SU1025782A1 - Method of constructing underground spillway - Google Patents

Method of constructing underground spillway Download PDF

Info

Publication number
SU1025782A1
SU1025782A1 SU802962356A SU2962356A SU1025782A1 SU 1025782 A1 SU1025782 A1 SU 1025782A1 SU 802962356 A SU802962356 A SU 802962356A SU 2962356 A SU2962356 A SU 2962356A SU 1025782 A1 SU1025782 A1 SU 1025782A1
Authority
SU
USSR - Soviet Union
Prior art keywords
conduits
walls
conduit
floor
steel sheets
Prior art date
Application number
SU802962356A
Other languages
Russian (ru)
Inventor
Дмитрий Михайлович Савин
Original Assignee
Ленинградское Специальное Конструкторское Бюро "Ленгидросталь"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ленинградское Специальное Конструкторское Бюро "Ленгидросталь" filed Critical Ленинградское Специальное Конструкторское Бюро "Ленгидросталь"
Priority to SU802962356A priority Critical patent/SU1025782A1/en
Application granted granted Critical
Publication of SU1025782A1 publication Critical patent/SU1025782A1/en

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

СПОСОБ СООРУЖЕНИЯ ГЛУБИННОГО ВОДОСБРОСА, включаюишй возведение бетонной части с водосбросными водоволс1ми пр моугольного сечени , заделку закладных элементов в стены водоводов, облицовку стальными листами периметра водоводов, ограничение стальным листе пола каждого эксплуатационного водовода и заполнение бетоном полости под ним, отличающийс  тем, что, с целью снижени  материалоемкости, закладные элементы выполн ют . лис.тов и згщелывают на всю длину на уровне потолка и пола каждого эксплуатационного водовода, причем облицовку приваривают непосредственно к листам перед заполнением полости под полом эксплуатационного водо- Q вода.S ш сTHE METHOD OF CONSTRUCTING A DEPTH WATER DISCHARGE, including erecting a concrete part with spillway water conduits of rectangular section, embedding embedded elements into the walls of the conduits, lining the conduits with the steel sheets at the floor of the floor of each production conduit and filling the walls with the perimeter of the conduits with the steel sheets, limiting the total area of each production conduit with the steel sheets and filling the walls with the steel sheet at the perimeter of the conduits, limiting the total area of each operational conduit with the steel sheets to the walls of the conduit, and limiting the surface of each production conduit to the walls with the steel sheets of the conduits, limiting the internal layers material consumption reductions, embedded elements are performed. listov and zscheldyvayut the entire length at the level of the ceiling and floor of each operational conduit, and the lining is welded directly to the sheets before filling the cavity under the floor of the operational water-Q water.

Description

Изобретение относитс  к гидротехнике и может быть использовано при строительстве гидроузлов. Известен способ сооружень  глубин Hoio водосброса, включающий возведение бетонной части с водосбросными водоводами и облицствку их стальными листами 11. - Водосброс используетс  как в стро ительный период при малых напорах так и в эксплуатационный при значиТельных напорах, следовательно, сечение водоводов рассчитываетс  по строительному периоду и имеет большие размеры, а следовательно, все металлоконструкции(затворы, решетки имеют значительные размеры. Известен также способ сооружени  глубинного водосброса, включашци возведение бетонной части с водосбро ными водоводгъми пр моугольного сечени , заселку закладных элементов в стены водоводов, облицовку стальны ми листами периметра водоводов, ограничение .сталь rottt листом пола каждо го эксплуатационного водовода и заполнение бетоном полости пол . Недостаток известного способа заключаетс  в неббходимости поперечных арматурных элементов, воспринимающих нагрузку от дгшлани  sooti на стенки водоводов в период эксплуата .ции водосброса. Облицовка же служит только ди  защиты водоводов от кавитационной эрозии. , Цель изобретени  - снижение мгстериалоемкости . Поставленна  цель достигаетс  тем что эаклгигыые элемент выполн ют в виде листов и дадегшввют на всю длийу иа потолка и пола каждого эксплуатационного водовода, причем облицовку приваривают непосредственио к листам перёд заполнением тюлости под полом эксплуатационного водов да. На фиг. 1 изображена схема сил, лействую{2{их на элементы водосброса в эксплуатационный период; на фиг.2 водосборе , у которого отверстие 2 имеет конфигурацию строительного периода , а отверстие 3 - эксплуатационного , поперечное сечение; йа фиг.З - узел 1 на фиг.2.; на фиг.4 разрез А-А на фиг.З. Сначала возвод т бетонную часть 1 с пр моугольными водоводами 2,3 и 4 шириной в, рассто нием между ними 5 и высотой h. В стены водоводов 2, 3 и 4 заделывают опорные листы 5 с анкерс1ми 6 и анкер 7 д.п  арматуры 8, расположенной под облицовкой пола, выполнеиной..в виде листа 9 с отверсти ми 10. BafQvi производ т облицовку водоводов 2,3 и 4 листами, 11, 12 и 13 стен, потолка и пола и пропускают расход воды строительного периода . В эксплуатационный период сброс воды осуществл ют через водоводы 2,3 и 4 с уменьшенной высотой h, представл ющие собс эксплуатационные водовод$ы. Дл  этого приваривают к листам 5 лист 9 с отверсти ми 10 и сгроизвод т Заполнение бетоном по лоёти под-ним через отверсти  10 в каждом водоводе 2,3 и 4. Листы 9 и 11 имеют ребра 12и ацлйтурные стержни 13 . а к листам 11 и 9 в. углах приварены листы 14 полость между которыми цементир тот. Схема работы листов 9 и 12 облицовок пола и потолка изображена на фиг.1 дл  случа , когда средний водовод находитс  под напоре, а крайние перекрыты затворами с верхнего бьефа. Благодар  гидростатической нагрузке С , приложенной по всему периметру водовода 3, промежуточные бычки тол(аиной (Г будут подвергатьс  деформаци м (указанным пунктирными п нк мл), благодар  чему в листах 9 и 12 обли-цовки возникнут раст гивающие усили  PY- и рс восприннма&ам этими листами 9 и 12 или, частично а{ «атур6й 8. Эти усили  сварными швами передаютс  на опорные л сты 5 (фиг.з). При необходимости увеличени  периметра сварного шва край листа 9 может быть выполнен зубчатым СФиг.4. Применение краев облицовки такой конфигурации также позвол ет значительно упростить работы по сварке. Наклонный лист 14 предназначаетс  дл  защиты зубчатого кра  о лицовки от кавитационной эрозии при эксплуатации водосброса. На бетон раст гивакх ие усили  передают с  анкерами б и 7. Аналогично работает и облицовка потолка. Пpeдлaгae Qliй способ позвол ет включить в работу стальную облнцовку водоводов и уменьшить армирование бетона под полом эксплуатационного всАовода, что уменьшает материалоемкость водосброса.The invention relates to hydraulic engineering and can be used in the construction of waterworks. The known method is the construction of the depths of the Hoio spillway, including the erection of the concrete part with the spillway conduits and facing them with steel sheets 11. The spillway is used both during the construction period at low pressures and at significant pressures, therefore, the section of the conduits is calculated over the construction period and has large sizes and, therefore, all metal constructions (gates, gratings are of considerable dimensions. There is also a known method of constructing a deep spillway, including the construction of concrete rectangular cross section, settling of embedded elements in conduit walls, cladding of steel conduit perimeter with steel sheets, limiting steel rottt with a floor sheet of each production conduit and filling the cavity with concrete. The disadvantage of this method is the lack of transverse reinforcement elements perceiving the load from the sooti on the walls of the pipelines during the operation of the spillway. Facing the same serves only to protect water lines from cavitation erosion. The purpose of the invention is the reduction of the mass intensity. This goal is achieved by the fact that the element is made in the form of sheets and is extended the entire length of the ceiling and the floor of each production conduit, and the lining is welded directly to the sheets before filling the tulle under the floor of the production water. FIG. 1 shows the scheme of forces, the effect of {2 {them on the elements of the spillway in the operational period; 2, a catchment area, in which opening 2 has the configuration of a construction period, and opening 3 is operational, the cross section; ya fig.Z - node 1 in figure 2 .; Fig.4 section aa on Fig.Z. First, the concrete part 1 was erected with rectangular conduits 2,3 and 4 of width c, distance between them 5 and height h. In the walls of conduits 2, 3 and 4, support sheets 5 with anchors 6 and anchor 7 dp of fittings 8 located under the floor covering are made in the form of sheet 9 with holes 10. BafQvi makes facing of conduits 2.3 and 4 sheets, 11, 12 and 13 walls, a ceiling and a floor also pass a consumption of water of the construction period. During the operational period, water is discharged through conduits 2.3 and 4 with a reduced height h, which represent their own operational conduits. For this, sheet 9 with holes 10 is welded to sheets 5 and is built. Filling with concrete is lifted with concrete through holes 10 in each conduit 2,3 and 4. Sheets 9 and 11 have fins 12 and reinforced rods 13. and to sheets 11 and 9 into. the corners are welded sheets 14 cavity between which cement one. The pattern of operation of sheets 9 and 12 of the floor and ceiling claddings is shown in Fig. 1 for the case when the middle water conduit is under pressure and the extreme ones are blocked by gates from the upstream. Due to the hydrostatic load C applied along the entire perimeter of the conduit 3, intermediate bulls are thickened (G will be subjected to deformations (indicated by dashed pn ml), due to which, in sheets 9 and 12 of the lining, the tensile forces PY- and RS will be perceived & These sheets 9 and 12 or, partially a {"atur 8. 8. These forces are transmitted by welding seams to support sections 5 (Fig. 3). If necessary, the edge of the sheet 9 can be increased by the toothed edge of the weld. 4. Use edges of facing of such configuration also allowed It greatly simplifies welding work. Inclined sheet 14 is designed to protect the jagged edge of the face from cavitation erosion during spillway operation. Strength is transmitted to concrete with anchors b and 7. The ceiling lining also works in a similar way. the operation of steel linings of water conduits and reduce the reinforcement of concrete under the floor of the operational pipeline, which reduces the consumption of materials from the spillway.

ОABOUT

Claims (1)

СПОСОБ СООРУЖЕНИЯ ГЛУБИННОГО ВОДОСБРОСА, включающий возведе- $ut1METHOD FOR DEEP WATER DISCHARGE CONSTRUCTION, including the construction of $ ut1
SU802962356A 1980-07-19 1980-07-19 Method of constructing underground spillway SU1025782A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802962356A SU1025782A1 (en) 1980-07-19 1980-07-19 Method of constructing underground spillway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802962356A SU1025782A1 (en) 1980-07-19 1980-07-19 Method of constructing underground spillway

Publications (1)

Publication Number Publication Date
SU1025782A1 true SU1025782A1 (en) 1983-06-30

Family

ID=20910530

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802962356A SU1025782A1 (en) 1980-07-19 1980-07-19 Method of constructing underground spillway

Country Status (1)

Country Link
SU (1) SU1025782A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР № 389200, кл. Е 02 В 1/00, 1970. 2. Проект СКВ Ленги росталь, Бурейский гидроузел на реке Бурее -. черт. 236ПЛ-ППР9, Л., 1979 (прототип). *

Similar Documents

Publication Publication Date Title
US4314775A (en) Method of site casting tunnels, culverts, pressure pipes with minimum forming
RU2375523C1 (en) Formwork for constructing reinforcing covering of construction made from corrugated steel plates
CN205742213U (en) Foundation pit supporting construction
KR20040027252A (en) Construction and design method about center wall of three arch tunnel excavation method
CN108396711A (en) A kind of detachable gravity dam and its construction, method for dismounting
SU1025782A1 (en) Method of constructing underground spillway
GB2038908A (en) A Lining for a Channel or the Like
KR100317530B1 (en) An underground pressure release well system
CN210104806U (en) Basement outer wall post-cast strip closed in advance
CN210315651U (en) Upward inclined concrete wall formwork supporting and reinforcing structure
CN208088282U (en) Prestressing force shaped steel support pile
SU1086062A1 (en) Lining for water-passing hydraulic structure
CN115404888B (en) Deep foundation pit bottom water treatment method for finished main body structure
JPS60184127A (en) Precast concrete multilayered caisson
JP2571426B2 (en) Construction method of retaining wall
JP2003239316A (en) Underground structure
CN221072748U (en) Basement wall post-pouring strip assembled plugging plate
RU2807350C1 (en) Constructive and technological solution for foundation of intermediate support of high pile work type constructed in temporary enclosing structure
US1362852A (en) Pile and panel system for concrete construction
CN108277798A (en) Prestressing force shaped steel support pile and its construction method
RU2692383C1 (en) Reinforcing tape shallow foundation method
SU958594A1 (en) Prefabricated-monolythic wall in soil
CN212337307U (en) Arch cover structure of tunnel lower-penetrating river channel
RU2138597C1 (en) Method for erection of underground structure
RU2266361C1 (en) Reinforced concrete pipe