SE8800270L - Fencing method using concrete posts - has tubular socket driven into ground, into which concrete post is inserted - Google Patents
Fencing method using concrete posts - has tubular socket driven into ground, into which concrete post is insertedInfo
- Publication number
- SE8800270L SE8800270L SE8800270A SE8800270A SE8800270L SE 8800270 L SE8800270 L SE 8800270L SE 8800270 A SE8800270 A SE 8800270A SE 8800270 A SE8800270 A SE 8800270A SE 8800270 L SE8800270 L SE 8800270L
- Authority
- SE
- Sweden
- Prior art keywords
- concrete
- post
- ground
- tubular socket
- posts
- Prior art date
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract 2
- 229910052742 iron Inorganic materials 0.000 abstract 1
- 230000002787 reinforcement Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Joining Of Building Structures In Genera (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
After the concrete post (9,10) has been lowered into the tubular socket (1), the latter is drawn upwards again by means of a jack or similar. The post is then finally locked into position by at least one reinforcement iron extending from a shoe (5) at the base of the post to a top plate at its upper end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE8800270A SE8800270L (en) | 1988-01-28 | 1988-01-28 | Fencing method using concrete posts - has tubular socket driven into ground, into which concrete post is inserted |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE8800270A SE8800270L (en) | 1988-01-28 | 1988-01-28 | Fencing method using concrete posts - has tubular socket driven into ground, into which concrete post is inserted |
Publications (2)
Publication Number | Publication Date |
---|---|
SE8800270D0 SE8800270D0 (en) | 1988-01-28 |
SE8800270L true SE8800270L (en) | 1989-07-29 |
Family
ID=20371200
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SE8800270A SE8800270L (en) | 1988-01-28 | 1988-01-28 | Fencing method using concrete posts - has tubular socket driven into ground, into which concrete post is inserted |
Country Status (1)
Country | Link |
---|---|
SE (1) | SE8800270L (en) |
-
1988
- 1988-01-28 SE SE8800270A patent/SE8800270L/en unknown
Also Published As
Publication number | Publication date |
---|---|
SE8800270D0 (en) | 1988-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2035014A1 (en) | Means and method for rigidly elevating a structure | |
MY101133A (en) | Ground treatment. | |
DE69216203D1 (en) | Device and method for the production of compacted stone or ballast columns in earth masses | |
SE8800270L (en) | Fencing method using concrete posts - has tubular socket driven into ground, into which concrete post is inserted | |
ZA88907B (en) | A process for reinforcing a driven tubular piling,the piling obtained by this process,an arrangement for implementing the process | |
FR2453964A2 (en) | driven embedded vertical anchor plate for fence post - includes socket for post foot having linear undulating form in horizontal section | |
JPS57219A (en) | Method and apparatus for construction of support central pillar | |
JPS6433315A (en) | Formation of hardened column using cloth cylinder under ground | |
JPS57228A (en) | Construction of independent foundation | |
CN216345532U (en) | On-site lighting equipment for hydraulic engineering construction | |
JPS56125528A (en) | Construction of in-situ driven pile | |
FR2300849A1 (en) | Tractor mounted post driver - has hammer and post guides and control lever for disconnection when on uneven ground | |
JPS6421117A (en) | Upper pile reinforcing work for pc pile | |
JPS6436821A (en) | Construction of hardened column | |
JPS6466312A (en) | Method and apparatus for concrete pile foundation work | |
JPS5774424A (en) | Steel frame for foundation ground insertion | |
JPS5748038A (en) | Adjusting method for level of structure | |
FR2395378A1 (en) | Ground anchor for pylon stay - has tie bar seated in bore whose head is plugged with bulb formed at base by pressure grouting permeating adjacent soil | |
SU808595A1 (en) | Driven pile | |
JPS5532809A (en) | Pile foundation practice | |
JPS55105028A (en) | Method and apparatus for crushing concrete pile | |
JPS55105025A (en) | Pile driving method | |
JPS5664030A (en) | Placement of soil-sheathing fence | |
FR2309694A1 (en) | Moulded plastic two-part tubular fence post - has base piece which is driven into ground and forms socket for sectional post | |
ES2058005A2 (en) | Method of anchoring posts, stakes (pegs) and the like in the ground |