WO2014121270A3 - Methods for time-delayed fracturing in hydrocarbon formations - Google Patents

Methods for time-delayed fracturing in hydrocarbon formations Download PDF

Info

Publication number
WO2014121270A3
WO2014121270A3 PCT/US2014/014663 US2014014663W WO2014121270A3 WO 2014121270 A3 WO2014121270 A3 WO 2014121270A3 US 2014014663 W US2014014663 W US 2014014663W WO 2014121270 A3 WO2014121270 A3 WO 2014121270A3
Authority
WO
WIPO (PCT)
Prior art keywords
time
methods
hydrocarbon formations
fracturing
delayed fracturing
Prior art date
Application number
PCT/US2014/014663
Other languages
French (fr)
Other versions
WO2014121270A2 (en
Inventor
Mukul M. Sharma
Ripudaman MANCHANDA
Original Assignee
Board Of Regents, The University Of Texas System
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Board Of Regents, The University Of Texas System filed Critical Board Of Regents, The University Of Texas System
Priority to US14/765,613 priority Critical patent/US20160003020A1/en
Publication of WO2014121270A2 publication Critical patent/WO2014121270A2/en
Publication of WO2014121270A3 publication Critical patent/WO2014121270A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/006Measuring wall stresses in the borehole

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Earth Drilling (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

Methods of fracturing a hydrocarbon formation are described herein. A method may include propagating one or more first fractures from a first wellbore in the hydrocarbon formation, allowing a selected period of time to elapse so that at least a portion of the first fractures close, and propagating at least one second fracture in the wellbore or a second wellbore after the elapsed selected period of time.
PCT/US2014/014663 2013-02-04 2014-02-04 Methods for time-delayed fracturing in hydrocarbon formations WO2014121270A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/765,613 US20160003020A1 (en) 2013-02-04 2014-02-04 Methods for time-delayed fracturing in hydrocarbon formations

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201361760480P 2013-02-04 2013-02-04
US61/760,480 2013-02-04

Publications (2)

Publication Number Publication Date
WO2014121270A2 WO2014121270A2 (en) 2014-08-07
WO2014121270A3 true WO2014121270A3 (en) 2015-01-08

Family

ID=50138004

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2014/014663 WO2014121270A2 (en) 2013-02-04 2014-02-04 Methods for time-delayed fracturing in hydrocarbon formations

Country Status (2)

Country Link
US (1) US20160003020A1 (en)
WO (1) WO2014121270A2 (en)

Families Citing this family (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9988895B2 (en) 2013-12-18 2018-06-05 Conocophillips Company Method for determining hydraulic fracture orientation and dimension
WO2015187919A1 (en) * 2014-06-04 2015-12-10 The Johns Hopkins University Method for a radiator egs to harvest geothermal energy
US10480289B2 (en) * 2014-09-26 2019-11-19 Texas Tech University System Fracturability index maps for fracture placement and design of shale reservoirs
GB2544012A (en) 2014-10-14 2017-05-03 Landmark Graphics Corp Automated fracture planning methods for multi-well fields
US10030497B2 (en) 2015-02-10 2018-07-24 Statoil Gulf Services LLC Method of acquiring information of hydraulic fracture geometry for evaluating and optimizing well spacing for multi-well pad
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US9988900B2 (en) 2015-06-30 2018-06-05 Statoil Gulf Services LLC Method of geometric evaluation of hydraulic fractures by using pressure changes
US20170114613A1 (en) * 2015-10-22 2017-04-27 Schlumberger Technology Corporation Well re-stimulation
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation
US10215014B2 (en) 2016-07-03 2019-02-26 Reveal Energy Services, Inc. Mapping of fracture geometries in a multi-well stimulation process
WO2018102271A1 (en) * 2016-11-29 2018-06-07 Conocophillips Company Methods for shut-in pressure escalation analysis
US10801307B2 (en) 2016-11-29 2020-10-13 Conocophillips Company Engineered stress state with multi-well completions
US11365617B1 (en) 2017-01-24 2022-06-21 Devon Energy Corporation Systems and methods for controlling fracturing operations using monitor well pressure
US11028679B1 (en) 2017-01-24 2021-06-08 Devon Energy Corporation Systems and methods for controlling fracturing operations using monitor well pressure
WO2019014090A2 (en) * 2017-07-10 2019-01-17 Texas Tech University System Methods and systems for ballooned hydraulic fractures and complex toe-to-heel flooding
US10513923B2 (en) * 2017-07-24 2019-12-24 Reveal Energy Services, Inc. Dynamically modeling a hydraulic fracture
WO2019089977A1 (en) * 2017-11-01 2019-05-09 Seismos, Inc. Fracture length and fracture complexity determination using fluid pressure waves
CN108180006B (en) * 2017-12-25 2021-03-30 中国石油天然气股份有限公司 Horizontal well productivity prediction method based on formation energy uplift after volume fracturing
US20190249527A1 (en) * 2018-02-09 2019-08-15 Crestone Peak Resources Simultaneous Fracturing Process
WO2019212734A1 (en) * 2018-05-04 2019-11-07 Exxonmobil Upstream Research Company Performing a well operation based upon a minimum in-situ stress determination
CA3099731A1 (en) 2018-05-09 2019-11-14 Conocophillips Company Ubiquitous real-time fracture monitoring
CN108952663B (en) * 2018-08-15 2019-10-18 中国石油大学(北京) The live fracturing process of complicated seam net is generated using interval pressure break mode
WO2020153972A1 (en) * 2019-01-25 2020-07-30 Halliburton Energy Services, Inc. Evaluating anisotropic effective permeability in rock formations having natural fracture networks
WO2021011817A1 (en) * 2019-07-16 2021-01-21 Well Data Labs, Inc. Real-time analysis of in-field collected well fracturing data
US11674376B2 (en) * 2019-11-04 2023-06-13 Chevron U.S.A. Inc. Wellbore to fracture connectivity
WO2021126963A1 (en) * 2019-12-19 2021-06-24 Schlumberger Technology Corporation Method of predicting and preventing an event of fracture hit
US20210230992A1 (en) * 2020-01-24 2021-07-29 Halliburton Energy Services, Inc. Fracturing control
BR112022025118A2 (en) * 2020-06-09 2022-12-27 Baker Hughes Oilfield Operations Llc GEOMECHANICAL APPLICATIONS USING THE BIOT COEFFICIENT BASED ON ADVANCED BOTTOM-HOLE PROFILE MEASUREMENTS
CA3155410A1 (en) 2020-07-20 2022-02-20 Reveal Energy Services, Inc. Determining fracture driven interactions between wellbores
CN112177604A (en) * 2020-07-31 2021-01-05 中国石油天然气集团有限公司 Quantitative evaluation method for determining interference degree between fracturing wells
US11753917B2 (en) * 2020-09-25 2023-09-12 Halliburton Energy Services, Inc. Real time parent child well interference control
US11739631B2 (en) * 2020-10-21 2023-08-29 Saudi Arabian Oil Company Methods and systems for determining reservoir and fracture properties
US11859490B2 (en) 2021-08-19 2024-01-02 Devon Energy Corporation Systems and methods for monitoring fracturing operations using monitor well flow
CN117662126B (en) * 2024-01-31 2024-04-16 四川富利斯达石油科技发展有限公司 Crack closure pressure and output profile monitoring method based on quantum tracer

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080083532A1 (en) * 2006-10-10 2008-04-10 Surjaatmadja Jim B Methods for Maximizing Second Fracture Length
US20090194273A1 (en) * 2005-12-01 2009-08-06 Surjaatmadja Jim B Method and Apparatus for Orchestration of Fracture Placement From a Centralized Well Fluid Treatment Center

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090194273A1 (en) * 2005-12-01 2009-08-06 Surjaatmadja Jim B Method and Apparatus for Orchestration of Fracture Placement From a Centralized Well Fluid Treatment Center
US20080083532A1 (en) * 2006-10-10 2008-04-10 Surjaatmadja Jim B Methods for Maximizing Second Fracture Length

Also Published As

Publication number Publication date
WO2014121270A2 (en) 2014-08-07
US20160003020A1 (en) 2016-01-07

Similar Documents

Publication Publication Date Title
WO2014121270A3 (en) Methods for time-delayed fracturing in hydrocarbon formations
MX2017003461A (en) Proppant compositions and methods of use.
EP3102782A4 (en) Frac sleeve system and method for non-sequential downhole operations
GB201711578D0 (en) Emulsions, treatment fluids and methods for treating subterranean formations
MX2013012009A (en) Systems and methods for hydraulic fracture characterization using microseismic event data.
ZA201405065B (en) Geologic fracturing method and resulting fractured geologic structure
GB2535346A (en) Methods for enhancing propped fracture conductivity
MX2017006623A (en) Proppant comprising an oil well treatment agent coating.
WO2012178026A3 (en) Method for determining spacing of hydraulic fractures in a rock formation
GB201400669D0 (en) System and method for performing wellbore fracture operations
GB201401193D0 (en) System and method for performing wellbore fracture operations
EP3303513A4 (en) Fluids and methods for treating hydrocarbon-bearing formations
MX343560B (en) Methods and devices for hydraulic fracturing design and optimization: a modification to zipper frac.
EP3507339A4 (en) Emulsions, treatment fluids and methods for treating subterranean formations
WO2013055851A3 (en) Hydraulic fracturing with proppant pulsing through clustered abrasive perforations
WO2011130159A3 (en) Methods and systems for drilling
GB2535080B (en) Methods and systems for acidizing subterranean formations
EP3132112A4 (en) Stimulation of wells in nano-darcy shale formations
EP2753793A4 (en) Lithology and borehole condition independent methods for locating tagged proppant in induced subterranean formation fractures
GB201610135D0 (en) Fracturing sequential operation method using signal responsive ported subs and packers
GB201700493D0 (en) Enhancing complex fracture networks in subterranean formations
EP3008283A4 (en) Methods and compositions for stimulating the production of hydrocarbons from subterranean formations
GB2525808B (en) Components of drilling assemblies, drilling assemblies, and methods of stabilizing drilling assemblies in wellbores in subterranean formations
EP3019697A4 (en) Characterizing wellbore depth interval from rock fragments
EP3022391A4 (en) Multiple-interval wellbore stimulation system and method

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14705450

Country of ref document: EP

Kind code of ref document: A2

WWE Wipo information: entry into national phase

Ref document number: 14765613

Country of ref document: US

122 Ep: pct application non-entry in european phase

Ref document number: 14705450

Country of ref document: EP

Kind code of ref document: A2