SA519410849B1 - اختبار تداخل واختبار تكسير متزامنان - Google Patents
اختبار تداخل واختبار تكسير متزامنانInfo
- Publication number
- SA519410849B1 SA519410849B1 SA519410849A SA519410849A SA519410849B1 SA 519410849 B1 SA519410849 B1 SA 519410849B1 SA 519410849 A SA519410849 A SA 519410849A SA 519410849 A SA519410849 A SA 519410849A SA 519410849 B1 SA519410849 B1 SA 519410849B1
- Authority
- SA
- Saudi Arabia
- Prior art keywords
- testing
- fluids
- fracture zone
- wellbore
- satisfied
- Prior art date
Links
- 239000012530 fluid Substances 0.000 abstract 5
- 238000005086 pumping Methods 0.000 abstract 3
- 230000015572 biosynthetic process Effects 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/162—Injecting fluid from longitudinally spaced locations in injection well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/006—Measuring wall stresses in the borehole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B49/087—Well testing, e.g. testing for reservoir productivity or formation parameters
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
Landscapes
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Analytical Chemistry (AREA)
- Chemical & Material Sciences (AREA)
- Geophysics (AREA)
- Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Motor Or Generator Frames (AREA)
- Separation Using Semi-Permeable Membranes (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
يتم ضخ الموائع في حفرة البئر من خلال نبض الموائع عند ضغط إيجابي، متغير بالنسبة للتكوين الجيولوجي حتى يتم الإيفاء ببداية ضغط أولى في منطقة الكسر الأولى. يُنتج الضخ شكل ضغط أول في منطقة الكسر الأولى يمثل الضغوط في منطقة الكسر الأولى على مدى فترة من الوقت استجابةً للضخ، وشكل ضغط ثاني في المنطقة الثانية يمثل الضغوط في المنطقة الثانية على مدى فترة من الوقت استجابةً للضخ. واستجابةً لتحديد أن بداية الضغط الأولى قد تم الإيفاء بها، يتوقف ضخ المائع في حفرة البئر لفترة من الوقت. بعد مدة من الزمن، يتم إعادة ضخ الموائع في حفرة البئر من خلال نبض الموائع عند الضغط الإيجابي، المتغير بالنسبة للتكوين الجيولوجي حتى يتم الإيفاء ببداية ضغط ثانية في منطقة الكسر الأولى. شكل 2.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/630,305 US10704369B2 (en) | 2017-06-22 | 2017-06-22 | Simultaneous injection and fracturing interference testing |
Publications (1)
Publication Number | Publication Date |
---|---|
SA519410849B1 true SA519410849B1 (ar) | 2022-09-21 |
Family
ID=62875300
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SA519410849A SA519410849B1 (ar) | 2017-06-22 | 2019-12-18 | اختبار تداخل واختبار تكسير متزامنان |
Country Status (3)
Country | Link |
---|---|
US (3) | US10704369B2 (ar) |
SA (1) | SA519410849B1 (ar) |
WO (1) | WO2018236752A1 (ar) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110671082B (zh) * | 2019-09-19 | 2022-03-01 | 大庆油田有限责任公司 | 一种砂岩油藏薄差油层注水井注入大剂量驱油液后井组的调整方法 |
CN111255442B (zh) * | 2020-01-14 | 2023-04-07 | 大庆油田有限责任公司 | 一种利用干扰试井理论评价压裂裂缝方法 |
US11486788B2 (en) * | 2020-05-28 | 2022-11-01 | Schlumberger Technology Corporation | Test system for a pressure control equipment system |
US11111773B1 (en) | 2020-06-18 | 2021-09-07 | Saudi Arabian Oil Company | Systems and methods for testing wellbore completion systems |
US11739631B2 (en) * | 2020-10-21 | 2023-08-29 | Saudi Arabian Oil Company | Methods and systems for determining reservoir and fracture properties |
US11913329B1 (en) | 2022-09-21 | 2024-02-27 | Saudi Arabian Oil Company | Untethered logging devices and related methods of logging a wellbore |
Family Cites Families (32)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5050674A (en) | 1990-05-07 | 1991-09-24 | Halliburton Company | Method for determining fracture closure pressure and fracture volume of a subsurface formation |
US5555945A (en) * | 1994-08-15 | 1996-09-17 | Halliburton Company | Early evaluation by fall-off testing |
US5789669A (en) * | 1997-08-13 | 1998-08-04 | Flaum; Charles | Method and apparatus for determining formation pressure |
US6076046A (en) | 1998-07-24 | 2000-06-13 | Schlumberger Technology Corporation | Post-closure analysis in hydraulic fracturing |
US7032661B2 (en) * | 2001-07-20 | 2006-04-25 | Baker Hughes Incorporated | Method and apparatus for combined NMR and formation testing for assessing relative permeability with formation testing and nuclear magnetic resonance testing |
US6675892B2 (en) * | 2002-05-20 | 2004-01-13 | Schlumberger Technology Corporation | Well testing using multiple pressure measurements |
FR2840071B1 (fr) | 2002-05-22 | 2004-07-23 | Saint Gobain Isover | Dispositif de determination de la finesse de fibres minerales |
US6832515B2 (en) | 2002-09-09 | 2004-12-21 | Schlumberger Technology Corporation | Method for measuring formation properties with a time-limited formation test |
US7036578B2 (en) | 2003-04-25 | 2006-05-02 | Halliburton Energy Services, Inc. | Tubing guide and coiled tubing injector |
US7031841B2 (en) * | 2004-01-30 | 2006-04-18 | Schlumberger Technology Corporation | Method for determining pressure of earth formations |
US7054751B2 (en) | 2004-03-29 | 2006-05-30 | Halliburton Energy Services, Inc. | Methods and apparatus for estimating physical parameters of reservoirs using pressure transient fracture injection/falloff test analysis |
US7788037B2 (en) | 2005-01-08 | 2010-08-31 | Halliburton Energy Services, Inc. | Method and system for determining formation properties based on fracture treatment |
US7272973B2 (en) * | 2005-10-07 | 2007-09-25 | Halliburton Energy Services, Inc. | Methods and systems for determining reservoir properties of subterranean formations |
US7389185B2 (en) * | 2005-10-07 | 2008-06-17 | Halliburton Energy Services, Inc. | Methods and systems for determining reservoir properties of subterranean formations with pre-existing fractures |
US7445043B2 (en) | 2006-02-16 | 2008-11-04 | Schlumberger Technology Corporation | System and method for detecting pressure disturbances in a formation while performing an operation |
US9477002B2 (en) * | 2007-12-21 | 2016-10-25 | Schlumberger Technology Corporation | Microhydraulic fracturing with downhole acoustic measurement |
US20090250207A1 (en) * | 2008-04-07 | 2009-10-08 | Baker Hughes Incorporated | Method and apparatus for sampling and/or testing downhole formations |
US8015869B2 (en) * | 2008-09-02 | 2011-09-13 | Schlumberger Technology Corporation | Methods and apparatus to perform pressure testing of geological formations |
US9045969B2 (en) * | 2008-09-10 | 2015-06-02 | Schlumberger Technology Corporation | Measuring properties of low permeability formations |
US8985218B2 (en) | 2009-10-05 | 2015-03-24 | Schlumberger Technology Corporation | Formation testing |
US9033045B2 (en) * | 2010-09-21 | 2015-05-19 | Baker Hughes Incorporated | Apparatus and method for fracturing portions of an earth formation |
US20120111559A1 (en) * | 2010-11-05 | 2012-05-10 | Aps Technology, Inc. | Method for fracturing and analyzing an earthen formation surrounding a well bore |
US9631489B2 (en) | 2011-06-15 | 2017-04-25 | Halliburton Energy Services, Inc. | Systems and methods for measuring parameters of a formation |
PL408174A1 (pl) * | 2011-07-11 | 2014-12-22 | Schlumberger Technology B.V. | Układ i sposób przeprowadzania operacji stymulacji odwiertu |
US8899349B2 (en) | 2011-07-22 | 2014-12-02 | Schlumberger Technology Corporation | Methods for determining formation strength of a wellbore |
US9297250B2 (en) | 2013-03-14 | 2016-03-29 | Halliburton Energy Services, Inc. | Controlling net treating pressure in a subterranean region |
US9702247B2 (en) | 2013-09-17 | 2017-07-11 | Halliburton Energy Services, Inc. | Controlling an injection treatment of a subterranean region based on stride test data |
US9500076B2 (en) | 2013-09-17 | 2016-11-22 | Halliburton Energy Services, Inc. | Injection testing a subterranean region |
US9574443B2 (en) | 2013-09-17 | 2017-02-21 | Halliburton Energy Services, Inc. | Designing an injection treatment for a subterranean region based on stride test data |
US9422811B2 (en) | 2013-12-20 | 2016-08-23 | Schlumberger Technology Corporation | Packer tool including multiple port configurations |
US10036247B2 (en) * | 2015-11-16 | 2018-07-31 | Baker Hughes, A Ge Company, Llc | Downhole fiber optic measurement of packers during fluid injection operations |
US10738600B2 (en) * | 2017-05-19 | 2020-08-11 | Baker Hughes, A Ge Company, Llc | One run reservoir evaluation and stimulation while drilling |
-
2017
- 2017-06-22 US US15/630,305 patent/US10704369B2/en active Active
-
2018
- 2018-06-18 WO PCT/US2018/038079 patent/WO2018236752A1/en active Application Filing
-
2019
- 2019-12-18 SA SA519410849A patent/SA519410849B1/ar unknown
-
2020
- 2020-07-06 US US16/921,701 patent/US11047218B2/en active Active
- 2020-07-06 US US16/921,710 patent/US11125061B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
US11125061B2 (en) | 2021-09-21 |
US20200332635A1 (en) | 2020-10-22 |
WO2018236752A1 (en) | 2018-12-27 |
US10704369B2 (en) | 2020-07-07 |
US11047218B2 (en) | 2021-06-29 |
US20180371886A1 (en) | 2018-12-27 |
US20200332634A1 (en) | 2020-10-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SA519410849B1 (ar) | اختبار تداخل واختبار تكسير متزامنان | |
WO2018035400A4 (en) | Method for determining characteristics of a network of hydraulic fractures | |
MX2017015000A (es) | Pruebas de formacion de fractura llena de hidrocarburos antes de la fracturacion de esquisto. | |
SA518390993B1 (ar) | عـمـلـيـات الـتـصـديـع الهـيـدرولـيـكـي فـي التــــكـوينــــات الجــــوفــيـــة | |
MX2016002657A (es) | Metodo para optimizar la conductividad en una operacion de fracturacion hidraulica. | |
SA517381327B1 (ar) | تكوين صدوع وحقن مادة حشو دعمي في الموضع باستخدام أداة اختبار تكوين | |
AR095506A1 (es) | Estimulación con gas natural | |
GB2547128A (en) | Determining depth of loss zones in subterranean formations | |
SA518392039B1 (ar) | توليد نماذج جيولوجية معايرة ديناميكيًا في حقول خضراء | |
MX2016016569A (es) | Metodo para el diseño de pozos de produccion y pozos de inyeccion. | |
GB2541579A (en) | Injecting polyelectrolyte based sacrificial agents for use in unconventional formations | |
WO2016085454A8 (en) | Optimizing hydraulic fracturing in a subterranean formation | |
SA518400298B1 (ar) | تحديد معدل تدفق مستعرض لتسرب حفرة بئر بين تكوينات في بئر حقن | |
WO2015030930A3 (en) | Systems and mehtods for artificial lift via a downhole piezoelectric pump | |
MX2017008525A (es) | Metodos para producir hidrocarburos a partir de un pozo que utiliza inyeccion optimizada de agua a alta presion. | |
MX2023013727A (es) | Pulsaciones de cemento para pozo submarino. | |
MX2016009138A (es) | Sistema y metodologia para el tratamiento de pozos. | |
SA520411763B1 (ar) | مادة خافضة للتوتر السطحي ذاتية الدعم لتحفيز بئر | |
MX367518B (es) | Sistemas y métodos para la caracterización de muestras. | |
EA201700280A1 (ru) | Способ и установка для откачки жидкости из скважины | |
MX346532B (es) | Método para determinar el volumen de una red de fracturas usando señales sísmicas pasivas. | |
SA519402442B1 (ar) | تكييف تكوين جوفي | |
SA519400807B1 (ar) | عامل خفض احتكاك منظم لعمليات جوفية | |
EA201891497A1 (ru) | Улучшения в нагнетательных скважинах или относящиеся к ним | |
SA518400039B1 (ar) | تكوين قنوات خالية من مواد الحشو الدعمي في حشوة بمادة حشو دعمي |