RU95101972A - Method for erection of tower and mast structures by means of crank mechanism - Google Patents
Method for erection of tower and mast structures by means of crank mechanismInfo
- Publication number
- RU95101972A RU95101972A RU95101972/33A RU95101972A RU95101972A RU 95101972 A RU95101972 A RU 95101972A RU 95101972/33 A RU95101972/33 A RU 95101972/33A RU 95101972 A RU95101972 A RU 95101972A RU 95101972 A RU95101972 A RU 95101972A
- Authority
- RU
- Russia
- Prior art keywords
- hinges
- sections
- block
- section
- connecting rod
- Prior art date
Links
Landscapes
- Jib Cranes (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
FIELD: construction engineering. SUBSTANCE: first, erected by one of traditional methods (by crane, mast) is lower part of structure 4. Then, affixed to top of lower part at external sides are two rope tackles 5 with one common rope. Rigid structural unit preliminarily enlarged on ground level and consisting of several spacious sections C1, C2, C3, C4 which are rigidly interconnected along one face by two flat hinges 6, and along opposite face by temporary bolts, is raised to vertical position by means of rope tackles and guy hinges 7. Lower movable rollers of rope tackles 5 are connected with lower end of hanging vertical block. Temporary bolts between two upper sections C1 and C2 are removed, leaving hinges 6 in their place. By this way, block is converted into crank mechanism in which crank function is performed by upper block C1, and connecting rod function is performed by rigid block consisting of sections C2, C3, C4. After actuation of electric winch of rope tackles 5 for lifting, lower part of section C4 (slide member) slides along temporary guide members 10 and raises up, and section C1 (crank) after turning through 180 degrees and fixing occupies designed position. Connecting rod hangs on hinges 6. After removing temporary bolts between two upper sections C2 and C3 of connecting rod (hinges 6 remain) all components create new crank mechanism in initial position ready fir initiation of new erection cycle. Last section C4 is erected with the help of false section 8 used in function of last connecting rod. EFFECT: high efficiency. 2 dwg
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU95101972A RU2091549C1 (en) | 1995-02-09 | 1995-02-09 | Method of mounting of tower and mast structures by means of crank mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU95101972A RU2091549C1 (en) | 1995-02-09 | 1995-02-09 | Method of mounting of tower and mast structures by means of crank mechanism |
Publications (2)
Publication Number | Publication Date |
---|---|
RU95101972A true RU95101972A (en) | 1996-12-10 |
RU2091549C1 RU2091549C1 (en) | 1997-09-27 |
Family
ID=20164705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU95101972A RU2091549C1 (en) | 1995-02-09 | 1995-02-09 | Method of mounting of tower and mast structures by means of crank mechanism |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2091549C1 (en) |
-
1995
- 1995-02-09 RU RU95101972A patent/RU2091549C1/en active
Also Published As
Publication number | Publication date |
---|---|
RU2091549C1 (en) | 1997-09-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE59201741D1 (en) | Assembly scaffold movable in an elevator shaft for assembling shaft equipment. | |
CN110952550B (en) | Suspended self-supporting pile driving method and pile driver | |
CN111219055A (en) | Light-duty recyclable efficient construction building equipment and construction method thereof | |
CN205387439U (en) | Mast hoisting accessory | |
CN110685433A (en) | Chimney construction device and construction method applying hydraulic lifting and rollover technology | |
CN110886509A (en) | Hydraulic support device for large-span steel structure construction | |
CN210735910U (en) | Self-lifting hoisting equipment suitable for assembly type additional elevator construction | |
CN201330506Y (en) | Spreader climbing mechanism | |
RU95101972A (en) | Method for erection of tower and mast structures by means of crank mechanism | |
RU2232863C2 (en) | Craneless method for mounting and dismounting drilling derricks, mast and tower constructions with enlarged sections | |
CN201362571Y (en) | Equipment of cross beam for hoisting arch-first and girder-late tied bars arch bridge | |
CN210620081U (en) | Cantilever crane device suitable for dismantling external scaffold of assembled high-rise residence | |
CN210002233U (en) | Hoisting system suitable for suspension bridge steel structure bridge deck system | |
CN113235460A (en) | Prefabricated segment swinging method for bridge cantilever assembly | |
JP2012025540A (en) | Jib crane and method of dismantling the same | |
CN101429827B (en) | Leaning tower self-stabilization upside-down mounting assembling apparatus and method thereof | |
CN218881540U (en) | Construction protection frame | |
CN2510616Y (en) | Derrick and drill block once-continuous starting-stopping mechanism | |
CN215889306U (en) | Large-span cable-carried sliding suspension hanging basket system | |
CN110820564B (en) | Liftable and openable bent cap construction overhaul multipurpose platform | |
CN219218723U (en) | Steel truss bridge on-site suspension sliding assembly device | |
CN220813471U (en) | Prefabricated bent cap hoist and mount protection network | |
CN213016228U (en) | Assembled wellhead support with winch controlling mast to stretch | |
CN216240042U (en) | Holding pole standing device | |
RU2097477C1 (en) | Gear for longitudinal pushing of span structure of bridge |