RU2739638C2 - Method for transportation of perishable goods by electrified railways, site for picking/installation of perishable goods from railway platforms and container train - Google Patents

Method for transportation of perishable goods by electrified railways, site for picking/installation of perishable goods from railway platforms and container train Download PDF

Info

Publication number
RU2739638C2
RU2739638C2 RU2019119488A RU2019119488A RU2739638C2 RU 2739638 C2 RU2739638 C2 RU 2739638C2 RU 2019119488 A RU2019119488 A RU 2019119488A RU 2019119488 A RU2019119488 A RU 2019119488A RU 2739638 C2 RU2739638 C2 RU 2739638C2
Authority
RU
Russia
Prior art keywords
container
containers
train
platforms
station
Prior art date
Application number
RU2019119488A
Other languages
Russian (ru)
Other versions
RU2019119488A3 (en
RU2019119488A (en
Inventor
Михаил Иванович Мехедов
Вячеслав Вячеславович Петров
Original Assignee
Михаил Иванович Мехедов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Михаил Иванович Мехедов filed Critical Михаил Иванович Мехедов
Priority to RU2019119488A priority Critical patent/RU2739638C2/en
Publication of RU2019119488A3 publication Critical patent/RU2019119488A3/ru
Publication of RU2019119488A publication Critical patent/RU2019119488A/en
Application granted granted Critical
Publication of RU2739638C2 publication Critical patent/RU2739638C2/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P3/00Vehicles adapted to transport, to carry or to comprise special loads or objects
    • B60P3/20Refrigerated goods vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B1/00General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D3/00Wagons or vans
    • B61D3/16Wagons or vans adapted for carrying special loads
    • B61D3/20Wagons or vans adapted for carrying special loads for forwarding containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D88/00Large containers
    • B65D88/74Large containers having means for heating, cooling, aerating or other conditioning of contents

Abstract

FIELD: rail transport.
SUBSTANCE: invention relates to transportation of perishable goods by electrified railways in isothermal containers, and can be used for transportation of perishable goods. Method for perishable cargo transportation by electrified railways is implemented as follows: container terminal of a departure station is used to form a container train with a diesel-generator container and isothermal containers mounted on the platforms with station assignments along the route, which is sent according to the schedule of the fast passenger train. Further, the train follows a "solid" schedule on the established route to large cities in a refrigerated container train with unloading and loading of containers on the lateral track of certain stations (reference) during the technological standstill of train within 1–2 hours.
EFFECT: as a result, perishable cargo is transported in isothermal containers with passenger speed, container train service time is reduced.
3 cl

Description

Группа изобретений относится к железнодорожному транспорту, а именно к перевозке скоропортящихся грузов по электрифицированным железным дорогам в изотермических контейнерах и может быть использована для перевозки скоропортящихся грузов, например, с Дальнего востока в европейскую часть РФ.The group of inventions relates to railway transport, namely to the transportation of perishable goods by electrified railways in insulated containers and can be used to transport perishable goods, for example, from the Far East to the European part of the Russian Federation.

Известен способ перевозки скоропортящихся грузов в изотермических вагонах (см. Скачков, А.А. Перевозка скоропортящихся грузов по технологии «Холодный экспресс» [Текст] / А.А. Скачков, М.И. Мехедов, В.В. Петров // Железнодорожный транспорт. - 2018. - №9. - С. 51-54.).There is a known method of transportation of perishable goods in insulated wagons (see Skachkov, AA Transportation of perishable goods using the "Cold Express" technology [Text] / AA Skachkov, MI Mekhedov, VV Petrov // Railway transport. - 2018. - No. 9. - S. 51-54.).

Недостатком этого способа является необходимость выгрузки скоропортящегося груза из изотермического вагона поезда на другой вид транспорта, как правило, на автомобили, что требует значительных затрат времени и не позволяет железным дорогам конкурировать в этом сегменте с другими видами транспорта.The disadvantage of this method is the need to unload perishable cargo from an insulated train car to another mode of transport, usually cars, which requires a significant investment of time and does not allow railways to compete in this segment with other modes of transport.

Наиболее близким к предложенному является способ перевозки скоропортящихся грузов по электрифицированным железным дорогам в изотермических контейнерах, по которому на контейнерном терминале станции отправления формируют и отправляют контейнерный поезд с установленными на платформах изотермическими контейнерами с назначениями на станции по маршруту следования, на которых расположены контейнерные терминалы. На таких станциях вагоны с контейнерами, имеющими индивидуальные силовые установки, назначением на данную станцию, отцепляются от поезда и маневровым локомотивом подаются на контейнерный терминал, где с платформ снимают/устанавливают соответствующие изотермические контейнеры. В случае наличия одного или группы контейнеров в составе сцепа вагона, питающихся от силовой установки на базе дизель-генераторного контейнера или вагона, на контейнерный терминал подается сцеп вагонов с контейнерами в полном составе. Кроме этого, вагоны с изотермическими контейнерами могут отправляться с терминалов повагонными и групповыми отправками со следованием соответственно в сборных, участковых и поездах других категорий с прохождением переработки согласно плана установленного формирования грузовых поездов. После прибытия на станцию назначения вагоны подаются на пути общего и необщего пользования для проведения грузовых операций. (См. Абрамов, А.А. Контейнерные перевозки на железнодорожном транспорте [Текст] / А.А. Абрамов // Учебное пособие. - М.: РГОТУПС, 2004. - 332 с.).The closest to the proposed method is the method of transporting perishable goods on electrified railways in insulated containers, through which a container train with insulated containers installed on platforms is formed and sent at the container terminal of the departure station with appointments to stations along the route where the container terminals are located. At such stations, wagons with containers that have individual power plants assigned to a given station are uncoupled from the train and, by a shunting locomotive, are fed to the container terminal, where the corresponding insulated containers are removed / installed from the platforms. If there is one or a group of containers as part of a wagon coupling, powered by a power plant based on a diesel generator container or a wagon, a wagon train with full containers is supplied to the container terminal. In addition, wagons with insulated containers can be sent from the terminals by wagon and group shipments, followed, respectively, in groupage, sectional and trains of other categories with the passage of processing in accordance with the plan of the established formation of freight trains. After arriving at the destination station, the wagons are delivered on the track of general and non-public use for carrying out cargo operations. (See Abramov, AA Container transportation by railway transport [Text] / AA Abramov // Study guide. - M .: RGOTUPS, 2004. - 332 p.).

Недостатком этого способа перевозки скоропортящихся грузов является: значительное время обслуживания контейнерного поезда из-за необходимости проведения маневровых операций по отцепке/прицепке вагонов с контейнерными поездами, время на подачу/уборку вагонов с изотермическими контейнерами, время на прохождение сортировочных операций с отдельными вагонами или группами вагонов в пути следования согласно плана формирования грузовых поездов, задержка всего сцепа вагонов с изотермическими контейнерами, питающимися от общей силовой установки, для выгрузки отдельных контейнеров, прибывших на станцию по назначению.The disadvantage of this method of transportation of perishable goods is: a significant time for servicing a container train due to the need to carry out shunting operations for uncoupling / coupling wagons with container trains, time for supplying / cleaning wagons with insulated containers, time for passing sorting operations with individual wagons or groups of wagons along the route in accordance with the plan for the formation of freight trains, the delay of the entire linkage of wagons with isothermal containers powered by a common power plant for unloading individual containers that arrived at the station at their destination.

Технической задачей, решаемой предложением, является обеспечение перевозки скоропортящихся грузов в изотермических контейнерах с пассажирской скоростью на станции по пути следования и на станцию назначения.The technical problem solved by the proposal is to ensure the transportation of perishable goods in insulated containers at passenger speed to the station along the route and to the destination station.

Для решения этой технической задачи предлагаются:To solve this technical problem, we offer:

Способ перевозки скоропортящихся грузов по электрифицированным железным дорогам в изотермических контейнерах, по которому на контейнерном терминале станции отправления формируют и отправляют контейнерный поезд с установленными на платформах изотермическими контейнерами с назначениями на станции по маршруту следования, на которых с платформ снимают/устанавливают соответствующие изотермические контейнеры, на станциях назначения/ отправления боковой электрифицированный ж.д. путь, оборудованный для выполнения технологических операций по смене локомотивной бригады, дополняют площадкой снятия/установки контейнеров с фронтальным погрузчиком, оборудованным спредером, по прибытии на станцию по маршруту следования контейнерный поезд переводят на боковой электрифицированный ж.д. путь, по длине площадки снятия/установки контейнеров снимают напряжение с контактного провода на время снятия/установки контейнеров, совмещенное с выполнением технологических операций по смене локомотивной бригады;A method of transporting perishable goods on electrified railways in insulated containers, by which a container train with insulated containers installed on platforms is formed and dispatched at the container terminal of the departure station with appointments to stations along the route, on which the corresponding insulated containers are removed / installed from the platforms, on stations of destination / departure lateral electrified railway the track, equipped for performing technological operations to change the locomotive crew, is supplemented with a platform for removing / installing containers with a front loader equipped with a spreader, upon arrival at the station along the route, the container train is transferred to the side electrified railway. the way, along the length of the platform for removing / installing containers, relieve tension from the contact wire during the removal / installation of containers, combined with the performance of technological operations to change the locomotive crew;

Площадка снятия/установки изотермических контейнеров с ж.д платформ на станции электрифицированной железной дороги, оборудованная фронтальным погрузчиком со спредером на электрифицированном ж.д. пути, контактный провод по сторонам площадки подключен к контактной сети станции через автоматические выключатели с дистанционным управлением, к по меньшей мере одному автоматическому заземляющему выключателю и элементам световой и звуковой сигнализации;A site for removing / installing insulated containers from railway platforms at an electrified railway station, equipped with a front-end loader with a spreader on an electrified railway. track, the overhead wire on the sides of the site is connected to the contact network of the station through automatic switches with remote control, to at least one automatic grounding switch and light and sound alarm elements;

Контейнерный поезд с установленными на платформах изотермическими контейнерами и дизель-генераторным контейнером, электрические цепи дизель-генераторного контейнера, платформ и изотермических контейнеров объединены комплементарными разъемами.A container train with isothermal containers and a diesel generator container installed on platforms, the electric circuits of the diesel generator container, platforms and insulated containers are connected by complementary connectors.

Боковой путь. - Путь, при следовании на который подвижной состав отклоняется по стрелочному переводу…"(Правила технической эксплуатации железных дорог Российской Федерации" (утв. МПС РФ 26.05.2000 NЦРБ-756) (ред. от 03.07.2001, с изм. от 09.03.2004)Side path. - The track, when following to which the rolling stock deviates along the turnout ... "(Rules for the technical operation of the railways of the Russian Federation" (approved by the Ministry of Railways of the Russian Federation on 05/26/2000 NTSRB-756) (revised on 03.07.2001, as amended on 09.03. 2004)

40 футовый изотермический контейнер имеет теплоизолированный корпус, в котором установлено рефрижераторное оборудование - холодильный агрегат и станция управления им. Контейнер-рефрижератор предназначен для перевозки и хранения грузов, которым требуется особый температурный режим. В первую очередь это продовольственные товары (например, масла и жиры различного происхождения, замороженное мясные и колбасные продукты, рыба, морепродукты, другие различные пищевые продукты, фрукты, овощи), а также некоторые виды химической, фармацевтической промышленности и другие грузы, требующие специального температурного режима при их транспортировке и хранении. Контейнер-рефрижератор имеет два основных блока - корпус контейнера и холодильный агрегат со станцией управления. Корпус контейнера - это жесткий стальной несущий каркас, внешние поверхности которого покрыты стальными или дюралюминиевыми листами. Внутренняя обшивка 40' контейнера изготовлена из нержавеющей стали. Пространство между внешней и внутренней обшивкой корпуса заполняется термоизоляцией из пенополиуретана. Пол изготовлен из алюминиевого Т-образного профиля. Контейнер оборудован холодильным агрегатом, который питается от внешнего источника электроэнергии и с помощью станции управления поддерживает внутри грузового помещения необходимую температуру в автоматическом режиме, обычно в рабочем диапазоне от +25С до -25С. Со станции управления программируется цикл работы установки (время работы, отключения, оттаивания, вентилирования и т.д.), контролируется работа основных агрегатов, записываются в память рабочие параметры, информация о сбоях в работе. Рефрижераторное оборудование подает поток воздуха необходимой температуры внутрь грузового помещения на уровне его пола. Этот поток воздуха идет вдоль Т-образных профилей пола по всей длине 40' контейнера и поднимается вдоль дверей к его потолку. Затем поток движется вдоль потолка в обратном направлении, возвращаясь в холодильный агрегат. Во время такой циркуляции внутри грузового помещения, поток воздуха нагревает или охлаждает его внутренний объем и обеспечивает температуру и влажность, которые необходимы для поддержания установленного режима, (http://speccont.ru/?product=40-ka-futovyj-izotermicheskij-refrizheratornyj-kontejner-uvelichennoj-vmestimostiA 40-foot isothermal container has a heat-insulated body, in which refrigeration equipment is installed - a refrigeration unit and a control station for it. Refrigerated container is designed for the transportation and storage of goods that require a special temperature regime. First of all, these are food products (for example, oils and fats of various origins, frozen meat and sausage products, fish, seafood, other various food products, fruits, vegetables), as well as some types of chemical, pharmaceutical industries and other goods that require special temperature mode during their transportation and storage. The refrigerated container has two main units - the container body and the refrigeration unit with a control station. The container body is a rigid steel supporting frame, the outer surfaces of which are covered with steel or duralumin sheets. The inner lining of the 40 'container is made of stainless steel. The space between the outer and inner skin of the body is filled with polyurethane foam thermal insulation. The floor is made of an aluminum T-profile. The container is equipped with a refrigeration unit, which is powered from an external power source and with the help of a control station maintains the required temperature inside the cargo compartment in automatic mode, usually in the operating range from + 25C to -25C. From the control station, the unit operation cycle is programmed (operating time, shutdown, defrosting, ventilation, etc.), the operation of the main units is monitored, operating parameters are recorded in the memory, information on malfunctions. Refrigeration equipment supplies the air flow of the required temperature inside the cargo compartment at the floor level. This air flow follows the T-shaped floor profiles along the entire length 40 'of the container and rises along the doors to its ceiling. The flow then moves along the ceiling in the opposite direction, returning to the refrigeration unit. During such circulation inside the cargo space, the air flow heats or cools its internal volume and provides the temperature and humidity that are necessary to maintain the set regime, (http://speccont.ru/?product=40-ka-futovyj-izotermicheskij-refrizheratornyj -kontejner-uvelichennoj-vmestimosti

Известен комплементарный разъем с ловителями, не требующий ручного соединения/разъединения при погрузке/выгрузке (стыковке/расстыковке), выполненный из двух частей, одна из которых, неподвижная часть, например вилка, жестко закреплена на корпусе отделяемой части изделия, например орбитального космического аппарата, отделяемого в полете от ракеты-носителя, а другая, подвижная часть, например розетка, распаяна на свободном конце кабеля, закрепленного на корпусе изделия, например на ракете-носителе, состыкована с вилкой (пат. РФ №2110124, Мкл. H01R 13/62, публ. 27.04.1998, пат. РФ №2165666, Мкл. H01R 24/0, F41F 3/04, публ. 20.04.2001), комплементарный разъем с ловителями не требует ручной расцепки при рассоединении, в частности при снятии погрузчиком изотермического контейнера с платформы контейнерного поезда.Known is a complementary connector with safety devices, which does not require manual connection / disconnection during loading / unloading (docking / undocking), made of two parts, one of which, a stationary part, such as a plug, is rigidly fixed to the body of the detachable part of the product, such as an orbital spacecraft, detachable in flight from the launch vehicle, and the other, movable part, such as a socket, is soldered at the free end of the cable fixed to the product body, for example, on the launch vehicle, docked with a plug (US Pat. RF No. 2110124, Mkl. H01R 13/62 , publ. 27.04.1998, patent RF No. 2165666, MKL H01R 24/0, F41F 3/04, publ. 20.04.2001), the complementary connector with safety devices does not require manual uncoupling when disconnecting, in particular when removing an isothermal container by a loader from the platform of the container train.

Предлагаемая группа изобретений может быть реализована на существующем оборудовании из известных коипонентов. Других технических решений аналогичного назначения с подобными существенными признаками при проведении поиска по научно-технической литературе и патентной документации заявителем не обнаружено. Поэтому заявитель считает, что предложение по данной заявке соответствует критериям охраноспособности изобретения «новизна», «изобретательский уровень» и «промышленная применимость».The proposed group of inventions can be implemented on existing equipment from known components. The applicant did not find other technical solutions of a similar purpose with similar essential features during a search in scientific and technical literature and patent documentation. Therefore, the applicant considers that the proposal for this application meets the criteria of patentability of the invention "novelty", "inventive step" and "industrial applicability".

Предлагаемый способ перевозки скоропортящихся грузов по электрифицированным железным дорогам в изотермических контейнерах реализуется следующим образом: на контейнерном терминале станции отправления формируют контейнерный поезд с установленными на платформах дизель-генераторным контейнером и изотермическими контейнерами с назначениями на станции по маршруту следования, который отправляют по графику скорого пассажирского поезда. Далее поезд следует по «твердому» расписанию на установленном маршруте в крупные города в рефрижераторном контейнерном поезде, с выгрузкой и погрузкой контейнеров на боковом пути определенных станций (опорных) за время технологической стоянки поезда в пределах 1-2 часов. На опорной станции, расположенной вблизи большого города и основной технической станции, на боковом пути во время выполнения технологических операций по смене локомотивной бригады на оборудованной площадке фронтальным погрузчиком большой грузоподъемности, производится снятие с платформы с одновременным отключением электрических цепей контейнера с назначением на данную станцию и погрузка на его место контейнера, следующего далее по соответствующему маршруту с одновременным подключением электрических цепей контейнера к платформе поезда. Выгруженный контейнер доставляется конечному потребителю автомобильным транспортом. Погрузо-разгрузочная площадка имеет минимальные технологически и технически обоснованные размеры. Поезд прибывает и отправляется по жесткому расписанию, что позволяет составить график подвоза груженых или порожних контейнеров к прибытию поезда и погрузку на автомобиль выгруженного контейнера практически после завершения операций с поездом. Погрузчик должен быть соответствующей грузоподъемности с грузозахватным механизмом, позволяющим работать под контактным проводом.The proposed method for the transportation of perishable goods on electrified railways in insulated containers is implemented as follows: at the container terminal of the departure station, a container train is formed with a diesel generator container installed on platforms and insulated containers with appointments at the station along the route, which is sent according to the schedule of a fast passenger train ... Further, the train follows a "fixed" schedule on the established route to large cities in a refrigerated container train, with unloading and loading of containers on the side track of certain stations (reference) during the technological parking of the train within 1-2 hours. At the support station located near the big city and the main technical station, on the side track, during the performance of technological operations to change the locomotive crew on the equipped site with a heavy-duty front loader, the container is removed from the platform with the simultaneous disconnection of the electrical circuits of the container with the appointment to this station and loading in its place of the container, following further along the corresponding route with the simultaneous connection of the electrical circuits of the container to the train platform. The unloaded container is delivered to the end consumer by road. The loading and unloading area has the minimum technologically and technically justified dimensions. The train arrives and leaves according to a rigid schedule, which allows you to draw up a schedule for the delivery of loaded or empty containers to the arrival of the train and loading the unloaded container onto the car almost after the completion of operations with the train. The loader must be of the appropriate lifting capacity with a lifting mechanism that allows working under the contact wire.

Контактный провод секционируется над фронтом погрузочно-выгрузочных работ, место над локомотивом остается под напряжением на все время технологической стоянки поезда. Отключение проводится с рабочего места дежурного по станции с автоматическим заземлением контактного провода. Кроме этого боковая площадка оборудована световой и звуковой сигнализацией о наличии или отсутствии напряжения в контактной сети над фронтом работ. Подача напряжения в контактную сеть производится после окончания погрузочно-разгрузочных работ и снятия блокировки на подачу напряжения водителем погрузчика.The overhead wire is sectioned over the front of loading and unloading operations, the place above the locomotive remains energized for the entire time of the technological parking of the train. Disconnection is carried out from the workplace of the station duty officer with automatic grounding of the contact wire. In addition, the side platform is equipped with light and sound alarms about the presence or absence of voltage in the contact network above the work front. The voltage is applied to the contact network after the end of loading and unloading operations and the unlocking of the voltage supply by the driver of the loader is released.

Claims (3)

1. Способ перевозки скоропортящихся грузов по электрифицированным железным дорогам в изотермических контейнерах, по которому на контейнерном терминале станции отправления формируют и отправляют контейнерный поезд с установленными на платформах изотермическими контейнерами с назначениями на станциях по маршруту следования, на которых с платформ снимают/устанавливают соответствующие изотермические контейнеры, отличающийся тем, что на станциях назначения/отправления боковой электрифицированный железнодорожный путь, оборудованный для выполнения технологических операций по смене локомотивной бригады, дополняют площадкой снятия/установки контейнеров с фронтальным погрузчиком, оборудованным спредером, по прибытии на станцию по маршруту следования контейнерный поезд переводят на боковой электрифицированный железнодорожный путь, по длине площадки снятия/установки контейнеров снимают напряжение с контактного провода на время снятия/установки контейнеров, совмещенное с выполнением технологических операций по смене локомотивной бригады.1. A method of transportation of perishable goods on electrified railways in insulated containers, according to which a container train with insulated containers installed on platforms is formed and dispatched at the container terminal of the departure station with appointments at stations along the route, on which the corresponding insulated containers are removed / installed from the platforms , characterized in that at the stations of destination / departure, the side electrified railway track, equipped for performing technological operations for changing the locomotive crew, is supplemented with a platform for removing / installing containers with a front loader equipped with a spreader, upon arrival at the station along the route, the container train is transferred to the side electrified railway track, along the length of the container removal / installation site, the voltage is removed from the contact wire during the removal / installation of containers, combined with the implementation of technological operations to change the locomotive crew. 2. Площадка снятия/установки изотермических контейнеров с железнодорожных платформ на станции электрифицированной железной дороги, оборудованная фронтальным погрузчиком со спредером на электрифицированном железнодорожном пути, отличающаяся тем, что контактный провод по сторонам площадки подключен к контактной сети станции через автоматические выключатели с дистанционным управлением, к по меньшей мере одному автоматическому заземляющему выключателю и элементам световой и звуковой сигнализации.2. A site for removing / installing insulated containers from railway platforms at an electrified railway station, equipped with a front loader with a spreader on an electrified railway track, characterized in that the overhead wire on the sides of the site is connected to the station's contact network through remote-controlled circuit breakers, to the at least one automatic grounding switch and elements of light and sound signaling. 3. Контейнерный поезд с установленными на платформах изотермическими контейнерами, отличающийся тем, что в него введен дизель-генераторный контейнер, электрические цепи дизель-генераторного контейнера, платформ и изотермических контейнеров объединены комплементарными разъемами.3. A container train with isothermal containers installed on platforms, characterized in that a diesel generator container is inserted into it, the electrical circuits of the diesel generator container, platforms and isothermal containers are connected by complementary connectors.
RU2019119488A 2019-06-21 2019-06-21 Method for transportation of perishable goods by electrified railways, site for picking/installation of perishable goods from railway platforms and container train RU2739638C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2019119488A RU2739638C2 (en) 2019-06-21 2019-06-21 Method for transportation of perishable goods by electrified railways, site for picking/installation of perishable goods from railway platforms and container train

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2019119488A RU2739638C2 (en) 2019-06-21 2019-06-21 Method for transportation of perishable goods by electrified railways, site for picking/installation of perishable goods from railway platforms and container train

Publications (3)

Publication Number Publication Date
RU2019119488A3 RU2019119488A3 (en) 2020-12-21
RU2019119488A RU2019119488A (en) 2020-12-21
RU2739638C2 true RU2739638C2 (en) 2020-12-28

Family

ID=74062146

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2019119488A RU2739638C2 (en) 2019-06-21 2019-06-21 Method for transportation of perishable goods by electrified railways, site for picking/installation of perishable goods from railway platforms and container train

Country Status (1)

Country Link
RU (1) RU2739638C2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19804491A1 (en) * 1998-02-05 1999-08-12 Volker H Rosenkranz Plant for transferring freight containers from trucks onto railway and vice versa
RU65875U1 (en) * 2006-06-07 2007-08-27 Общество с ограниченной ответственностью "ИнТрансРейл" BLOCK-MODULAR ENERGY CONTAINER "BMEK"
RU2346837C1 (en) * 2007-11-20 2009-02-20 Государственное образовательное учреждение высшего профессионального образования "Самарский государственный университет путей сообщения" (СамГУПС) Method of sorting and breaking-up consists with detachable containers

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19804491A1 (en) * 1998-02-05 1999-08-12 Volker H Rosenkranz Plant for transferring freight containers from trucks onto railway and vice versa
RU65875U1 (en) * 2006-06-07 2007-08-27 Общество с ограниченной ответственностью "ИнТрансРейл" BLOCK-MODULAR ENERGY CONTAINER "BMEK"
RU2346837C1 (en) * 2007-11-20 2009-02-20 Государственное образовательное учреждение высшего профессионального образования "Самарский государственный университет путей сообщения" (СамГУПС) Method of sorting and breaking-up consists with detachable containers

Also Published As

Publication number Publication date
RU2019119488A3 (en) 2020-12-21
RU2019119488A (en) 2020-12-21

Similar Documents

Publication Publication Date Title
CN109689545B (en) Automated cargo handling system and method
US20050158158A1 (en) Method for railroad transport and apparatus for loading and unloading trains
US9539879B2 (en) System for tracking and testing generator sets used in conjunction with temperature controlled containers
US11332168B2 (en) Rail transport system
US6087739A (en) Train set and an electrically powered train including such a set
US10457503B2 (en) Apparatus and method for intermodal distribution of freight
JP4122225B2 (en) Point-to-point transportation system
RU2739638C2 (en) Method for transportation of perishable goods by electrified railways, site for picking/installation of perishable goods from railway platforms and container train
NL2018714B1 (en) Power system and associated methods
RU146904U1 (en) RAILWAY PLATFORM OR WAGON WITH AUTONOMOUS POWER SUPPLY
CN211765171U (en) Refrigerator car and fill cold system
WO2021133995A3 (en) System, method, and layout for loading, unloading, and managing shipping containers and passenger containers transported by monorail, maglev line, grooved pathway, roadway, or rail tracks
US1581745A (en) Transportation system
US20230174119A1 (en) Self-propelled railcar
CN212313699U (en) Movable refrigeration compartment
CN103124665B (en) Train yard classification system
CN111532345A (en) Mobile refrigerated compartment with switchable temperature zones
RU17500U1 (en) Three-car trailer for the transport of large-tonnage refrigerated cars
RU17502U1 (en) COMBINED REFRIGERATOR COMPLEX
CN105172655A (en) Vehicle-mounted conveying system, bottom plate structure and carriage
WO2015167364A1 (en) Railroad cars or platforms equipped with autonomous power supply
EA201600454A1 (en) MOBILE EQUIPMENT RAILWAY COMPLEX
RU17478U1 (en) NINE WAGON REFRIGERATED TRAIN
RU17501U1 (en) RAIL TRAILER FOR TRANSPORTATION OF REFRIGERATED CONTAINERS
KR102354475B1 (en) Apparatus for guiding arrangement of freight cars for inter-modal transport railroad