EP3447195B1 - A foundation and a method of establishing pile foundation - Google Patents

A foundation and a method of establishing pile foundation Download PDF

Info

Publication number
EP3447195B1
EP3447195B1 EP17187707.9A EP17187707A EP3447195B1 EP 3447195 B1 EP3447195 B1 EP 3447195B1 EP 17187707 A EP17187707 A EP 17187707A EP 3447195 B1 EP3447195 B1 EP 3447195B1
Authority
EP
European Patent Office
Prior art keywords
pile
threaded bolt
threaded
bolt connectors
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP17187707.9A
Other languages
German (de)
French (fr)
Other versions
EP3447195A1 (en
Inventor
Otte Søren
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Centrum Pæle AS
Original Assignee
Centrum Pæle AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Centrum Pæle AS filed Critical Centrum Pæle AS
Priority to DK17187707.9T priority Critical patent/DK3447195T3/en
Priority to EP17187707.9A priority patent/EP3447195B1/en
Publication of EP3447195A1 publication Critical patent/EP3447195A1/en
Application granted granted Critical
Publication of EP3447195B1 publication Critical patent/EP3447195B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/06Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against corrosion by soil or water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder
    • E04H12/2276Clamping poles or posts on a stub

Definitions

  • the present invention relates to a foundation or a pile driven foundation for an overhead line mast, power line mast or the like, comprising a reinforced concrete pile including pile threaded bolt connectors, a number of gaskets and a corresponding number of tightening nuts.
  • Prefabricated concrete piles are normally used for foundations at location where the upper soil layers are not suitable for accommodating a shallow foundation. At location where the bearing capacity of the ground is weak in relation to the construction, piles are preferred option compared to shallow foundations.
  • piles are driven into the ground by using a pile driver or hammer or the like.
  • the piles are intended for embedment deep into the ground for providing a stable foundation for various structures such as buildings, bridges and similar constructions.
  • the pile foundation can be used in soil layers along railways.
  • Such prior art piles are disclosed in e.g. PL67224Y1 which discloses a foundation suitable for an overhead line mast and comprising a reinforced concrete pile including threaded bolt connectors being embedded in the concrete pile, each connector having an exposed part extending beyond a first end part and connected to reinforcement elements of the pile.
  • the document does not disclose any improvement to the sealing capability and the prevention penetration of water into the reinforced concrete pile at the bolt shaft.
  • the general object of the present invention is to provide a foundation, which is able to withstand the environment impact and exposure accruing over time on the structure at the installation location.
  • a foundation for an overhead line mast, power line mast or the like comprising a reinforced concrete pile including threaded bolt, a number of gaskets and a corresponding number of tightening nuts:
  • the reinforced concrete pile is an elongated prefabricated concrete piles.
  • the reinforced concrete pile is provided in various lengths.
  • the pile threaded bolt connectors would preferably be made from a stainless steel material, as the pile threaded bolt connectors are exposed to the environment and have to be able to withstand the weather.
  • Stainless steel is the preferred material due to its corrosion resistance as stainless does not corrode or rust as ordinary steel (carbon steel) does.
  • carbon steel it is possible to use carbon steel for the steel reinforcement elements as the steel reinforcement element are embedded into the reinforcement concrete pile,
  • the gasket is preferably made from an elastomer material with a round cross-section and being designed to be compressed during assembly and would create a sealing at the interface between the plain unthreaded surface of the pile threaded bolt connectors and the planar abutment surface.
  • Each gasket has an annual shape forming a second inner diameter being congruent to the first outer diameter of the pile threaded bolt connectors and second outer diameter being larger than the inner diameter of the internal threaded part of the tightening nut.
  • Each of the tightening nuts is configured to be rotated relative to the threaded portion of a pile threaded bolt connector and by rotating the tightening nut the tapered portion of the tightening nuts will be moved towards the gasket. Rotation of the tightening nut would cause the gasket to be compressed towards the outer surface of the pile threaded bolt connectors and the planar abutment surface and the compression of the gasket will provide a sealing between the pile threaded bolt connectors and the planar abutment surface.
  • transition portions having threaded portions being tapered over two revolutions from a fully threaded shaft to a plain unthreaded shaft.
  • the central aperture of the tightening nuts having an intermediate section having a second threaded section, the second threaded section extending between the tapered portion and the internal threaded portion, the second threaded section having a diameter being larger than the threaded diameter of the internal threaded portion.
  • the second portions of the pile threaded bolt connectors being plain unthreaded portions.
  • the plain contact surface improves the sealing capability compared to a threaded contact surface, hereby serving a first function.
  • the plain unthreaded portion of the pile threaded bolt connectors will prevent, that the gasket from getting damaged or torn during tightening of tightening nuts during installation, where the overhead line mast is installed on top of the reinforced concrete pile, hereby serving a second function.
  • the reinforcement elements including additional steel reinforcement elements extending in the circumference of the reinforced concrete.
  • additional steel reinforcement elements extending in the circumference, it is possible to obtain a steel mesh structure, which allows easier handling and positioning of the steel mesh structure during casting and fabrication of the reinforcement concrete pile.
  • the of additional steel reinforcement elements forms a steel mesh or mesh cage together with the steel reinforcing bar.
  • the mesh cage or reinforcement cage consisted of two parts: longitudinal bars and transverse bars or spiral bar.
  • the steel bar has vertical rib and transverse rib on surface for better application in concrete reinforcement and the steel bar is preferable made from cold drawn or hot drawn carbon steel wire rod, galvanized or mill black finish.
  • the longitudinal steel bars confines the core concrete, and the transverse steel bars or spiral bars fit around the longitudinal bars.
  • the steel mesh cage provides reinforcement in the longitudinal and lateral strength to prevent cracking, and reduce the deflections occurrence probability.
  • the reinforcement cage has a polygonal geometry e.g. triangle or square and the reinforcement cages is positioned in the casting mould before the concrete is poured the casting form.
  • the steel reinforcement elements are spot welded to form a reinforcement cage, preferably by an automatic spot welding machine and the spot welding machine furthermore is able to program for being able to adjust the spacing and opening of the reinforcement cage.
  • the reinforced concrete pile is a prefabricated structure. Through the use of a prefabricated reinforced concrete pile, it is faster to establish the foundation as the reinforced concrete does not need to casted in-situ and await the hardening of the concrete before the overhead line mast can be connected to the foundation.
  • the second polygonal geometry and the first polygonal geometry being 3-12, preferably 4.
  • the geometry should be rectangular, pentagonal, hexagonal etc.
  • the reinforced concrete pile having visual markings on the outer surface for positioning the end part 0.1-1 meter above ground level, when the reinforced concrete pile is being driven into the ground.
  • the pile threaded bolt connectors being connected to the steel reinforcement elements of the reinforced concrete pile by welding, preferably friction welding.
  • welding the each pile threaded bolt connectors to the steel reinforcement bars the structural loads from the mast can be transferred from the pile threaded bolt connectors to the steel reinforcement elements embedded in the reinforced concrete pile.
  • pile foundation should in this context be understood as a prepared ground or base on which the overhead line mast, the power line mast or the like structure can be mounted.
  • the pile foundation consists of an elongated structural element being driven or drilled into the deep of the ground and belong to the category also referred to as deep foundation.
  • deep foundation should in the context be understood as the type of foundation, which transfers load into the soil farther down from the ground level in contrast to shallow foundation, which primarily transfers loads from the structure to the surface layer at the vicinity of the ground level.
  • each gasket being able to provide a tight fit relative to the outer diameter of the second portion of the pile threaded bolt connectors.
  • Each gasket would have an inner diameter being identical to the outer diameter of the second portion of each of the pile threaded bolt connectors or an inner diameter substantial smaller than the outer diameter of the second portion of each of the pile threaded bolt connectors.
  • internal threaded portion is used in this context to describe an internal thread of the tightening nut is divided into two sections, which both have a major diameter and a minor diameter.
  • the diameter of the internal threaded portion would in this context refer to the major diameter.
  • the overhead power line 16 is suspended above the railway track 14 between the overhead line mast, supporting posts or arched catenary support or other carrying structures spaced along the railway track 14.
  • the overhead power line 16 is kept at a high electric potential for suppling electric power to the train.
  • the reinforced concrete pile 20 penetrates the upper soil layers and will be embedded in the lower, more rigid lower soil layers.
  • the reinforced concrete pile 20 is a precasted element and the reinforced concrete pile 20 is casted in a standardized length between 4 meter and 20 meter.
  • Fig. 2 and 3 show a reinforced concrete pile 20 having an elongated structure with a first end part 22 including a planar abutment surface of a first polygonal geometry and a second end part 26.
  • Steel reinforcement elements 28 extends between the first end part 22 and the second end parts 28.
  • pile threaded bolt connectors 30 are embedded in the reinforced concrete pile 20 and each of pile threaded bolt connectors 30 has an exposed part extending beyond the first end part 22.
  • the four pile threaded bolt connectors 30 are positioned in a second polygonal geometry and connected to the steel reinforcement elements 28 of the reinforced concrete pile 20.
  • connection between each of the pile threaded bolt connectors 30 and the steel reinforcement elements 28 of the reinforced concrete pile 20 is obtained by welding process e.g. friction welding and the connection will be embedded inside the reinforced concrete pile 20.
  • the pile threaded bolt connectors 30 would be made from a stainless steel material, as the pile threaded bolt connectors is exposed to the environment and have to be able to withstand the corrosion.
  • the steel reinforcement elements 28 are fabricated from an assembly of steel reinforcing bar 28', also commonly referred to as rebars, held together in the desired configuration by means of additional steel reinforcement elements 28" extending in the circumference of the reinforced concrete pile 20.
  • the additional steel reinforcement elements 28" forms a steel mesh or mesh cage incorporation with the steel reinforcing bar 28'.
  • Two lifting sockets 29 are embedded into the reinforced concrete pile 20 and the lifting sockets 29 are placed at equal distance from the center of gravity of the reinforced concrete pile 20 for allowing as stable lifting of the reinforced concrete pile 20.
  • Each of the lifting sockets 29 is connected to the steel reinforcement elements 28 by welding.
  • the lifting sockets 29 comprise an inner threaded portion and the threaded portion makes it possible for a worker to insert a swivel lifting eye into the lifting socket prior to lifting the reinforced concrete pile 20.
  • the lifting socket could also be formed as tubular lifting socket, flat plate lifting socket or the like.
  • Each of the lifting sockets 29 is covered by a sealing cap for preventing any foreign objects from entering the socket and the sealing cap fits inside the lifting socket 29.
  • the steel reinforcement elements 28 have the same polygonal geometry as the reinforced concrete pile 20 and the 28' steel reinforcing bars are placed along the circumference of the reinforced concrete pile 20 more specific near the edges of the polygonal geometry.
  • the second polygonal geometry is defined by the number of pile threaded bolt connectors embedded in the reinforced concrete pile 20 and the first polygonal geometry corresponds the outer geometry of the reinforced concrete pile 20.
  • the first polygonal geometry is equivalent to the second polygonal geometry in fig. 2 .
  • the tightening the tightening nut 501, 502, 503, 504 can be done in two steps, 'Initial Torque' and 'Final torque' using a calibrated torque wrench.
  • This can be either a manual wrench or power tool fitted with a torque cut-out that must first be calibrated on a bolt from the job batch using a bolt load meter or similar device for determining bolt tension.
  • Fig. 4-5 show the pile threaded bolt connectors 30 having a first portion 32 including a threaded portion 33, a second portion 34 having a circular cross sectional configuration of a first outer diameter and a transition portion 38 interconnecting the first portion 32 and the second portion 32.
  • the gaskets 40 having an annual shape forming a second inner diameter 42 and second outer diameter 44.
  • Fig. 4A shows a pile threaded bolt connectors 30 connected to the steel reinforcement elements 28 in the reinforced concrete pile 20.
  • the second portion 34 of the pile threaded bolt connectors 30 has a circular cross sectional and the second portion 34 is connected to the steel reinforcing bar 28' by welding.
  • the second portion 34 of the pile threaded bolt connectors 30 has a plain unthreaded portions. 6.
  • the steel reinforcement elements 28 comprising of a number of steel reinforcing bars 28' and additional steel reinforcement elements 28" extending in the circumference of the reinforced concrete pile 20.
  • the additional steel reinforcement elements 28" forms a steel mesh or mesh cage incorporation with the steel reinforcing bar 28'.
  • the gasket 40 has a second inner diameter 42 being congruent to the first outer diameter of the second portions 36 of the pile threaded bolt connectors and the second outer diameter 44 is larger than the inner diameter of the internal threaded part of the tightening nuts 59.
  • the first interface 60 is located between the first portion 32 and the transition portion 38 the pile threaded bolt connectors at a first distance d 1 from the planar abutment surface 24.
  • the second interface 62 is located between the transition portion 38 and the second portion 34 of the pile threaded bolt connectors 30 at a second distance d 2 from the planar abutment surface 24
  • the first distance d 1 is larger than the second distance d 2 and the second distance d 2 is also larger the height h g of the gasket.
  • the height h g of the gasket 40 corresponds to the thickness of the gasket 40.
  • the second portion 34 of the pile threaded bolt connectors 30 has a plain unthreaded portion, which will prevent, that the gasket 40 from getting damaged or torn during tightening of tightening nut 50 during installation of the mast on top of the reinforced concrete pile.
  • Fig. 4B-4D show the sequence of tightening the tightening nut 50, where the tightening nut is configured to be rotated relative to the threaded portion of the pile threaded bolt connectors .
  • Fig. 4B shows the tightening nut 50, where the tightening nut 50 does not exert any compression force on the gasket 40 and the gasket 40 is positioned around the plain unthreaded portion of the pile threaded bolt connectors 30 and abuts the planar abutment surface of the first end part 22.
  • Fig. 4C shows the tightening nut 50, where the tightening nut 50 is rotated further towards the planar abutment surface of the first end part 22.
  • the tightening nut 50 begins to compress onto the gasket 40.
  • the gasket 40 is positioned around the plain unthreaded portion of the pile threaded bolt connectors 30 and abuts the planar abutment surface of the first end part 22.
  • Fig. 4D shows a final position, where the tightening nut 50 is rotated relative to the threaded portion of the pile threaded bolt connectors 30 to the position, where the tightening nut 50 exerts the full compression load on the gasket.
  • the amount of load on the gasket 40 causes the gasket to deform and the deformation of the gasket results in the gasket 40 being compressed towards the pile threaded bolt connectors, the inner tapered portion 55 of the tightening nuts and the planar abutment surface 24 for providing sealing relative to the pile threaded bolt connectors 30 and the planar abutment surface 24.
  • the tightening nut 50 has an intermediate section including a second threaded section 56 and the second threaded section 56 extends between the tapered portion 55 and the internal threaded portion 58.
  • the second threaded section 56 has a threaded diameter d 4 being larger than the threaded diameter d 3 of the internal threaded portion 58.
  • the tightening nut has first end surface 51, a second end surface 52 and a central aperture 54 including a tapered portion 55 at the second end surface 52 for providing a larger opening compared to the central aperture.
  • the central aperture 54 further includes a internal threaded portion 58 at the first end surface 54 complimenting the threaded portion 33 of the pile threaded bolt connectors 30.
  • Fig. 5D shows a first embodiment of the tightening nut 50 having a internal threaded portion being tapered over two revolutions.
  • Fig. 5C shows a first embodiment of the transition portions having threaded portions being tapered over two revolutions from a fully threaded shaft to a plain unthreaded shaft.
  • Fig. 6A-6D shows a second preferred embodiment of casting of the reinforced concrete pile.
  • each of pile threaded bolt connectors 30 is placed in the casting mould 70 and each of pile threaded bolt connectors 30 has an exposed part extending into the apertures 75 of the first mould end part 74 and beyond the first end part 22.
  • the steel reinforcement elements 28 consists of steel bars 28' 28" forming a steel reinforcement cage 28'" fabricated from an assembly of longitudinal steel reinforcing bar 28' and transverse steel reinforcement bar 28" extending in the circumference of the reinforced concrete pile 20.
  • the four pile threaded bolt connectors 30 are positioned in a second polygonal geometry and connected to the steel reinforcement bars 28' of the steel reinforcement cage.
  • the steel reinforcement cage 28'" forms a recgtangular polygonal geometry.
  • Two lifting sockets 29 are placed at equal distance in the casting mould 70 and the lifting sockets 29 is connected to the steel reinforcement elements 28 by welding.
  • the lifting socket 29 comprises an inner threaded portion and the threaded portion makes it possible for a worker to insert a swivel lifting eye into the lifting socket prior to lifting the casted reinforced concrete pile 20 out of the casting mould 70.
  • the casting mould 70 is used for casting reinforced concrete pile 20 having an elongated structure with a first end part 22 including a planar abutment surface of a first polygonal geometry and a second end part 26.
  • the reinforced concrete piles are preferably precasted concrete elements manufactured in at a larger manufacturing facility and delivered, ready to use, to the installation site. Pre-casted reinforced concrete piles can also be fabricated on site and tilted or lifted into position.
  • Fig 6A shows the step of placing the steel reinforcement cage 28'" into the casting mould 70 and steel reinforcement cage 28" comprising of a number of steel reinforcing bars 28' and additional steel reinforcement elements 28" extending in the circumference of the steel reinforcement cage 28"'.
  • the inserts 80 is made of anti-adherent synthetic material, without or with a built-in supporting body, made of metal or synthetic material.
  • the method further comprising the step of:

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Description

    TECHNICAL FIELD
  • The present invention relates to a foundation or a pile driven foundation for an overhead line mast, power line mast or the like, comprising a reinforced concrete pile including pile threaded bolt connectors, a number of gaskets and a corresponding number of tightening nuts.
  • BACKGROUND OF THE INVENTION
  • Prefabricated concrete piles are normally used for foundations at location where the upper soil layers are not suitable for accommodating a shallow foundation. At location where the bearing capacity of the ground is weak in relation to the construction, piles are preferred option compared to shallow foundations. Through the use a piling foundation the load from the construction may be transferred from the weaker upper layers of the soil to lower stronger layers, which are typically found deeper level in the ground. The piles are driven into the ground by using a pile driver or hammer or the like.
  • The piles are intended for embedment deep into the ground for providing a stable foundation for various structures such as buildings, bridges and similar constructions. The pile foundation can be used in soil layers along railways.
  • For purposes where prefabricated concrete foundations used with threaded bolt connections it is necessary to protect the reinforcement from water penetrating into the concrete at the bolt shaft. The water will penetrate the foundations, more precisely the water will penetrate into the reinforced concrete piles between the bolt shaft and the reinforcing concrete causing the reinforcement elements of the reinforced concrete piles to corrode and eventually cause the reinforced concrete supporting the bolt shaft to break, which will reduce the stability of the overlying construction. The penetrating water may also freeze when subjected to temperatures below 0° C and cause damage to the pile. There is consequently a need for technologies for avoiding water penetration into the concrete foundation, especially reinforced concrete bolt-foundations for railway powerlines, or similar with demand for long durability being exposed to outside weather conditions.
  • Such prior art piles are disclosed in e.g. PL67224Y1 which discloses a foundation suitable for an overhead line mast and comprising a reinforced concrete pile including threaded bolt connectors being embedded in the concrete pile, each connector having an exposed part extending beyond a first end part and connected to reinforcement elements of the pile. The document does not disclose any improvement to the sealing capability and the prevention penetration of water into the reinforced concrete pile at the bolt shaft.
  • The general object of the present invention is to provide a foundation, which is able to withstand the environment impact and exposure accruing over time on the structure at the installation location.
  • The above need and object together with numerous other needs and objects, which will be evident from below detailed description, are according to a first aspect of the present invention obtained by a foundation for an overhead line mast, power line mast or the like, comprising a reinforced concrete pile including threaded bolt, a number of gaskets and a corresponding number of tightening nuts:
    • the reinforced concrete pile defining an elongated structure having a first end part including a planar abutment surface of a first polygonal geometry and a second end part, steel reinforcement elements extending between the first end part and the second end parts, the threaded bolt connectors being embedded in the reinforced concrete pile and each having an exposed part extending beyond the first end part and positioned in a second polygonal geometry and connected to the steel reinforcement elements of the reinforced concrete pile, the second polygonal geometry being equivalent to the first polygonal geometry,
    • each of the exposed part of the pile threaded bolt connectors having a first portion including a threaded portion, a second portion having a circular cross sectional configuration of a first outer diameter and a transition portion interconnecting the first portion and the second portion,
    • a first interface being located between the first portion and the transition portion of each of the pile threaded bolt connectors at a first distance from the planar abutment surface,
    • a second interface being located between the transition portion and the second portion of each of the pile threaded bolt connectors at a second distance from the planar abutment surface, the first distance being larger than the second distance,
    • each of the gaskets having an annual shape forming a second inner diameter and second outer diameter,
    • the tightening nuts having a first end surface, a second end surface and a central aperture including a tapered portion at the second surface end for providing a larger opening compared to the central aperture, the central aperture further including an internal threaded portion at the first end surface complimenting the threaded portion of the pile threaded bolt connectors,
    • the second inner diameter of the gasket being congruent to the first outer diameter of each of the second portions of each the pile threaded bolt connectors and the second outer diameter being larger than the inner diameter of the internal threaded part of the tightening nuts,
    • the tightening nuts being configured to be rotated relative to the threaded portion of the pile threaded bolt connectors for allowing the gaskets to be compressed towards the pile threaded bolt connectors, the inner tapered portion of the tightening nuts and the planar abutment surface for providing sealing relative to the pile threaded bolt connectors and the planar abutment surface.
  • The reinforced concrete pile is an elongated prefabricated concrete piles. The reinforced concrete pile is provided in various lengths.
  • The pile threaded bolt connectors would preferably be made from a stainless steel material, as the pile threaded bolt connectors are exposed to the environment and have to be able to withstand the weather. Stainless steel is the preferred material due to its corrosion resistance as stainless does not corrode or rust as ordinary steel (carbon steel) does. However, it is possible to use carbon steel for the steel reinforcement elements as the steel reinforcement element are embedded into the reinforcement concrete pile,
  • The gasket is preferably made from an elastomer material with a round cross-section and being designed to be compressed during assembly and would create a sealing at the interface between the plain unthreaded surface of the pile threaded bolt connectors and the planar abutment surface. Each gasket has an annual shape forming a second inner diameter being congruent to the first outer diameter of the pile threaded bolt connectors and second outer diameter being larger than the inner diameter of the internal threaded part of the tightening nut.
  • Each of the tightening nuts is configured to be rotated relative to the threaded portion of a pile threaded bolt connector and by rotating the tightening nut the tapered portion of the tightening nuts will be moved towards the gasket. Rotation of the tightening nut would cause the gasket to be compressed towards the outer surface of the pile threaded bolt connectors and the planar abutment surface and the compression of the gasket will provide a sealing between the pile threaded bolt connectors and the planar abutment surface.
  • In a further embodiment according to the first aspect, the transition portions having threaded portions being tapered over two revolutions from a fully threaded shaft to a plain unthreaded shaft. Through the use of pile threaded bolt connectors having a threaded portions being tapered over two revolutions from a fully threaded shaft to a plain unthreaded shaft, it is possible to obtain a sealing for preventing water to penetrate into the structure.
  • In a further embodiment according to the first aspect, the central aperture of the tightening nuts having an intermediate section having a second threaded section, the second threaded section extending between the tapered portion and the internal threaded portion, the second threaded section having a diameter being larger than the threaded diameter of the internal threaded portion. Through the use of tightening nuts having a second threaded section with a diameter being larger than the inner diameter of the internal threaded portion, it is possible for the tightening nut to be rotated beyond the threaded portion of the pile threaded bolt connectors. The second threaded section being an inner threaded section and the diameter of the second threaded section corresponds to the major diameter.
  • In a further embodiment according to the first aspect, wherein the internal threaded portion being tapered over two revolutions. Through the use of tightening nuts having internal threaded portion being tapered over two revolutions, it is possible to improve the sealing capability further and prevent penetration of water into the reinforced concrete pile.
  • In a further embodiment according to the first aspect, the second portions of the pile threaded bolt connectors being plain unthreaded portions. By using a pile threaded bolt connectors with a second portions having a plain unthreaded surface, it is possible to enhance the sealing capability at the interface between the outer surface of the gasket and the plain surface of the pile threaded bolt connectors. The plain contact surface improves the sealing capability compared to a threaded contact surface, hereby serving a first function. The plain unthreaded portion of the pile threaded bolt connectors will prevent, that the gasket from getting damaged or torn during tightening of tightening nuts during installation, where the overhead line mast is installed on top of the reinforced concrete pile, hereby serving a second function.
  • In a further embodiment according to the first aspect, the reinforcement elements including additional steel reinforcement elements extending in the circumference of the reinforced concrete. By using an additional steel reinforcement elements extending in the circumference, it is possible to obtain a steel mesh structure, which allows easier handling and positioning of the steel mesh structure during casting and fabrication of the reinforcement concrete pile. The of additional steel reinforcement elements forms a steel mesh or mesh cage together with the steel reinforcing bar.
  • The mesh cage or reinforcement cage consisted of two parts: longitudinal bars and transverse bars or spiral bar. The steel bar has vertical rib and transverse rib on surface for better application in concrete reinforcement and the steel bar is preferable made from cold drawn or hot drawn carbon steel wire rod, galvanized or mill black finish.
  • The longitudinal steel bars confines the core concrete, and the transverse steel bars or spiral bars fit around the longitudinal bars. The steel mesh cage provides reinforcement in the longitudinal and lateral strength to prevent cracking, and reduce the deflections occurrence probability.
  • The reinforcement cage has a polygonal geometry e.g. triangle or square and the reinforcement cages is positioned in the casting mould before the concrete is poured the casting form. The steel reinforcement elements are spot welded to form a reinforcement cage, preferably by an automatic spot welding machine and the spot welding machine furthermore is able to program for being able to adjust the spacing and opening of the reinforcement cage.
  • In a further embodiment according to the first aspect, the reinforced concrete pile is a prefabricated structure. Through the use of a prefabricated reinforced concrete pile, it is faster to establish the foundation as the reinforced concrete does not need to casted in-situ and await the hardening of the concrete before the overhead line mast can be connected to the foundation.
  • In a further embodiment according to the first aspect, the second polygonal geometry and the first polygonal geometry being 3-12, preferably 4. By using a polygonal geometry it is optional, where the geometry should be rectangular, pentagonal, hexagonal etc.
  • In a further embodiment according to the first aspect, the reinforced concrete pile having visual markings on the outer surface for positioning the end part 0.1-1 meter above ground level, when the reinforced concrete pile is being driven into the ground. By using a visual markings on the reinforced concrete pile, the installation of the reinforced concrete pile can be done in a more precise manner, as the worker at the installation site can visual determine and inspect whether the reinforced concrete pile needs to be driven further into the ground.
  • In a further embodiment according to the first aspect, the pile threaded bolt connectors being connected to the steel reinforcement elements of the reinforced concrete pile by welding, preferably friction welding. By welding the each pile threaded bolt connectors to the steel reinforcement bars, the structural loads from the mast can be transferred from the pile threaded bolt connectors to the steel reinforcement elements embedded in the reinforced concrete pile.
  • The term pile foundation should in this context be understood as a prepared ground or base on which the overhead line mast, the power line mast or the like structure can be mounted. The pile foundation consists of an elongated structural element being driven or drilled into the deep of the ground and belong to the category also referred to as deep foundation.
  • The term deep foundation should in the context be understood as the type of foundation, which transfers load into the soil farther down from the ground level in contrast to shallow foundation, which primarily transfers loads from the structure to the surface layer at the vicinity of the ground level.
  • The term congruent is used in this context to describe a gasket being able to provide a tight fit relative to the outer diameter of the second portion of the pile threaded bolt connectors. Each gasket would have an inner diameter being identical to the outer diameter of the second portion of each of the pile threaded bolt connectors or an inner diameter substantial smaller than the outer diameter of the second portion of each of the pile threaded bolt connectors.
  • The term internal threaded portion is used in this context to describe an internal thread of the tightening nut is divided into two sections, which both have a major diameter and a minor diameter. The diameter of the internal threaded portion would in this context refer to the major diameter.
  • DETAILED DESCRIPTION
  • The invention will now be explained in more detail by means of examples of embodiments with reference to the schematic drawing.
    • Figure 1 shows a foundation installed along a railway track.
    • Figure 2 shows of a first and presently preferred embodiment of the reinforced concrete pile.
    • Figure 3 shows the steel reinforcement elements embedded inside the reinforced.
    • Figure 4A-4D shows the tightening of the tightening nut.
    • Figure 5A-5E shows a first and presently preferred embodiment of the pile threaded bolt connectors and a tightening nut.
    • Figure 6A-6D shows a second preferred embodiment of casting a reinforced concrete pile according to first embodiment of the invention.
    • Fig. 1 shows foundation 10 comprising a reinforced concrete pile 20 having threaded bolt connectors for allowing an overhead line mast 12 to be connected to the reinforced concrete pile 20 of the pile foundation.
  • The overhead power line 16 is suspended above the railway track 14 between the overhead line mast, supporting posts or arched catenary support or other carrying structures spaced along the railway track 14. The overhead power line 16 is kept at a high electric potential for suppling electric power to the train. The reinforced concrete pile 20 penetrates the upper soil layers and will be embedded in the lower, more rigid lower soil layers. The reinforced concrete pile 20 is a precasted element and the reinforced concrete pile 20 is casted in a standardized length between 4 meter and 20 meter.
  • Fig. 2 and 3 show a reinforced concrete pile 20 having an elongated structure with a first end part 22 including a planar abutment surface of a first polygonal geometry and a second end part 26. Steel reinforcement elements 28 extends between the first end part 22 and the second end parts 28.
  • Four pile threaded bolt connectors 30 are embedded in the reinforced concrete pile 20 and each of pile threaded bolt connectors 30 has an exposed part extending beyond the first end part 22. The four pile threaded bolt connectors 30 are positioned in a second polygonal geometry and connected to the steel reinforcement elements 28 of the reinforced concrete pile 20.
  • The connection between each of the pile threaded bolt connectors 30 and the steel reinforcement elements 28 of the reinforced concrete pile 20 is obtained by welding process e.g. friction welding and the connection will be embedded inside the reinforced concrete pile 20.The pile threaded bolt connectors 30 would be made from a stainless steel material, as the pile threaded bolt connectors is exposed to the environment and have to be able to withstand the corrosion.
  • The steel reinforcement elements 28 are fabricated from an assembly of steel reinforcing bar 28', also commonly referred to as rebars, held together in the desired configuration by means of additional steel reinforcement elements 28" extending in the circumference of the reinforced concrete pile 20. The additional steel reinforcement elements 28" forms a steel mesh or mesh cage incorporation with the steel reinforcing bar 28'.
  • Two lifting sockets 29 are embedded into the reinforced concrete pile 20 and the lifting sockets 29 are placed at equal distance from the center of gravity of the reinforced concrete pile 20 for allowing as stable lifting of the reinforced concrete pile 20. Each of the lifting sockets 29 is connected to the steel reinforcement elements 28 by welding.
  • The lifting sockets 29 comprise an inner threaded portion and the threaded portion makes it possible for a worker to insert a swivel lifting eye into the lifting socket prior to lifting the reinforced concrete pile 20. The lifting socket could also be formed as tubular lifting socket, flat plate lifting socket or the like. Each of the lifting sockets 29 is covered by a sealing cap for preventing any foreign objects from entering the socket and the sealing cap fits inside the lifting socket 29.
  • The steel reinforcement elements 28 have the same polygonal geometry as the reinforced concrete pile 20 and the 28' steel reinforcing bars are placed along the circumference of the reinforced concrete pile 20 more specific near the edges of the polygonal geometry.
  • The second polygonal geometry is defined by the number of pile threaded bolt connectors embedded in the reinforced concrete pile 20 and the first polygonal geometry corresponds the outer geometry of the reinforced concrete pile 20. The first polygonal geometry is equivalent to the second polygonal geometry in fig. 2.
  • It is contemplated, that the tightening the tightening nut 501, 502, 503, 504 can be done in two steps, 'Initial Torque' and 'Final torque' using a calibrated torque wrench. This can be either a manual wrench or power tool fitted with a torque cut-out that must first be calibrated on a bolt from the job batch using a bolt load meter or similar device for determining bolt tension.
  • Fig. 4-5 show the pile threaded bolt connectors 30 having a first portion 32 including a threaded portion 33, a second portion 34 having a circular cross sectional configuration of a first outer diameter and a transition portion 38 interconnecting the first portion 32 and the second portion 32. The gaskets 40 having an annual shape forming a second inner diameter 42 and second outer diameter 44.
  • Fig. 4A shows a pile threaded bolt connectors 30 connected to the steel reinforcement elements 28 in the reinforced concrete pile 20. The second portion 34 of the pile threaded bolt connectors 30 has a circular cross sectional and the second portion 34 is connected to the steel reinforcing bar 28' by welding. The second portion 34 of the pile threaded bolt connectors 30 has a plain unthreaded portions. 6. The steel reinforcement elements 28 comprising of a number of steel reinforcing bars 28' and additional steel reinforcement elements 28" extending in the circumference of the reinforced concrete pile 20. The additional steel reinforcement elements 28" forms a steel mesh or mesh cage incorporation with the steel reinforcing bar 28'.
  • In fig. 4A-4D, the gasket 40 has a second inner diameter 42 being congruent to the first outer diameter of the second portions 36 of the pile threaded bolt connectors and the second outer diameter 44 is larger than the inner diameter of the internal threaded part of the tightening nuts 59.
  • In Fig. 4D, the first interface 60 is located between the first portion 32 and the transition portion 38 the pile threaded bolt connectors at a first distance d1 from the planar abutment surface 24. The second interface 62 is located between the transition portion 38 and the second portion 34 of the pile threaded bolt connectors 30 at a second distance d2 from the planar abutment surface 24
  • As indicated in fig. 4D, the first distance d1 is larger than the second distance d2 and the second distance d2 is also larger the height hg of the gasket. The height hg of the gasket 40 corresponds to the thickness of the gasket 40. The second portion 34 of the pile threaded bolt connectors 30 has a plain unthreaded portion, which will prevent, that the gasket 40 from getting damaged or torn during tightening of tightening nut 50 during installation of the mast on top of the reinforced concrete pile.
  • Fig. 4B-4D show the sequence of tightening the tightening nut 50, where the tightening nut is configured to be rotated relative to the threaded portion of the pile threaded bolt connectors .
  • Fig. 4B shows the tightening nut 50, where the tightening nut 50 does not exert any compression force on the gasket 40 and the gasket 40 is positioned around the plain unthreaded portion of the pile threaded bolt connectors 30 and abuts the planar abutment surface of the first end part 22.
  • Fig. 4C shows the tightening nut 50, where the tightening nut 50 is rotated further towards the planar abutment surface of the first end part 22. The tightening nut 50 begins to compress onto the gasket 40. The gasket 40 is positioned around the plain unthreaded portion of the pile threaded bolt connectors 30 and abuts the planar abutment surface of the first end part 22.
  • Fig. 4D shows a final position, where the tightening nut 50 is rotated relative to the threaded portion of the pile threaded bolt connectors 30 to the position, where the tightening nut 50 exerts the full compression load on the gasket. The amount of load on the gasket 40 causes the gasket to deform and the deformation of the gasket results in the gasket 40 being compressed towards the pile threaded bolt connectors, the inner tapered portion 55 of the tightening nuts and the planar abutment surface 24 for providing sealing relative to the pile threaded bolt connectors 30 and the planar abutment surface 24.
  • As shown in fig. 5B, the tightening nut 50 has an intermediate section including a second threaded section 56 and the second threaded section 56 extends between the tapered portion 55 and the internal threaded portion 58. The second threaded section 56 has a threaded diameter d4 being larger than the threaded diameter d3 of the internal threaded portion 58. By using a tightening nut 50 having an inner second threaded section 56 having a threaded diameter d4 being larger than the inner diameter d3 of the internal threaded portion, it is possible for the tightening nut 50 to be rotating beyond the threaded portion 33 of the pile threaded bolt connectors. The second threaded section being an inner threaded section and the threaded diameter corresponds to the major diameter of an internal thread.
  • As indicated in fig. 5B-5D, the tightening nut has first end surface 51, a second end surface 52 and a central aperture 54 including a tapered portion 55 at the second end surface 52 for providing a larger opening compared to the central aperture.
  • The central aperture 54 further includes a internal threaded portion 58 at the first end surface 54 complimenting the threaded portion 33 of the pile threaded bolt connectors 30.
  • Fig. 5D shows a first embodiment of the tightening nut 50 having a internal threaded portion being tapered over two revolutions.
  • Fig. 5C shows a first embodiment of the transition portions having threaded portions being tapered over two revolutions from a fully threaded shaft to a plain unthreaded shaft.
  • Fig. 6A-6D shows a second preferred embodiment of casting of the reinforced concrete pile. The method of casting a foundation, wherein the foundation comprising a reinforced concrete pile including pile threaded bolt connectors, a number of gaskets and a corresponding number of tightening nuts, comprising the step of:
    • providing a casting mould 70 having two mould side walls 72, a first mould end part 74 including apertures 75, a second mould end part 76 and a bottom mould part 78,
    • inserting a number of anti-adherent elements 80 made of a synthetic material, Teflon or the like into the apertures 75 of the first mould end part 74,
    • placing corresponding gasket 40 and tightening nut 501, 502, 503, 504 to said pile threaded bold connectors 30 (not shown).
    • placing steel reinforcement elements into the casting mould, the steel reinforcement elements extending between the first end part and the second end parts of the casting mould and a number of pile threaded bolt connectors being connected to the steel reinforcement elements and allowing the pile threaded bolt connectors to extend beyond the first mould end part,
    • pouring concrete into the casting mould.
    • casting a reinforced concrete pile defining an elongated structure having a first end part including a planar abutment surface of a first polygonal geometry and a second end part, steel reinforcement elements extending between the first end part and the second end parts, the pile threaded bolt connectors being embedded in the reinforced concrete pile and each having an exposed part extending beyond the first end part and positioned in a second polygonal geometry and connected to the steel reinforcement elements of the reinforced concrete pile, the second polygonal geometry being equivalent to the first polygonal geometry.
  • By using a number of anti-adherent elements 80 made of a synthetic material, Teflon or the like into the apertures 75 of the first mould end part 74, it is possible to establish a reinforced concrete pile having a smooth planar abutment surface. By having a smooth planar abutment surface, the sealing capability is enhanced and the smooth surface of first end part 22 prevent water from gathering in void created in an otherwise uneven first end part 22.
  • In figure 6A-6D, the four pile threaded bolt connectors 30 are placed in the casting mould 70 and each of pile threaded bolt connectors 30 has an exposed part extending into the apertures 75 of the first mould end part 74 and beyond the first end part 22.
  • The steel reinforcement elements 28 consists of steel bars 28' 28" forming a steel reinforcement cage 28'" fabricated from an assembly of longitudinal steel reinforcing bar 28' and transverse steel reinforcement bar 28" extending in the circumference of the reinforced concrete pile 20. The four pile threaded bolt connectors 30 are positioned in a second polygonal geometry and connected to the steel reinforcement bars 28' of the steel reinforcement cage. The steel reinforcement cage 28'" forms a recgtangular polygonal geometry.
  • Two lifting sockets 29 are placed at equal distance in the casting mould 70 and the lifting sockets 29 is connected to the steel reinforcement elements 28 by welding.
  • The lifting socket 29 comprises an inner threaded portion and the threaded portion makes it possible for a worker to insert a swivel lifting eye into the lifting socket prior to lifting the casted reinforced concrete pile 20 out of the casting mould 70.
  • The casting mould 70 is used for casting reinforced concrete pile 20 having an elongated structure with a first end part 22 including a planar abutment surface of a first polygonal geometry and a second end part 26.
  • The reinforced concrete piles are preferably precasted concrete elements manufactured in at a larger manufacturing facility and delivered, ready to use, to the installation site. Pre-casted reinforced concrete piles can also be fabricated on site and tilted or lifted into position.
  • Fig 6A shows the step of placing the steel reinforcement cage 28'" into the casting mould 70 and steel reinforcement cage 28" comprising of a number of steel reinforcing bars 28' and additional steel reinforcement elements 28" extending in the circumference of the steel reinforcement cage 28"'.
  • The inserts 80 is made of anti-adherent synthetic material, without or with a built-in supporting body, made of metal or synthetic material.
  • The method further comprising the step of:
    • arranging the pile threaded bolt connectors in the casting mould for providing a reinforced concrete pile having a first interface being located between the first portion and the transition portion of each of the pile threaded bolt connectors at a first distance from the planar abutment surface, and a second interface being located between the transition portion and the second portion of each of the pile threaded bolt connectors at a second distance from the planar abutment surface, the first distance being larger than the second distance.
    REFERENCE NUMBERS
  • 10
    foundation
    12
    mast
    14
    railway track
    16
    overhead line, power line mast or the like,
    18
    support structure
    20
    reinforced concrete pile
    22
    first end part
    24
    planar abutment surface
    26
    second end part,
    28
    steel reinforcement elements
    28'
    steel reinforcing bar
    28"
    additional steel reinforcement elements steel reinforcement cage 28'"
    29
    lifting socket
    30
    pile threaded bolt connectors
    31
    exposed part
    32
    first portion,
    33
    threaded portion
    34
    second portion
    36
    first outer diameter of the second portion
    38
    transition portion
    40
    gaskets
    42
    second inner diameter
    44
    second outer diameter
    50
    tightening nut
    501, 502, 503, 504
    tightening nuts
    51
    first end surface
    52
    second end surface
    54
    central aperture
    55
    tapered portion
    56
    second threaded section
    57
    intermediate section
    58
    internal threaded portion
    59
    inner diameter of the internal threaded
    60
    first interface
    62
    second interface
    d1
    first distance
    d2
    second distance
    d3
    diameter, third distance
    d4
    diameter, fourth distance
    hg
    height of the gasket
    70
    casting mould
    72
    mould side wall
    73
    mould side wall
    74
    first mould end part
    75
    apertures
    76
    second mould end part
    78
    bottom mould part
    80
    anti-adherent element

Claims (14)

  1. A foundation (10) for an overhead line mast, power line mast (12) or the like, comprising a reinforced concrete pile (20) including pile threaded bolt connectors (30):
    - said reinforced concrete pile (20) defining an elongated structure having a first end part (22) including a planar abutment surface (24) of a first polygonal geometry and a second end part (26), steel reinforcement elements (28) extending between said first end part (22) and said second end part (26), said pile threaded bolt connectors (30) being embedded in said reinforced concrete (20) pile and each having an exposed part extending beyond said first end part (22) and positioned in a second polygonal geometry and connected to said steel reinforcement elements (28) of said reinforced concrete pile (20), said second polygonal geometry being equivalent to said first polygonal geometry, characterized in said foundation further comprising a number of gaskets (40) and a corresponding number of tightening nuts (501), (502), (503), (504);
    - each of said exposed parts of said pile threaded bolt connectors (30) having a first portion (32) including a threaded portion (33), a second portion (34) having a circular cross sectional configuration of a first outer diameter (36) and a transition portion (38) interconnecting said first portion (32) and said second portion (34),
    - a first interface (60) being located between said first portion (32) and said transition portion (38) of each of said pile threaded bolt connectors (30) at a first distance (d1) from said planar abutment surface (24),
    - a second interface (62) being located between said transition portion (38) and said second portion (34) of each of said pile threaded bolt connectors (30) at a second distance (d2) from said planar abutment surface (24), said first distance d1 being larger than said second distance (d2),
    - each of said gaskets (40) having an annual shape defining a second inner diameter (42) and second outer diameter (44),
    - said tightening nuts (501), (502), (503), (504) having a first end surface (51), a second end surface and a central aperture (54) including a tapered portion (55) at said second surface (52) end for providing a larger opening compared to said central aperture (54), said central aperture (54) further including an internal threaded portion at said first end surface (51) complimenting said threaded portion (33) of said pile threaded bolt connectors (30),
    - said second inner diameter (42) of said gasket (40) being congruent to said first outer diameter (44) of each of said second portions (34) of each of said pile threaded bolt connectors 30 and said second outer diameter (44) being larger than said inner diameter (59) of said internal threaded part of said tightening nuts (501), (502), (503), (504),
    - said tightening nuts (501), (502), (503), (504) being configured to be rotated relative to said threaded portion (33) of said pile threaded bolt connectors (30) for allowing said gaskets (40) to be compressed towards said pile threaded bolt connectors (30), said tapered portion (55) of said tightening nuts (501), (502), (503), (504) and said planar abutment surface (24) for providing sealing relative to said pile threaded bolt connectors (30) and said planar abutment surface (24).
  2. A foundation (10) according to claim 1, wherein said transition portions (38) having threaded portions being tapered over two revolutions from a fully threaded shaft to a plain unthreaded shaft.
  3. A foundation (10) according to any of the preceding claims, said central aperture (54) of said tightening nuts (501), (502), (503), (504) having an intermediate section having a second threaded section, said second threaded section extending between said tapered portion (55) and said internal threaded portion, said second threaded section having a diameter being larger than the thread angle of the said internal threaded portion.
  4. A foundation (10) according to claim 1, wherein said internal threaded portion being tapered over two revolutions.
  5. A foundation (10) according to any of the preceding claims, wherein said second portions (34) of said pile threaded bolt connectors (30) being plain unthreaded portions.
  6. A foundation (10) according to any of the preceding claims, wherein said reinforcement elements including additional steel reinforcement elements (28) extending in the circumference of said reinforced concrete pile (20).
  7. A foundation (10) according to any of the preceding claims, wherein said reinforced concrete pile (20) is a prefabricated structure.
  8. A foundation (10) according to any of the preceding claims, wherein said second polygonal geometry and said first polygonal geometry being 3-12, preferably 4.
  9. A foundation (10) according to any of the preceding claims, wherein said reinforced concrete pile (20) having visual markings on the outer surface for positioning said first end part (22) 0,1-1 meter above ground level, when said reinforced concrete pile (20) is being driven into the ground.
  10. A foundation (10) according to any of the preceding claims, wherein said pile threaded bolt connectors (30) being connected to said steel reinforcement elements (28) of said reinforced concrete pile (20) by welding, preferably friction welding.
  11. A method of establishing a foundation (10) for an overhead line mast (12), power line mast or the like, comprising a reinforced concrete pile including pile threaded bolt connectors (30):
    - providing said reinforced concrete pile (20) defining an elongated structure having a first end part (22) including a planar abutment surface (24) of a first polygonal geometry and a second end part (26), steel reinforcement elements (28) extending between said first end part (22) and said second end part (26), said pile threaded bolt connectors (30) being embedded in said reinforced concrete pile (20) and each having an exposed part extending beyond said first end part (22) and positioned in a second polygonal geometry and connected to said steel reinforcement elements (28) of said reinforced concrete pile (20), said second polygonal geometry being equivalent to said first polygonal geometry, characterized in said foundation further comprising a number of gaskets (40) and a corresponding number of tightening nuts (501), (502), (503), (504):
    - providing each of said exposed part of said pile threaded bolt connectors (30) having a first portion (32) including a threaded portion, a second portion (34) having a circular cross sectional configuration of a first outer diameter (36) and a transition portion (38) interconnecting said first portion (32) and said second portion (34),
    - providing a first interface (60) being located between said first portion (32) and said transition portion (38) of each of said pile threaded bolt connectors (30) at a first distance d1 from said planar abutment surface (24),
    - providing a second interface (62) being located between said transition portion (38) and said second portion (34) of each of said pile threaded bolt connectors (30) at a second distance (d2) from said planar abutment surface (24), said first distance (d1) being larger than said second distance (d2),
    - each of said gaskets (40) having an annual shape forming a second inner diameter (42) and second outer diameter (44),
    - providing said tightening nuts (501), (502), (503), (504) having a first end surface (51), a second end surface (52) and a central aperture including a tapered (55) portion at said second surface (52) end for providing a larger opening compared to said central aperture (54), said central aperture (54) further including an internal threaded portion at said first end surface (51) complimenting said threaded portion of said pile threaded bolt connectors (30),
    - said second inner diameter (42) of said gasket (40) being congruent to said first outer diameter (44) of each of said second portions (34) of each said pile threaded bolt connectors (30) and said second outer diameter (44) being larger than the inner diameter (36) of said internal threaded part of said tightening nuts (501), (502), (503), (504),
    - rotating said tightening nuts (501), (502), (503), (504) relative to said threaded portion of said pile threaded bolt connectors (30), compressing said gaskets (40) towards said pile threaded bolt connectors (30), said inner tapered portion (55) of said tightening nuts and said planar abutment surface (24) and establishing sealing relative to said pile threaded bolt connectors (30) and said planar abutment surface (24).
  12. A method of establishing a foundation (10) according to claim 11 further rotating said tightening nuts (501), (502), (503), (504) in a predetermined tightening sequence providing a preloaded connecting between said reinforced concrete pile (20) and the overhead line mast (12), power line mast or the like.
  13. A method of casting a foundation (10) as claimed in any of claims 1-10, wherein said method comprises the steps of:
    - providing a casting mould having two mould side walls, a first mould end part (74) including apertures (75), a second mould end part (76) and a bottom mould part,
    - inserting a number of anti-adherent elements made of a synthetic material, Teflon or the like into the apertures (75) of the first mould end part (74),
    - placing steel reinforcement elements (28) into the casting mould and said steel reinforcement elements (28) extending between said first end part (22) and said second end part (26) of the casting mould, a number of pile threaded bolt connectors (30) being connected to said steel reinforcement elements (28) and allowing said pile threaded bolt connectors (30) to extend beyond said first mould end part (74),
    - placing corresponding gasket (40) and tightening nut (501), (502), (503), (504) to said pile threaded bold connectors (30),
    - pouring concrete into the casting mould.
    - casting a reinforced concrete pile (20) defining an elongated structure having a first end part (22) including a planar abutment surface (24) of a first polygonal geometry and a second end part (24), steel reinforcement elements (28) extending between said first end part (22) and said second end part (24), said pile threaded bolt connectors (30) being embedded in said reinforced concrete pile (20) and each having an exposed part extending beyond said first end part (22) and positioned in a second polygonal geometry and connected to said steel reinforcement elements (28) of said reinforced concrete pile (20), said second polygonal geometry being equivalent to said first polygonal geometry.
  14. A method of casting a foundation (10) according to claim 13, wherein said method further comprising the step of:
    - arranging said pile threaded bolt connectors (30) in the casting mould for providing a reinforced concrete pile (20) having a first interface (60) being located between said first portion (32) and said transition portion (38) of each of said pile threaded bolt connectors (30) at a first distance (d1) from said planar abutment surface (24), and a second interface (62) being located between said transition portion and said second portion (34) of each of said pile threaded bolt connectors (30) at a second distance (d2) from said planar abutment surface (24), said first distance (d1) being larger than said second distance (d2).
EP17187707.9A 2017-08-24 2017-08-24 A foundation and a method of establishing pile foundation Active EP3447195B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DK17187707.9T DK3447195T3 (en) 2017-08-24 2017-08-24 Foundation and method for establishing a pile foundation
EP17187707.9A EP3447195B1 (en) 2017-08-24 2017-08-24 A foundation and a method of establishing pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP17187707.9A EP3447195B1 (en) 2017-08-24 2017-08-24 A foundation and a method of establishing pile foundation

Publications (2)

Publication Number Publication Date
EP3447195A1 EP3447195A1 (en) 2019-02-27
EP3447195B1 true EP3447195B1 (en) 2021-09-29

Family

ID=59790924

Family Applications (1)

Application Number Title Priority Date Filing Date
EP17187707.9A Active EP3447195B1 (en) 2017-08-24 2017-08-24 A foundation and a method of establishing pile foundation

Country Status (2)

Country Link
EP (1) EP3447195B1 (en)
DK (1) DK3447195T3 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4187018A1 (en) * 2021-11-30 2023-05-31 Centrum Pæle A/S Pile foundation and method for installing a pile foundation

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638935A (en) * 2016-11-10 2017-05-10 中衡设计集团股份有限公司 Built-in joint of steel frame column built in basement
CN110587566A (en) * 2019-08-06 2019-12-20 中国华冶科工集团有限公司 Pile position paying-off device for cylindrical pile foundation

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202012100412U1 (en) * 2011-09-01 2012-12-05 Induo Gesellschaft Zur Verwertung Von Schutzrechten Mbh & Co. Kg mast assembly
PL67224Y1 (en) * 2011-12-02 2014-06-30 Torpol Spółka Z Ograniczoną Odpowiedzialnością Pile foundations

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4187018A1 (en) * 2021-11-30 2023-05-31 Centrum Pæle A/S Pile foundation and method for installing a pile foundation

Also Published As

Publication number Publication date
EP3447195A1 (en) 2019-02-27
DK3447195T3 (en) 2021-11-15

Similar Documents

Publication Publication Date Title
EP3447195B1 (en) A foundation and a method of establishing pile foundation
CN100567659C (en) The base configuration of iron tower
EP1849920A2 (en) Tower adapter, method of producing a tower foundation and tower foundation
CA2942790C (en) Pile foundations for supporting power transmission towers
DE102018107421A1 (en) Foundation for a structure prestressed by means of a plurality of tendons and structure prestressed by means of a plurality of prestressed tendons
EP3203065B1 (en) Wind tower connection system
CN112081305A (en) Self-resetting square concrete filled steel tube column base node with friction type anchoring device
US10100486B2 (en) Method for installing overhead transmission line supports on permafrost soils
JP5367496B2 (en) Reinforced concrete structure
US12018449B2 (en) Retrofit for existing wind turbine foundations, retrofitted wind turbine foundation and method for retrofitting a wind turbine foundation
CN109024654B (en) Structure of pier pile foundation and construction method thereof
US10450715B2 (en) Powered lifting station for and method for lifting a slab foundation
CN111485572A (en) Construction method of prefabricated root key type wing plate foundation
RU2646282C1 (en) Concrete screw pile and method of its mounting
CN212477709U (en) High-bearing large-diameter assembly type composite engineering pile
US10704252B2 (en) Method for lifting and supporting a new slab foundation with hydraulic jacks
EP3076013B1 (en) Method and connecting structure for connecting a foundation structure with a support structure of a wind turbine and wind turbine
JP6862022B1 (en) Fence foundation, fence, fence construction method and formwork
CN211898496U (en) Pile splicing structure for precast pile and foundation bearing platform
CN114319462A (en) Construction method and stress device for limiting sinking and floating of existing building foundation
KR101217488B1 (en) Extension structure of pile foundation
CN112112180A (en) Connecting system of assembled combined pier and bearing platform and construction method thereof
KR100942524B1 (en) Structure for connecting foundation piles having different diameter
CN210562273U (en) Foundation for bearing assembly type elevator
CN218027709U (en) Foundation pit supporting structure

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20190807

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20200921

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: E02D 5/30 20060101ALI20210223BHEP

Ipc: E04H 12/22 20060101ALI20210223BHEP

Ipc: E02D 27/42 20060101AFI20210223BHEP

Ipc: E02D 31/06 20060101ALI20210223BHEP

INTG Intention to grant announced

Effective date: 20210330

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602017046668

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1434293

Country of ref document: AT

Kind code of ref document: T

Effective date: 20211015

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20211108

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211229

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211229

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20210929

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1434293

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210929

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211230

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220129

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220131

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602017046668

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20220630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220824

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220831

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220831

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20220831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220824

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220831

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230817

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20230821

Year of fee payment: 7

Ref country code: DK

Payment date: 20230818

Year of fee payment: 7

Ref country code: DE

Payment date: 20230821

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20170824

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210929