SA516371568B1 - نظام وطريقة لتجهيز بئر - Google Patents
نظام وطريقة لتجهيز بئرInfo
- Publication number
- SA516371568B1 SA516371568B1 SA516371568A SA516371568A SA516371568B1 SA 516371568 B1 SA516371568 B1 SA 516371568B1 SA 516371568 A SA516371568 A SA 516371568A SA 516371568 A SA516371568 A SA 516371568A SA 516371568 B1 SA516371568 B1 SA 516371568B1
- Authority
- SA
- Saudi Arabia
- Prior art keywords
- wellbore
- zone
- perforating
- well completion
- fracturing
- Prior art date
Links
- 239000000126 substance Substances 0.000 abstract 2
- 230000009969 flowable effect Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/114—Perforators using direct fluid action on the wall to be perforated, e.g. abrasive jets
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/261—Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/138—Plastering the borehole wall; Injecting into the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Drilling And Boring (AREA)
Abstract
يتعلق الكشف الحالي بطريقة تجهيز بئر والتي يمكن أن تتضمَّن، في عملية سحب واحدة داخل حفرة بئر، الخطوات التالية التي يتم إجراؤها لكل منطقة من المناطق المتعددة المخترقة عن طريق حفرة البئر: ثقب المنطقة بطريقة كاشطة باستخدام مجموعة أنابيب يتم استخدامها في مجموعة تكوين الثقوب، وإحداث تصدع في المنطقة التي تم ثقبها عن طريق التدفق من السطح عن طريق فراغ حلقي لبئر، وبعد ذلك سد المنطقة التي حدثت لها تصدع باستخدام مادة مسببة للانسداد قابلة للإزالة، وإزاحة مجموعة تكوين الثقوب في حفرة البئر بينما يتم سد المنطقة التي حدث بها التصدع. يمكن أن تتضمَّن طريقة تجهيز بئر أخرى، في عملية سحب واحدة داخل حفرة بئر، الخطوات التالية التي يمكن إجراؤها لكل منطقة من المناطق المتعددة المخترقة عن طريق حفرة البئر: تكوين ثقوب في حفرة البئر باستخدام ثاقب كاشط، ثمَّ إزاحة الثاقب في حفرة البئر بعيداً عن سطح الأرض، وبعد ذلك إحداث تصدع بالمنطقة، وسد المنطقة المتصدعة بمادة مسببة للانسداد قابلة للتدفق. شكل 11.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201462082299P | 2014-11-20 | 2014-11-20 | |
US201562103786P | 2015-01-15 | 2015-01-15 | |
US14/720,532 US9810051B2 (en) | 2014-11-20 | 2015-05-22 | Well completion |
PCT/US2015/060280 WO2016081263A1 (en) | 2014-11-20 | 2015-11-12 | Well completion |
Publications (1)
Publication Number | Publication Date |
---|---|
SA516371568B1 true SA516371568B1 (ar) | 2021-12-18 |
Family
ID=56009698
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SA516371568A SA516371568B1 (ar) | 2014-11-20 | 2016-07-28 | نظام وطريقة لتجهيز بئر |
Country Status (6)
Country | Link |
---|---|
US (2) | US9810051B2 (ar) |
CN (1) | CN105917072A (ar) |
AU (1) | AU2015350289B2 (ar) |
CA (1) | CA2933578C (ar) |
SA (1) | SA516371568B1 (ar) |
WO (1) | WO2016081263A1 (ar) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10502014B2 (en) | 2017-05-03 | 2019-12-10 | Coil Solutions, Inc. | Extended reach tool |
WO2018204644A1 (en) | 2017-05-03 | 2018-11-08 | Coil Solutions, Inc. | Bit jet enhancement tool |
US11566498B2 (en) * | 2017-11-17 | 2023-01-31 | Thru Tubing Solutions, Inc. | Multi-zone perforate and treat system and method |
CN110242264B (zh) * | 2019-07-11 | 2024-04-30 | 安东柏林石油科技(北京)有限公司 | 一种用于同井注采的封隔方法及完井结构 |
US11994009B2 (en) * | 2020-03-31 | 2024-05-28 | Saudi Arabian Oil Company | Non-explosive CO2-based perforation tool for oil and gas downhole operations |
US11598192B1 (en) * | 2022-01-31 | 2023-03-07 | Halliburton Energy Services, Inc. | Methodology to consolidate sand or proppant with resin in two steps |
Family Cites Families (50)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2970645A (en) | 1957-03-06 | 1961-02-07 | Pan American Petroleum Corp | Producing multiple fractures in a well |
US3028914A (en) | 1958-09-29 | 1962-04-10 | Pan American Petroleum Corp | Producing multiple fractures in a cased well |
US4637468A (en) * | 1985-09-03 | 1987-01-20 | Derrick John M | Method and apparatus for multizone oil and gas production |
US4809781A (en) | 1988-03-21 | 1989-03-07 | Mobil Oil Corporation | Method for selectively plugging highly permeable zones in a subterranean formation |
US5314019A (en) | 1992-08-06 | 1994-05-24 | Mobil Oil Corporation | Method for treating formations |
US5353874A (en) | 1993-02-22 | 1994-10-11 | Manulik Matthew C | Horizontal wellbore stimulation technique |
US5390741A (en) | 1993-12-21 | 1995-02-21 | Halliburton Company | Remedial treatment methods for coal bed methane wells |
US5669448A (en) | 1995-12-08 | 1997-09-23 | Halliburton Energy Services, Inc. | Overbalance perforating and stimulation method for wells |
US5934377A (en) | 1997-06-03 | 1999-08-10 | Halliburton Energy Services, Inc. | Method for isolating hydrocarbon-containing formations intersected by a well drilled for the purpose of producing hydrocarbons therethrough |
WO1999010623A1 (en) | 1997-08-26 | 1999-03-04 | Exxonmobil Upstream Research Company | Stimulation of lenticular natural gas formations |
US6070666A (en) * | 1998-04-30 | 2000-06-06 | Atlantic Richfield Company | Fracturing method for horizontal wells |
US6695057B2 (en) * | 2001-05-15 | 2004-02-24 | Weatherford/Lamb, Inc. | Fracturing port collar for wellbore pack-off system, and method for using same |
US6394184B2 (en) | 2000-02-15 | 2002-05-28 | Exxonmobil Upstream Research Company | Method and apparatus for stimulation of multiple formation intervals |
MY132567A (en) * | 2000-02-15 | 2007-10-31 | Exxonmobil Upstream Res Co | Method and apparatus for stimulation of multiple formation intervals |
US7182138B2 (en) * | 2000-03-02 | 2007-02-27 | Schlumberger Technology Corporation | Reservoir communication by creating a local underbalance and using treatment fluid |
DZ3387A1 (fr) * | 2000-07-18 | 2002-01-24 | Exxonmobil Upstream Res Co | Procede pour traiter les intervalles multiples dans un trou de forage |
US6830104B2 (en) * | 2001-08-14 | 2004-12-14 | Halliburton Energy Services, Inc. | Well shroud and sand control screen apparatus and completion method |
US7516792B2 (en) * | 2002-09-23 | 2009-04-14 | Exxonmobil Upstream Research Company | Remote intervention logic valving method and apparatus |
US7225869B2 (en) | 2004-03-24 | 2007-06-05 | Halliburton Energy Services, Inc. | Methods of isolating hydrajet stimulated zones |
US7273099B2 (en) * | 2004-12-03 | 2007-09-25 | Halliburton Energy Services, Inc. | Methods of stimulating a subterranean formation comprising multiple production intervals |
WO2006088603A1 (en) * | 2005-01-21 | 2006-08-24 | Fairmount Minerals, Ltd. | Soluble diverting agents |
US8066059B2 (en) * | 2005-03-12 | 2011-11-29 | Thru Tubing Solutions, Inc. | Methods and devices for one trip plugging and perforating of oil and gas wells |
CN2856407Y (zh) * | 2005-05-31 | 2007-01-10 | 中国石油天然气股份有限公司 | 水平井射孔压裂联作管柱 |
CN101059070A (zh) * | 2006-04-21 | 2007-10-24 | 中国石油天然气股份有限公司 | 一种射孔、压裂一体化的方法及其工艺管柱 |
US7337844B2 (en) | 2006-05-09 | 2008-03-04 | Halliburton Energy Services, Inc. | Perforating and fracturing |
US7575062B2 (en) | 2006-06-09 | 2009-08-18 | Halliburton Energy Services, Inc. | Methods and devices for treating multiple-interval well bores |
US20070284106A1 (en) * | 2006-06-12 | 2007-12-13 | Kalman Mark D | Method and apparatus for well drilling and completion |
US7934556B2 (en) | 2006-06-28 | 2011-05-03 | Schlumberger Technology Corporation | Method and system for treating a subterranean formation using diversion |
US20080006407A1 (en) * | 2006-07-10 | 2008-01-10 | Lehr Douglas J | Annular fracturing service tool system |
US8281860B2 (en) | 2006-08-25 | 2012-10-09 | Schlumberger Technology Corporation | Method and system for treating a subterranean formation |
US7571766B2 (en) | 2006-09-29 | 2009-08-11 | Halliburton Energy Services, Inc. | Methods of fracturing a subterranean formation using a jetting tool and a viscoelastic surfactant fluid to minimize formation damage |
US7934557B2 (en) * | 2007-02-15 | 2011-05-03 | Halliburton Energy Services, Inc. | Methods of completing wells for controlling water and particulate production |
US20080196896A1 (en) * | 2007-02-15 | 2008-08-21 | Oscar Bustos | Methods and apparatus for fiber-based diversion |
US7810567B2 (en) * | 2007-06-27 | 2010-10-12 | Schlumberger Technology Corporation | Methods of producing flow-through passages in casing, and methods of using such casing |
US7673673B2 (en) * | 2007-08-03 | 2010-03-09 | Halliburton Energy Services, Inc. | Apparatus for isolating a jet forming aperture in a well bore servicing tool |
US8096358B2 (en) | 2008-03-27 | 2012-01-17 | Halliburton Energy Services, Inc. | Method of perforating for effective sand plug placement in horizontal wells |
US8074715B2 (en) | 2009-01-15 | 2011-12-13 | Halliburton Energy Services, Inc. | Methods of setting particulate plugs in horizontal well bores using low-rate slurries |
US8887803B2 (en) | 2012-04-09 | 2014-11-18 | Halliburton Energy Services, Inc. | Multi-interval wellbore treatment method |
US8853137B2 (en) | 2009-07-30 | 2014-10-07 | Halliburton Energy Services, Inc. | Increasing fracture complexity in ultra-low permeable subterranean formation using degradable particulate |
RU2009137265A (ru) | 2009-10-09 | 2011-04-20 | Шлюмберже Текнолоджи Б.В. (NL) | Способ формирования изолирующей пробки |
US20110162846A1 (en) * | 2010-01-06 | 2011-07-07 | Palidwar Troy F | Multiple Interval Perforating and Fracturing Methods |
US20110209873A1 (en) * | 2010-02-18 | 2011-09-01 | Stout Gregg W | Method and apparatus for single-trip wellbore treatment |
US9903192B2 (en) | 2011-05-23 | 2018-02-27 | Exxonmobil Upstream Research Company | Safety system for autonomous downhole tool |
CA2795940A1 (en) * | 2012-10-04 | 2014-04-04 | Nexen Inc. | Improved hydraulic fracturing process for deviated wellbores |
US9033046B2 (en) * | 2012-10-10 | 2015-05-19 | Baker Hughes Incorporated | Multi-zone fracturing and sand control completion system and method thereof |
US9790755B2 (en) * | 2013-04-24 | 2017-10-17 | Halliburton Energy Services, Inc. | Positive displacement dump bailer and method of operation |
CA2820704C (en) * | 2013-07-10 | 2018-10-16 | Don Getzlaf | Fracturing valve |
US9631468B2 (en) * | 2013-09-03 | 2017-04-25 | Schlumberger Technology Corporation | Well treatment |
US9926769B2 (en) * | 2013-11-07 | 2018-03-27 | Baker Hughes, A Ge Company, Llc | Systems and methods for downhole communication |
CA2842586A1 (en) * | 2014-02-11 | 2015-08-11 | Iron Horse Coiled Tubing Inc. | A combined perforating and fracking tool |
-
2015
- 2015-05-22 US US14/720,532 patent/US9810051B2/en active Active
- 2015-11-12 CN CN201580004718.0A patent/CN105917072A/zh active Pending
- 2015-11-12 WO PCT/US2015/060280 patent/WO2016081263A1/en active Application Filing
- 2015-11-12 CA CA2933578A patent/CA2933578C/en active Active
- 2015-11-12 AU AU2015350289A patent/AU2015350289B2/en active Active
-
2016
- 2016-07-28 SA SA516371568A patent/SA516371568B1/ar unknown
-
2017
- 2017-10-06 US US15/727,030 patent/US10989032B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
AU2015350289A1 (en) | 2016-06-30 |
US20160145989A1 (en) | 2016-05-26 |
CA2933578A1 (en) | 2016-05-26 |
CN105917072A (zh) | 2016-08-31 |
CA2933578C (en) | 2018-04-10 |
US10989032B2 (en) | 2021-04-27 |
WO2016081263A1 (en) | 2016-05-26 |
US9810051B2 (en) | 2017-11-07 |
US20180030822A1 (en) | 2018-02-01 |
AU2015350289B2 (en) | 2016-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SA516371568B1 (ar) | نظام وطريقة لتجهيز بئر | |
NZ719851A (en) | System and method for re-fracturing multizone horizontal wellbores | |
MX2019013507A (es) | Pozo de inyeccion y metodos de produccion, aparatos y sistemas. | |
MX2017007495A (es) | Composiciones y metodos para mejorar una red de fracturas hidraulicas. | |
SA518400165B1 (ar) | طرق استكمال بئر وجهاز لذلك الغرض | |
SA517381159B1 (ar) | طرق اختيار مادة خافضة للتوتر السطحي لاستخلاص مائع في تكوينات جوفية | |
MX2017015000A (es) | Pruebas de formacion de fractura llena de hidrocarburos antes de la fracturacion de esquisto. | |
WO2014121270A3 (en) | Methods for time-delayed fracturing in hydrocarbon formations | |
GB2506805A (en) | System and method for performing wellbore fracture operations | |
WO2010092352A3 (en) | Method and apparatus for multi-zone stimulation | |
MX370614B (es) | Produccion de hidrocarburos. | |
GB2541306A (en) | Forming multilateral wells | |
GB2536527A (en) | Wettability altering fluids during downhole operations | |
MX2016015359A (es) | Inyeccion de agentes de sacrificio a base de polielectrolitos para su uso en formaciones poco convencionales. | |
SA115370152B1 (ar) | تركيبة أسمنت مسامية لدعم الصدوع لتظل مفتوحة | |
SA518391330B1 (ar) | مركبات أمين معالجة بالإيثوكسي للاستخدام في تكوينات جوفية | |
MX357568B (es) | Metodos para minimizar el sobredesplazamiento de apuntalante en tratamientos de fracturas. | |
GB2553238A (en) | Cement isolation fluids for wellbores, methods of making, and methods of use | |
MX2016016569A (es) | Metodo para el diseño de pozos de produccion y pozos de inyeccion. | |
MX2016012778A (es) | Agente de apuntalamiento y metodo para colocar el mismo en una fractura hidraulica. | |
MX2018012882A (es) | Divergencia de acido en formaciones fracturadas naturalmente. | |
MX2016016113A (es) | Dilatacion controlada de polimeros dilatables en el interior del pozo. | |
SA518391966B1 (ar) | التحكم في التدفق العكسي لمادة حشو دعمي باستخدام كيمياء الراتنجات لعملية تصديع بالحمض | |
SA520411763B1 (ar) | مادة خافضة للتوتر السطحي ذاتية الدعم لتحفيز بئر | |
WO2016011327A3 (en) | Heel to toe fracturing and re-fracturing method |