SG10202106775TA - Construction Risk Evolution System, Construction Method and Construction Risk Evaluation Method - Google Patents

Construction Risk Evolution System, Construction Method and Construction Risk Evaluation Method

Info

Publication number
SG10202106775TA
SG10202106775TA SG10202106775TA SG10202106775TA SG10202106775TA SG 10202106775T A SG10202106775T A SG 10202106775TA SG 10202106775T A SG10202106775T A SG 10202106775TA SG 10202106775T A SG10202106775T A SG 10202106775TA SG 10202106775T A SG10202106775T A SG 10202106775TA
Authority
SG
Singapore
Prior art keywords
construction
construction risk
evolution system
evaluation method
risk
Prior art date
Application number
SG10202106775TA
Inventor
Shenxiang Lei
Zhengquan Ding
Yajuan Guo
Yueqin Yang
Xing Gui
Wenkui Yuan
Yuanyuan Tian
Zhenhua Yuan
Original Assignee
China Railway Fifth Survey And Design Institute Group Co Ltd
China Railway Construction Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Fifth Survey And Design Institute Group Co Ltd, China Railway Construction Corp Ltd filed Critical China Railway Fifth Survey And Design Institute Group Co Ltd
Publication of SG10202106775TA publication Critical patent/SG10202106775TA/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/067Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
SG10202106775TA 2020-11-18 2021-06-22 Construction Risk Evolution System, Construction Method and Construction Risk Evaluation Method SG10202106775TA (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011295858.7A CN112270503A (en) 2020-11-18 2020-11-18 Construction risk evolution system, construction method and construction risk assessment method

Publications (1)

Publication Number Publication Date
SG10202106775TA true SG10202106775TA (en) 2021-12-30

Family

ID=74340763

Family Applications (1)

Application Number Title Priority Date Filing Date
SG10202106775TA SG10202106775TA (en) 2020-11-18 2021-06-22 Construction Risk Evolution System, Construction Method and Construction Risk Evaluation Method

Country Status (2)

Country Link
CN (1) CN112270503A (en)
SG (1) SG10202106775TA (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116503207B (en) * 2023-03-31 2023-11-14 中建安装集团有限公司 Building construction safety monitoring system and method based on Internet

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080255910A1 (en) * 2007-04-16 2008-10-16 Sugato Bagchi Method and System for Adaptive Project Risk Management
CN102521710B (en) * 2011-12-22 2016-07-06 上海建科工程咨询有限公司 A kind of online risk evaluating system of Construction Quality safety
CN103093400B (en) * 2013-01-24 2017-04-26 华中科技大学 Adjacent building safety quantitative evaluation method in tunnel construction
CN107808347A (en) * 2016-09-08 2018-03-16 苏州热工研究院有限公司 The choosing method of key element is checked in a kind of risk-informed type inservice inspection
CN111523806A (en) * 2020-04-23 2020-08-11 北京鑫大禹水利建筑工程有限公司 Gravity dam risk assessment calculation method based on hierarchical analysis and fuzzy comprehensive evaluation
CN111612356A (en) * 2020-05-21 2020-09-01 盛安保险技术股份有限公司 Engineering quality insurance risk management effect and scheme analysis method and system
CN111815063B (en) * 2020-07-17 2023-01-03 中国环境科学研究院 Underground coal mining environment risk prediction grading method

Also Published As

Publication number Publication date
CN112270503A (en) 2021-01-26

Similar Documents

Publication Publication Date Title
GB2596770B (en) Carrier-resolved photo-hall system and method
GB2596439B (en) Three-dimensional measuring system, and three-dimensional measuring method
GB2584492B (en) Method, garment and system
SG10202106775TA (en) Construction Risk Evolution System, Construction Method and Construction Risk Evaluation Method
GB2602421B (en) Electrolysis system and method
EP4033495A4 (en) Activity task evaluating system, and activity task evaluating method
GB202116518D0 (en) Trading proposal arrangement, system and method
EP3819186C0 (en) Inspection system, inspection method, and program
ZA202206279B (en) Security system and method
GB2590652B (en) Structure monitoring system and method
GB2581221B (en) Monitoring system and method
SG11202111393VA (en) Reception system, reception method, and program
GB2581814B (en) Tessellatable container, system and method
GB201908187D0 (en) Method, garment and system
EP4258001A4 (en) Evaluation method, program, and evaluation system
GB2597202B (en) Analysis system and analysis method
GB202015542D0 (en) Evaluation method and system
GB2602592B (en) Design system and design method
GB2590532B (en) Information processing system, platform, and computer-readable program
EP4084012A4 (en) Health management system and health management method
EP4258202A4 (en) Program, method, and system
EP4258201A4 (en) Program, method, and system
SG11202010671PA (en) System and method for evaluating risk
SG11202108828SA (en) Structural health monitoring method and system
SG10201910873RA (en) Heat-illness risk assessment method and heat-illness risk assessment system