RU2646282C1 - Concrete screw pile and method of its mounting - Google Patents
Concrete screw pile and method of its mounting Download PDFInfo
- Publication number
- RU2646282C1 RU2646282C1 RU2016149073A RU2016149073A RU2646282C1 RU 2646282 C1 RU2646282 C1 RU 2646282C1 RU 2016149073 A RU2016149073 A RU 2016149073A RU 2016149073 A RU2016149073 A RU 2016149073A RU 2646282 C1 RU2646282 C1 RU 2646282C1
- Authority
- RU
- Russia
- Prior art keywords
- concrete
- screw pile
- concrete screw
- hollow
- cavity
- Prior art date
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 58
- 238000000034 method Methods 0.000 title claims description 16
- 239000002184 metal Substances 0.000 claims abstract description 38
- 230000002787 reinforcement Effects 0.000 claims abstract description 8
- 238000009434 installation Methods 0.000 claims description 11
- 239000002689 soil Substances 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 8
- 230000005540 biological transmission Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
- 239000011150 reinforced concrete Substances 0.000 description 5
- 238000004804 winding Methods 0.000 description 5
- 230000003014 reinforcing effect Effects 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000009827 uniform distribution Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/56—Screw piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Изобретение относится к области строительства, а именно к элементам фундамента зданий, опор линий электропередач, опор контактной сети, вышек сотовой связи, ограждений, анкерных закреплений, в опорах временных мостов, трубопроводов, причалов и пр.The invention relates to the field of construction, namely, the elements of the foundation of buildings, pylons of power lines, pylons of the contact network, cell towers, fences, anchors, in the piers of temporary bridges, pipelines, moorings, etc.
Из уровня техники известны конструкции винтовых свай.The prior art design of screw piles.
Известна конструкция железобетонной сваи, которая имеет бетонный слой с цилиндрической трубой внутри, при этом на конце сваи предусмотрена винтовая резьба, а внутри трубы выполнены поперечные перекладины (патент США №5188485, опубликован 23.02.1993 г.).A known construction of reinforced concrete piles, which has a concrete layer with a cylindrical pipe inside, with screw threads at the end of the pile and transverse crossbars made inside the pipe (US Pat. No. 5,188,485, published February 23, 1993).
Недостатком указанной конструкции является ее недостаточная прочность, обусловленная наличием перекладин внутри трубы, которые не обеспечивают равномерность распределения внешней нагрузки при погружении сваи в грунт. Также сложная конструкция сваи не позволяет получить высоконадежное изделие, что отражается на снижении срока службы как самой конструкции, так и тех объектов, которые используют сваю в качестве элемента фундамента.The disadvantage of this design is its lack of strength due to the presence of crossbars inside the pipe, which do not provide a uniform distribution of the external load when the pile is immersed in the ground. Also, the complex construction of the pile does not allow to obtain a highly reliable product, which is reflected in a decrease in the service life of both the structure itself and those objects that use the pile as an element of the foundation.
Из описания к патенту РФ №83078 (опубликован 20.05.2009 г.) известна сборная железобетонная бурозавинчиваемая свая, состоящая из железобетонного ствола переменного сечения с арматурным каркасом из продольных стержней и поперечной навивки арматуры, закрепленной на боковой поверхности ствола винтовой навивки и разрыхляющего наконечника, при этом железобетонный ствол сваи имеет форму параболоида вращения, а винтовая навивка на боковой поверхности ствола выполнена предварительно напряженной непрерывной или прерывистой с переменным шагом в соответствии с распределением усилий в стволе, возникающих при ввинчивании сваи в грунт, и зафиксирована на продольном стержне арматурного каркаса железобетонного ствола, причем винтовая навивка на боковой поверхности ствола выполнена в направлении, противоположном поперечной навивке арматуры арматурного каркаса железобетонного ствола. Ствол сваи выполнен из бетона класса В 25.From the description of the patent of the Russian Federation No. 83078 (published on 05/20/2009), a prefabricated reinforced concrete boring screw pile consisting of a reinforced concrete barrel of variable cross section with a reinforcing cage of longitudinal rods and transverse winding reinforcement fixed to the side surface of the barrel of the spiral winding and loosening tip is known for In this case, the reinforced concrete trunk of the pile has the shape of a rotation paraboloid, and the screw winding on the lateral surface of the trunk is pre-stressed continuous or intermittent with a variable pitch in tvetstvii distribution of efforts in the barrel encountered when screwing the pile into the ground and fixed to the longitudinal bar of the reinforcing cage concrete shaft, the helical winding at the side surface of the trunk is formed in a direction opposite coiling transverse reinforcement carcass reinforcing concrete shaft. The pile shaft is made of concrete of class B 25.
Сложная конструкция сваи, связанная с получением ствола с формой параболоида вращения, а также выполнением переменного шага винтовой навивки, приводит к повышению трудоемкости ее изготовления. При этом не обеспечивается достаточная прочность конструкции из-за неравномерности усилий, обусловленных удалением точки приложения силы для ввинчивания (верхняя наземная часть конструкции) и частью конструкции, ввиничиваемой в грунт, что в итоге не позволяет получить надежное изделие, способное в течение длительного времени выдерживать внешнюю нагрузку.The complex construction of piles associated with obtaining a trunk with the shape of a paraboloid of rotation, as well as performing a variable pitch of helical winding, increases the complexity of its manufacture. At the same time, sufficient structural strength is not ensured due to the uneven force due to the removal of the point of application of force for screwing (the upper ground part of the structure) and the part of the structure blamed into the ground, which ultimately does not allow to obtain a reliable product that can withstand external load.
Наиболее близким аналогом к патентуемой конструкции бетонной винтовой сваи под закрутку внутренним винтовым ключом является железобетонная винтовая свая, содержащая металлическую трубу, обвитую по спирали конструкционной арматурой и имеющую отверстия на боковой поверхности наземной части сваи для ее закручивания в грунт (патент РФ №114693, опубликован 24.11.2011 г.).The closest analogue to the patented design of a concrete screw pile for twisting with an internal screw wrench is a reinforced concrete screw pile containing a metal pipe twisted in a spiral by structural fittings and having holes on the side surface of the ground part of the pile for screwing it into the ground (RF patent No. 114693, published 24.11 .2011).
Наиболее близким аналогом к патентуемому способу монтажа бетонной винтовой сваи является способ, известный также из вышеуказанного патента РФ №114693 (опубликован 24.11.2011 г.), который заключается в том, что роют приямок (небольшое углубление конической формы), предназначенный для того, чтобы режущая кромка лопасти сразу же вошла в контакт с грунтом, затем винтовую сваю устанавливают в приямок в вертикальное положение и начинают вращать, при этом нижняя часть лопасти, расположенная на конической части сваи, и далее вся лопасть входит в грунт и преобразует вращательное усилие в поступательное, обеспечивая продвижение и заделку сваи в грунт без вертикальной пригружающей силы, далее ствол сваи заходит в скважину, образованную конической частью сваи с лопастью. При этом через отверстия, расположенные на боковой поверхности наземной части сваи продевают балку, далее за свободные концы балки при движении по кругу осуществляют ввинчивание сваи в грунт. Для вращения балки по кругу требуется привлечение рабочей силы.The closest analogue to the patented method of installing a concrete screw pile is the method also known from the above patent of the Russian Federation No. 114693 (published on November 24, 2011), which consists in digging a sump (a small depression of a conical shape), designed to the cutting edge of the blade immediately came into contact with the ground, then the screw pile is installed in the pit in a vertical position and they begin to rotate, while the lower part of the blade located on the conical part of the pile, and then the entire blade enters the soil and converts the rotational force into translational, providing the advancement and embedment of the pile into the ground without vertical loading force, then the pile shaft enters the well formed by the conical part of the pile with a blade. At the same time, a beam is threaded through holes located on the lateral surface of the ground part of the pile, then the piles are screwed into the ground for free movement of the beam in a circle. To rotate the beam in a circle, the attraction of labor is required.
Указанные конструкция сваи и способ ее монтажа являются неудобными в использовании, так как требуют задействования дополнительной рабочей силы. Погружение сваи в данном случае происходит с невысокой скоростью, что приводит к повышению трудоемкости ее установки. Также указанную сваю покрывают материалом на основе порошковой краски во избежание гниения, который при закручивании сваи в грунт стирается, что не позволяет обеспечить необходимую надежность изделия. Кроме того, рассмотренные конструкция сваи и способ ее монтажа не позволяют обеспечить необходимую прочность и надежность из-за неравномерности усилий, обусловленных удалением точки приложения силы от ввинчиваемой части конструкции.The indicated design of the piles and the method of its installation are inconvenient to use, since they require the use of additional labor. Piling in this case occurs at a low speed, which leads to an increase in the complexity of its installation. Also, the specified pile is covered with a material based on powder paint in order to avoid rotting, which is erased when the pile is twisted into the ground, which does not provide the necessary reliability of the product. In addition, the considered design of the piles and the method of its installation do not allow to provide the necessary strength and reliability due to uneven forces due to the removal of the point of application of force from the screwed part of the structure.
Задачей изобретения является получение простой конструкции бетонной винтовой сваи, снижение трудоемкости ее установки в грунт.The objective of the invention is to obtain a simple design of a concrete screw pile, reducing the complexity of its installation in the ground.
Техническим результатом изобретения является повышение надежности конструкции бетонной винтовой сваи и способа ее монтажа за счет обеспечения равномерности прилагаемых усилий при завинчивании сваи в грунт.The technical result of the invention is to increase the reliability of the construction of a concrete screw pile and the method of its installation by ensuring the uniformity of the applied forces when screwing the pile into the ground.
Заявленный технический результат достигается за счет использования конструкции бетонной винтовой сваи, включающей полый ствол из бетона, внутри которого коаксиально расположена полая профильная металлическая труба, обвитая конструкционной арматурой и выполненная с возможностью установки в ее полость внутреннего ключа для закрутки, при этом оконечная часть сваи содержит буровой виток, выполненный металлическим.The claimed technical result is achieved through the use of the construction of a concrete screw pile, including a hollow concrete barrel, inside of which a hollow profile metal pipe is coaxially located, entwined with structural reinforcement and made with the possibility of installing an internal key for twisting in its cavity, while the terminal part of the pile contains a drill metal coil.
Под буровым витком подразумевается виток, посредством которого запускается процесс заглубления бетонной винтовой сваи в грунт.A drilling turn means a turn by means of which the process of deepening a concrete screw pile into the ground is started.
Также заявленный технический результат достигается за счет осуществления способа монтажа бетонной винтовой сваи, заключающегося в том, что в полость полой профильной металлической трубы заводят внутренний ключ для закрутки бетонной винтовой сваи, устанавливают оконечную часть бетонной винтовой сваи с металлическим буровым витком в приямок и, вращая за головку ключа, заглубляют бетонную винтовую сваю, после чего внутренний ключ извлекают из полости полой профильной металлической трубы, заливают указанную полость бетоном, заделывают приямок грунтом.Also, the claimed technical result is achieved due to the implementation of the method of mounting a concrete screw pile, which consists in the fact that an internal key is inserted into the cavity of the hollow profile metal pipe for twisting the concrete screw pile, the terminal part of the concrete screw pile with a metal drill coil is installed in the pit and rotating the head of the key, deepen the concrete screw pile, after which the internal key is removed from the cavity of the hollow profile metal pipe, fill the specified cavity with concrete, close up riyamok soil.
Дополнительно для закрутки в грунт полый ствол из бетона на боковой поверхности его оконечной части может содержать шнек с бетонными лопастями, которые выполняются в продолжение металлического бурового витка, что также повышает несущие характеристики сваи.Additionally, for twisting into the ground, a hollow shaft made of concrete on the lateral surface of its end part may contain a screw with concrete blades, which are performed in the continuation of the metal drill loop, which also increases the bearing characteristics of the piles.
Полый ствол из бетона может быть выполнен со сквозной полостью.A hollow barrel made of concrete can be made with a through cavity.
Кроме этого, профильная металлическая труба, полость внутри нее, внутренний ключ для закрутки могут быть выполнены прямоугольного сечения.In addition, a profile metal pipe, a cavity inside it, an internal key for twisting can be made of rectangular cross-section.
Наличие полой профильной металлической трубы, выполненной с возможностью установки в ее полость внутреннего ключа для закрутки, позволяет максимально приблизить точку приложения воздействия силы для закручивания сваи в грунт к ввинчиваемой части конструкции сваи - ее оконечной части, что позволяет равномерно и точно распределить прилагаемые усилия только на указанную нижнюю часть конструкции, снизив тем самым нагрузку с верхней части ствола сваи, обеспечив повышение прочности и надежности конструкции и ее монтажа. Наличие внешней бетонной оболочки позволяет выдерживать увеличенные нагрузки, оказываемые на нижнюю ввинчиваемую часть конструкции, а также в процессе эксплуатации исключает взаимодействие полой профильной металлической трубы с грунтовыми водами, защищая ее тем самым от коррозии и в целом способствуя повышению прочности конструкции, ее надежности при монтаже и дальнейшем использовании. Заливка бетоном полости полой профильной металлической трубы после извлечения из нее внутреннего ключа для закрутки также увеличивает прочность указанной трубы, исключает попадание внутрь воды и осадков, не позволяя ей быть раздавленной при морозах.The presence of a hollow shaped metal pipe, made with the possibility of installing an internal key for twisting in its cavity, allows you to maximally approximate the point of application of the force for twisting the pile into the ground to the screwed part of the pile structure - its end part, which allows you to evenly and precisely distribute the applied forces only to the specified lower part of the structure, thereby reducing the load from the upper part of the pile shaft, providing increased strength and reliability of the structure and its installation. The presence of an external concrete shell makes it possible to withstand the increased loads exerted on the lower screw-in part of the structure, and also during operation eliminates the interaction of a hollow shaped metal pipe with groundwater, thereby protecting it from corrosion and, as a whole, contributing to an increase in the strength of the structure, its reliability during installation and further use. Pouring concrete into the cavity of a hollow shaped metal pipe after removing an internal key for twisting from it also increases the strength of the pipe, eliminates the ingress of water and precipitation, preventing it from being crushed during frost.
Следует также отметить, что использование бетонной оболочки и внутреннего ключа для закрутки, которые принимают на себя максимальную часть внешней нагрузки при монтаже сваи, позволяют выполнить полую профильную металлическую трубу тонкостенной, что способствует снижению металлоемкости и в целом делает решение экономичным.It should also be noted that the use of a concrete shell and an internal key for twisting, which take up the maximum part of the external load during the installation of the pile, allows the hollow profile metal pipe to be thin-walled, which helps to reduce the metal consumption and generally makes the solution economical.
На фиг. 1 представлен общий вид бетонной винтовой сваи без установки внутреннего ключа для закрутки, на фиг. 2 - общий вид полой металлической профильной трубы с арматурой, на фиг. 3 - общий вид внутреннего ключа для закрутки, на фиг. 4 - общий вид бетонной винтовой сваи с установленным внутренним ключом для закрутки.In FIG. 1 shows a general view of a concrete screw pile without installing an internal twist key; FIG. 2 is a general view of a hollow metal profile pipe with fittings; FIG. 3 is a general view of the internal key for twisting; FIG. 4 is a general view of a concrete screw pile with an installed internal key for twisting.
Свая содержит полый ствол 1 из бетона, внутри полости которого размещена полая металлическая профильная труба 2, обвитая по спирали конструкционной арматурой 3. Указанная труба 2 может быть выполнена прямоугольного сечения и может иметь полость также прямоугольного сечения. На конце оконечной части ствола 1 сваи расположен металлический буровой виток 4, который является первым витком, прорезающим грунт при заглублении сваи. На боковой поверхности оконечной части ствола 1, входящей в грунт, может быть расположен шнек 5 с бетонными лопастями 6, выполненными за одно целое со стволом 1 и являющимися продолжением металлического бурового витка 4. Внутренний ключ 7 для закрутки сваи может быть выполнен из металлического профиля прямоугольного сечения, длина которого должна быть не меньше длины (высоты) сваи, на одном конце которого перпендикулярно приварена головка 7.The pile contains a
Также полость внутри полой металлической трубы 2 и внутренний ключ 7 для закрутки сваи могут иметь сечение в форме многоугольника (например, шестиугольника и т.д.). Основное требование здесь - совпадение формы сечений указанных элементов, а также их размеров таким образом, чтобы ключ 7 мог войти в зацепление с полостью трубы 2 с целью получения неразъемного соединения сваи и ключа 7 с последующим ввинчиванием сваи в грунт.Also, the cavity inside the
Внутренний ключ 7 для закрутки может закручиваться посредством автоматизированных устройств, что исключает привлечение дополнительной рабочей силы и снижает трудоемкость установки сваи в грунт.The
Внутренний ключ 7 для закрутки является многоразовым и выполняется из высоко легированной стали или композиционного материала, хорошо сопротивляющихся кручению.The
Установка сваи происходит следующим образом.Installation of piles is as follows.
Готовят приямок, обычно конической формы. В полость сваи, внутрь и продольно металлической профильной трубы 2 устанавливают внутренний ключ 7 для закрутки с головкой 8, размер которой превышает ширину (диаметр) металлической профильной трубы 2. После этого сваю поднимают и устанавливают перпендикулярно в приямке. Далее, вращают за головку 8 ключа 7, при этом происходит прорезывание грунта сначала металлическим буровым витком 4, а потом бетонными лопастями 6 шнека 5 при их наличии и заглубление сваи. После чего внутренний ключ 7 для закрутки извлекают из полости полой металлической профильной трубы 2, заливают указанную полость бетоном, а приямок заделывают грунтом.A pit is prepared, usually conical in shape. In the cavity of the pile, inside and longitudinally of the
Заявляемые конструкция бетонной винтовой сваи и способ ее монтажа являются простыми в использовании, позволяют получить надежное и экономичное изделие с повышенным сроком службы.The inventive design of a concrete screw pile and the method of its installation are simple to use, they allow to obtain a reliable and economical product with increased service life.
Claims (14)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2016149073A RU2646282C1 (en) | 2016-12-14 | 2016-12-14 | Concrete screw pile and method of its mounting |
PCT/RU2017/000430 WO2018111144A1 (en) | 2016-12-14 | 2017-06-19 | Concrete screw pile and method of installing same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2016149073A RU2646282C1 (en) | 2016-12-14 | 2016-12-14 | Concrete screw pile and method of its mounting |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2646282C1 true RU2646282C1 (en) | 2018-03-02 |
Family
ID=61568502
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2016149073A RU2646282C1 (en) | 2016-12-14 | 2016-12-14 | Concrete screw pile and method of its mounting |
Country Status (2)
Country | Link |
---|---|
RU (1) | RU2646282C1 (en) |
WO (1) | WO2018111144A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU215199U1 (en) * | 2022-08-25 | 2022-12-02 | Кирилл Николаевич Степанов | REINFORCED SCREW CONCRETE PILE |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11522488B2 (en) | 2019-05-07 | 2022-12-06 | Solar Foundations Usa, Inc. | Vertical column |
WO2022056471A1 (en) | 2020-09-14 | 2022-03-17 | Nextracker Inc. | Support frames for solar trackers |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4239419A (en) * | 1977-10-27 | 1980-12-16 | Gillen William F Jr | Precast concrete threaded pilings |
RU2288326C1 (en) * | 2005-05-24 | 2006-11-27 | Аркадий Викторович Козлович | Screw pile, screw pile installation method, screw pile driving means and open-cut tunneling method with the use of screw pile |
RU2305729C1 (en) * | 2005-12-28 | 2007-09-10 | Федеральное государственное унитарное предприятие Конструкторское бюро транспортного машиностроения | Screw pile and pile driving method |
RU83078U1 (en) * | 2008-12-18 | 2009-05-20 | Федеральное государственное унитарное предприятие "Научно-исследовательский центр "Строительство" (ФГУП "НИЦ "Строительство") | PREFABRICATED REINFORCED CONCRETE BORROWNED PILES |
RU87176U1 (en) * | 2009-05-04 | 2009-09-27 | Общество с ограниченной ответственностью "Горномарийские стройматериалы" | PILOT SCREW REINFORCED CONCRETE |
RU114693U1 (en) * | 2011-11-24 | 2012-04-10 | Общество с ограниченной ответственностью "СВФ Инжиниринг" | SCREW PILES |
-
2016
- 2016-12-14 RU RU2016149073A patent/RU2646282C1/en active
-
2017
- 2017-06-19 WO PCT/RU2017/000430 patent/WO2018111144A1/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4239419A (en) * | 1977-10-27 | 1980-12-16 | Gillen William F Jr | Precast concrete threaded pilings |
RU2288326C1 (en) * | 2005-05-24 | 2006-11-27 | Аркадий Викторович Козлович | Screw pile, screw pile installation method, screw pile driving means and open-cut tunneling method with the use of screw pile |
RU2305729C1 (en) * | 2005-12-28 | 2007-09-10 | Федеральное государственное унитарное предприятие Конструкторское бюро транспортного машиностроения | Screw pile and pile driving method |
RU83078U1 (en) * | 2008-12-18 | 2009-05-20 | Федеральное государственное унитарное предприятие "Научно-исследовательский центр "Строительство" (ФГУП "НИЦ "Строительство") | PREFABRICATED REINFORCED CONCRETE BORROWNED PILES |
RU87176U1 (en) * | 2009-05-04 | 2009-09-27 | Общество с ограниченной ответственностью "Горномарийские стройматериалы" | PILOT SCREW REINFORCED CONCRETE |
RU114693U1 (en) * | 2011-11-24 | 2012-04-10 | Общество с ограниченной ответственностью "СВФ Инжиниринг" | SCREW PILES |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU215199U1 (en) * | 2022-08-25 | 2022-12-02 | Кирилл Николаевич Степанов | REINFORCED SCREW CONCRETE PILE |
Also Published As
Publication number | Publication date |
---|---|
WO2018111144A1 (en) | 2018-06-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU157321U1 (en) | SCREW PILES | |
EP2239376B1 (en) | Anchoring component for a wind farm tower | |
WO2005095717A1 (en) | Method for erecting a tower | |
DE102004017006A1 (en) | Method of erecting a tower | |
CA2942790A1 (en) | Pile foundations for supporting power transmission towers | |
RU2646282C1 (en) | Concrete screw pile and method of its mounting | |
EP3956520A1 (en) | Foundation for an offshore structure | |
RU114692U1 (en) | SCREW PILES | |
DE202006009554U1 (en) | Hybrid tower structure, especially for wind power plants, has tubular steel adaptor element which on inner generated surface facing tower pillar has anchoring elements which are enclosed in concrete body of tower pillar | |
RU179155U1 (en) | CONCRETE SCREW PILED | |
RU170986U1 (en) | CONCRETE SCREW PILED | |
CN113152535B (en) | Rear-inserted unbonded steel strand pressure-bearing type uplift pile construction method and assembly used in same | |
CN105064615B (en) | A kind of steel bar anchoring device and installation method | |
EP3447195B1 (en) | A foundation and a method of establishing pile foundation | |
RU114693U1 (en) | SCREW PILES | |
EP3336259A1 (en) | Anchor for anchoring in the ground and/or rock with reversible tension member | |
CN110714488A (en) | Prefabricated self-drilling screw anti-floating anchor rod | |
RU80690U1 (en) | SCREW PILES | |
CN211523297U (en) | Prefabricated self-drilling screw anti-floating anchor rod | |
RU83077U1 (en) | PREFABRICATED REINFORCED CONCRETE BORROWNED PILES | |
RU120426U1 (en) | PILOT SCREW | |
EP2400063B1 (en) | Foundation system | |
RU215199U1 (en) | REINFORCED SCREW CONCRETE PILE | |
RU83078U1 (en) | PREFABRICATED REINFORCED CONCRETE BORROWNED PILES | |
RU158887U1 (en) | PILOT SCREW |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
QB4A | Licence on use of patent |
Free format text: LICENCE FORMERLY AGREED ON 20190422 Effective date: 20190422 |
|
QB4A | Licence on use of patent |
Free format text: LICENCE FORMERLY AGREED ON 20190603 Effective date: 20190603 |
|
QB4A | Licence on use of patent |
Free format text: LICENCE FORMERLY AGREED ON 20190710 Effective date: 20190710 |
|
QB4A | Licence on use of patent |
Free format text: LICENCE FORMERLY AGREED ON 20190808 Effective date: 20190808 |
|
QB4A | Licence on use of patent |
Free format text: LICENCE FORMERLY AGREED ON 20190903 Effective date: 20190903 |