RU98102965A - METHOD FOR CARRYING OUT REPAIR WORKS IN AN OPERATIONAL WELL - Google Patents

METHOD FOR CARRYING OUT REPAIR WORKS IN AN OPERATIONAL WELL

Info

Publication number
RU98102965A
RU98102965A RU98102965/03A RU98102965A RU98102965A RU 98102965 A RU98102965 A RU 98102965A RU 98102965/03 A RU98102965/03 A RU 98102965/03A RU 98102965 A RU98102965 A RU 98102965A RU 98102965 A RU98102965 A RU 98102965A
Authority
RU
Russia
Prior art keywords
well
cement
column
viscoelastic composition
pumped
Prior art date
Application number
RU98102965/03A
Other languages
Russian (ru)
Other versions
RU2121559C1 (en
Inventor
Ф.А. Шарифуллин
Б.А. Мамедов
И.В. Цыкин
Р.Г. Исмагилов
В.Н. Трубанов
С.Н. Акименко
С.Г. Михалков
Original Assignee
Б.А. Мамедов
Зазирный Д.В.
Король П.В.
Filing date
Publication date
Application filed by Б.А. Мамедов, Зазирный Д.В., Король П.В. filed Critical Б.А. Мамедов
Priority to RU98102965A priority Critical patent/RU2121559C1/en
Priority claimed from RU98102965A external-priority patent/RU2121559C1/en
Application granted granted Critical
Publication of RU2121559C1 publication Critical patent/RU2121559C1/en
Publication of RU98102965A publication Critical patent/RU98102965A/en

Links

Claims (3)

1. Способ проведения ремонтных работ в эксплуатационной скважине, включающий закачку в скважину расчетного объема вязкоупругого состава, последующую закачку цементного раствора через колонну насосно-компрессорных труб при открытом кольцевом пространстве скважины и закачку расчетного количества продавочной жидкости при закрытом кольцевом пространстве скважины, приподъем колонны насосно-компрессорных труб и оставление скважины на период ОЗЦ, отличающийся тем, что расчетный объем вязкоупругого состава закачивают в скважину через колонну насосно-компрессорных труб и располагают его в интервале ниже нижней границы негерметичности обсадной колонны, приподъем колонны насосно-компрессорных труб производят для расположения ее нижнего открытого конца на уровне негерметичности обсадной колонны перед закачкой цементного раствора и выше верхней границы цементного раствора - после закачки, при этом перед закачкой цементного раствора делают технологическую выдержку, а расчетное количество продавочной жидкости выбирают равным 1,5-кратному объему части колонны насосно-компрессорных труб, находившейся в цементном растворе.1. A method of carrying out repair work in a production well, including pumping a calculated volume of viscoelastic composition into a well, pumping cement slurry through a tubing string with an open annular space of a well and injecting a calculated amount of displacement fluid with a closed annular space of a well, lifting a pumping string compressor pipes and the abandonment of the well for the period of the OZZ, characterized in that the estimated volume of viscoelastic composition is pumped into the well through the the tubing and place it in the interval below the lower boundary of the casing leakage, lift the tubing string to position its lower open end at the level of casing leakage before the injection of cement and above the upper boundary of the cement - after injection, this is done before the cement mortar is pumped, and the calculated amount of the squeezing liquid is chosen equal to 1.5 times the volume of the part of the pump-comp column spring pipes in cement mortar. 2. Способ по п. 1 отличающийся тем, что высоту столба вязкоупругого состава в скважине определяют из условия обеспечения равновесия гидростатического давления столба жидкости в скважине и пластового давления и используют для этого выражение:
Figure 00000001

где Hвус - высота столба вязкоупругого состава, м;
Fскв - площадь поперечного сечения ствола скважины, м2;
γц.p - плотность цементного раствора, кг/м3;
γж - плотность жидкости, заполняющей скважину, кг/м3;
Hц.р - высота столба цементного раствора, м;
R - радиус скважины, м;
τвус - предельное напряжение сдвига вязкоупругого состава, кг/м2;
K - коэффициент, учитывающий размеры каверн (K≥1).
2. The method according to p. 1 characterized in that the column height of the viscoelastic composition in the well is determined from the condition of equilibrium of the hydrostatic pressure of the liquid column in the well and reservoir pressure and use the expression:
Figure 00000001

where H vus is the height of the column of viscoelastic composition, m;
F SLE - the cross-sectional area of the wellbore, m 2 ;
γ c.p is the density of the cement, kg / m 3 ;
γ W - the density of the fluid filling the well, kg / m 3 ;
H tsr - the height of the column of cement, m;
R is the radius of the well, m;
τ vus - ultimate shear stress of viscoelastic composition, kg / m 2 ;
K - coefficient taking into account the size of the caverns (K≥1).
3. Способ по п.1, отличающийся тем, что нижний открытый конец колонны насосно-компрессорных труб при ее приподнятии после закачки цементного раствора располагают выше верхней его границы на 50 м. 3. The method according to claim 1, characterized in that the lower open end of the tubing string when it is raised after the cement slurry is pumped is placed 50 m above its upper boundary.
RU98102965A 1998-03-27 1998-03-27 Method of performing repair jobs in development well RU2121559C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU98102965A RU2121559C1 (en) 1998-03-27 1998-03-27 Method of performing repair jobs in development well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU98102965A RU2121559C1 (en) 1998-03-27 1998-03-27 Method of performing repair jobs in development well

Publications (2)

Publication Number Publication Date
RU2121559C1 RU2121559C1 (en) 1998-11-10
RU98102965A true RU98102965A (en) 1999-03-10

Family

ID=20202439

Family Applications (1)

Application Number Title Priority Date Filing Date
RU98102965A RU2121559C1 (en) 1998-03-27 1998-03-27 Method of performing repair jobs in development well

Country Status (1)

Country Link
RU (1) RU2121559C1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2485283C1 (en) * 2012-01-20 2013-06-20 Открытое акционерное общество "Газпром" Method of secondary cementing of process well of underground reservoirs of various purpose
RU2697099C1 (en) * 2018-11-12 2019-08-12 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method of recovery of tightness of a tubing string of a production well equipped with an insert sucker-rod pump
CN113494267B (en) * 2020-03-18 2023-04-28 中国石油化工股份有限公司 Oil-gas-water well leakage point plugging operation method

Similar Documents

Publication Publication Date Title
CN110821454B (en) Downhole pulse generating device driven by oil pipe transmission and injection method
RU98102965A (en) METHOD FOR CARRYING OUT REPAIR WORKS IN AN OPERATIONAL WELL
US10883351B2 (en) Apparatus for transferring a reciprocating movement from a surface machinery to a downhole device and a method of producing well fluids
RU2188301C1 (en) Method of preparation and performance of well servicing
RU82750U1 (en) INSTALLATION FOR INJECTING LIQUID INTO THE LOWER RESERVOIR AND OIL PRODUCTION FROM THE UPPER RESERVE
RU2121559C1 (en) Method of performing repair jobs in development well
CN2213228Y (en) Through plug stick well-flushing valve
RU2000125925A (en) METHOD FOR HYDRAULIC FRACTURING IN WELLS
RU33180U1 (en) Submersible pumping unit for operation of producing wells
SU1125406A1 (en) Method of lifting stratal fluid from wells with sucker-rod pump
RU2102583C1 (en) Device for recovering oil from horizontal wells
RU2055006C1 (en) Method of operation of underground compressed gas reservoir
RU186987U1 (en) DEPTH HYDRAULIC DRIVING PUMP DEVICE WITH GROUND DRIVE
SU872732A1 (en) Well starting method
SU1442638A1 (en) Method of cementing wells
RU2061175C1 (en) Method for operating deep pump plant
RU181991U1 (en) DEPRESSION DEVICE FOR DEVELOPING WELLS
RU51662U1 (en) DEVICE FOR STEP-BY-STEP CEMENTING OF A Casing COLUMN IN A WELL
SU1432197A1 (en) Method of cementing wells
SU1716098A1 (en) Method of casing cementing
RU2059789C1 (en) Method of pressure grouting of holes
RU43583U1 (en) Casing Cementing Device
SU1435759A1 (en) Arrangement for isolating absorbing formations
CN2382857Y (en) Automatic anchoring pipe pile of oil pumping well pipeline
RU52608U1 (en) DEVICE FOR STEP-BY-STEP CEMENTING OF A Casing COLUMN IN A WELL