EP3447195B1 - A foundation and a method of establishing pile foundation - Google Patents
A foundation and a method of establishing pile foundation Download PDFInfo
- Publication number
- EP3447195B1 EP3447195B1 EP17187707.9A EP17187707A EP3447195B1 EP 3447195 B1 EP3447195 B1 EP 3447195B1 EP 17187707 A EP17187707 A EP 17187707A EP 3447195 B1 EP3447195 B1 EP 3447195B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pile
- threaded bolt
- threaded
- bolt connectors
- reinforced concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 10
- 239000011150 reinforced concrete Substances 0.000 claims description 81
- 229910000831 Steel Inorganic materials 0.000 claims description 76
- 239000010959 steel Substances 0.000 claims description 76
- 230000002787 reinforcement Effects 0.000 claims description 68
- 238000005266 casting Methods 0.000 claims description 27
- 230000007704 transition Effects 0.000 claims description 20
- 239000004567 concrete Substances 0.000 claims description 16
- 238000007789 sealing Methods 0.000 claims description 14
- 238000003466 welding Methods 0.000 claims description 12
- 230000000181 anti-adherent effect Effects 0.000 claims description 5
- 239000003911 antiadherent Substances 0.000 claims description 5
- 229920002994 synthetic fiber Polymers 0.000 claims description 5
- 230000000007 visual effect Effects 0.000 claims description 4
- 239000004809 Teflon Substances 0.000 claims description 3
- 229920006362 Teflon® Polymers 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 9
- 238000009434 installation Methods 0.000 description 6
- 239000010410 layer Substances 0.000 description 6
- 239000002689 soil Substances 0.000 description 6
- 238000010276 construction Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 229910000975 Carbon steel Inorganic materials 0.000 description 3
- 239000010962 carbon steel Substances 0.000 description 3
- 230000006835 compression Effects 0.000 description 3
- 238000007906 compression Methods 0.000 description 3
- 230000035515 penetration Effects 0.000 description 3
- 239000010935 stainless steel Substances 0.000 description 3
- 229910001220 stainless steel Inorganic materials 0.000 description 3
- 230000007797 corrosion Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 238000010348 incorporation Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 238000005336 cracking Methods 0.000 description 1
- 229920001971 elastomer Polymers 0.000 description 1
- 239000000806 elastomer Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/06—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against corrosion by soil or water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2253—Mounting poles or posts to the holder
- E04H12/2276—Clamping poles or posts on a stub
Definitions
- the present invention relates to a foundation or a pile driven foundation for an overhead line mast, power line mast or the like, comprising a reinforced concrete pile including pile threaded bolt connectors, a number of gaskets and a corresponding number of tightening nuts.
- Prefabricated concrete piles are normally used for foundations at location where the upper soil layers are not suitable for accommodating a shallow foundation. At location where the bearing capacity of the ground is weak in relation to the construction, piles are preferred option compared to shallow foundations.
- piles are driven into the ground by using a pile driver or hammer or the like.
- the piles are intended for embedment deep into the ground for providing a stable foundation for various structures such as buildings, bridges and similar constructions.
- the pile foundation can be used in soil layers along railways.
- Such prior art piles are disclosed in e.g. PL67224Y1 which discloses a foundation suitable for an overhead line mast and comprising a reinforced concrete pile including threaded bolt connectors being embedded in the concrete pile, each connector having an exposed part extending beyond a first end part and connected to reinforcement elements of the pile.
- the document does not disclose any improvement to the sealing capability and the prevention penetration of water into the reinforced concrete pile at the bolt shaft.
- the general object of the present invention is to provide a foundation, which is able to withstand the environment impact and exposure accruing over time on the structure at the installation location.
- a foundation for an overhead line mast, power line mast or the like comprising a reinforced concrete pile including threaded bolt, a number of gaskets and a corresponding number of tightening nuts:
- the reinforced concrete pile is an elongated prefabricated concrete piles.
- the reinforced concrete pile is provided in various lengths.
- the pile threaded bolt connectors would preferably be made from a stainless steel material, as the pile threaded bolt connectors are exposed to the environment and have to be able to withstand the weather.
- Stainless steel is the preferred material due to its corrosion resistance as stainless does not corrode or rust as ordinary steel (carbon steel) does.
- carbon steel it is possible to use carbon steel for the steel reinforcement elements as the steel reinforcement element are embedded into the reinforcement concrete pile,
- the gasket is preferably made from an elastomer material with a round cross-section and being designed to be compressed during assembly and would create a sealing at the interface between the plain unthreaded surface of the pile threaded bolt connectors and the planar abutment surface.
- Each gasket has an annual shape forming a second inner diameter being congruent to the first outer diameter of the pile threaded bolt connectors and second outer diameter being larger than the inner diameter of the internal threaded part of the tightening nut.
- Each of the tightening nuts is configured to be rotated relative to the threaded portion of a pile threaded bolt connector and by rotating the tightening nut the tapered portion of the tightening nuts will be moved towards the gasket. Rotation of the tightening nut would cause the gasket to be compressed towards the outer surface of the pile threaded bolt connectors and the planar abutment surface and the compression of the gasket will provide a sealing between the pile threaded bolt connectors and the planar abutment surface.
- transition portions having threaded portions being tapered over two revolutions from a fully threaded shaft to a plain unthreaded shaft.
- the central aperture of the tightening nuts having an intermediate section having a second threaded section, the second threaded section extending between the tapered portion and the internal threaded portion, the second threaded section having a diameter being larger than the threaded diameter of the internal threaded portion.
- the second portions of the pile threaded bolt connectors being plain unthreaded portions.
- the plain contact surface improves the sealing capability compared to a threaded contact surface, hereby serving a first function.
- the plain unthreaded portion of the pile threaded bolt connectors will prevent, that the gasket from getting damaged or torn during tightening of tightening nuts during installation, where the overhead line mast is installed on top of the reinforced concrete pile, hereby serving a second function.
- the reinforcement elements including additional steel reinforcement elements extending in the circumference of the reinforced concrete.
- additional steel reinforcement elements extending in the circumference, it is possible to obtain a steel mesh structure, which allows easier handling and positioning of the steel mesh structure during casting and fabrication of the reinforcement concrete pile.
- the of additional steel reinforcement elements forms a steel mesh or mesh cage together with the steel reinforcing bar.
- the mesh cage or reinforcement cage consisted of two parts: longitudinal bars and transverse bars or spiral bar.
- the steel bar has vertical rib and transverse rib on surface for better application in concrete reinforcement and the steel bar is preferable made from cold drawn or hot drawn carbon steel wire rod, galvanized or mill black finish.
- the longitudinal steel bars confines the core concrete, and the transverse steel bars or spiral bars fit around the longitudinal bars.
- the steel mesh cage provides reinforcement in the longitudinal and lateral strength to prevent cracking, and reduce the deflections occurrence probability.
- the reinforcement cage has a polygonal geometry e.g. triangle or square and the reinforcement cages is positioned in the casting mould before the concrete is poured the casting form.
- the steel reinforcement elements are spot welded to form a reinforcement cage, preferably by an automatic spot welding machine and the spot welding machine furthermore is able to program for being able to adjust the spacing and opening of the reinforcement cage.
- the reinforced concrete pile is a prefabricated structure. Through the use of a prefabricated reinforced concrete pile, it is faster to establish the foundation as the reinforced concrete does not need to casted in-situ and await the hardening of the concrete before the overhead line mast can be connected to the foundation.
- the second polygonal geometry and the first polygonal geometry being 3-12, preferably 4.
- the geometry should be rectangular, pentagonal, hexagonal etc.
- the reinforced concrete pile having visual markings on the outer surface for positioning the end part 0.1-1 meter above ground level, when the reinforced concrete pile is being driven into the ground.
- the pile threaded bolt connectors being connected to the steel reinforcement elements of the reinforced concrete pile by welding, preferably friction welding.
- welding the each pile threaded bolt connectors to the steel reinforcement bars the structural loads from the mast can be transferred from the pile threaded bolt connectors to the steel reinforcement elements embedded in the reinforced concrete pile.
- pile foundation should in this context be understood as a prepared ground or base on which the overhead line mast, the power line mast or the like structure can be mounted.
- the pile foundation consists of an elongated structural element being driven or drilled into the deep of the ground and belong to the category also referred to as deep foundation.
- deep foundation should in the context be understood as the type of foundation, which transfers load into the soil farther down from the ground level in contrast to shallow foundation, which primarily transfers loads from the structure to the surface layer at the vicinity of the ground level.
- each gasket being able to provide a tight fit relative to the outer diameter of the second portion of the pile threaded bolt connectors.
- Each gasket would have an inner diameter being identical to the outer diameter of the second portion of each of the pile threaded bolt connectors or an inner diameter substantial smaller than the outer diameter of the second portion of each of the pile threaded bolt connectors.
- internal threaded portion is used in this context to describe an internal thread of the tightening nut is divided into two sections, which both have a major diameter and a minor diameter.
- the diameter of the internal threaded portion would in this context refer to the major diameter.
- the overhead power line 16 is suspended above the railway track 14 between the overhead line mast, supporting posts or arched catenary support or other carrying structures spaced along the railway track 14.
- the overhead power line 16 is kept at a high electric potential for suppling electric power to the train.
- the reinforced concrete pile 20 penetrates the upper soil layers and will be embedded in the lower, more rigid lower soil layers.
- the reinforced concrete pile 20 is a precasted element and the reinforced concrete pile 20 is casted in a standardized length between 4 meter and 20 meter.
- Fig. 2 and 3 show a reinforced concrete pile 20 having an elongated structure with a first end part 22 including a planar abutment surface of a first polygonal geometry and a second end part 26.
- Steel reinforcement elements 28 extends between the first end part 22 and the second end parts 28.
- pile threaded bolt connectors 30 are embedded in the reinforced concrete pile 20 and each of pile threaded bolt connectors 30 has an exposed part extending beyond the first end part 22.
- the four pile threaded bolt connectors 30 are positioned in a second polygonal geometry and connected to the steel reinforcement elements 28 of the reinforced concrete pile 20.
- connection between each of the pile threaded bolt connectors 30 and the steel reinforcement elements 28 of the reinforced concrete pile 20 is obtained by welding process e.g. friction welding and the connection will be embedded inside the reinforced concrete pile 20.
- the pile threaded bolt connectors 30 would be made from a stainless steel material, as the pile threaded bolt connectors is exposed to the environment and have to be able to withstand the corrosion.
- the steel reinforcement elements 28 are fabricated from an assembly of steel reinforcing bar 28', also commonly referred to as rebars, held together in the desired configuration by means of additional steel reinforcement elements 28" extending in the circumference of the reinforced concrete pile 20.
- the additional steel reinforcement elements 28" forms a steel mesh or mesh cage incorporation with the steel reinforcing bar 28'.
- Two lifting sockets 29 are embedded into the reinforced concrete pile 20 and the lifting sockets 29 are placed at equal distance from the center of gravity of the reinforced concrete pile 20 for allowing as stable lifting of the reinforced concrete pile 20.
- Each of the lifting sockets 29 is connected to the steel reinforcement elements 28 by welding.
- the lifting sockets 29 comprise an inner threaded portion and the threaded portion makes it possible for a worker to insert a swivel lifting eye into the lifting socket prior to lifting the reinforced concrete pile 20.
- the lifting socket could also be formed as tubular lifting socket, flat plate lifting socket or the like.
- Each of the lifting sockets 29 is covered by a sealing cap for preventing any foreign objects from entering the socket and the sealing cap fits inside the lifting socket 29.
- the steel reinforcement elements 28 have the same polygonal geometry as the reinforced concrete pile 20 and the 28' steel reinforcing bars are placed along the circumference of the reinforced concrete pile 20 more specific near the edges of the polygonal geometry.
- the second polygonal geometry is defined by the number of pile threaded bolt connectors embedded in the reinforced concrete pile 20 and the first polygonal geometry corresponds the outer geometry of the reinforced concrete pile 20.
- the first polygonal geometry is equivalent to the second polygonal geometry in fig. 2 .
- the tightening the tightening nut 501, 502, 503, 504 can be done in two steps, 'Initial Torque' and 'Final torque' using a calibrated torque wrench.
- This can be either a manual wrench or power tool fitted with a torque cut-out that must first be calibrated on a bolt from the job batch using a bolt load meter or similar device for determining bolt tension.
- Fig. 4-5 show the pile threaded bolt connectors 30 having a first portion 32 including a threaded portion 33, a second portion 34 having a circular cross sectional configuration of a first outer diameter and a transition portion 38 interconnecting the first portion 32 and the second portion 32.
- the gaskets 40 having an annual shape forming a second inner diameter 42 and second outer diameter 44.
- Fig. 4A shows a pile threaded bolt connectors 30 connected to the steel reinforcement elements 28 in the reinforced concrete pile 20.
- the second portion 34 of the pile threaded bolt connectors 30 has a circular cross sectional and the second portion 34 is connected to the steel reinforcing bar 28' by welding.
- the second portion 34 of the pile threaded bolt connectors 30 has a plain unthreaded portions. 6.
- the steel reinforcement elements 28 comprising of a number of steel reinforcing bars 28' and additional steel reinforcement elements 28" extending in the circumference of the reinforced concrete pile 20.
- the additional steel reinforcement elements 28" forms a steel mesh or mesh cage incorporation with the steel reinforcing bar 28'.
- the gasket 40 has a second inner diameter 42 being congruent to the first outer diameter of the second portions 36 of the pile threaded bolt connectors and the second outer diameter 44 is larger than the inner diameter of the internal threaded part of the tightening nuts 59.
- the first interface 60 is located between the first portion 32 and the transition portion 38 the pile threaded bolt connectors at a first distance d 1 from the planar abutment surface 24.
- the second interface 62 is located between the transition portion 38 and the second portion 34 of the pile threaded bolt connectors 30 at a second distance d 2 from the planar abutment surface 24
- the first distance d 1 is larger than the second distance d 2 and the second distance d 2 is also larger the height h g of the gasket.
- the height h g of the gasket 40 corresponds to the thickness of the gasket 40.
- the second portion 34 of the pile threaded bolt connectors 30 has a plain unthreaded portion, which will prevent, that the gasket 40 from getting damaged or torn during tightening of tightening nut 50 during installation of the mast on top of the reinforced concrete pile.
- Fig. 4B-4D show the sequence of tightening the tightening nut 50, where the tightening nut is configured to be rotated relative to the threaded portion of the pile threaded bolt connectors .
- Fig. 4B shows the tightening nut 50, where the tightening nut 50 does not exert any compression force on the gasket 40 and the gasket 40 is positioned around the plain unthreaded portion of the pile threaded bolt connectors 30 and abuts the planar abutment surface of the first end part 22.
- Fig. 4C shows the tightening nut 50, where the tightening nut 50 is rotated further towards the planar abutment surface of the first end part 22.
- the tightening nut 50 begins to compress onto the gasket 40.
- the gasket 40 is positioned around the plain unthreaded portion of the pile threaded bolt connectors 30 and abuts the planar abutment surface of the first end part 22.
- Fig. 4D shows a final position, where the tightening nut 50 is rotated relative to the threaded portion of the pile threaded bolt connectors 30 to the position, where the tightening nut 50 exerts the full compression load on the gasket.
- the amount of load on the gasket 40 causes the gasket to deform and the deformation of the gasket results in the gasket 40 being compressed towards the pile threaded bolt connectors, the inner tapered portion 55 of the tightening nuts and the planar abutment surface 24 for providing sealing relative to the pile threaded bolt connectors 30 and the planar abutment surface 24.
- the tightening nut 50 has an intermediate section including a second threaded section 56 and the second threaded section 56 extends between the tapered portion 55 and the internal threaded portion 58.
- the second threaded section 56 has a threaded diameter d 4 being larger than the threaded diameter d 3 of the internal threaded portion 58.
- the tightening nut has first end surface 51, a second end surface 52 and a central aperture 54 including a tapered portion 55 at the second end surface 52 for providing a larger opening compared to the central aperture.
- the central aperture 54 further includes a internal threaded portion 58 at the first end surface 54 complimenting the threaded portion 33 of the pile threaded bolt connectors 30.
- Fig. 5D shows a first embodiment of the tightening nut 50 having a internal threaded portion being tapered over two revolutions.
- Fig. 5C shows a first embodiment of the transition portions having threaded portions being tapered over two revolutions from a fully threaded shaft to a plain unthreaded shaft.
- Fig. 6A-6D shows a second preferred embodiment of casting of the reinforced concrete pile.
- each of pile threaded bolt connectors 30 is placed in the casting mould 70 and each of pile threaded bolt connectors 30 has an exposed part extending into the apertures 75 of the first mould end part 74 and beyond the first end part 22.
- the steel reinforcement elements 28 consists of steel bars 28' 28" forming a steel reinforcement cage 28'" fabricated from an assembly of longitudinal steel reinforcing bar 28' and transverse steel reinforcement bar 28" extending in the circumference of the reinforced concrete pile 20.
- the four pile threaded bolt connectors 30 are positioned in a second polygonal geometry and connected to the steel reinforcement bars 28' of the steel reinforcement cage.
- the steel reinforcement cage 28'" forms a recgtangular polygonal geometry.
- Two lifting sockets 29 are placed at equal distance in the casting mould 70 and the lifting sockets 29 is connected to the steel reinforcement elements 28 by welding.
- the lifting socket 29 comprises an inner threaded portion and the threaded portion makes it possible for a worker to insert a swivel lifting eye into the lifting socket prior to lifting the casted reinforced concrete pile 20 out of the casting mould 70.
- the casting mould 70 is used for casting reinforced concrete pile 20 having an elongated structure with a first end part 22 including a planar abutment surface of a first polygonal geometry and a second end part 26.
- the reinforced concrete piles are preferably precasted concrete elements manufactured in at a larger manufacturing facility and delivered, ready to use, to the installation site. Pre-casted reinforced concrete piles can also be fabricated on site and tilted or lifted into position.
- Fig 6A shows the step of placing the steel reinforcement cage 28'" into the casting mould 70 and steel reinforcement cage 28" comprising of a number of steel reinforcing bars 28' and additional steel reinforcement elements 28" extending in the circumference of the steel reinforcement cage 28"'.
- the inserts 80 is made of anti-adherent synthetic material, without or with a built-in supporting body, made of metal or synthetic material.
- the method further comprising the step of:
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Architecture (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Description
- The present invention relates to a foundation or a pile driven foundation for an overhead line mast, power line mast or the like, comprising a reinforced concrete pile including pile threaded bolt connectors, a number of gaskets and a corresponding number of tightening nuts.
- Prefabricated concrete piles are normally used for foundations at location where the upper soil layers are not suitable for accommodating a shallow foundation. At location where the bearing capacity of the ground is weak in relation to the construction, piles are preferred option compared to shallow foundations. Through the use a piling foundation the load from the construction may be transferred from the weaker upper layers of the soil to lower stronger layers, which are typically found deeper level in the ground. The piles are driven into the ground by using a pile driver or hammer or the like.
- The piles are intended for embedment deep into the ground for providing a stable foundation for various structures such as buildings, bridges and similar constructions. The pile foundation can be used in soil layers along railways.
- For purposes where prefabricated concrete foundations used with threaded bolt connections it is necessary to protect the reinforcement from water penetrating into the concrete at the bolt shaft. The water will penetrate the foundations, more precisely the water will penetrate into the reinforced concrete piles between the bolt shaft and the reinforcing concrete causing the reinforcement elements of the reinforced concrete piles to corrode and eventually cause the reinforced concrete supporting the bolt shaft to break, which will reduce the stability of the overlying construction. The penetrating water may also freeze when subjected to temperatures below 0° C and cause damage to the pile. There is consequently a need for technologies for avoiding water penetration into the concrete foundation, especially reinforced concrete bolt-foundations for railway powerlines, or similar with demand for long durability being exposed to outside weather conditions.
- Such prior art piles are disclosed in e.g.
PL67224Y1 - The general object of the present invention is to provide a foundation, which is able to withstand the environment impact and exposure accruing over time on the structure at the installation location.
- The above need and object together with numerous other needs and objects, which will be evident from below detailed description, are according to a first aspect of the present invention obtained by a foundation for an overhead line mast, power line mast or the like, comprising a reinforced concrete pile including threaded bolt, a number of gaskets and a corresponding number of tightening nuts:
- the reinforced concrete pile defining an elongated structure having a first end part including a planar abutment surface of a first polygonal geometry and a second end part, steel reinforcement elements extending between the first end part and the second end parts, the threaded bolt connectors being embedded in the reinforced concrete pile and each having an exposed part extending beyond the first end part and positioned in a second polygonal geometry and connected to the steel reinforcement elements of the reinforced concrete pile, the second polygonal geometry being equivalent to the first polygonal geometry,
- each of the exposed part of the pile threaded bolt connectors having a first portion including a threaded portion, a second portion having a circular cross sectional configuration of a first outer diameter and a transition portion interconnecting the first portion and the second portion,
- a first interface being located between the first portion and the transition portion of each of the pile threaded bolt connectors at a first distance from the planar abutment surface,
- a second interface being located between the transition portion and the second portion of each of the pile threaded bolt connectors at a second distance from the planar abutment surface, the first distance being larger than the second distance,
- each of the gaskets having an annual shape forming a second inner diameter and second outer diameter,
- the tightening nuts having a first end surface, a second end surface and a central aperture including a tapered portion at the second surface end for providing a larger opening compared to the central aperture, the central aperture further including an internal threaded portion at the first end surface complimenting the threaded portion of the pile threaded bolt connectors,
- the second inner diameter of the gasket being congruent to the first outer diameter of each of the second portions of each the pile threaded bolt connectors and the second outer diameter being larger than the inner diameter of the internal threaded part of the tightening nuts,
- the tightening nuts being configured to be rotated relative to the threaded portion of the pile threaded bolt connectors for allowing the gaskets to be compressed towards the pile threaded bolt connectors, the inner tapered portion of the tightening nuts and the planar abutment surface for providing sealing relative to the pile threaded bolt connectors and the planar abutment surface.
- The reinforced concrete pile is an elongated prefabricated concrete piles. The reinforced concrete pile is provided in various lengths.
- The pile threaded bolt connectors would preferably be made from a stainless steel material, as the pile threaded bolt connectors are exposed to the environment and have to be able to withstand the weather. Stainless steel is the preferred material due to its corrosion resistance as stainless does not corrode or rust as ordinary steel (carbon steel) does. However, it is possible to use carbon steel for the steel reinforcement elements as the steel reinforcement element are embedded into the reinforcement concrete pile,
- The gasket is preferably made from an elastomer material with a round cross-section and being designed to be compressed during assembly and would create a sealing at the interface between the plain unthreaded surface of the pile threaded bolt connectors and the planar abutment surface. Each gasket has an annual shape forming a second inner diameter being congruent to the first outer diameter of the pile threaded bolt connectors and second outer diameter being larger than the inner diameter of the internal threaded part of the tightening nut.
- Each of the tightening nuts is configured to be rotated relative to the threaded portion of a pile threaded bolt connector and by rotating the tightening nut the tapered portion of the tightening nuts will be moved towards the gasket. Rotation of the tightening nut would cause the gasket to be compressed towards the outer surface of the pile threaded bolt connectors and the planar abutment surface and the compression of the gasket will provide a sealing between the pile threaded bolt connectors and the planar abutment surface.
- In a further embodiment according to the first aspect, the transition portions having threaded portions being tapered over two revolutions from a fully threaded shaft to a plain unthreaded shaft. Through the use of pile threaded bolt connectors having a threaded portions being tapered over two revolutions from a fully threaded shaft to a plain unthreaded shaft, it is possible to obtain a sealing for preventing water to penetrate into the structure.
- In a further embodiment according to the first aspect, the central aperture of the tightening nuts having an intermediate section having a second threaded section, the second threaded section extending between the tapered portion and the internal threaded portion, the second threaded section having a diameter being larger than the threaded diameter of the internal threaded portion. Through the use of tightening nuts having a second threaded section with a diameter being larger than the inner diameter of the internal threaded portion, it is possible for the tightening nut to be rotated beyond the threaded portion of the pile threaded bolt connectors. The second threaded section being an inner threaded section and the diameter of the second threaded section corresponds to the major diameter.
- In a further embodiment according to the first aspect, wherein the internal threaded portion being tapered over two revolutions. Through the use of tightening nuts having internal threaded portion being tapered over two revolutions, it is possible to improve the sealing capability further and prevent penetration of water into the reinforced concrete pile.
- In a further embodiment according to the first aspect, the second portions of the pile threaded bolt connectors being plain unthreaded portions. By using a pile threaded bolt connectors with a second portions having a plain unthreaded surface, it is possible to enhance the sealing capability at the interface between the outer surface of the gasket and the plain surface of the pile threaded bolt connectors. The plain contact surface improves the sealing capability compared to a threaded contact surface, hereby serving a first function. The plain unthreaded portion of the pile threaded bolt connectors will prevent, that the gasket from getting damaged or torn during tightening of tightening nuts during installation, where the overhead line mast is installed on top of the reinforced concrete pile, hereby serving a second function.
- In a further embodiment according to the first aspect, the reinforcement elements including additional steel reinforcement elements extending in the circumference of the reinforced concrete. By using an additional steel reinforcement elements extending in the circumference, it is possible to obtain a steel mesh structure, which allows easier handling and positioning of the steel mesh structure during casting and fabrication of the reinforcement concrete pile. The of additional steel reinforcement elements forms a steel mesh or mesh cage together with the steel reinforcing bar.
- The mesh cage or reinforcement cage consisted of two parts: longitudinal bars and transverse bars or spiral bar. The steel bar has vertical rib and transverse rib on surface for better application in concrete reinforcement and the steel bar is preferable made from cold drawn or hot drawn carbon steel wire rod, galvanized or mill black finish.
- The longitudinal steel bars confines the core concrete, and the transverse steel bars or spiral bars fit around the longitudinal bars. The steel mesh cage provides reinforcement in the longitudinal and lateral strength to prevent cracking, and reduce the deflections occurrence probability.
- The reinforcement cage has a polygonal geometry e.g. triangle or square and the reinforcement cages is positioned in the casting mould before the concrete is poured the casting form. The steel reinforcement elements are spot welded to form a reinforcement cage, preferably by an automatic spot welding machine and the spot welding machine furthermore is able to program for being able to adjust the spacing and opening of the reinforcement cage.
- In a further embodiment according to the first aspect, the reinforced concrete pile is a prefabricated structure. Through the use of a prefabricated reinforced concrete pile, it is faster to establish the foundation as the reinforced concrete does not need to casted in-situ and await the hardening of the concrete before the overhead line mast can be connected to the foundation.
- In a further embodiment according to the first aspect, the second polygonal geometry and the first polygonal geometry being 3-12, preferably 4. By using a polygonal geometry it is optional, where the geometry should be rectangular, pentagonal, hexagonal etc.
- In a further embodiment according to the first aspect, the reinforced concrete pile having visual markings on the outer surface for positioning the end part 0.1-1 meter above ground level, when the reinforced concrete pile is being driven into the ground. By using a visual markings on the reinforced concrete pile, the installation of the reinforced concrete pile can be done in a more precise manner, as the worker at the installation site can visual determine and inspect whether the reinforced concrete pile needs to be driven further into the ground.
- In a further embodiment according to the first aspect, the pile threaded bolt connectors being connected to the steel reinforcement elements of the reinforced concrete pile by welding, preferably friction welding. By welding the each pile threaded bolt connectors to the steel reinforcement bars, the structural loads from the mast can be transferred from the pile threaded bolt connectors to the steel reinforcement elements embedded in the reinforced concrete pile.
- The term pile foundation should in this context be understood as a prepared ground or base on which the overhead line mast, the power line mast or the like structure can be mounted. The pile foundation consists of an elongated structural element being driven or drilled into the deep of the ground and belong to the category also referred to as deep foundation.
- The term deep foundation should in the context be understood as the type of foundation, which transfers load into the soil farther down from the ground level in contrast to shallow foundation, which primarily transfers loads from the structure to the surface layer at the vicinity of the ground level.
- The term congruent is used in this context to describe a gasket being able to provide a tight fit relative to the outer diameter of the second portion of the pile threaded bolt connectors. Each gasket would have an inner diameter being identical to the outer diameter of the second portion of each of the pile threaded bolt connectors or an inner diameter substantial smaller than the outer diameter of the second portion of each of the pile threaded bolt connectors.
- The term internal threaded portion is used in this context to describe an internal thread of the tightening nut is divided into two sections, which both have a major diameter and a minor diameter. The diameter of the internal threaded portion would in this context refer to the major diameter.
- The invention will now be explained in more detail by means of examples of embodiments with reference to the schematic drawing.
-
Figure 1 shows a foundation installed along a railway track. -
Figure 2 shows of a first and presently preferred embodiment of the reinforced concrete pile. -
Figure 3 shows the steel reinforcement elements embedded inside the reinforced. -
Figure 4A-4D shows the tightening of the tightening nut. -
Figure 5A-5E shows a first and presently preferred embodiment of the pile threaded bolt connectors and a tightening nut. -
Figure 6A-6D shows a second preferred embodiment of casting a reinforced concrete pile according to first embodiment of the invention. -
Fig. 1 showsfoundation 10 comprising a reinforcedconcrete pile 20 having threaded bolt connectors for allowing anoverhead line mast 12 to be connected to the reinforcedconcrete pile 20 of the pile foundation. - The
overhead power line 16 is suspended above therailway track 14 between the overhead line mast, supporting posts or arched catenary support or other carrying structures spaced along therailway track 14. Theoverhead power line 16 is kept at a high electric potential for suppling electric power to the train. The reinforcedconcrete pile 20 penetrates the upper soil layers and will be embedded in the lower, more rigid lower soil layers. The reinforcedconcrete pile 20 is a precasted element and the reinforcedconcrete pile 20 is casted in a standardized length between 4 meter and 20 meter. -
Fig. 2 and 3 show a reinforcedconcrete pile 20 having an elongated structure with afirst end part 22 including a planar abutment surface of a first polygonal geometry and a second end part 26.Steel reinforcement elements 28 extends between thefirst end part 22 and thesecond end parts 28. - Four pile threaded
bolt connectors 30 are embedded in the reinforcedconcrete pile 20 and each of pile threadedbolt connectors 30 has an exposed part extending beyond thefirst end part 22. The four pile threadedbolt connectors 30 are positioned in a second polygonal geometry and connected to thesteel reinforcement elements 28 of the reinforcedconcrete pile 20. - The connection between each of the pile threaded
bolt connectors 30 and thesteel reinforcement elements 28 of the reinforcedconcrete pile 20 is obtained by welding process e.g. friction welding and the connection will be embedded inside the reinforced concrete pile 20.The pile threadedbolt connectors 30 would be made from a stainless steel material, as the pile threaded bolt connectors is exposed to the environment and have to be able to withstand the corrosion. - The
steel reinforcement elements 28 are fabricated from an assembly of steel reinforcing bar 28', also commonly referred to as rebars, held together in the desired configuration by means of additionalsteel reinforcement elements 28" extending in the circumference of the reinforcedconcrete pile 20. The additionalsteel reinforcement elements 28" forms a steel mesh or mesh cage incorporation with the steel reinforcing bar 28'. - Two lifting
sockets 29 are embedded into the reinforcedconcrete pile 20 and the liftingsockets 29 are placed at equal distance from the center of gravity of the reinforcedconcrete pile 20 for allowing as stable lifting of the reinforcedconcrete pile 20. Each of the liftingsockets 29 is connected to thesteel reinforcement elements 28 by welding. - The lifting
sockets 29 comprise an inner threaded portion and the threaded portion makes it possible for a worker to insert a swivel lifting eye into the lifting socket prior to lifting the reinforcedconcrete pile 20. The lifting socket could also be formed as tubular lifting socket, flat plate lifting socket or the like. Each of the liftingsockets 29 is covered by a sealing cap for preventing any foreign objects from entering the socket and the sealing cap fits inside the liftingsocket 29. - The
steel reinforcement elements 28 have the same polygonal geometry as the reinforcedconcrete pile 20 and the 28' steel reinforcing bars are placed along the circumference of the reinforcedconcrete pile 20 more specific near the edges of the polygonal geometry. - The second polygonal geometry is defined by the number of pile threaded bolt connectors embedded in the reinforced
concrete pile 20 and the first polygonal geometry corresponds the outer geometry of the reinforcedconcrete pile 20. The first polygonal geometry is equivalent to the second polygonal geometry infig. 2 . - It is contemplated, that the tightening the tightening
nut -
Fig. 4-5 show the pile threadedbolt connectors 30 having afirst portion 32 including a threaded portion 33, asecond portion 34 having a circular cross sectional configuration of a first outer diameter and atransition portion 38 interconnecting thefirst portion 32 and thesecond portion 32. Thegaskets 40 having an annual shape forming a second inner diameter 42 and second outer diameter 44. -
Fig. 4A shows a pile threadedbolt connectors 30 connected to thesteel reinforcement elements 28 in the reinforcedconcrete pile 20. Thesecond portion 34 of the pile threadedbolt connectors 30 has a circular cross sectional and thesecond portion 34 is connected to the steel reinforcing bar 28' by welding. Thesecond portion 34 of the pile threadedbolt connectors 30 has a plain unthreaded portions. 6. Thesteel reinforcement elements 28 comprising of a number of steel reinforcing bars 28' and additionalsteel reinforcement elements 28" extending in the circumference of the reinforcedconcrete pile 20. The additionalsteel reinforcement elements 28" forms a steel mesh or mesh cage incorporation with the steel reinforcing bar 28'. - In
fig. 4A-4D , thegasket 40 has a second inner diameter 42 being congruent to the first outer diameter of the second portions 36 of the pile threaded bolt connectors and the second outer diameter 44 is larger than the inner diameter of the internal threaded part of the tightening nuts 59. - In
Fig. 4D , thefirst interface 60 is located between thefirst portion 32 and thetransition portion 38 the pile threaded bolt connectors at a first distance d1 from theplanar abutment surface 24. Thesecond interface 62 is located between thetransition portion 38 and thesecond portion 34 of the pile threadedbolt connectors 30 at a second distance d2 from theplanar abutment surface 24 - As indicated in
fig. 4D , the first distance d1 is larger than the second distance d2 and the second distance d2 is also larger the height hg of the gasket. The height hg of thegasket 40 corresponds to the thickness of thegasket 40. Thesecond portion 34 of the pile threadedbolt connectors 30 has a plain unthreaded portion, which will prevent, that thegasket 40 from getting damaged or torn during tightening of tighteningnut 50 during installation of the mast on top of the reinforced concrete pile. -
Fig. 4B-4D show the sequence of tightening the tighteningnut 50, where the tightening nut is configured to be rotated relative to the threaded portion of the pile threaded bolt connectors . -
Fig. 4B shows the tighteningnut 50, where the tighteningnut 50 does not exert any compression force on thegasket 40 and thegasket 40 is positioned around the plain unthreaded portion of the pile threadedbolt connectors 30 and abuts the planar abutment surface of thefirst end part 22. -
Fig. 4C shows the tighteningnut 50, where the tighteningnut 50 is rotated further towards the planar abutment surface of thefirst end part 22. The tighteningnut 50 begins to compress onto thegasket 40. Thegasket 40 is positioned around the plain unthreaded portion of the pile threadedbolt connectors 30 and abuts the planar abutment surface of thefirst end part 22. -
Fig. 4D shows a final position, where the tighteningnut 50 is rotated relative to the threaded portion of the pile threadedbolt connectors 30 to the position, where the tighteningnut 50 exerts the full compression load on the gasket. The amount of load on thegasket 40 causes the gasket to deform and the deformation of the gasket results in thegasket 40 being compressed towards the pile threaded bolt connectors, the inner taperedportion 55 of the tightening nuts and theplanar abutment surface 24 for providing sealing relative to the pile threadedbolt connectors 30 and theplanar abutment surface 24. - As shown in
fig. 5B , the tighteningnut 50 has an intermediate section including a second threadedsection 56 and the second threadedsection 56 extends between the taperedportion 55 and the internal threadedportion 58. The second threadedsection 56 has a threaded diameter d4 being larger than the threaded diameter d3 of the internal threadedportion 58. By using a tighteningnut 50 having an inner second threadedsection 56 having a threaded diameter d4 being larger than the inner diameter d3 of the internal threaded portion, it is possible for the tighteningnut 50 to be rotating beyond the threaded portion 33 of the pile threaded bolt connectors. The second threaded section being an inner threaded section and the threaded diameter corresponds to the major diameter of an internal thread. - As indicated in
fig. 5B-5D , the tightening nut hasfirst end surface 51, asecond end surface 52 and a central aperture 54 including a taperedportion 55 at thesecond end surface 52 for providing a larger opening compared to the central aperture. - The central aperture 54 further includes a internal threaded
portion 58 at the first end surface 54 complimenting the threaded portion 33 of the pile threadedbolt connectors 30. -
Fig. 5D shows a first embodiment of the tighteningnut 50 having a internal threaded portion being tapered over two revolutions. -
Fig. 5C shows a first embodiment of the transition portions having threaded portions being tapered over two revolutions from a fully threaded shaft to a plain unthreaded shaft. -
Fig. 6A-6D shows a second preferred embodiment of casting of the reinforced concrete pile. The method of casting a foundation, wherein the foundation comprising a reinforced concrete pile including pile threaded bolt connectors, a number of gaskets and a corresponding number of tightening nuts, comprising the step of: - providing a
casting mould 70 having twomould side walls 72, a firstmould end part 74 includingapertures 75, a secondmould end part 76 and abottom mould part 78, - inserting a number of
anti-adherent elements 80 made of a synthetic material, Teflon or the like into theapertures 75 of the firstmould end part 74, - placing
corresponding gasket 40 and tighteningnut - placing steel reinforcement elements into the casting mould, the steel reinforcement elements extending between the first end part and the second end parts of the casting mould and a number of pile threaded bolt connectors being connected to the steel reinforcement elements and allowing the pile threaded bolt connectors to extend beyond the first mould end part,
- pouring concrete into the casting mould.
- casting a reinforced concrete pile defining an elongated structure having a first end part including a planar abutment surface of a first polygonal geometry and a second end part, steel reinforcement elements extending between the first end part and the second end parts, the pile threaded bolt connectors being embedded in the reinforced concrete pile and each having an exposed part extending beyond the first end part and positioned in a second polygonal geometry and connected to the steel reinforcement elements of the reinforced concrete pile, the second polygonal geometry being equivalent to the first polygonal geometry.
- By using a number of
anti-adherent elements 80 made of a synthetic material, Teflon or the like into theapertures 75 of the firstmould end part 74, it is possible to establish a reinforced concrete pile having a smooth planar abutment surface. By having a smooth planar abutment surface, the sealing capability is enhanced and the smooth surface offirst end part 22 prevent water from gathering in void created in an otherwise unevenfirst end part 22. - In
figure 6A-6D , the four pile threadedbolt connectors 30 are placed in thecasting mould 70 and each of pile threadedbolt connectors 30 has an exposed part extending into theapertures 75 of the firstmould end part 74 and beyond thefirst end part 22. - The
steel reinforcement elements 28 consists of steel bars 28' 28" forming a steel reinforcement cage 28'" fabricated from an assembly of longitudinal steel reinforcing bar 28' and transversesteel reinforcement bar 28" extending in the circumference of the reinforcedconcrete pile 20. The four pile threadedbolt connectors 30 are positioned in a second polygonal geometry and connected to the steel reinforcement bars 28' of the steel reinforcement cage. The steel reinforcement cage 28'" forms a recgtangular polygonal geometry. - Two lifting
sockets 29 are placed at equal distance in thecasting mould 70 and the liftingsockets 29 is connected to thesteel reinforcement elements 28 by welding. - The lifting
socket 29 comprises an inner threaded portion and the threaded portion makes it possible for a worker to insert a swivel lifting eye into the lifting socket prior to lifting the casted reinforcedconcrete pile 20 out of thecasting mould 70. - The
casting mould 70 is used for casting reinforcedconcrete pile 20 having an elongated structure with afirst end part 22 including a planar abutment surface of a first polygonal geometry and a second end part 26. - The reinforced concrete piles are preferably precasted concrete elements manufactured in at a larger manufacturing facility and delivered, ready to use, to the installation site. Pre-casted reinforced concrete piles can also be fabricated on site and tilted or lifted into position.
-
Fig 6A shows the step of placing the steel reinforcement cage 28'" into thecasting mould 70 andsteel reinforcement cage 28" comprising of a number of steel reinforcing bars 28' and additionalsteel reinforcement elements 28" extending in the circumference of thesteel reinforcement cage 28"'. - The
inserts 80 is made of anti-adherent synthetic material, without or with a built-in supporting body, made of metal or synthetic material. - The method further comprising the step of:
- arranging the pile threaded bolt connectors in the casting mould for providing a reinforced concrete pile having a first interface being located between the first portion and the transition portion of each of the pile threaded bolt connectors at a first distance from the planar abutment surface, and a second interface being located between the transition portion and the second portion of each of the pile threaded bolt connectors at a second distance from the planar abutment surface, the first distance being larger than the second distance.
-
- 10
- foundation
- 12
- mast
- 14
- railway track
- 16
- overhead line, power line mast or the like,
- 18
- support structure
- 20
- reinforced concrete pile
- 22
- first end part
- 24
- planar abutment surface
- 26
- second end part,
- 28
- steel reinforcement elements
- 28'
- steel reinforcing bar
- 28"
- additional steel reinforcement elements steel reinforcement cage 28'"
- 29
- lifting socket
- 30
- pile threaded bolt connectors
- 31
- exposed part
- 32
- first portion,
- 33
- threaded portion
- 34
- second portion
- 36
- first outer diameter of the second portion
- 38
- transition portion
- 40
- gaskets
- 42
- second inner diameter
- 44
- second outer diameter
- 50
- tightening nut
- 501, 502, 503, 504
- tightening nuts
- 51
- first end surface
- 52
- second end surface
- 54
- central aperture
- 55
- tapered portion
- 56
- second threaded section
- 57
- intermediate section
- 58
- internal threaded portion
- 59
- inner diameter of the internal threaded
- 60
- first interface
- 62
- second interface
- d1
- first distance
- d2
- second distance
- d3
- diameter, third distance
- d4
- diameter, fourth distance
- hg
- height of the gasket
- 70
- casting mould
- 72
- mould side wall
- 73
- mould side wall
- 74
- first mould end part
- 75
- apertures
- 76
- second mould end part
- 78
- bottom mould part
- 80
- anti-adherent element
Claims (14)
- A foundation (10) for an overhead line mast, power line mast (12) or the like, comprising a reinforced concrete pile (20) including pile threaded bolt connectors (30):- said reinforced concrete pile (20) defining an elongated structure having a first end part (22) including a planar abutment surface (24) of a first polygonal geometry and a second end part (26), steel reinforcement elements (28) extending between said first end part (22) and said second end part (26), said pile threaded bolt connectors (30) being embedded in said reinforced concrete (20) pile and each having an exposed part extending beyond said first end part (22) and positioned in a second polygonal geometry and connected to said steel reinforcement elements (28) of said reinforced concrete pile (20), said second polygonal geometry being equivalent to said first polygonal geometry, characterized in said foundation further comprising a number of gaskets (40) and a corresponding number of tightening nuts (501), (502), (503), (504);- each of said exposed parts of said pile threaded bolt connectors (30) having a first portion (32) including a threaded portion (33), a second portion (34) having a circular cross sectional configuration of a first outer diameter (36) and a transition portion (38) interconnecting said first portion (32) and said second portion (34),- a first interface (60) being located between said first portion (32) and said transition portion (38) of each of said pile threaded bolt connectors (30) at a first distance (d1) from said planar abutment surface (24),- a second interface (62) being located between said transition portion (38) and said second portion (34) of each of said pile threaded bolt connectors (30) at a second distance (d2) from said planar abutment surface (24), said first distance d1 being larger than said second distance (d2),- each of said gaskets (40) having an annual shape defining a second inner diameter (42) and second outer diameter (44),- said tightening nuts (501), (502), (503), (504) having a first end surface (51), a second end surface and a central aperture (54) including a tapered portion (55) at said second surface (52) end for providing a larger opening compared to said central aperture (54), said central aperture (54) further including an internal threaded portion at said first end surface (51) complimenting said threaded portion (33) of said pile threaded bolt connectors (30),- said second inner diameter (42) of said gasket (40) being congruent to said first outer diameter (44) of each of said second portions (34) of each of said pile threaded bolt connectors 30 and said second outer diameter (44) being larger than said inner diameter (59) of said internal threaded part of said tightening nuts (501), (502), (503), (504),- said tightening nuts (501), (502), (503), (504) being configured to be rotated relative to said threaded portion (33) of said pile threaded bolt connectors (30) for allowing said gaskets (40) to be compressed towards said pile threaded bolt connectors (30), said tapered portion (55) of said tightening nuts (501), (502), (503), (504) and said planar abutment surface (24) for providing sealing relative to said pile threaded bolt connectors (30) and said planar abutment surface (24).
- A foundation (10) according to claim 1, wherein said transition portions (38) having threaded portions being tapered over two revolutions from a fully threaded shaft to a plain unthreaded shaft.
- A foundation (10) according to any of the preceding claims, said central aperture (54) of said tightening nuts (501), (502), (503), (504) having an intermediate section having a second threaded section, said second threaded section extending between said tapered portion (55) and said internal threaded portion, said second threaded section having a diameter being larger than the thread angle of the said internal threaded portion.
- A foundation (10) according to claim 1, wherein said internal threaded portion being tapered over two revolutions.
- A foundation (10) according to any of the preceding claims, wherein said second portions (34) of said pile threaded bolt connectors (30) being plain unthreaded portions.
- A foundation (10) according to any of the preceding claims, wherein said reinforcement elements including additional steel reinforcement elements (28) extending in the circumference of said reinforced concrete pile (20).
- A foundation (10) according to any of the preceding claims, wherein said reinforced concrete pile (20) is a prefabricated structure.
- A foundation (10) according to any of the preceding claims, wherein said second polygonal geometry and said first polygonal geometry being 3-12, preferably 4.
- A foundation (10) according to any of the preceding claims, wherein said reinforced concrete pile (20) having visual markings on the outer surface for positioning said first end part (22) 0,1-1 meter above ground level, when said reinforced concrete pile (20) is being driven into the ground.
- A foundation (10) according to any of the preceding claims, wherein said pile threaded bolt connectors (30) being connected to said steel reinforcement elements (28) of said reinforced concrete pile (20) by welding, preferably friction welding.
- A method of establishing a foundation (10) for an overhead line mast (12), power line mast or the like, comprising a reinforced concrete pile including pile threaded bolt connectors (30):- providing said reinforced concrete pile (20) defining an elongated structure having a first end part (22) including a planar abutment surface (24) of a first polygonal geometry and a second end part (26), steel reinforcement elements (28) extending between said first end part (22) and said second end part (26), said pile threaded bolt connectors (30) being embedded in said reinforced concrete pile (20) and each having an exposed part extending beyond said first end part (22) and positioned in a second polygonal geometry and connected to said steel reinforcement elements (28) of said reinforced concrete pile (20), said second polygonal geometry being equivalent to said first polygonal geometry, characterized in said foundation further comprising a number of gaskets (40) and a corresponding number of tightening nuts (501), (502), (503), (504):- providing each of said exposed part of said pile threaded bolt connectors (30) having a first portion (32) including a threaded portion, a second portion (34) having a circular cross sectional configuration of a first outer diameter (36) and a transition portion (38) interconnecting said first portion (32) and said second portion (34),- providing a first interface (60) being located between said first portion (32) and said transition portion (38) of each of said pile threaded bolt connectors (30) at a first distance d1 from said planar abutment surface (24),- providing a second interface (62) being located between said transition portion (38) and said second portion (34) of each of said pile threaded bolt connectors (30) at a second distance (d2) from said planar abutment surface (24), said first distance (d1) being larger than said second distance (d2),- each of said gaskets (40) having an annual shape forming a second inner diameter (42) and second outer diameter (44),- providing said tightening nuts (501), (502), (503), (504) having a first end surface (51), a second end surface (52) and a central aperture including a tapered (55) portion at said second surface (52) end for providing a larger opening compared to said central aperture (54), said central aperture (54) further including an internal threaded portion at said first end surface (51) complimenting said threaded portion of said pile threaded bolt connectors (30),- said second inner diameter (42) of said gasket (40) being congruent to said first outer diameter (44) of each of said second portions (34) of each said pile threaded bolt connectors (30) and said second outer diameter (44) being larger than the inner diameter (36) of said internal threaded part of said tightening nuts (501), (502), (503), (504),- rotating said tightening nuts (501), (502), (503), (504) relative to said threaded portion of said pile threaded bolt connectors (30), compressing said gaskets (40) towards said pile threaded bolt connectors (30), said inner tapered portion (55) of said tightening nuts and said planar abutment surface (24) and establishing sealing relative to said pile threaded bolt connectors (30) and said planar abutment surface (24).
- A method of establishing a foundation (10) according to claim 11 further rotating said tightening nuts (501), (502), (503), (504) in a predetermined tightening sequence providing a preloaded connecting between said reinforced concrete pile (20) and the overhead line mast (12), power line mast or the like.
- A method of casting a foundation (10) as claimed in any of claims 1-10, wherein said method comprises the steps of:- providing a casting mould having two mould side walls, a first mould end part (74) including apertures (75), a second mould end part (76) and a bottom mould part,- inserting a number of anti-adherent elements made of a synthetic material, Teflon or the like into the apertures (75) of the first mould end part (74),- placing steel reinforcement elements (28) into the casting mould and said steel reinforcement elements (28) extending between said first end part (22) and said second end part (26) of the casting mould, a number of pile threaded bolt connectors (30) being connected to said steel reinforcement elements (28) and allowing said pile threaded bolt connectors (30) to extend beyond said first mould end part (74),- placing corresponding gasket (40) and tightening nut (501), (502), (503), (504) to said pile threaded bold connectors (30),- pouring concrete into the casting mould.- casting a reinforced concrete pile (20) defining an elongated structure having a first end part (22) including a planar abutment surface (24) of a first polygonal geometry and a second end part (24), steel reinforcement elements (28) extending between said first end part (22) and said second end part (24), said pile threaded bolt connectors (30) being embedded in said reinforced concrete pile (20) and each having an exposed part extending beyond said first end part (22) and positioned in a second polygonal geometry and connected to said steel reinforcement elements (28) of said reinforced concrete pile (20), said second polygonal geometry being equivalent to said first polygonal geometry.
- A method of casting a foundation (10) according to claim 13, wherein said method further comprising the step of:- arranging said pile threaded bolt connectors (30) in the casting mould for providing a reinforced concrete pile (20) having a first interface (60) being located between said first portion (32) and said transition portion (38) of each of said pile threaded bolt connectors (30) at a first distance (d1) from said planar abutment surface (24), and a second interface (62) being located between said transition portion and said second portion (34) of each of said pile threaded bolt connectors (30) at a second distance (d2) from said planar abutment surface (24), said first distance (d1) being larger than said second distance (d2).
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DK17187707.9T DK3447195T3 (en) | 2017-08-24 | 2017-08-24 | Foundation and method for establishing a pile foundation |
EP17187707.9A EP3447195B1 (en) | 2017-08-24 | 2017-08-24 | A foundation and a method of establishing pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP17187707.9A EP3447195B1 (en) | 2017-08-24 | 2017-08-24 | A foundation and a method of establishing pile foundation |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3447195A1 EP3447195A1 (en) | 2019-02-27 |
EP3447195B1 true EP3447195B1 (en) | 2021-09-29 |
Family
ID=59790924
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP17187707.9A Active EP3447195B1 (en) | 2017-08-24 | 2017-08-24 | A foundation and a method of establishing pile foundation |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP3447195B1 (en) |
DK (1) | DK3447195T3 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4187018A1 (en) * | 2021-11-30 | 2023-05-31 | Centrum Pæle A/S | Pile foundation and method for installing a pile foundation |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638935A (en) * | 2016-11-10 | 2017-05-10 | 中衡设计集团股份有限公司 | Built-in joint of steel frame column built in basement |
CN110587566A (en) * | 2019-08-06 | 2019-12-20 | 中国华冶科工集团有限公司 | Pile position paying-off device for cylindrical pile foundation |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202012100412U1 (en) * | 2011-09-01 | 2012-12-05 | Induo Gesellschaft Zur Verwertung Von Schutzrechten Mbh & Co. Kg | mast assembly |
PL67224Y1 (en) * | 2011-12-02 | 2014-06-30 | Torpol Spółka Z Ograniczoną Odpowiedzialnością | Pile foundations |
-
2017
- 2017-08-24 DK DK17187707.9T patent/DK3447195T3/en active
- 2017-08-24 EP EP17187707.9A patent/EP3447195B1/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4187018A1 (en) * | 2021-11-30 | 2023-05-31 | Centrum Pæle A/S | Pile foundation and method for installing a pile foundation |
Also Published As
Publication number | Publication date |
---|---|
EP3447195A1 (en) | 2019-02-27 |
DK3447195T3 (en) | 2021-11-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3447195B1 (en) | A foundation and a method of establishing pile foundation | |
CN100567659C (en) | The base configuration of iron tower | |
EP1849920A2 (en) | Tower adapter, method of producing a tower foundation and tower foundation | |
CA2942790C (en) | Pile foundations for supporting power transmission towers | |
DE102018107421A1 (en) | Foundation for a structure prestressed by means of a plurality of tendons and structure prestressed by means of a plurality of prestressed tendons | |
EP3203065B1 (en) | Wind tower connection system | |
CN112081305A (en) | Self-resetting square concrete filled steel tube column base node with friction type anchoring device | |
US10100486B2 (en) | Method for installing overhead transmission line supports on permafrost soils | |
JP5367496B2 (en) | Reinforced concrete structure | |
US12018449B2 (en) | Retrofit for existing wind turbine foundations, retrofitted wind turbine foundation and method for retrofitting a wind turbine foundation | |
CN109024654B (en) | Structure of pier pile foundation and construction method thereof | |
US10450715B2 (en) | Powered lifting station for and method for lifting a slab foundation | |
CN111485572A (en) | Construction method of prefabricated root key type wing plate foundation | |
RU2646282C1 (en) | Concrete screw pile and method of its mounting | |
CN212477709U (en) | High-bearing large-diameter assembly type composite engineering pile | |
US10704252B2 (en) | Method for lifting and supporting a new slab foundation with hydraulic jacks | |
EP3076013B1 (en) | Method and connecting structure for connecting a foundation structure with a support structure of a wind turbine and wind turbine | |
JP6862022B1 (en) | Fence foundation, fence, fence construction method and formwork | |
CN211898496U (en) | Pile splicing structure for precast pile and foundation bearing platform | |
CN114319462A (en) | Construction method and stress device for limiting sinking and floating of existing building foundation | |
KR101217488B1 (en) | Extension structure of pile foundation | |
CN112112180A (en) | Connecting system of assembled combined pier and bearing platform and construction method thereof | |
KR100942524B1 (en) | Structure for connecting foundation piles having different diameter | |
CN210562273U (en) | Foundation for bearing assembly type elevator | |
CN218027709U (en) | Foundation pit supporting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20190807 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20200921 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E02D 5/30 20060101ALI20210223BHEP Ipc: E04H 12/22 20060101ALI20210223BHEP Ipc: E02D 27/42 20060101AFI20210223BHEP Ipc: E02D 31/06 20060101ALI20210223BHEP |
|
INTG | Intention to grant announced |
Effective date: 20210330 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602017046668 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1434293 Country of ref document: AT Kind code of ref document: T Effective date: 20211015 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20211108 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211229 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211229 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20210929 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1434293 Country of ref document: AT Kind code of ref document: T Effective date: 20210929 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211230 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220129 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220131 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602017046668 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20220630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220824 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220831 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220831 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20220831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220824 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220831 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20230817 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20230821 Year of fee payment: 7 Ref country code: DK Payment date: 20230818 Year of fee payment: 7 Ref country code: DE Payment date: 20230821 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20170824 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210929 |