CN109751053A - A kind of double-layer wall of well and construction technology of the radially connected component of band - Google Patents

A kind of double-layer wall of well and construction technology of the radially connected component of band Download PDF

Info

Publication number
CN109751053A
CN109751053A CN201811569702.6A CN201811569702A CN109751053A CN 109751053 A CN109751053 A CN 109751053A CN 201811569702 A CN201811569702 A CN 201811569702A CN 109751053 A CN109751053 A CN 109751053A
Authority
CN
China
Prior art keywords
wall
connecting elements
well
inner layer
outer shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811569702.6A
Other languages
Chinese (zh)
Other versions
CN109751053B (en
Inventor
杨志江
杨维好
张涛
张驰
韩涛
黄家会
邹久群
韩继欢
胡琛琛
杨权威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201811569702.6A priority Critical patent/CN109751053B/en
Publication of CN109751053A publication Critical patent/CN109751053A/en
Application granted granted Critical
Publication of CN109751053B publication Critical patent/CN109751053B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention discloses a kind of double-layer wall of well of radially connected component of band, is related to Mine construction engineering technical field.The double-layer wall of well includes outer shaft wall, inner layer well wall, interlayer and connecting elements, interval in connecting elements includes that overlapped connecting elements skin segment and connecting elements;Interval is arranged with prestressing force pallet far from one end of outer shaft wall in connecting elements, and interval welds in prestressing force pallet and connecting elements.Double-layer wall of well disclosed by the invention realizes radially connected between inner layer well wall and outer shaft wall, raising borehole wall globality by being arranged radially connecting elements between double-layer wall of well;In addition interval far from one end of outer shaft wall is arranged prestressing force pallet in connecting elements, realize the prestressing effect between inner layer well wall and outer shaft wall, increase the carrying connection and load transmitting of inner layer well wall and outer shaft wall, on the basis of guaranteeing that pit shaft is able to bear the higher hydraulic pressure in deep, the design thickness of inner layer well wall is reduced, project cost is reduced.

Description

A kind of double-layer wall of well and construction technology of the radially connected component of band
Technical field
The present invention relates to Mine construction engineering technical fields, and in particular to a kind of double-layer wall of well of the radially connected component of band and Construction technology.
Background technique
Manual pipe jacking stratum method be in rich water or soft stratum pit shaft dig main method, the borehole wall be stop water flooding, The supporting construction of soil pressure.Currently, the borehole wall is generally double-layer structure in manual pipe jacking sinking technique, it is divided into outer shaft wall and interior The layer borehole wall.The effect of outer shaft wall is that safety work space is provided for shaft excavation, due to the work of manual pipe jacking sinking technique Skill feature, outer shaft wall is up and down and discontinuous, successively exists between construction section and connects stubble, and after melting, outer shaft wall can not be risen To good waterproof action, it is therefore desirable to inner layer well wall is built, it is permanent that underground water is stopped to pour in pit shaft.
In existing double-layer wall of well, inner layer well wall and outer shaft wall be it is separated, outer shaft wall is temporary support structures, well It is considered as completing function after the completion of cylinder driving, and inner layer well wall is permanent support structure, needs permanently to bear ground water pressure.With Mining depth increase, inner layer well wall bear hydraulic pressure incrementally increase, the prior art mainly by thicken inner layer well wall come Its bearing capacity is improved, this way not only increases construction cost, wastes the bearing capacity of outer shaft wall.
Therefore, in view of problem above, it is necessary to propose a kind of globality of raising ectonexine borehole wall, make full use of outer layer well The double-layer wall of well with radially connected component of the radial bearing capacity of wall, raising inner layer well wall is bearing Deep Mine to realize On the basis of higher hydraulic pressure, reduce inner layer well wall thickness.
Summary of the invention
In view of this, the present invention proposes a kind of double-layer wall of well of radially connected component of band, by the way that radially connected internal layer is arranged The connecting elements of the borehole wall and outer shaft wall, it is radially connected between realization inner layer well wall and outer shaft wall, improve the globality of the borehole wall. In addition, interval far from one end of outer shaft wall is arranged prestressing force pallet in connecting elements, inner layer well wall and outer shaft wall are realized Between prestressing effect, increase inner layer well wall and outer shaft wall carrying connection and load transmitting, efficiently use outer layer well Wall improves the radial bearing capacity of inner layer well wall, on the basis of guaranteeing that the borehole wall is able to bear the higher hydraulic pressure in deep, reduce in The design thickness of the layer borehole wall, to reduce project cost.
A kind of double-layer wall of well for the radially connected component of band that purpose according to the present invention proposes, including outer shaft wall, internal layer The connecting elements of interlayer and radially connected outer shaft wall and inner layer well wall between the borehole wall, outer shaft wall and inner layer well wall, institute Connecting elements is stated to include the pre- connecting elements skin segment being embedded in outer shaft wall and pour in the connecting elements in inner layer well wall Interval, interval overlap joint in the connecting elements skin segment and connecting elements.
Preferably, interval far from one end of outer shaft wall is arranged with prestressing force pallet in the connecting elements, described pre- to answer Power pallet welds under prestressed stretch-draw effect with interval in connecting elements, and the prestressing force pallet anchor clamp is in inner layer well wall reinforcing bar On cage.
Preferably, the connecting elements further includes one being set to interval lap-joint in connecting elements skin segment and connecting elements Connector case, the connector case is fixed on outer shaft wall at the reserved location on the steel reinforcement cage of inner layer well wall side, described to connect Head case is open towards inner layer well wall;The connecting elements skin segment close to manual pipe jacking stratum one end binding on steel reinforcement cage, Other end perforation is fixed in connector case, and closure processing is done in perforation.
Preferably, interval is hot rolled ribbed bars or fining twisted steel in the connecting elements skin segment and connecting elements Muscle.
Preferably, in the connecting elements skin segment and connecting elements the overlapping mode of interval be welding or sleeve connection or It is bolted.
Preferably, correspond on the interlayer between the outer shaft wall and inner layer well wall at the setting of connecting elements and form Through-hole, the interlayer are plastic plate or needle spikesedge herb.
A kind of construction technology of the double-layer wall of well of the radially connected component of band, comprising the following steps:
Step 1: manual pipe jacking stratum method, sublevel drive freezing shaft are used;
Step 2: segmentation binding outer shaft wall steel reinforcement cage, position is by the welding binding of connector case in steel reinforcement cage in every section of section At upper reserved location, connector box opening is towards inner layer well wall;Meanwhile by the radial pre-buried connecting elements skin segment of pit shaft, structure is connected Part skin segment is bound on steel reinforcement cage close to the one end on manual pipe jacking stratum, and one end piercing welding close to inner layer well wall is fixed on In connector case;
Step 3: the position of connecting elements skin segment perforation on connector case is blocked, the cover board at connector box opening is covered, is sealed Close connector box opening;
Step 4: being laid with a layer compression thickness and the comparable rubber and plastic heat-preservation cotton of well-wall protection thickness degree outside cover board, and with moulding Expect adhesive tape winding binding rubber and plastic heat-preservation cotton;
Step 5: pouring outer shaft wall, the demoulding after each section of outer shaft wall concrete initial set;
Step 6: after demoulding, outer shaft wall exposes rubber and plastic heat-preservation cotton close to the side of inner layer well wall, scratches rubber and plastic heat preservation Cotton, connector cover plate of dismantling expose the overlap joint stubble on connecting elements skin segment;
Step 7: the interlayer being laid between inner layer well wall and outer shaft wall, and in setting corresponding to connecting elements on interlayer Dig out through-hole in the place of setting;
Step 8: binding inner layer well wall steel reinforcement cage, when binding to each bonding layer, along pit shaft radially binding connecting elements Interval, interval one end is overlapped on overlap joint stubble in connecting elements, and the other end passes through inner layer well wall steel reinforcement cage, and is arranged one in end Prestressing force pallet, interval is arranged with the end of prestressing force pallet one end in pre- drawing connecting elements, answers in advance to connecting elements application Power is welded and fixed interval in prestressing force pallet and connecting elements, discharges after the completion of welding later in the state of keeping pulling capacity Pulling capacity, prestressing force pallet anchor clamp is on inner layer well wall steel reinforcement cage;
Step 9: from bottom to top continuously bind and pour inner layer well wall.
Compared with prior art, a kind of the advantages of double-layer wall of well of the radially connected component of band disclosed by the invention, is:
The double-layer wall of well realizes internal layer well by the way that the connecting elements of radially connected inner layer well wall and outer shaft wall is arranged It is radially connected between wall and outer shaft wall, the globality of the borehole wall is improved, while realizing pre- between inner layer well wall and outer shaft wall Stress effect, the carrying connection and load for increasing inner layer well wall and outer shaft wall are transmitted, effective use outer shaft wall, in raising The radial bearing capacity of the layer borehole wall reduces inner layer well wall on the basis of guaranteeing that the borehole wall is able to bear the higher hydraulic pressure in deep Design thickness substantially reduces project cost.
Detailed description of the invention
It, below will be to embodiment or existing for the clearer technical solution for illustrating the embodiment of the present invention or the prior art Attached drawing needed in technical description does simple introduction, it is clear that, the accompanying drawings in the following description is only this hair Bright some embodiments, it will be clear to the skilled person that without creative efforts, may be used also Other accompanying drawings can also be obtained according to these attached drawings.
Fig. 1 is a kind of structural schematic diagram of the double-layer wall of well of the radially connected component of band disclosed by the invention.
Fig. 2 is double-layer wall of well horizontal sectional view.
Fig. 3 is connecting elements skin segment schematic diagram.
Parts title representated by number or letter in figure are as follows:
1- manual pipe jacking stratum;2- outer shaft wall;3- inner layer well wall;4- interlayer;5- connecting elements skin segment;6- connector Case;7- rubber and plastic heat-preservation cotton;Interval in 8- connecting elements;9- prestressing force pallet.
Specific embodiment
A specific embodiment of the invention is described briefly with reference to the accompanying drawing.Obviously, described embodiment is only It is a part of the embodiments of the present invention, rather than whole embodiments, based on the embodiments of the present invention, ordinary skill people Member's every other embodiment obtained without making creative work, belongs to the scope of protection of the invention.
Fig. 1-Fig. 3 shows preferred embodiments of the present invention, has carried out detailed cut open to structure from different angles respectively Analysis.
A kind of double-layer wall of well of the radially connected component of band as shown in Figs. 1-3, the outer shaft wall 2 built including segmentation pick connect Interlayer 4 and radially connected outer shaft wall 2 and internal layer between continuous inner layer well wall 3, outer shaft wall 2 and the inner layer well wall 3 poured The connecting elements of the borehole wall 3, and the setting of connecting elements, it is radially connected between realization inner layer well wall 3 and outer shaft wall 2, it improves The globality of double-layer wall of well.Specifically, connecting elements includes the pre- connecting elements skin segment 5 being embedded in outer shaft wall 2 and pours It is overlapped in interval 8 in interval 8 in the connecting elements in inner layer well wall 3, connecting elements skin segment 5 and connecting elements.Connecting elements Skin segment 5 and the overlapping mode of interval 8 in connecting elements are unlimited, preferred weld, sleeve connection or are bolted.
Further, 8 one end of interval and connecting elements skin segment 5 overlap in connecting elements, one end far from outer shaft wall 2 Across inner layer well wall 3, it is equipped with prestressing force pallet 9 in its end sleeve, interval 8 is in prestressing force in prestressing force pallet 9 and connecting elements The lower welding of tensioning effect, after discharging pulling capacity, 9 anchor clamp of prestressing force pallet is on 3 steel reinforcement cage of inner layer well wall.Prestressing force pallet 9 Setting, realizes the prestressing effect between inner layer well wall 3 and outer shaft wall 2, increases inner layer well wall 3 and outer shaft wall 2 Carrying connection and load transmitting reduce setting for inner layer well wall 3 on the basis of guaranteeing that pit shaft is able to bear the higher hydraulic pressure in deep Thickness is counted, to reduce project cost.
Further, connecting elements further includes one being set to 8 lap-joint of interval in connecting elements skin segment 5 and connecting elements Connector case 6, connector case 6 is fixed on outer shaft wall 2 at the reserved location on the steel reinforcement cage of 3 side of inner layer well wall, connector case 6 It is open towards inner layer well wall 3.Connecting elements skin segment 5 close to manual pipe jacking stratum 1 one end binding on steel reinforcement cage, the other end Piercing welding is fixed in connector case 6.The setting of connector case 6, convenient for exposure overlap joint stubble after demoulding, so that the implementation of lap joint process It is more convenient.
Further, closure processing need to be done at connector case 6 and 5 perforation of connecting elements skin segment, enters to prevent concrete and connects In head case.
Further, 8 selection of interval is unlimited in connecting elements skin segment 5 and connecting elements, preferably hot rolled ribbed bars or Finish rolling deformed bar.
Further, corresponding to molding at the setting of connecting elements on the interlayer 4 between outer shaft wall 2 and inner layer well wall 3 There is through-hole, the setting of through-hole is convenient for exposure overlap joint stubble.And the interlayer 4 between outer shaft wall 2 and inner layer well wall 3 is plastic plate or ox Felt.
A kind of construction technology of the double-layer wall of well of the radially connected component of band, comprising the following steps:
Step 1: manual pipe jacking stratum method, sublevel drive pit shaft are used.
Step 2: segmentation binding 2 steel reinforcement cage of outer shaft wall, connector case 6 is welded or is bound in steel by position in every section of section On muscle cage at reserved location, connector case 6 is open towards inner layer well wall 3, meanwhile, by the radial pre-buried connecting elements skin segment 5 of pit shaft, Connecting elements skin segment 5 is bound on steel reinforcement cage close to the one end on manual pipe jacking stratum 1, is perforated close to one end of inner layer well wall 3 It is weldingly fixed in connector case 6.
Step 3: connector case 6 and 5 punch position of connecting elements skin segment are blocked using cold-patching tube gum, covers the lid of connector case 6 Plate, the unsuitable higher cage of 6 cover board of connector case are too many.
Step 4: being laid with a layer compression thickness and the comparable rubber and plastic heat-preservation cotton 7 of well-wall protection thickness degree outside cover board, and with moulding Expect adhesive tape winding binding rubber and plastic heat-preservation cotton 7, after punching block slab supporting is good, so that rubber and plastic heat-preservation cotton 7 is just tightly against steel form, So that just leaking out rubber and plastic heat-preservation cotton 7 when removing outer borehole wall template.
Step 5: segmentation pours outer shaft wall 2 to design wall seat and sets, and tears open after each section of 2 concrete initial set of outer shaft wall Mould.
Step 6: after demoulding, outer shaft wall 2 exposes rubber and plastic heat-preservation cotton 7 close to the side of inner layer well wall 3, scratches rubber and plastic guarantor Warm cotton 7,6 cover board of connector case of dismantling expose the overlap joint stubble on connecting elements skin segment 5.
Step 7: the interlayer 4 being laid between inner layer well wall 3 and outer shaft wall 2, and in corresponding to connecting elements on interlayer 4 Setting at dig out through-hole.
Step 8: binding 3 steel reinforcement cage of inner layer well wall when binding to each bonding layer, radially binds connecting elements along pit shaft Interior interval 8,8 one end of interval is overlapped on overlap joint stubble in connecting elements, and the other end passes through 3 steel reinforcement cage of inner layer well wall, and in end It is arranged a prestressing force pallet 9, interval 8 is arranged with the end of 9 one end of prestressing force pallet in pre- drawing connecting elements, gives connecting elements Apply prestressing force, later in the state of keeping pulling capacity, interval 8 in prestressing force pallet 9 and connecting elements, welding is welded and fixed Pulling capacity is discharged after the completion, and 9 anchor clamp of prestressing force pallet realizes inner layer well wall 3 and outer shaft wall 2 on 3 steel reinforcement cage of inner layer well wall Between prestressing effect.Specifically, the one end of interval 8 far from outer shaft wall 2 in connecting elements, exposed to exceed inner layer well wall 3 The length of steel reinforcement cage is less than 3 protective layer thickness of inner layer well wall.
Step 9: from bottom to top continuous placing inner layer well wall 3 completes the construction of double-layer wall of well.
In conclusion a kind of double-layer wall of well of the radially connected component of band disclosed by the invention, by being arranged in radially connected The connecting elements of the layer borehole wall and outer shaft wall, it is radially connected between realization inner layer well wall and outer shaft wall, improve the entirety of the borehole wall Property.In addition, by connecting elements interval far from one end of outer shaft wall be arranged prestressing force pallet, realize inner layer well wall and outer Prestressing effect between the layer borehole wall increases the carrying connection and load transmitting of inner layer well wall and outer shaft wall, effective use Outer shaft wall improves the radial bearing capacity of inner layer well wall, on the basis of guaranteeing that the borehole wall is able to bear the higher hydraulic pressure in deep, drop The low design thickness of inner layer well wall, to reduce project cost.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be mechanical connect It connects, is also possible to be electrically connected;It can be directly connected, can also can be in two elements indirectly connected through an intermediary The interaction relationship of the connection in portion or two elements.It for the ordinary skill in the art, can be according to specific feelings Condition understands the concrete meaning of above-mentioned term in the present invention.
The foregoing description of the disclosed embodiments makes professional and technical personnel in the field can be realized and use the present invention. Various modifications to these embodiments mode will be readily apparent to those skilled in the art, and determine herein The General Principle of justice can be realized in other embodiments without departing from the spirit and scope of the present invention.Therefore, originally Invention is not intended to be limited to the embodiments shown herein, and is to fit to the principles and novel features disclosed herein phase Consistent widest scope.

Claims (7)

1. a kind of double-layer wall of well of the radially connected component of band, which is characterized in that the double-layer wall of well includes outer shaft wall (2), internal layer Interlayer (4) and radially connected outer shaft wall (2) and internal layer well between the borehole wall (3), outer shaft wall (2) and inner layer well wall (3) The connecting elements of wall (3), the connecting elements include the connecting elements skin segment (5) being embedded in outer shaft wall (2) in advance and pour It is taken in interval (8) in interval (8) in the connecting elements in inner layer well wall (3), the connecting elements skin segment (5) and connecting elements It connects.
2. a kind of double-layer wall of well of the radially connected component of band according to claim 1, which is characterized in that the connecting elements Interior interval (8) is arranged with prestressing force pallet (9) far from the one end of outer shaft wall (2), the prestressing force pallet (9) and connecting elements Interior interval (8) is welded under prestressed stretch-draw effect, and prestressing force pallet (9) anchor clamp is on inner layer well wall (3) steel reinforcement cage.
3. a kind of double-layer wall of well of the radially connected component of band according to claim 2, which is characterized in that the connecting elements It further include a connector case (6) for being set to interval (8) lap-joint in connecting elements skin segment (5) and connecting elements, the connector Case (6) is fixed on outer shaft wall (2) at the reserved location on the steel reinforcement cage of inner layer well wall (3) side, and the connector case (6) is opened Mouthful towards inner layer well wall (3);The connecting elements skin segment (5) binds close to the one end of manual pipe jacking stratum (1) in steel reinforcement cage On, other end perforation is fixed in connector case (6), and closure processing is done in perforation.
4. a kind of double-layer wall of well of the radially connected component of band according to claim 1, which is characterized in that the connecting elements Interval (8) is hot rolled ribbed bars or finish rolling deformed bar in skin segment (5) and connecting elements.
5. a kind of double-layer wall of well of the radially connected component of band according to claim 1, which is characterized in that the connecting elements The overlapping mode of interval (8) is welding or sleeve connection or is bolted in skin segment (5) and connecting elements.
6. a kind of double-layer wall of well of the radially connected component of band according to claim 1, which is characterized in that the outer shaft wall (2) corresponding to through-hole is formed at the setting of connecting elements on the interlayer (4) between inner layer well wall (3), the interlayer (4) is Plastic plate or needle spikesedge herb.
7. a kind of described in any item construction technologies of the double-layer wall of well of the radially connected component of band of manufacturing claims 1-6, special Sign is, comprising the following steps:
Step 1: manual pipe jacking stratum method, sublevel drive freezing shaft are used;
Step 2: segmentation binding outer shaft wall (2) steel reinforcement cage, position is by connector case (6) welding binding in reinforcing bar in every section of section On cage at reserved location, connector case (6) is open towards inner layer well wall (3);Meanwhile by the radial pre-buried connecting elements skin segment of pit shaft (5), connecting elements skin segment (5) is bound on steel reinforcement cage close to the one end of manual pipe jacking stratum (1), close to inner layer well wall (3) One end piercing welding be fixed in connector case (6);
Step 3: the position of connecting elements skin segment (5) perforation on connector case (6) is blocked, the lid of connector case (6) opening is covered Plate, closed joint case (6) opening;
Step 4: it is laid with a layer compression thickness and the comparable rubber and plastic heat-preservation cotton (7) of well-wall protection thickness degree outside cover board, and uses plastics Adhesive tape winding binding rubber and plastic heat-preservation cotton (7);
Step 5: pouring outer shaft wall (2), the demoulding after each section of outer shaft wall (2) concrete initial set;
Step 6: after demoulding, outer shaft wall (2) exposes rubber and plastic heat-preservation cotton (7) close to the side of inner layer well wall (3), scratches rubber and plastic Heat-preservation cotton (7), connector case (6) cover board of dismantling expose the overlap joint stubble on connecting elements skin segment (5);
Step 7: the interlayer (4) being laid between inner layer well wall (3) and outer shaft wall (2), and connected in corresponding on interlayer (4) Through-hole is dug out at the setting of component;
Step 8: binding inner layer well wall (3) steel reinforcement cage, when binding to each bonding layer, along pit shaft radially binding connecting elements Interval (8), interval (8) one end is overlapped on overlap joint stubble in connecting elements, and the other end passes through inner layer well wall (3) steel reinforcement cage, and in End is arranged a prestressing force pallet (9), and interval (8) is arranged with the end of prestressing force pallet (9) one end in pre- drawing connecting elements, Apply prestressing force to connecting elements and prestressing force pallet (9) and connecting elements is welded and fixed later in the state of keeping pulling capacity Interior interval (8) discharges pulling capacity after the completion of welding, and prestressing force pallet (9) anchor clamp is on inner layer well wall (3) steel reinforcement cage;
Step 9: it from bottom to top continuously binds and pours inner layer well wall (3).
CN201811569702.6A 2018-12-21 2018-12-21 Double-layer well wall with radial connecting members and construction process Active CN109751053B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811569702.6A CN109751053B (en) 2018-12-21 2018-12-21 Double-layer well wall with radial connecting members and construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811569702.6A CN109751053B (en) 2018-12-21 2018-12-21 Double-layer well wall with radial connecting members and construction process

Publications (2)

Publication Number Publication Date
CN109751053A true CN109751053A (en) 2019-05-14
CN109751053B CN109751053B (en) 2020-03-27

Family

ID=66403027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811569702.6A Active CN109751053B (en) 2018-12-21 2018-12-21 Double-layer well wall with radial connecting members and construction process

Country Status (1)

Country Link
CN (1) CN109751053B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2020273364B2 (en) * 2019-06-26 2021-04-22 Beijing China Coal Mine Engineering Co., Ltd. A new type of mining rooting-anchoring double-layer shaft lining

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1040157A1 (en) * 1982-02-09 1983-09-07 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела Multilayer support of mine working
CN2841963Y (en) * 2005-09-10 2006-11-29 中国矿业大学 Well wall reinforcing device
CN1900484A (en) * 2006-06-27 2007-01-24 中国矿业大学 Single layer well wall with connecting plate and its constructing method
CN101906973A (en) * 2010-07-23 2010-12-08 中国矿业大学 Composite well wall with compressible interlayer and construction method thereof
CN102619521A (en) * 2012-04-19 2012-08-01 中国矿业大学 Construction method for vertical shaft bedrock section wall structure
CN103075158A (en) * 2013-02-04 2013-05-01 中国矿业大学 Steel plate and steel reinforced concrete well wall
CN105201514A (en) * 2015-09-15 2015-12-30 中国矿业大学 Water-bearing rock stratum borehole wall structure and construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1040157A1 (en) * 1982-02-09 1983-09-07 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела Multilayer support of mine working
CN2841963Y (en) * 2005-09-10 2006-11-29 中国矿业大学 Well wall reinforcing device
CN1900484A (en) * 2006-06-27 2007-01-24 中国矿业大学 Single layer well wall with connecting plate and its constructing method
CN101906973A (en) * 2010-07-23 2010-12-08 中国矿业大学 Composite well wall with compressible interlayer and construction method thereof
CN102619521A (en) * 2012-04-19 2012-08-01 中国矿业大学 Construction method for vertical shaft bedrock section wall structure
CN103075158A (en) * 2013-02-04 2013-05-01 中国矿业大学 Steel plate and steel reinforced concrete well wall
CN105201514A (en) * 2015-09-15 2015-12-30 中国矿业大学 Water-bearing rock stratum borehole wall structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2020273364B2 (en) * 2019-06-26 2021-04-22 Beijing China Coal Mine Engineering Co., Ltd. A new type of mining rooting-anchoring double-layer shaft lining

Also Published As

Publication number Publication date
CN109751053B (en) 2020-03-27

Similar Documents

Publication Publication Date Title
CN106869017A (en) A kind of pier bottom sets the precast assembly bridge pier-cushion cap node connected mode and its practice of flexible layer
CN106869315A (en) Concrete-filled steel tubular frame and its construction method with presstressed reinforcing steel
CN107327030A (en) The plate-column structure node and its cap prefabricated components and construction method of a kind of steel column
CN106894830B (en) A kind of double curvature arch supporting construction and construction method for underground engineering
CN105970803B (en) The shearing resistance energy-dissipating device and construction method of assembled bridge pier
CN103321215A (en) Construction technology of cast-in-situ concrete tubular pile applied to water area, as well as special hole-forming device of construction technology
CN111733837A (en) Rock slope filling, sealing, protecting and constructing method
CN109751053A (en) A kind of double-layer wall of well and construction technology of the radially connected component of band
CN109853362A (en) A kind of interim prestress anchoraging prefabricated bent cap of segmentation and interim method for applying prestressing force
CN108824230B (en) Method for reinforcing underwater bridge pier by FRP pipe
CN105586975B (en) The integrated structure and construction method that prefabricated fender post is superimposed with structural wall
CN107859059A (en) Prefabricated sandwich side wall and prefabricated overlapping bottom plate connecting joint structure and its construction method
KR100679480B1 (en) Drain board
CN107100099B (en) Reinforcing method for railway culvert
JP3756385B2 (en) Composite pile and its construction method
CN205742550U (en) Novel fabricated building connects node
CN112267373A (en) Partially unbonded grouting corrugated pipe prefabricated assembly connecting structure and construction method
CN110593320A (en) Early sealing structure for outer wall post-cast strip and construction method thereof
CN110886294A (en) PRC (prestressed concrete pipe) pipe pile for deep foundation pit supporting and pile splicing method thereof
JPS633101B2 (en)
CN115748688A (en) Bag type enlarged footing prefabricated hollow pile and construction method thereof
CN108999053A (en) A kind of composite assembly cement concrete pavement structure and construction method
CN207348090U (en) Prefabricated sandwich side wall and prefabricated overlapping bottom plate connecting joint structure
CN203320525U (en) Hole forming device for construction of cast-in-place concrete tubular pile applied to water area
JP2730705B2 (en) Improvement method for soft ground

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant