SU1705549A1 - Well completion method - Google Patents

Well completion method Download PDF

Info

Publication number
SU1705549A1
SU1705549A1 SU894678382A SU4678382A SU1705549A1 SU 1705549 A1 SU1705549 A1 SU 1705549A1 SU 894678382 A SU894678382 A SU 894678382A SU 4678382 A SU4678382 A SU 4678382A SU 1705549 A1 SU1705549 A1 SU 1705549A1
Authority
SU
USSR - Soviet Union
Prior art keywords
perforation
clay
well
unloading
casing
Prior art date
Application number
SU894678382A
Other languages
Russian (ru)
Inventor
Анатолий Моисеевич Рудаков
Расим Нагимович Дияшев
Галина Федоровна Кандаурова
Раис Салихович Хисамов
Анас Сафиуллович Калимуллин
Фарит Миргасимович Хайретдинов
Original Assignee
Татарский Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Татарский Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности filed Critical Татарский Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности
Priority to SU894678382A priority Critical patent/SU1705549A1/en
Application granted granted Critical
Publication of SU1705549A1 publication Critical patent/SU1705549A1/en

Links

Abstract

Изобретение относитс  к нефте- газодобывающей пром-сти. Цель - повышение эффективности способа за счет возможности увеличени  степени разгрузки призабойной зоны и предотвращени  обвалов в необсаженном стволе скважины (С). После строительства С по геофизическим данным определ ют наличие глинистых прослоев (П). Перфорируют С в пределах П выше и ниже продуктивного пласта. Снижают уровень жидкости в С так, чтобы создавшийс  перепад давлени  не разрушил цементное кольцо и обсадную колонну. В таком положении оставл ют С на врем  равное периоду релаксации глин. Глина из П через перфорационные отверсти  выжимаетс  в С. Цементируют интервалы перфорации С в пределах П. Далее вскрывают перфорацией продуктивный пласт и приступают к освоению С. 3 елThe invention relates to the oil and gas industry. The goal is to increase the efficiency of the method due to the possibility of increasing the degree of unloading the bottom-hole zone and preventing collapses in the open hole (C). After construction C, the presence of clay interlayers (P) is determined from geophysical data. Perforate C within the P above and below the reservoir. The fluid level in C is lowered so that the resulting pressure drop does not destroy the cement ring and casing. In this position, C is left for a time equal to the clay relaxation period. Clay from II is squeezed out through perforation holes in C. Cementing the perforation intervals C within P. Then the perforation is opened by the perforation and the development is started. C. 3 ate

Description

Изобретение относитс  к нефтега- зодобывающей промышленности, в частности к способам заканчивани  скважины .The invention relates to the oil and gas industry, in particular to methods for completing a well.

Цель изобретени  - повышение эффективности способа за счет возможности увеличени  степени разгрузки призабойной зоны и предотвращени  обвалов в необсаженном стволе скважины .The purpose of the invention is to increase the efficiency of the method due to the possibility of increasing the degree of unloading of the wellbore zone and preventing collapses in the open hole.

Способ осуществл ют следующим обра- зон.The method is carried out as follows.

На многопластовом нефт ном месторождении согласно проекту бур т нагнетательные и добывающие скважины. После строительства скважин и определени  продуктивных объектов дл According to the project, injection wells and production wells are drilled at the multi-layer oil field. After construction of wells and determination of productive objects for

вскрыти  по геофизическим данным (записи ПС, ГК) определ ют расположение глинистых прослоев. Затем пескоструйной перфорацией перфорируют эксплуатационную колонну против глинистых прослоев, расположенных зыше кровли и/или ниже подошвы продуктивных пластов. Затем снижают гидростатический уровень жидкости в скважине с таким расчетом, чтобы разность между пластовым давлением жидкости, насыщающей продуктивные пласты, и забойным давлением не превышала предела прочности эксплуатационной колонны на см тие и предельного перепада давлени  на цементное кольцо. В таком положении скважинуOpen up according to geophysical data (PS, GC records) determine the location of clay interlayers. Then, by sandblasting perforation, the production column is perforated against clay interlayers located above the top of the roof and / or below the bottom of the productive formations. Then, the hydrostatic level of the fluid in the well is reduced so that the difference between the reservoir pressure of the fluid saturating the producing formations and the bottomhole pressure does not exceed the tensile strength of the production string and the maximum pressure drop across the cement ring. In this position, the well

inin

У1U1

ЈJ

ГR

оставл ют на врем , равное периоду релаксации глин. При этом глина из прослоев через перфорационные отверсти  в колонне выжимаетс  в ствол скважины , которую удал ют промывкой скважин . Промывают скважину до отсутстви  содержани  глинистых частиц в промывочной жидкости. Затеи интервалы перфорации герметизируют путем закачки, например, цементного раствора. После герметизации вскрывают перфорацией продуктивные пласты и приступают к освоению скважин. Врем  релаксации наход т из формулы:leave for a time equal to the clay relaxation period. At the same time, the clay from the interlayers is squeezed through the perforations in the column into the wellbore, which is removed by washing the wells. Flush the well until no clay particles are present in the washing fluid. At the same time, the perforation intervals are sealed by injection of, for example, cement mortar. After sealing, the productive formations are opened by perforation and proceed to the development of wells. The relaxation time is found from the formula:

In  In

ЕО ЕEo e

-JLS-JLS

- Ее,- Her,

Затем начали следить за повышением уровн  в скважине. Через 2 сут уровень повысилс  на 13 м. После этого промыли забой скважины. Дл  этого спустили на кровлю пласта НКТ с пером, После промывки повторили снижение гидростатического уровн  до той же глубины. По истечении суток уровень жидкости в скважине подн лс  на 0,25м, Промыли снова скважину. Через 20 сут поступление глины практически прекратилось . После этого приступили к герметизации интервалов перфорации против глин путем закачки цементного раствора в интервал перфорации. Затем вскрыли перфорацией продуктивные пласты. После освоени  приемистость скважин составила 900 мэ/сут.Then they began to monitor the increase in the well. After 2 days, the level increased by 13 m. After that, the bottom of the well was washed. To do this, the tubing with a feather was lowered onto the top of the reservoir. After washing, the decrease of the hydrostatic level to the same depth was repeated. At the end of the day, the fluid level in the well was raised by 0.25 m. The well was washed again. After 20 days, the clay supply practically ceased. After that, they proceeded to seal the perforation intervals against clays by pumping cement mortar into the perforation interval. Then productive formations were perforated. After the development, the injectivity of the wells amounted to 900 me / day.

1515

где t - врем  приложени  нагрузки where t is the load time

(врем  деформации); te - врем  релаксации; Е - мгновенна  упруга  деформаци  при t О; Е - упруга  деформаци  за вре- (deformation time); te is the relaxation time; Е - instantaneous elastic deformation at t О; E - elastic deformation over time

м  t ;m t;

EOQ- деформаци  при t °° Деформаци  EQQ соответствует полному исчерпанию ползучести материала Пример. Нагнетательную сквд- жину № пробурили на продуктивный горизонт Л,, EOQ-deformation at t °° The deformation of EQQ corresponds to the complete depletion of the material creep Example. Injection well No. drilled to the productive horizon L,

Глубина сквзжины 1750 м. Диаметр эксплуатационной колонны 1U6 мм.The depth of the squash is 1750 m. The diameter of the production string is 1U6 mm.

Предел прочности эксплуатационной колонны на см тие PCjW кг/см2 . Бурением вскрыты продуктивные пласты: a, 6Hi, б,,, в, г. Интервалы пластов соответственно: 1761, - 1763,6; Г/65-1766,8; 1768-1 7&9, 1775,8-1778,6; 1783,6-1787,6.Tensile strength of the production string at cm PCjW kg / cm2. The productive layers were opened by drilling: a, 6Hi, b ,,, c, g. Intervals of layers, respectively: 1761, - 1763.6; Г / 65-1766,8; 1768-1 7 & 9, 1775.8-1778.6; 1783.6-1787.6.

Глинистые прослои представлены аргиллитами в интервалах между продуктивными пластами, покрышкой пласта а и подошвой пласта г. Гидропескоструйной перфорацией вскрыли все глинистые прослои на глубину 1 м. После подъема пескоструйного аппарата компрессором снизили уровень жидкости до глубины 1750 м, т.е. забойное давление достигло величины атмосферного из расчета:The clay interlayers are represented by argillites in the intervals between the productive strata, the seam tire A and the bottom of the seam of the city. The hydraulic sandblasting perforation opened all the clay interlayers to a depth of 1 m. After lifting the sanding apparatus, the compressor lowered the liquid level to a depth of 1750 m, bottomhole pressure reached the value of atmospheric rate:

Рс РRS R

боковое гор . преА.Г1рочн.см,lateral mountains. preAg1crc.cm,

00

5five

оabout

5five

00

5five

00

Claims (1)

Формула изобретени Invention Formula Способ заканчивани  скважины, включающий разгрузку продуктивного пласта от горного давлени  со снижением гидростатического давлени  в скважине, установку и цементировку в скважине обсадной колонны и вскрытие ее интервалом перфорации в пределах продуктивного пласта, отличающийс  тем, что, с целью повышени  эффективности способа за счет возможности увеличени  степени разгрузки призабойной зоны и предотвращени  обвалов в необсаженном стволе скважины, установку и цементировку обсадной колонны производ т до разгрузки продуктивного пласта, а розгрузку осуществл ют вскрытием дополнительной перфорацией и выдержкой во времени глинистых прослоев JB прикровельной и приподошвенной час-. т х продуктивного пласта на период (релаксации глин, при этом снижение гидростатического давлени  в скважине осуществл ют до величины, не нарушающей прочность эксплуатационной колонны и цементного камн , после чего интервалы перфорации глинистых прослоев цементируют, а вскрытие перфорацией обсадной колонны в пределах продуктивного пласта осуществл ют после цементировки интервалов дополнительной перфорации глинистых прослоев.A well completion method including unloading a producing formation from a rock pressure with a decrease in hydrostatic pressure in the well, setting and cementing the casing in the well and opening it with a perforation interval within the producing formation, in order to increase the degree of the unloading of the bottomhole zone and the prevention of collapses in the open hole, the installation and cementing of the casing are performed before unloading the productive The flippers, and the unloading is performed by opening by additional perforation and time-keeping of the clay interbeds JB by the roof covering and the basement part-. tons of productive formation for a period (relaxation of clay, while reducing the hydrostatic pressure in the well is carried out to a value that does not violate the strength of the production casing and cement stone, after which the perforation intervals of the clay interlayers are cemented, and opening the casing perforation within the producing formation is carried out after cementation of intervals of additional perforation of clay interlayers.
SU894678382A 1989-04-14 1989-04-14 Well completion method SU1705549A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894678382A SU1705549A1 (en) 1989-04-14 1989-04-14 Well completion method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894678382A SU1705549A1 (en) 1989-04-14 1989-04-14 Well completion method

Publications (1)

Publication Number Publication Date
SU1705549A1 true SU1705549A1 (en) 1992-01-15

Family

ID=21441518

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894678382A SU1705549A1 (en) 1989-04-14 1989-04-14 Well completion method

Country Status (1)

Country Link
SU (1) SU1705549A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 1 492022, кл. Е 21 В , 1987. Патент US № 3&37020, кл. Е 21 В , 1972. *

Similar Documents

Publication Publication Date Title
US4714117A (en) Drainhole well completion
US3814187A (en) Subsurface formation plugging
RU2630519C1 (en) Method for well construction in complicated conditions
RU2427703C1 (en) Procedure for construction of wells of multi-pay oil field
SU1705549A1 (en) Well completion method
RU2196880C1 (en) Method of well two-stage cementing
RU2209941C1 (en) Method of well completion
RU2172384C2 (en) Method of drilling of auxiliary wellbore from flow string
RU2235854C1 (en) Method for construction of well for multibed oil deposit
RU2795281C1 (en) Well completion method
RU1810491C (en) Method for well cementing
RU2762321C9 (en) Technology for the development of a highly permeable reservoir bed saturated with gas and underlain by reservoir water
RU2183265C2 (en) Method of segregation of formations in well
RU2000129690A (en) METHOD FOR INSULATING WATER-BODY LAYERS
SU1352061A1 (en) Method of recovering materials from underground formations
RU2211303C2 (en) Method of shutoff of water inflow to well
RU27147U1 (en) OPERATION WELL BOTTOM DESIGN
SU1739008A1 (en) Method for construction of rising water-drainage well
RU2072030C1 (en) Method for opening productive seams
RU2109935C1 (en) Method for hydraulic fracturing of bed
SU1659630A1 (en) Method of well cementing
RU2109128C1 (en) Method of injecting into wells
SU1435755A1 (en) Method of opening up a producing formation
SU1691513A1 (en) Method for tapping producing formation
RU1798483C (en) Method for cementing flow string in well