RU93029487A - METHOD OF MOUNTING WELLS - Google Patents

METHOD OF MOUNTING WELLS

Info

Publication number
RU93029487A
RU93029487A RU93029487/03A RU93029487A RU93029487A RU 93029487 A RU93029487 A RU 93029487A RU 93029487/03 A RU93029487/03 A RU 93029487/03A RU 93029487 A RU93029487 A RU 93029487A RU 93029487 A RU93029487 A RU 93029487A
Authority
RU
Russia
Prior art keywords
rocks
plastic
casing
annular space
wells
Prior art date
Application number
RU93029487/03A
Other languages
Russian (ru)
Other versions
RU2057904C1 (en
Inventor
П.С. Шмелев
Б.П. Губанов
Ю.А. Еремеев
Г.А. Семенычев
Original Assignee
Нижневолжский научно-исследовательский институт геологии и геофизики
Filing date
Publication date
Application filed by Нижневолжский научно-исследовательский институт геологии и геофизики filed Critical Нижневолжский научно-исследовательский институт геологии и геофизики
Priority to RU93029487A priority Critical patent/RU2057904C1/en
Priority claimed from RU93029487A external-priority patent/RU2057904C1/en
Publication of RU93029487A publication Critical patent/RU93029487A/en
Application granted granted Critical
Publication of RU2057904C1 publication Critical patent/RU2057904C1/en

Links

Claims (1)

Способ относится к креплению скважин в интервале залегания горных пород, склонных к значительным пластическим деформациям. Цель изобретения - повышение надежности крепления скважин в условиях наличия в разрезе пластичных горных пород путем обеспечения равномерной прочности крепи по отношению к гидростатическому и неравномерному давлению. Для этого в способе крепления скважин, включающем спуск в скважину, проходящую пластичные породы, обсадных колонн и закачку в межтрубное и затрубное пространство цементного раствора, цементный раствор в межтрубное пространство закачивают от забоя скважины до подошвы пластичных пород и от кровли пластичных пород до устья скважины, а в интервал от подошвы до кровли пластичных пород закачивают вязкоупругую жидкость. При этом вязкоупругую жидкость выбирают с коэффициентом сжимаемости
Figure 00000001

где ΔV - изменение объема межтрубного пространства при деформации обсадных колонн, Vо - первоначальный объем межтрубного пространства, q - давление в межтрубном пространстве. Прочностные характеристики обсадных колонн выбирают из условия Pнар > Wу, Pвн. > Pгеост., где Pнар. - критическое давление разрыва наружной колонны, Pвн. - критическое давление снятия внутренней колонны, Wу - контактное давление пластичной породы на наружную обсадную колонну, Rгеост. - геостатическое давление в подошве пластичной породы. Использование способа повышает надежность крепления скважин, улучшает условия текучести пород без дополнительных затрат на увеличение толщин стенок обсадных труб и категорий их прочности.
The method relates to the mounting of wells in the interval of occurrence of rocks prone to significant plastic deformation. The purpose of the invention is to improve the reliability of the mounting wells in the presence of plastic rocks in the section by ensuring uniform lining strength in relation to hydrostatic and uneven pressure. To do this, in the method of attaching wells, including the descent into the well, passing plastic rocks, casing strings and pumping cement mortar into the annular and annular space, cement mortar is pumped into the annular space from the bottom of the well to the sole of ductile rocks and from the roof of ductile rocks to the wellhead and in the interval from the bottom to the roof of plastic rocks, a viscoelastic fluid is injected. In this case, the viscoelastic fluid is chosen with a compressibility factor
Figure 00000001

where ΔV is the change in the volume of the annular space during deformation of the casing, V о is the initial volume of the annular space, q is the pressure in the annular space. The strength characteristics of the casing is chosen from the condition P n and p > W y , P in n . > P g e o s t . where P n and p . - the critical pressure of rupture of the outer column, P in n . - removing critical pressure inside the column, W y - rock contact pressure to the outer plastic casing, R f g C m. - geostatic pressure at the bottom of the plastic rock. The use of the method increases the reliability of the mounting wells, improves the conditions of fluidity of rocks without additional costs to increase the thickness of the walls of casing and their strength categories.
RU93029487A 1993-06-15 1993-06-15 Method of borehole fixing RU2057904C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU93029487A RU2057904C1 (en) 1993-06-15 1993-06-15 Method of borehole fixing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU93029487A RU2057904C1 (en) 1993-06-15 1993-06-15 Method of borehole fixing

Publications (2)

Publication Number Publication Date
RU93029487A true RU93029487A (en) 1996-01-10
RU2057904C1 RU2057904C1 (en) 1996-04-10

Family

ID=20142695

Family Applications (1)

Application Number Title Priority Date Filing Date
RU93029487A RU2057904C1 (en) 1993-06-15 1993-06-15 Method of borehole fixing

Country Status (1)

Country Link
RU (1) RU2057904C1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2465434C1 (en) * 2011-06-29 2012-10-27 Открытое акционерное общество "Газпром" Method of recovery of flooded gas well with collapsed production tubing in productive interval
WO2021050952A1 (en) 2019-09-11 2021-03-18 Alexandru Balan Adaptive ducted fan propulsion system
CN114718505B (en) * 2021-01-04 2024-03-26 中国石油天然气股份有限公司 Well cementation method and well cementation system

Similar Documents

Publication Publication Date Title
RU93029487A (en) METHOD OF MOUNTING WELLS
EA200600310A1 (en) CONTINUOUS FIXING SYSTEM BY LIQUID PUMP PERMANENT DIAMETER
RU2057904C1 (en) Method of borehole fixing
SU1375830A1 (en) Method of setting rope anchor with piston member and air-removing tube
SU968344A1 (en) Deep-well agent-metering device
SU1199906A1 (en) Method of securing wells
SU1615331A1 (en) Method of cementing casings
SU810944A1 (en) Borehole-securing method
RU1810491C (en) Method for well cementing
SU636375A1 (en) Method of securing boreholes
SU1432197A1 (en) Method of cementing wells
RU93041196A (en) METHOD OF MOUNTING WELLS
SU775292A1 (en) Packer
RU98116494A (en) METHOD FOR FITTING A CASING OF A HORIZONTAL WELL BORE
SU1668686A1 (en) Anchor support for mine workings
SU1183673A1 (en) Method of locating the puncture of casing in well
RU2014434C1 (en) Method for cementing wells
SU1618867A1 (en) Method of constructing wells
SU1705549A1 (en) Well completion method
SU889891A1 (en) Well sucker rod pump
SU1002526A1 (en) Method of cementing wells
RU2150574C1 (en) Method of well casing and cementing of horizontal section
SU981678A1 (en) Well sucker rod pumping unit
RU2184212C2 (en) Process of pressure grouting of wells
SU673726A1 (en) Method of pressing-around casing columns