-05-31 федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" Method for ensuring pliability of support of vertical trunk located in salt rocks

Similar Documents

Publication Publication Date Title
JP3279227B2 (en) How to construct an intake pipe
CN106193132B (en) Pressure relief anti-floating system for bottom plate of deep foundation pit high-water-level building and pressure relief anti-floating method thereof
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN110847199A (en) Construction method for drainage of underground water of deep foundation pit
SU1040157A1 (en) Multilayer support of mine working
US3958637A (en) Technique for lining shaft
JPS63293224A (en) Groundwater draining work
KR100317530B1 (en) An underground pressure release well system
CN211258624U (en) Anti-floating structure for subway tunnel
CN212104113U (en) Anchor pile and soil nail wall combined retaining structure
JPS611715A (en) Reflux well work
KR100383656B1 (en) Drainage construction method for concrete bottom of the underground floor
JPH04125B2 (en)
CN206956755U (en) A kind of saturating drainpipe of Novel replaceable underground engineering
JPS61282513A (en) Reduction well construction work
CN105649098B (en) Sand hole forming method is taken suitable for the Multi-stage sleeve of medium coarse sand geology Application of light well point precipitation
JPH09235726A (en) Construction method of underground continuous wall
JP2001020291A (en) Groundwater draining method
CN214993984U (en) Be used for basement bottom plate to reserve variable cross section precipitation well structure
CN100540846C (en) The method that fully mechanized coal mining face crosses the river by force
SU1041621A1 (en) Concrete-film cover for slopes of hydraulic engineering structures
CN117552475A (en) Underground anti-floating structure capable of flexibly resisting buoyancy of underground water and construction method thereof
CN211080490U (en) A prevent ponding structure for manhole
JP7240279B2 (en) Underground reservoir
JPH0892984A (en) Excess pore water pressure absorption mechanism of ground around manhole