SE401539B - WAY TO PLACE A PACKED SAND PILLAR IN THE GROUND - Google Patents

WAY TO PLACE A PACKED SAND PILLAR IN THE GROUND

Info

Publication number
SE401539B
SE401539B SE7207834A SE783472A SE401539B SE 401539 B SE401539 B SE 401539B SE 7207834 A SE7207834 A SE 7207834A SE 783472 A SE783472 A SE 783472A SE 401539 B SE401539 B SE 401539B
Authority
SE
Sweden
Prior art keywords
ground
place
way
packed sand
sand pillar
Prior art date
Application number
SE7207834A
Other languages
Swedish (sv)
Inventor
M Ogawa
Original Assignee
Fudo Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudo Construction Co filed Critical Fudo Construction Co
Publication of SE401539B publication Critical patent/SE401539B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • E02D3/106Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by forming sand drains containing only loose aggregates

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
SE7207834A 1971-09-18 1972-06-14 WAY TO PLACE A PACKED SAND PILLAR IN THE GROUND SE401539B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP46072882A JPS4949055B2 (en) 1971-09-18 1971-09-18

Publications (1)

Publication Number Publication Date
SE401539B true SE401539B (en) 1978-05-16

Family

ID=13502134

Family Applications (1)

Application Number Title Priority Date Filing Date
SE7207834A SE401539B (en) 1971-09-18 1972-06-14 WAY TO PLACE A PACKED SAND PILLAR IN THE GROUND

Country Status (14)

Country Link
US (1) US3772892A (en)
JP (1) JPS4949055B2 (en)
AU (1) AU463686B2 (en)
BE (1) BE785183A (en)
BR (1) BR7205635D0 (en)
DE (1) DE2229282C3 (en)
DK (1) DK141207B (en)
FR (1) FR2153926A5 (en)
GB (1) GB1391662A (en)
HU (1) HU170414B (en)
IT (1) IT956621B (en)
NL (1) NL167215C (en)
NO (1) NO140774C (en)
SE (1) SE401539B (en)

Families Citing this family (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5220046B2 (en) * 1973-10-19 1977-06-01
JPS5735327B2 (en) * 1974-02-01 1982-07-28
JPS5130013U (en) * 1974-08-23 1976-03-04
US4397588A (en) * 1981-01-23 1983-08-09 Vibroflotation Foundation Company Method of constructing a compacted granular or stone column in soil masses and apparatus therefor
JPS5854119A (en) * 1981-09-22 1983-03-31 Matsupu Eng Kk Constructing method for sand pile utilizing recorder
AU552443B2 (en) * 1981-09-22 1986-05-29 Fudo Construction Co. Ltd. Compacting soils
US4676693A (en) * 1984-11-30 1987-06-30 S: Kajima Corporation Method of confirming position of drain material left and apparatus for confirming same in drain engineering method
JPS6427724A (en) * 1987-07-23 1989-01-30 Kato Seisakusho Kk Automatic control spinning device
NL1002255C2 (en) * 1996-02-06 1997-08-07 Oranjewoud Ingb Bv Method for placing a pipe system.
DE29716673U1 (en) * 1997-09-17 1998-01-02 Keller Grundbau Gmbh Soil improvement device using powdery binder
DE29716935U1 (en) * 1997-09-20 1998-02-12 Keller Grundbau Gmbh Device for introducing additional material
DE19814021A1 (en) * 1998-03-30 1999-10-14 Degen Wilhelm Device for introducing a foreign substance into soils or for compacting the soil
US6517292B1 (en) * 1999-09-01 2003-02-11 Richard E Landau Apparatus to form columns of granular material
US6957930B2 (en) * 1999-09-01 2005-10-25 Landau Richard E Apparatus to form columns of granular material
US9169611B2 (en) 2000-06-15 2015-10-27 Geopier Foundation Company, Inc. Method and apparatus for building support piers from one or more successive lifts formed in a soil matrix
US8152415B2 (en) * 2000-06-15 2012-04-10 Geopier Foundation Company, Inc. Method and apparatus for building support piers from one or more successive lifts formed in a soil matrix
US7226246B2 (en) * 2000-06-15 2007-06-05 Geotechnical Reinforcement, Inc. Apparatus and method for building support piers from one or successive lifts formed in a soil matrix
US20060008326A1 (en) * 2003-02-11 2006-01-12 Landau Richard E Apparatus to form columns of granular material
US6881013B2 (en) * 2003-06-19 2005-04-19 Fudo Construction Co., Ltd. Sand pile driving method
JP4856967B2 (en) * 2006-01-27 2012-01-18 株式会社不動テトラ Ground improvement method
US7931424B2 (en) * 2008-06-16 2011-04-26 GeoTech Goundation Company—West Apparatus and method for producing soil columns
CN102071675A (en) * 2011-01-10 2011-05-25 广东省建筑科学研究院 Soft soil foundation consolidation method combining drainage pile loading prepressing and deep mixing piles
EP2737132B1 (en) 2011-06-15 2016-03-02 Alexander Degen Method for ground probing
JP5964179B2 (en) * 2012-08-27 2016-08-03 株式会社不動テトラ Ground improvement method by compaction pile construction.
JP6150289B2 (en) * 2013-09-24 2017-06-21 株式会社不動テトラ Construction management method in compacted sand pile method
JP6518558B2 (en) * 2015-09-08 2019-05-22 日本製鉄株式会社 Construction method of casing pipe and crushed stone pile
US11261576B1 (en) * 2020-10-20 2022-03-01 Ramesh Chandra Gupta Rapid consolidation and compaction method for soil improvement of various layers of soils and intermediate geomaterials in a soil deposit
US10844568B1 (en) * 2020-06-23 2020-11-24 Ramesh Chandra Gupta Rapid consolidation and compacion method for soil improvement of various layers of soils and intermediate geomaterials in a soil deposit

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3300988A (en) * 1960-12-23 1967-01-31 Raymond Int Inc Apparatus for forming piles
US3255592A (en) * 1961-05-01 1966-06-14 Herman L Moor Control system for discharging concrete grout to form piles
GB989635A (en) * 1961-05-31 1965-04-22 Heinz Staunau A concrete pile
JPS5310370B1 (en) * 1969-08-27 1978-04-13
US3707848A (en) * 1971-04-07 1973-01-02 Bolt Associates Inc Process and system for increasing load-bearing capacity of soil

Also Published As

Publication number Publication date
AU4401472A (en) 1974-01-03
AU463686B2 (en) 1975-07-31
JPS4949055B2 (en) 1974-12-25
NO140774B (en) 1979-07-30
IT956621B (en) 1973-10-10
BR7205635D0 (en) 1973-07-17
JPS4837906A (en) 1973-06-04
DK141207C (en) 1980-07-21
NL167215B (en) 1981-06-16
US3772892A (en) 1973-11-20
DE2229282A1 (en) 1973-03-29
DE2229282C3 (en) 1979-04-26
FR2153926A5 (en) 1973-05-04
NO140774C (en) 1979-11-07
DE2229282B2 (en) 1978-08-24
NL167215C (en) 1981-11-16
NL7208150A (en) 1973-03-20
BE785183A (en) 1972-10-16
GB1391662A (en) 1975-04-23
HU170414B (en) 1977-06-28
DK141207B (en) 1980-02-04

Similar Documents

Publication Publication Date Title
SE401539B (en) WAY TO PLACE A PACKED SAND PILLAR IN THE GROUND
SE384240B (en) ROOF CONSTRUCTION AND WAY TO PRODUCE DYLIK
SE382076B (en) WAY TO PRODUCE REINFORCEMENT STEELS
SE393186B (en) WAY TO MAKE THE SPLITTER OIL
SE393383B (en) WAY TO PRODUCE ADENOSIN DERIVATIVES
SE404189B (en) WAY TO PRODUCE SUBSTITUTED BENZOFURANES
SE401006B (en) TUB-PROTECTED PROTECTIVE ORGANIZED ORGANIZED TO KEEP A SAND PILLAR IN A SANDWELL DESIGNED IN A COVER IN THE GROUND
SE383952B (en) WAY TO INCREASE THE FILLING FILLING OF TOBACCO
SE382235B (en) WAY TO FERRY TEXTILE MATERIAL USING A POLYALKYLENIMINE.
SE383133B (en) CONTAINER AND WAY TO PRODUCE A DYLIK
SE7608643L (en) WAY TO PREPARE SEGMENT POLYMERISAT
SE382215B (en) WAY TO PRODUCE CHROMANDER DERIVATIVES
SE391181B (en) WAY TO PRODUCE CHINAZOLINE DERIVATIVES
SE399255B (en) WAY TO PRODUCE CHINAZOLINE DERIVATIVES
SE385981B (en) WAY TO INDICATE THE NERVARENCE OF VANADIN IN AN EARTH FORMATION
SE384154B (en) WAY TO STRENGTHEN A METAL SURFACE
SE380312B (en) SET TO CONSTRUCT A TUNNEL
SE399270B (en) WAY TO PRODUCE SPIROLACTONSTEROIDS
SE397679B (en) WAY TO PRODUCE CHINAZOLINE DERIVATIVES
SE392996B (en) EARTH CONNECTION AND WAY TO PRODUCE A SUITABLE EARTH CONNECTION
SE410462B (en) WAY TO DISPROPRIATE HYDROSILANESTERS TO LOWER SILANES AND SILANESTERS
SE400078B (en) WAY TO PRODUCE CHINAZOLINE DERIVATIVES
SE385918B (en) WAY TO PRODUCE MALT
SE397495B (en) WAY TO CORRECT DIFFERENCES IN THE CONSTRUCTION OF A DECK
SE389443B (en) WAY TO PREPARE A FERGED SUBJECT COMPOSITION