SE422670B - Cableway between offshore platform and supply vessel - Google Patents

Cableway between offshore platform and supply vessel

Info

Publication number
SE422670B
SE422670B SE8006303A SE8006303A SE422670B SE 422670 B SE422670 B SE 422670B SE 8006303 A SE8006303 A SE 8006303A SE 8006303 A SE8006303 A SE 8006303A SE 422670 B SE422670 B SE 422670B
Authority
SE
Sweden
Prior art keywords
cable
vessel
platform
deck
cableway
Prior art date
Application number
SE8006303A
Other languages
Swedish (sv)
Other versions
SE8006303L (en
Inventor
Hans Otto Paffrath
Original Assignee
Hans Otto Paffrath
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hans Otto Paffrath filed Critical Hans Otto Paffrath
Priority to SE8006303A priority Critical patent/SE422670B/en
Publication of SE8006303L publication Critical patent/SE8006303L/en
Publication of SE422670B publication Critical patent/SE422670B/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/18Arrangement of ship-based loading or unloading equipment for cargo or passengers of cableways, e.g. with breeches-buoys

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

In order to facilitate transports between a supply vessel 15 and an offshore platform 10 and eliminate the risks associated with handling by means of a hoisting crane 12, a cableway 14 is used in which a section 21 of supporting cable is held stretched essentially parallel with the deck 16 of the vessel between transverse trestle constructions 18, 19 placed on the front edge and back edge respectively of the deck at some height above the uppermost cargo level. The crew of the vessel can then under tolerable working conditions moor the freight parcel 20 to the hoisting gear 22 of the cableway. The cable can be constituted by a single, crude wire or hawser, supporting a travelling carriage 22a which is displaced along the cable in any preferred known manner. Alternatively, the cable can be constituted by a multiple- shear tackle 14a, in which a hoisting gear 22b is borne by first wire parts 34 running out towards the platform, whilst a return part 38 from the platform is fixed to the vessel. The hoisting gear 22a is hauled up by the vessel being moved away from the platform, as wire is simultaneously fed out from a winch 31. <IMAGE>

Description

8006303-5 2 är försedd med styrhjul för kabeln, och bockkonstruktio- nerna i övrigt är så inrättade, att ett parti av kabeln, mellan dem hålls väsentligen parallellt med lastdäcket och på ett avstånd över detta överstigande högsta beräk- nad lasthöjd. Besättningen kan då alltid arbeta med lyft- donskroken i rätt position över aktuellt kolli, och behö- ; vez*inte besväras av att kroken rör sig över stora områden av däcket som är fallet när plattformskranen utnyttjas. 8006303-5 2 is provided with guide wheels for the cable, and the bending constructions are otherwise arranged so that a portion of the cable, between them, is kept substantially parallel to the load deck and at a distance above this exceeding the maximum calculated load height. The crew can then always work with the hoist hook in the correct position over the current package, and need-; vez * is not bothered by the hook moving over large areas of the deck which is the case when the platform crane is used.

Operationen av lyftdonskroken sker via besättningen och ej via kranföraren, som sitter långt ifrån supplyfartyget.The operation of the hoist hook takes place via the crew and not via the crane operator, who is located far from the supply vessel.

Styrningen vid båda bockkonstruktionerna är företrädesvis förskjutbara i fartygets tvärriktning.The steering in both buoy structures is preferably displaceable in the transverse direction of the vessel.

Kabeln kan utgöras av en enda kraftig wire el- ler tross,varvid en av densamma uppburen löpvagn är för- sedd med hjularrangemang som medger passage förbi aktre styrhjul. Alternativt kan kabeln utgöras av en flerskuren talja, där lastlyftdon är fast monterat på förstafrån supplyfartyget utgående part, medan en returpart av wire- ändan är fastgjord till fartyget.The cable can consist of a single strong wire or rope, one of the trolleys supported by the same being provided with wheel arrangements which allow passage past the aft steering wheels. Alternatively, the cable may consist of a multi-cut hoist, where the cargo lifter is fixedly mounted on the outgoing part of the supply vessel, while a return part of the wire end is attached to the vessel.

Uppfinningen kommer här nedan att beskrivas med hänvisning till bifogade ritningar, på vilka Ä Fig. 1 schematiskt illustrerar en kabelbana enligt uppfin- ningen, Fig. 2 visar ett supplyfartyg utrustat enligt uppfinningen, Fig. 3 är en planvy av fartygets däck (något schematiskt), Fig. 4 visar ett löpvagnsutförande, Fig. 5 visar en modifikation, där kabeln utgörs av en flerskuren talja och Fig. 6 visar en planvy av taljan I Fig. 1 betecknas en offshore-plattform av god- tyckligt slag med 10. Det kan vara en borr-rigg elleren pro- duktions- eller bostadsplattform, som vilar på ben 11, vil- ka antingen når ned till havsbottnen, eller vilar på pon- toner, som är nedsänkta så djupt att plattformen inte på- verkas av vågrörelser. I senare fallet är plattformen för- ankrad.The invention will be described below with reference to the accompanying drawings, in which Fig. 1 schematically illustrates a cableway according to the invention, Fig. 2 shows a supply vessel equipped according to the invention, Fig. 3 is a plan view of the ship's deck (somewhat schematic) Fig. 4 shows a trolley design, Fig. 5 shows a modification, where the cable consists of a multi-cut hoist and Fig. 6 shows a plan view of the hoist. In Fig. 1, an offshore platform of any kind is denoted by 10. It can be a drilling rig or a production or housing platform, which rests on legs 11, which either reach down to the seabed, or rest on pontoons, which are submerged so deep that the platform is not affected by wave movements. In the latter case, the platform is anchored.

Av intresse för uppfinningen är att plattformen 8006303-5 är utrustad med en jibbkran 12 och en bompåle 13 eller motsvarande stödkonstruktion, där ena ändan av en kabel ïü kan fästas på för mottagande av gods lämplig höjd.Of interest for the invention is that the platform 8006303-5 is equipped with a jib crane 12 and a boom post 13 or corresponding support structure, where one end of a cable ïü can be attached at a height suitable for receiving goods.

En supplybåt, som kan vara av godtyckligt känt slag, är betecknad med 15, och är försedd med ett akter ut tillgängligt lastdäck 16. Fartyget kangivetvisäven vara utrustat för transport av flytande last, - vatten, brännolja, s.k. mud o.d. - som på vanligt sätt överförs via slangledning.A supply boat, which can be of any known type, is denoted by 15, and is provided with a stern out available cargo deck 16. The vessel may also be equipped for transport of liquid cargo, water, fuel oil, so-called mud o.d. - which is transmitted in the usual way via hose line.

Kabeln 14 förvaras lämpligen under resor om- bord i fartyget 15, och matas ut vid transporttillfällen.The cable 14 is conveniently stored during voyages on board the vessel 15, and is discharged at transport times.

Kranens 12 lastkrok - 17, stretkade läget - firas ned till lämplig höjd över fartygsdäcket och kabelns ända fastgörs. Detta är det enda tillfälle då besättningen på fartyget behöver fånga upp en lastkrok från plattformen och fastgöra den till något föremål på fartyget.The crane's 12 load hook - 17, stretched position - is lowered to a suitable height above the ship's deck and the end of the cable is fastened. This is the only time when the crew on the ship needs to catch a cargo hook from the platform and attach it to any object on the ship.

Kabeln 14 fästs till bompålen IB och fartyget avlägsnar sig från plattformen så att kabeln hålls sträckt i lämplig lutning. Fartyget är - se även fig. 2 - försett med en tvärgående bockkonstruktion 18, 19 vid förkant resp. akterkant av lastdäcket 16.The cable 14 is attached to the boom pile IB and the vessel moves away from the platform so that the cable is kept stretched at a suitable slope. The vessel is - see also Fig. 2 - provided with a transverse trestle structure 18, 19 at the leading edge resp. aft edge of the cargo deck 16.

Den last som skall hanteras kan vara av va- rierande art, men illustreras här av enhetscontnlnor 20, vilka är staplade på varandra i två lager. Det kan natur- ligtvis alternativt vara fråga om buntar av rör eller annat gods, men hanteringen blir i princip densamma.The load to be handled can be of varying nature, but is illustrated here by unit containers 20, which are stacked on top of each other in two layers. It can, of course, alternatively be a matter of bundles of pipes or other goods, but the handling will in principle be the same.

Bomkonstruktionerna 18, 19 är så höga, att det blir ett utrymme om ca 2 meter mellan översta godslagret och det parti 21 av kabeln 1ä, som sträcker sig mellan bomkonstruktionerna, väsentligen parallellt med fartyge- däcket.The boom structures 18, 19 are so high that there is a space of about 2 meters between the uppermost cargo layer and the portion 21 of the cable 1a which extends between the boom structures, substantially parallel to the ship's deck.

På kabeln arbetar ett lyftdon 22a.som kan ut- formas på olika sätt. Eftersom kabeln alltid hålls i visst läge över däcket blir det inte stora rörelser vid lyftdonskroken, och det blir lätt för besättningen att 8006303-5 Ä angöra densamma till utvalt kolli 20. Bockkonstruktionerna 18, 19 är försedda med styrorgan 23, 24 för kabeln, och dessa är, se Fig. 3, monterade på bockkonstruktionerna så att de kan förskjutas i fartygets tvärriktning. Lyftdonet 22a kan lätt flyttas längs kabeln till önskad position, och genom förskjutning i sidled av styrorganen 23, 24 kan man få lyftdonet exakt över önskat kolli.A lifting device 22a works on the cable, which can be designed in different ways. Since the cable is always kept in a certain position above the deck, there will be no large movements at the hoist hook, and it will be easy for the crew to attach it to the selected package 20. The buck constructions 18, 19 are provided with guide means 23, 24 for the cable, and these are, see Fig. 3, mounted on the bow structures so that they can be displaced in the transverse direction of the ship. The lifting device 22a can easily be moved along the cable to the desired position, and by lateral displacement of the guide means 23, 24, the lifting device can be moved exactly over the desired package.

Kabelbanan, d.v.s. transportarrangemanget mel- lan fartyg och plattform kan utformas på olika sätt. En- ligt Fig. 3 är kabeln en grov wire eller tross. Styrorga- nen 23, 2ü är då lämpligen blockskivor, som flyttas i sid- led med hjälp av någon lämplig mekanism.The cable car, i.e. The transport arrangement between ship and platform can be designed in different ways. According to Fig. 3, the cable is a coarse wire or cable. The guide members 23, 2ü are then suitably block discs, which are moved laterally by means of some suitable mechanism.

Lyftdonet 22a (Fig. h) omfattar då en löpvagn 36, som uppbär en talja 25 driven av elmotor. Det före- ligger viss svårighet att få löpvagnen förbi det yttre styrorganet 2Ä, men vagnens överkant 26 kan formas så att den momentant pressar ned kabeln från blockskivan, medan den själv är styrd av denna. Det finns, exempelvis vid bergbanor, upphängningsanordningar i pendelarmar för de bärande hjulen 27, varför förbipasseringsmomentet kan lösas på olika sätt.The lifting device 22a (Fig. H) then comprises a trolley 36, which carries a hoist 25 driven by an electric motor. There is some difficulty in getting the trolley past the outer guide member 2Ä, but the upper edge 26 of the trolley can be shaped so that it momentarily presses down the cable from the block disc, while it itself is guided by it. There are, for example at mountain railways, suspension devices in pendulum arms for the supporting wheels 27, so that the passing moment can be solved in different ways.

Transport av löpvagnen kan ordnas på olika sätt,t.ex. genom dragande wirar 28, 29, som manövreras på känt sätt. Det finns även kända arrangemang, där grip- organ på löpvagnen sluter om kabeln och steg för steg drar vagnen fram längs kabeln. Detta förutsätter kontinu- erlig strömtillförsel under hela transportvägen, vilket som på känt sätt kan ske medelst strömkabel som löper längs den bärande kabeln lä.Transport of the trolley can be arranged in different ways, e.g. by pulling wires 28, 29, which are operated in a known manner. There are also known arrangements, where gripping means on the trolley close the cable and step by step pull the trolley forward along the cable. This presupposes a continuous power supply throughout the transport route, which can be done in a known manner by means of a power cable running along the load-bearing cable.

Viddet i Fig. Ä visade utförandet, där löp- vagnen 22a dras medelst wirar 28,29 behöver man endast ström till motorn för taljan 25. Detta kan åstadkommas genom strömkabel som tillfälligt inkopplas vid anslut- ning 30 under lastning och lossning.The width shown in Fig. Ä, where the trolley 22a is pulled by means of wires 28,29, only power is needed to the motor for the pulley 25. This can be achieved by power cable which is temporarily connected at connection 30 during loading and unloading.

Vid utförandet enligt Fig. 5 och 6 utgörs ka- 8006303-5 5 beln 14a av en flerskuren talja. Vinschen 31 är monterad invid lastdäcket, det främre styrorganet 23a utgörs av ett block med tre skivor, och det aktre styrorganet 2ha utgörs av ett block med sex skivor. Vid bompåle 13 på plattformen uppbärs ett block 32 med tre skivor. Det är detta som måste angöras till plattformskranens krok 17, och hissas upp till plattformen. Blocken 23a och 2ha är på tidigare beskrivet sätt monterade i bomkonstruktioner- na 18, 19 så att de kan förskjutas i fartygets tvärrikt- ning, t.ex. med hjälp av till höger i Fig. 6 antydd led- skruv 37.In the embodiment according to Figs. 5 and 6, the cable 14a consists of a multi-cut hoist. The winch 31 is mounted next to the load deck, the front guide member 23a consists of a block with three discs, and the aft guide member 2ha consists of a block with six discs. At boom post 13 on the platform, a block 32 with three boards is supported. This is what must be anchored to the hook crane 17 of the platform crane, and hoisted up to the platform. Blocks 23a and 2ha are mounted in the previously described manner in the boom structures 18, 19 so that they can be displaced in the transverse direction of the ship, e.g. by means of a guide screw 37 indicated on the right in Fig. 6.

Wiren löper med en part 33 från vinschen 31 till en första skiva i'främre styrorganet 23a. Wirens part 34 fortsätter till aktra styrorganet 24a, vidare till block 32 via bompålen 13. Wirens huvuddel 35 skär sedan fram och tillbaka flera gånger mellan styrorganet 23a och blocket 32, förbi skivor vid styrørganet aha. Lyft-done: 22b monteras fast på den första från blocket 23a utgående parten BÄ. Returparten 38 från bompålen 13 förs tillbaka enligt taljprincipen och fästs till godtycklig punkt i fartyget, nära bomkonstruktionen 19 i däck 16, lämpligen medelst shockdämpare 39.The wire runs with a part 33 from the winch 31 to a first disc in the front guide means 23a. The part 34 of the wire continues to the aft guide means 24a, further to block 32 via the boom pile 13. The main part 35 of the wire then cuts back and forth several times between the guide means 23a and the block 32, past discs at the guide means aha. Lift-done: 22b is mounted on the first part BÄ starting from block 23a. The return part 38 from the boom pile 13 is returned according to the hoisting principle and fastened to any point in the ship, near the boom structure 19 in deck 16, suitably by means of shock absorbers 39.

När taljan 14a är uppriggad intar fartyget en position ett stycke från plattformen. Sedan önskat kolli fastgjorts till lyftdonet och lyfts så mycket att det är fritt från underlaget kör fartyget bort från plattformen, samtidigt som wire matas ut från vinschen 31. Parten 35 drar då upp lyftdonet längs parten 34, så att det snabbt förflyttas upp till plattformen. Lyftdo- net förs tillbaka till fartyget genom att detta backar mot plattformen, under samtidig hemtagning av wire.When the hoist 14a is rigged up, the vessel assumes a position some distance from the platform. After the desired package has been attached to the hoist and lifted so much that it is free from the ground, the ship drives away from the platform, at the same time as wire is discharged from the winch 31. The part 35 then pulls up the hoist along the part 34, so that it is quickly moved up to the platform. The lifting device is returned to the ship by backing it towards the platform, while taking the wire home at the same time.

Med detta arrangemang behöver man inte företa några extra åtgärder för förflyttning av lyftdonet, och en annan fördel är att den rätt avsevärda dragpåkänning som kabeln utsätts för när fartyget sättes i sjön, kommer att fördelas på flera wireparter. Antalet parter i taljan 14a bestäms av väntad belastning och önskad wiredimension. 8006303-5 Ovan beskrivna och på ritningarna visade ut- föringsformer är endast exempel,där ingående komponenter kan varieras på många sätt inom ramen för efterföljande patentkrav. Det för uppfinningen väsentliga är arrange- manget vid det parti av kabeln som sträcker sig över far- tygsdäcket, men för övriga partier är känd teknik i stort sett användbar.With this arrangement, there is no need to take any additional measures for moving the hoist, and another advantage is that the fairly considerable tensile stress to which the cable is subjected when the vessel is put into the lake, will be distributed over several wire sections. The number of parties in the pulley 14a is determined by the expected load and the desired wire dimension. 8006303-5 Embodiments described above and shown in the drawings are only examples, where the components included can be varied in many ways within the scope of the appended claims. What is essential for the invention is the arrangement at the part of the cable which extends over the ship's deck, but for other parts known technology is largely useful.

Claims (5)

8006303-5 P a t e n t k r a v8006303-5 P a t e n t k r a v 1. Kabelbana mellan en av vågrörelser opäverkad offshore-plattform (10) och ett rörligt supplyfartyg (15) med akterut tillgängligt lascdäck (16) k ä n n e t e c k - n a d därav, att Fartyget (15) vid vardera ändan av last- däcket (16) är försett med en relativt lastdäcket tvärgående bockkonstruktion (18, 19), av vilka åtminstone den aktra (19) är försedd med styrhjul (24) för kabeln (lä), som uppbär ett lastlyftdon (22a; 22b) som medger passage förbi styrhjulen och bockkonstruktionerna (18, 19) i övrigt är så inrättade, att ett pnrti (21) av kuhvln, mellan dem, hålls väsentligen parallellt med lastdäcket (lo) och på ett avstånd över detta överstigande högsta beräknad lasthöjd.Cableway between an offshore platform (10) unaffected by wave motions and a movable supply vessel (15) with a stern-accessible cargo deck (16), characterized in that the vessel (15) at each end of the cargo deck (16) is provided with a relatively load-bearing transverse bending structure (18, 19), at least the stern (19) of which is provided with guide wheels (24) for the cable (lä), which support a load-lifting device (22a; 22b) which allows passage past the guide wheels and the bending structures (18, 19) are otherwise arranged so that a portion (21) of the coil, between them, is kept substantially parallel to the load deck (lo) and at a distance above this exceeding maximum calculated load height. 2. Kabelbana enligt patentkrav 1, k ä n n e - t e c k n a d därav, att kabelstyrningar (23, 2Å) vid båda bockkonstruktionerna (18, 19) är förskjutbara i fartygets tvärriktning.2. A cableway according to claim 1, characterized in that cable guides (23, 2Å) at both bending structures (18, 19) are displaceable in the transverse direction of the vessel. 3. Kabelbana enligt något av patentkrav 1 eller 2, k ä n n e t e c k n a d därav, att kabeln utgörs av en enda kraftig wire eller tross (1Å) och att av densamma upp- buret lastlyftdon omfattar en löpvagn (22a) försedd med hjularrangemang (26, 27) som medger passage förbi de aktre styrhjulen (ZQ).Cableway according to one of Claims 1 or 2, characterized in that the cable consists of a single strong wire or cable (1Å) and in that the load-lifting device supported by it comprises a trolley (22a) provided with wheel arrangements (26, 27). ) which allows passage past the aft steering wheels (ZQ). 4. Kabelbana enligt något av patentkrav 1 eller 2, k ä n n e t e c k n a d av att kabeln utgörs av en fler- skurcn tulja (ßßu, 32), där lastlyftdon (22h) är fast mun- terat på första från supplyfartyget utgående part (Bh), medan en returpart (38) av wireändan är fastgjord till far- tyg-et.Cableway according to one of Claims 1 or 2, characterized in that the cable consists of a multi-cut tulle (ßßu, 32), the load lifting device (22h) being fixedly mounted on the first part of the supply vessel (Bh), while a return portion (38) of the wire end is attached to the vessel. 5. Kabelbana enligt patentkrav H, k ä n n e - t e c k n a d därav, att kabeln är fastgjord i fartygets däck med hjälp av en shockdämpare (39).Cableway according to Claim H, characterized in that the cable is fixed in the ship's deck by means of a shock absorber (39).
SE8006303A 1980-09-10 1980-09-10 Cableway between offshore platform and supply vessel SE422670B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SE8006303A SE422670B (en) 1980-09-10 1980-09-10 Cableway between offshore platform and supply vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SE8006303A SE422670B (en) 1980-09-10 1980-09-10 Cableway between offshore platform and supply vessel

Publications (2)

Publication Number Publication Date
SE8006303L SE8006303L (en) 1982-03-11
SE422670B true SE422670B (en) 1982-03-22

Family

ID=20341692

Family Applications (1)

Application Number Title Priority Date Filing Date
SE8006303A SE422670B (en) 1980-09-10 1980-09-10 Cableway between offshore platform and supply vessel

Country Status (1)

Country Link
SE (1) SE422670B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011091854A1 (en) * 2010-01-29 2011-08-04 Xemc Darwind B.V. System for transferring a person or a load between a vessel and an offshore structure
WO2011095316A1 (en) 2010-02-02 2011-08-11 Xemc Darwind B.V. A method of transferring a load between a vessel and a wind turbine, and a wind turbine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011091854A1 (en) * 2010-01-29 2011-08-04 Xemc Darwind B.V. System for transferring a person or a load between a vessel and an offshore structure
WO2011095316A1 (en) 2010-02-02 2011-08-11 Xemc Darwind B.V. A method of transferring a load between a vessel and a wind turbine, and a wind turbine

Also Published As

Publication number Publication date
SE8006303L (en) 1982-03-11

Similar Documents

Publication Publication Date Title
US7712429B1 (en) Launch and recovery system for unmanned undersea vehicles
CN105008218B (en) For at sea between ships that transport and structure or ship transfer object improve equipment and method
US3390657A (en) Gantry crane for loading barges on ships
CN107735314B (en) Unmanned boat and its recovery method equipped with attachment device
US9630814B2 (en) System and apparatus for motion compensation and anti-pendulation
EP0612655B1 (en) Method for the casting of anchors and mooring of platforms, and an anchor casting unit
US4348960A (en) Aerial cableway between a sea vessel and a fixed installation
US3807334A (en) Motion compensating device for surface supported underwater structures
US7882792B2 (en) Auxiliary floating structure and procedure for descent of equipment into the sea
US20220227467A1 (en) Deployment of Unmanned Underwater Vehicles
JP2002255093A (en) Method for salvaging sunk ship
SE422670B (en) Cableway between offshore platform and supply vessel
WO2013073950A1 (en) Vessel and method for towing a heavy load under water
CN202829351U (en) Longitudinal hoisting device of full-gyration tug
JPH0776443B2 (en) Mooring equipment and methods for dams
SU485912A1 (en) Device for transporting objects under water
JPS6340515Y2 (en)
US647449A (en) Marine tram.
CN109422200B (en) Installation method of tensioning hydraulic cylinder of drilling platform marine riser
US907845A (en) Cableway.
SU500114A1 (en) Device for lowering and lifting heavy boats and other floating objects
RU2163878C2 (en) Ship-raising unit
WO2024018024A1 (en) Monopiles transport and installation vessel
US885774A (en) Conveying apparatus.
US710492A (en) Conveying apparatus.