RU2638052C2 - Determination of rail vehicles location - Google Patents

Determination of rail vehicles location Download PDF

Info

Publication number
RU2638052C2
RU2638052C2 RU2014147689A RU2014147689A RU2638052C2 RU 2638052 C2 RU2638052 C2 RU 2638052C2 RU 2014147689 A RU2014147689 A RU 2014147689A RU 2014147689 A RU2014147689 A RU 2014147689A RU 2638052 C2 RU2638052 C2 RU 2638052C2
Authority
RU
Russia
Prior art keywords
time
rail vehicle
rail
location
busy signal
Prior art date
Application number
RU2014147689A
Other languages
Russian (ru)
Other versions
RU2014147689A (en
Inventor
Йенс БРАБАНД
Original Assignee
Сименс Акциенгезелльшафт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Сименс Акциенгезелльшафт filed Critical Сименс Акциенгезелльшафт
Publication of RU2014147689A publication Critical patent/RU2014147689A/en
Application granted granted Critical
Publication of RU2638052C2 publication Critical patent/RU2638052C2/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L1/00Devices along the route controlled by interaction with the vehicle or vehicle train, e.g. pedals
    • B61L1/18Railway track circuits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L25/00Recording or indicating positions or identities of vehicles or vehicle trains or setting of track apparatus
    • B61L25/02Indicating or recording positions or identities of vehicles or vehicle trains
    • B61L25/025Absolute localisation, e.g. providing geodetic coordinates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L1/00Devices along the route controlled by interaction with the vehicle or vehicle train, e.g. pedals
    • B61L1/16Devices for counting axles; Devices for counting vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • B61L2027/202Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation using European Train Control System [ETCS]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L2205/00Communication or navigation systems for railway traffic
    • B61L2205/04Satellite based navigation systems, e.g. GPS
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L25/00Recording or indicating positions or identities of vehicles or vehicle trains or setting of track apparatus
    • B61L25/02Indicating or recording positions or identities of vehicles or vehicle trains
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation

Abstract

FIELD: transportation.
SUBSTANCE: in the method, a busy signal is generated by the track idling control device, which indicates that the rail vehicle occupies a rail section controlled by the track idling monitor, as soon as the rail vehicle occupies the rail portion. The busy signal is supplied by the time stamping device with the time stamping means to form a time-referenced busy signal which indicates the time of rail portion occupation, the time-referenced busy signal is transmitted to the guiding device controlling the idle track monitor, the time-referenced busy signal is transmitted by the guiding device further into the rail vehicle, and in the rail vehicle, based on the time-referenced signal, the actual location of the rail vehicle is determined and a location indication is created.
EFFECT: simplified location of the rail vehicle.
10 cl, 5 dwg

Description

Изобретение относится к способу создания указания местоположения, которое указывает местоположение рельсового транспортного средства на железнодорожном рельсовом пути.The invention relates to a method for creating a location indication that indicates the location of a rail vehicle on a rail track.

Как известно, железнодорожные рельсовые пути могут снабжаться так называемыми маяками, например, так называемыми евро-маяками или маяками ETCS, которые служат в качестве неподвижных меток положения и создают радиосигналы, которые принимаются рельсовыми транспортными средствами и могут обрабатываться для определения местоположения. Однако использование таких маяков не всегда желательно по причинам стоимости.As you know, rail tracks can be equipped with so-called beacons, for example, the so-called Euro-beacons or ETCS beacons, which serve as fixed position markers and create radio signals that are received by rail vehicles and can be processed to determine the location. However, the use of such beacons is not always desirable for cost reasons.

Кроме того, известно снабжение железнодорожных рельсовых путей устройствами контроля незанятости пути, которые могут быть основаны на так называемых рельсовых электрических цепях или счетчиках осей, с целью определения состояния занятости участков рельсовых путей.In addition, it is known to supply rail tracks with devices for monitoring the unemployment of tracks, which can be based on so-called rail electrical circuits or axle counters, in order to determine the state of employment of sections of rail tracks.

В основу изобретения положена задача обеспечения возможности определения местоположения рельсовых транспортных средств на железнодорожном рельсовом пути простым и дешевым образом.The basis of the invention is the task of providing the ability to determine the location of rail vehicles on the rail track in a simple and cheap way.

Эта задача решена, согласно изобретению, с помощью способа с признаками п. 1 формулы изобретения. Предпочтительные варианты выполнения способа, согласно изобретению, указаны в зависимых пунктах формулы изобретения.This problem is solved, according to the invention, using a method with the characteristics of paragraph 1 of the claims. Preferred embodiments of the method according to the invention are indicated in the dependent claims.

В соответствии с этим, согласно изобретению предусмотрено, что с помощью устройства контроля незанятости пути создается сигнал занятости, который указывает занятость рельсового участка рельсовым транспортным средством, как только рельсовое транспортное средство занимает контролируемый устройством контроля незанятости пути рельсовый участок, сигнал занятости снабжается меткой времени с образованием привязанного ко времени сигнала занятости, который указывает момент времени занятия рельсового участка, привязанный ко времени сигнал занятости передается в контролирующее устройство контроля незанятости пути направляющее устройство, привязанный ко времени сигнал занятости передается направляющим устройством в рельсовое транспортное средство, и в рельсовом транспортном средстве на основании привязанного ко времени сигнала занятости определяется фактическое местоположение рельсового транспортного средства и создается указание местоположения.In accordance with this, according to the invention, it is provided that an employment signal is generated by the device for monitoring the idleness of the track, which indicates the occupancy of the rail section by the rail vehicle, as soon as the rail vehicle occupies the rail section controlled by the device for monitoring the unemployment of the rail, the busy signal is time stamped with the formation time-bound busy signal, which indicates the time of occupation of the rail section, time-bound signal Allocation is transmitted to the control device controls the idle path guiding device, attached to the time the busy signal is transmitted guiding device in the rail vehicle and a rail vehicle on the basis of the busy signal tied to the time determined by the actual location of the rail vehicle and is created to specify the location.

Существенное преимущество способа, согласно изобретению, состоит в том, что можно отказаться от использования маяков для передачи сигналов местоположения. А именно, согласно изобретению предусмотрено использование для определения местоположения уже и без того имеющихся устройств контроля незанятости пути, собственная задача которых состоит в контролировании состояния занятости железнодорожного рельсового участка. Таким образом, устройство контроля незанятости пути используется в соответствии с изобретением двояко, а именно, для определения состояния занятости рельсового участка, а также дополнительно для создания сигнала для рельсового транспортного средства, с помощью которого рельсовое транспортное средство может само определять свое фактическое местоположение. Таким образом, устройство контроля незанятости пути применяется как своего рода виртуальный маяк, которое через направляющее устройство передает сигнал в рельсовое транспортное средство, за счет чего обеспечивается возможность определения на стороне рельсового транспортного средства местоположения.A significant advantage of the method according to the invention is that it is possible to abandon the use of beacons for transmitting location signals. Namely, according to the invention, it is envisaged to use, for determining the location of already existing devices for monitoring the unemployment of a track, whose own task is to monitor the state of employment of a railway rail section. Thus, the device for controlling the unemployment of the track is used in accordance with the invention in two ways, namely, to determine the occupancy state of the rail section, and also to create a signal for the rail vehicle with which the rail vehicle can itself determine its actual location. Thus, the device for controlling the unemployment of the track is used as a kind of virtual beacon, which transmits a signal to the rail vehicle through the guide device, which makes it possible to determine the location on the side of the rail vehicle.

Особенно просто и тем самым предпочтительно можно определять на стороне рельсового транспортного средства фактическое местоположение и создавать указание местоположения, когда вычислительное устройство рельсового транспортного средства на основании находящейся в памяти карты участка и на основании привязанного ко времени сигнала занятости определяет местоположение рельсового транспортного средства в момент времени, указанном в привязанном ко времени сигнале занятости.It is particularly simple and thereby preferable to determine the actual location on the side of the rail vehicle and to create an indication of the location when the computing device of the rail vehicle, based on the site map stored in the memory and based on the time-related busy signal, determines the location of the rail vehicle at a time indicated in a time-bound busy signal.

Поскольку передача привязанного ко времени сигнала занятости от устройства контроля незанятости пути через направляющее устройство в рельсовое транспортное средство иногда может иметь значительную задержку во времени, то Since the transmission of a time-tied busy signal from an idle-track device through a guide device to a rail vehicle can sometimes have a significant time delay, then

предпочтительно, когда вычислительное устройство на основании скорости рельсового транспортного средства в интервале времени между указанным в привязанном ко времени сигнале занятости моментом времени и моментом времени определения фактического местоположения определяет длину пути, который проходит рельсовое транспортное средство в этом интервале времени, и вычисляет фактическое местоположение рельсового транспортного средства посредством прибавления длины пути к местоположению в момент времени, указанный в привязанном ко времени сигнале занятости. Таким образом, при этом выполнении способа осуществляется коррекция, которая учитывает длину пути, который проходит рельсовое транспортное средство во время между въездом на рельсовый участок и вычислением фактического местоположения.preferably, when the computing device based on the speed of the rail vehicle in the time interval between the time point specified in the time signal of the busy signal and the time point of determining the actual location determines the length of the path that the rail vehicle travels in this time interval, and calculates the actual location of the rail vehicle means by adding the length of the path to the location at a point in time specified in time-bound no busy signals. Thus, in this embodiment of the method, a correction is made that takes into account the length of the path that the rail vehicle passes between entering the rail section and calculating the actual location.

Для образования метки времени предпочтительно, когда устройство контроля незанятости пути использует передаваемую глобальной спутниковой системой навигации информацию времени для определения момента времени занятия рельсового участка и с помощью информации времени образует метку времени.To create a time stamp, it is preferable when the device for monitoring the unemployment of the track uses the time information transmitted by the global satellite navigation system to determine the time of occupation of the rail section and uses the time information to form a time stamp.

Для обеспечения возможности контролирования созданного с помощью привязанного ко времени сигнала занятости указания местоположения предпочтительно, когда рельсовое транспортное средство содержит основанное на глобальной спутниковой системе навигации устройство определения местоположения, второе указание местоположения создается с помощью спутникового устройства определения местоположения, и второе указание местоположения сравнивается с определяемым на основании привязанного ко времени сигнала занятости фактическим местоположением рельсового транспортного средства. Таким образом, при таком выполнении способа создаются два указания местоположения, которые сравниваются друг с другом, с целью предотвращения ошибочного определения местоположения.In order to be able to control the location indication generated by the time-locked busy signal, it is preferable that the rail vehicle contains a global positioning system based on a satellite navigation system, a second positioning is created using a satellite-based positioning device, and the second positioning is compared with that determined on based on time-based busy signal by actual location zheniem rail vehicle. Thus, with this method, two location indications are created that are compared with each other in order to prevent erroneous positioning.

Особенно предпочтительно, когда в устройстве определения местоположения рельсового транспортного средства используется та же глобальная спутниковая навигационная система, что и в устройстве контроля незанятости пути для создания метки времени.It is especially preferred that the same global satellite navigation system is used in the rail vehicle positioning device as in the idle track device for creating a time stamp.

Предпочтительно, создается сигнал ошибки, когда отклонение между фактическим местоположением рельсового транспортного средства , определяемым на основе привязанного ко времени сигнала занятости, и вторым указанием местоположения достигает или превышает заданное пороговое значение.Preferably, an error signal is generated when the deviation between the actual location of the rail vehicle, determined based on the time-related busy signal, and the second location indication reaches or exceeds a predetermined threshold value.

Кроме того, предпочтительно, когда направляющее устройство передает привязанный ко времени сигнал занятости вместе с сигналом опознавания состава, который обозначает въехавший на рельсовый участок состав. Передача сигнала опознавания состава обеспечивает возможность для рельсовых транспортных средств, которые принимают привязанный ко времени сигнал занятости, проверки, действительно ли этот сигнал подлежит или нет оценке. Если рельсовое транспортное средство в рамках оценки сигнала опознавания состава устанавливает, что сигнал занятости не предназначен для этого рельсового транспортного средства, то может быть исключена дальнейшая обработка сигнала занятости.In addition, it is preferable that the guiding device transmits a time-bound busy signal along with a train identification signal, which indicates a train which has entered the rail section. The transmission of the composition recognition signal provides an opportunity for rail vehicles that receive a time-bound busy signal to check whether this signal is really subject to evaluation or not. If the rail vehicle, as part of the evaluation of the composition recognition signal, determines that the busy signal is not intended for that rail vehicle, further processing of the busy signal may be excluded.

Кроме того, изобретение относится к устройству контроля незанятости пути, которое способно создавать сигнал занятости, который указывает занятость контролируемого устройством контроля незанятости пути рельсового участка рельсовым транспортным средством, как только рельсовое транспортное средство занимает рельсовый участок.In addition, the invention relates to a device for monitoring the unemployment of a track that is capable of generating a busy signal that indicates the occupancy of a device monitoring the unemployment of a track of a rail section by a rail vehicle as soon as the rail vehicle occupies the rail section.

Для этого согласно изобретению предусмотрено, что устройство контроля незанятости пути содержит устройство для определения времени, которое способно снабжать сигнал занятости меткой времени с образованием привязанного ко времени сигнала занятости, который указывает момент времени занятия рельсового участка.To this end, according to the invention, it is provided that the track idleness monitoring device comprises a time determination device that is capable of providing a busy signal with a time stamp to produce a time-related busy signal that indicates a time point of occupation of the rail section.

Относительно преимуществ устройства контроля незанятости пути, согласно изобретению, делается ссылка на приведенные выше выкладки во взаимосвязи со способом, согласно изобретению, поскольку преимущества устройства контроля незанятости пути, согласно изобретению, по существу соответствуют преимуществам способа, согласно изобретению.Regarding the advantages of the device for monitoring the unemployment of the path according to the invention, reference is made to the above calculations in conjunction with the method according to the invention, since the advantages of the device for monitoring the unemployment of the path according to the invention essentially correspond to the advantages of the method according to the invention.

Кроме того, изобретение относится к железнодорожному рельсовому пути, содержащему направляющее устройство и соединенное с направляющим устройством устройство контроля незанятости пути.In addition, the invention relates to a rail track comprising a guiding device and a track idle control device connected to a guiding device.

В этой связи согласно изобретению предусмотрено, что направляющее устройство выполнено так, что оно направляет далее привязанный ко времени сигнал занятости после приема из устройства контроля незанятости пути в рельсовое транспортное средство. Относительно преимуществ железнодорожного рельсового пути, согласно изобретению, делается ссылка на приведенные выше выкладки во взаимосвязи со способом, согласно изобретению, поскольку преимущества железнодорожного рельсового пути, согласно изобретению, по существу соответствуют преимуществам способа, согласно изобретению.In this regard, according to the invention, it is provided that the guiding device is configured so that it further sends a time-dependent busy signal after receiving from the control device an idle path to the rail vehicle. Regarding the advantages of the railway track according to the invention, reference is made to the above calculations in conjunction with the method according to the invention, since the advantages of the railway track according to the invention substantially correspond to the advantages of the method according to the invention.

Кроме того, изобретение относится к рельсовому транспортному средству, содержащему устройство для определения местоположения. Относительно рельсового транспортного средства согласно изобретению предусмотрено, что устройство для определения местоположения имеет приемное устройство для приема снабженного меткой времени сигнала занятости и вычислительное устройство, которое программировано так, что оно на основании находящейся в памяти карты участка и на основании привязанного ко времени сигнала занятости определяет местоположение рельсового транспортного средства в момент времени, указанный в привязанном ко времени сигнале занятости. Относительно преимуществ рельсового транспортного средства, согласно изобретению, делается ссылка на приведенные выше выкладки во взаимосвязи со способом, согласно изобретению, поскольку преимущества рельсового транспортного средства, согласно изобретению, по существу соответствуют преимуществам способа, согласно изобретению.In addition, the invention relates to a rail vehicle comprising a location device. With respect to the rail vehicle according to the invention, it is provided that the location device has a receiver for receiving a time-stamped busy signal and a computing device that is programmed to determine a location based on a stored area map and based on a busy time signal rail vehicle at a time indicated in the time-bound busy signal. Regarding the advantages of a rail vehicle according to the invention, reference is made to the above calculations in conjunction with the method according to the invention, since the advantages of a rail vehicle according to the invention substantially correspond to the advantages of the method according to the invention.

Ниже приводится более подробное пояснение изобретения на основе примеров выполнения со ссылками на прилагаемые чертежи, на которых в качестве примера изображено:The following is a more detailed explanation of the invention based on exemplary embodiments with reference to the accompanying drawings, which show, by way of example:

фиг. 1 - пример выполнения железнодорожного рельсового пути, согласно изобретению, который снабжен направляющим устройством и устройством контроля незанятости пути;FIG. 1 is an exemplary embodiment of a rail track according to the invention, which is provided with a guiding device and a device for monitoring the unemployment of the track;

фиг. 2 - первый пример выполнения направляющего устройства, предназначенного для использования в железнодорожном рельсовом пути, согласно фиг. 1;FIG. 2 is a first exemplary embodiment of a guide device for use in a rail track, as shown in FIG. one;

фиг. 3 - второй пример выполнения направляющего устройства, предназначенного для использования в железнодорожном рельсовом пути, согласно фиг. 1;FIG. 3 is a second exemplary embodiment of a guiding device for use in a rail track, as shown in FIG. one;

фиг. 4 - первый пример выполнения рельсового транспортного средства, которое может оценивать привязанные ко времени сигналы занятости устройства контроля незанятости пути железнодорожного рельсового пути, согласно фиг. 1, иFIG. 4 is a first embodiment of a rail vehicle that can evaluate time-related busy signals of an idle track control device of a rail rail track, according to FIG. 1 and

фиг. 5 - второй пример выполнения рельсового транспортного средства, которое может оценивать привязанные ко времени сигналы занятости устройства контроля незанятости пути.FIG. 5 is a second embodiment of a rail vehicle that can evaluate time-related busy signals of an idle track control device.

На фигурах для ясности идентичные или подобные компоненты всегда обозначены одинаковыми позициями.In the figures, for clarity, identical or similar components are always indicated with the same reference numerals.

На фиг. 1 показан железнодорожный рельсовый путь 10, в котором рельсовый участок 15 контролируется с помощью устройства 20 контроля незанятости пути. Устройство 20 контроля незанятости пути содержит в показанном на фиг. 1 примере выполнения два или больше датчиков 21 и 22, которые создают сигналы S1 и S2 датчиков, на основе которых устройство 20 контроля незанятости пути может определять состояние занятости рельсового участка 15. Датчики могут быть образованы с помощью счетчиков осей или с помощью точек пересечения рельсовых электрических цепей. В частности, в случае, когда датчики устройства 20 контроля незанятости пути образованы с помощью точек пересечения одной или нескольких рельсовых электрических цепей, предпочтительно, что рельсовая электрическая цепь или рельсовые электрические цепи проходят по всему рельсовому участку 15 и имеется несколько точек пересечения. Устройство 20 контроля незанятости пути соединено с направляющим устройством 30, которое снабжено радиоустройством.In FIG. 1, a rail track 10 is shown in which the rail portion 15 is monitored by the track idle control device 20. The idle path control device 20 comprises, as shown in FIG. 1 of the exemplary embodiment, two or more sensors 21 and 22, which generate sensor signals S1 and S2, on the basis of which the idle track control device 20 can determine the occupancy state of the rail section 15. The sensors can be formed using axle counters or using rail electric intersection points chains. In particular, in the case where the sensors of the track idle control device 20 are formed by the intersection points of one or more rail electric circuits, it is preferable that the rail electric circuit or rail electric circuits extend throughout the rail portion 15 and there are several intersection points. The device 20 control the unemployment of the path is connected to the guide device 30, which is equipped with a radio device.

Железнодорожный рельсовый путь 10 работает, например, следующим образом:The rail track 10 operates, for example, as follows:

При въезде рельсового транспортного средства 40 на рельсовый участок 15 железнодорожного рельсового пути 10 в направлении стрелки Р, это обнаруживает датчик 21 устройства 20 контроля незанятости пути и сообщает с помощью сигнала S1 датчика. Устройство 20 контроля незанятости пути на основании сигнала S1 датчик распознает состояние занятости рельсового участка 15 и создает соответствующий сигнал занятости. Этот сигнал занятости устройство 20 контроля незанятости пути снабжает меткой времени с образованием привязанного ко времени сигнала SBZ занятости. Метка времени указывает момент времени, в который рельсовый участок 15 занимается рельсовым транспортным средством 40.When the rail vehicle 40 enters the rail section 15 of the rail track 10 in the direction of arrow P, this detects the sensor 21 of the track idle control device 20 and reports using the sensor signal S1. The device 20 monitoring the unemployment of the path based on the signal S1, the sensor recognizes the busy state of the rail section 15 and creates a corresponding busy signal. This busy signal is tracked by the idle path monitoring device 20 to form a time-related busy signal SBZ. The time stamp indicates the point in time at which the rail section 15 is engaged in the rail vehicle 40.

Привязанный ко времени сигнал SBZ занятости попадает в направляющее устройство 30, которое передает его с помощью радиоустройства в виде радиосигнала SBZF в рельсовое транспортное средство 40. Радиосигнал SBZF может содержать, наряду с привязанным ко времени сигналом SBZ занятости, также сигнал опознавания состава, который обозначает состав, который в соответствии с заданным графиком движения должен был въехать на рельсовый участок 15. Передача такого сигнала опознавания состава является предпочтительной, но не обязательной.The time-linked busy signal SBZ enters the guide device 30, which transmits it via a radio device in the form of the SBZF radio signal to the rail vehicle 40. The SBZF radio signal may contain, in addition to the time-bound busy signal SBZ, also a composition recognition signal that indicates the composition , which, in accordance with a predetermined timetable, was supposed to enter the rail section 15. The transmission of such a signal to identify the composition is preferable, but not required.

Рельсовое транспортное средство 40 после приема радиосигнала SBZF и содержащегося в нем привязанного ко времени сигнала SBZ занятости, на основании находящейся в памяти карты участка и на основании привязанного ко времени сигнала SBZ занятости определяет свое местоположение. Такое определение местоположения вполне возможно, когда находящаяся в памяти карта участка имеет рельсовый участок 15 железнодорожного рельсового пути 10.The rail vehicle 40, after receiving the SBZF radio signal and the time-related busy signal SBZ contained therein, determines its location based on the stored area map and the time-related busy signal SBZ. Such a location determination is quite possible when the stored site map has a rail section 15 of the rail track 10.

Кроме того, при вычислении фактического местоположения и при создании указания местоположения в рельсовом транспортном средстве 40 может учитываться его собственная скорость, и на основании скорости в интервале времени между указанным в привязанном ко времени сигнале SBZ занятости моментом времени и соответствующим моментом времени определения фактического местоположения определяться длина пути, пройденного рельсовым транспортным средством 40 в этот интервал времени. Фактическое местоположение рельсового транспортного средства 40 можно затем вычислять посредством прибавления длины пути к местоположению, которое указано в привязанном ко времени сигнале SBZ занятости.In addition, when calculating the actual location and creating the location indication in the rail vehicle 40, its own speed can be taken into account, and the length is determined based on the speed in the time interval between the time point indicated in the busy signal SBZ and the corresponding time point for determining the actual location the path traveled by the rail vehicle 40 at this time interval. The actual location of the rail vehicle 40 can then be calculated by adding the path length to the location indicated in the time-bound busy signal SBZ.

Таким образом, образованный устройством 20 контроля незанятости пути привязанный ко времени сигнал SBZ занятости, который направляется направляющим устройством 30 в рельсовое транспортное средство 40, обеспечивает возможность определения в рельсовом транспортном средстве 40 его фактического местоположения и создания соответствующего указания местоположения.Thus, the time-related busy signal SBZ formed by the idle track control device 20, which is sent by the guide device 30 to the rail vehicle 40, makes it possible to determine its actual location in the rail vehicle 40 and create an appropriate location indication.

На фиг. 2 показан пример выполнения устройства 20 контроля незанятости пути, которое можно использовать на железнодорожном рельсовом пути 10, согласно фиг. 1. Устройство 20 контроля незанятости пути, согласно фиг. 2, имеет устройство 100 распознавания занятости, которое соединено с датчиками 21 и 22, согласно фиг. 1, и оценивает их сигналы S1 и S2. Устройство 100 распознавания занятости может быть обычным устройством, с помощью которого можно обнаруживать состояние занятости рельсового участка. Устройство 100 распознавания занятости может оценивать, например, сигналы счетчиков осей, рельсовых электрических цепей или т.п. При обнаружении состояния занятости рельсового участка 15 в устройстве 100 распознавания занятости может также выполняться обычный способ распознавания занятости.In FIG. 2 shows an exemplary embodiment of a track idle control device 20 that can be used on a rail track 10 according to FIG. 1. The idle track control device 20 of FIG. 2, has an occupancy recognition device 100 that is connected to sensors 21 and 22, according to FIG. 1, and estimates their signals S1 and S2. The occupancy recognition device 100 may be a conventional device with which it is possible to detect a busy state of a rail section. The occupancy recognition device 100 may evaluate, for example, the signals of axis counters, rail circuits, or the like. Upon detecting the occupancy state of the rail portion 15 in the occupancy recognition apparatus 100, a conventional occupancy recognition method may also be performed.

Устройство 100 распознавания занятости создает на выходе сигнал SB занятости, который передается в управляющее устройство 110 устройства 20 контроля незанятости пути. Управляющее устройство 110 соединено с устройством 120 определения времени, которое передает информацию времени SZ в управляющее устройство 110. На основании информации времени SZ устройства 120 определения времени, управляющее устройство 110 способно снабжать сигнал SB занятости меткой времени, которая указывает момент времени занятия рельсового участка 15, как только рельсовое транспортное средство 40 въезжает на рельсовый участок 15 и занимает его. Снабженный меткой времени, соответственно, информацией времени SZ сигнал SB занятости выдается в качестве привязанного ко времени сигнала SBZ занятости на выходе А20 устройства 20 контроля незанятости пути (см. фиг. 1).The busy recognition device 100 generates a busy signal SB at the output, which is transmitted to the control device 110 of the pathless control device 20. The control device 110 is connected to the time determination device 120, which transmits the SZ time information to the control device 110. Based on the SZ time information of the time determination device 120, the control device 110 is able to provide a busy signal SB with a time stamp that indicates the time of occupation of the rail portion 15, as soon as the rail vehicle 40 enters and occupies the rail section 15. Equipped with a time stamp, respectively, with time information SZ, the busy signal SB is output as a time-related busy signal SBZ at the output A20 of the track idle control device 20 (see FIG. 1).

В показанном на фиг. 2 примере выполнения устройство 120 определения времени является спутниковым устройством определения времени, которое оценивает навигационные сигналы показанной лишь схематично на фиг. 2 глобальной навигационной спутниковой системы 200 и образует соответствующее время, соответственно, информацию времени SZ с использованием оси времени глобальной навигационной спутниковой системы 200. Навигационные сигналы обозначены на фиг. 2 в качестве примера позицией GPS.As shown in FIG. 2, the time determination device 120 is a satellite time determination device that evaluates the navigation signals shown only schematically in FIG. 2 of the global navigation satellite system 200 and generates the corresponding time, respectively, time information SZ using the time axis of the global navigation satellite system 200. The navigation signals are indicated in FIG. 2 as an example with the GPS position.

С помощью этой выведенной из навигационных сигналов GPS информации времени SZ затем с помощью управляющего устройства 110 создается привязанный ко времени сигнал SBZ занятости, как было уже пояснено выше.Using this SZ time information derived from the GPS navigation signals, then, using the control device 110, a time-related busy signal SBZ is created, as already explained above.

На фиг. 3 показан второй пример выполнения устройства 20 контроля незанятости пути, которое можно использовать на железнодорожном рельсовом пути 10, согласно фиг. 1. В отличие от показанного на фиг. 2 примера выполнения, устройство определения времени не является спутниковым устройством определения времени, а синхронизированными радиочасами 130, которые синхронизируются с помощью излучаемого по радио сигнала времени ZS. Сигнал времени ZS может быть, например, сигналом времени, который передается расположенным во Франкфурте на Майне длинноволновым передатчиком DZF77. Длинноволновый передатчик обозначен на фиг. 3 позицией 300.In FIG. 3 shows a second exemplary embodiment of a track idle control device 20 that can be used on a rail track 10, as shown in FIG. 1. In contrast to that shown in FIG. 2 of the exemplary embodiment, the time determination device is not a satellite time determination device, but synchronized clock radios 130, which are synchronized by the time signal ZS emitted by the radio. The time signal ZS can be, for example, a time signal that is transmitted by the DZF77 long-wave transmitter located in Frankfurt am Main. The long wave transmitter is indicated in FIG. 3 by 300.

Создаваемая синхронизированными радиочасами 130 информация времени SZ оценивается управляющим устройством 110 для снабжения сигнала SB занятости устройства 100 распознавания занятости меткой времени и создания привязанного ко времени сигнала SBZ занятости на выходе А20 устройства 20 контроля незанятости пути.The time information SZ generated by the synchronized clock radio 130 is evaluated by the control device 110 to provide the busy signal SB of the busy recognition device 100 with a time stamp and create a time-related busy signal SBZ at the output A20 of the track idle control device 20.

На фиг. 4 показан пример выполнения рельсового транспортного средства 40, которое способно оценивать привязанный ко времени сигнал SBZ занятости устройства контроля незанятости пути и определять на его основе свое собственное фактическое местоположение.In FIG. 4 shows an exemplary embodiment of the rail vehicle 40, which is capable of evaluating the time-related busy signal SBZ of the idle track device and determining its own actual location based on it.

Рельсовое транспортное средство 40 содержит вычислительное устройство 410, которое соединено с приемным устройством 420, а также с памятью 430. В память 430 занесена карта SP участка, которая содержит данные D о железнодорожном рельсовом пути 10, согласно фиг. 1, а также о контролируемом устройством 20 контроля незанятости пути рельсовом участке 15, согласно фиг. 1.The rail vehicle 40 comprises a computing device 410 that is connected to the receiver 420, as well as to the memory 430. A section map SP is stored in the memory 430, which contains data D about the rail track 10 according to FIG. 1, as well as about the controlled device 20 for monitoring the unemployment of the track of the rail section 15, according to FIG. one.

Приемное устройство 420 способно принимать передаваемый по радио направляющим устройством 30, согласно фиг. 1, радиосигнал SBZF и извлекать из него содержащийся в нем привязанный ко времени сигнал SBZ занятости. Извлеченный привязанный ко времени сигнал SBZ занятости передается в вычислительное устройство 410.Receiver 420 is capable of receiving a radio transmitted guide device 30 according to FIG. 1, the radio signal SBZF and to extract from it the time-related busy signal SBZ contained therein. The extracted time-bound busy signal SBZ is transmitted to computing device 410.

Вычислительное устройство 410 программировано с помощью модуля SM1 программного обеспечения так, что оно на основании привязанного ко времени сигнала SBZ занятости и данных D карты SP участка определяет фактическое местоположение рельсового транспортного средства 40. При этом вычислительное устройство 410 может учитывать интервал времени между указанным в метке времени временем и фактическим временем, посредством определения на основании скорости рельсового транспортного средства 40 длины пути, пройденного рельсовым транспортным средством 40 в этот интервал времени. Затем вычислительное устройство 410 может вычислять фактическое местоположение рельсового транспортного средства 40 посредством добавления этой длины пути к местоположению, которое получается из привязанного ко времени сигнала SBZ занятости и карты SP участка.The computing device 410 is programmed by the software module SM1 so that it determines the actual location of the rail vehicle 40 based on the time-based busy signal SBZ and the data D of the area map SP. The computing device 410 can take into account the time interval between the timestamps time and actual time, by determining, based on the speed of the rail vehicle 40, the length of the path traveled by the rail vehicle 40 at this time interval. The computing device 410 can then calculate the actual location of the rail vehicle 40 by adding this path length to the location that is obtained from the time-related busy signal SBZ and the site map SP.

После определения фактического местоположения рельсового транспортного средства 40, вычислительное устройство 410 создает на стороне выхода указание ОА местоположения, которое указывает фактическое местоположение рельсового транспортного средства 40.After determining the actual location of the rail vehicle 40, the computing device 410 generates an OA of the location on the output side that indicates the actual location of the rail vehicle 40.

На фиг. 5 показан другой пример выполнения рельсового транспортного средства 40, которое может работать на железнодорожном рельсовом пути 10, согласно фиг. 1, и которое способно оценивать радиосигнал SBZF направляющего устройства 30, согласно фиг. 1, с целью определения фактического местоположения.In FIG. 5 shows another exemplary embodiment of a rail vehicle 40 that can operate on a rail track 10, according to FIG. 1, and which is capable of evaluating the radio signal SBZF of the guide device 30 according to FIG. 1, in order to determine the actual location.

Рельсовое транспортное средство 40, согласно фиг. 5, содержит дополнительно к вычислительному устройству 420, приемному устройству 420 и памяти 430, которые уже пояснены применительно к фиг. 4, спутниковое устройство 440 определения местоположения, которое может принимать навигационные сигналы GPS глобальной навигационной спутниковой системы 200. Спутниковое устройство 440 определения местоположения создает с помощью навигационных сигналов GPS второе указание ОА2 местоположения, которое подается в вычислительное устройство 410.Rail vehicle 40 according to FIG. 5 comprises, in addition to the computing device 420, the receiving device 420 and the memory 430, which are already explained with reference to FIG. 4, a satellite positioning device 440 that can receive GPS navigation signals of the global navigation satellite system 200. The satellite positioning device 440 generates a second location indication OA2 using the GPS navigation signals, which is supplied to the computing device 410.

Вычислительное устройство 410 в примере выполнения, согласно фиг. 5, программировано с помощью двух модулей SM1 и SM2 программного обеспечения. Первый модуль SM1 программного обеспечения служит для оценки привязанного ко времени сигнала SBZ занятости приемного устройства 420, а также данных D карты SP участка и для образования первого указания ОА1 местоположения.The computing device 410 in the exemplary embodiment of FIG. 5, programmed using two software modules SM1 and SM2. The first software module SM1 serves to evaluate the time-bound busy signal SBZ of the receiver 420, as well as the data D of the site map SP, and to form the first location indication OA1.

Второй модуль SM2 программного обеспечения служит для сравнения первого указания ОА1 местоположения первого модуля SM1 программного обеспечения со вторым указание ОА2 местоположения спутникового устройства 440 определения местоположения. Если оба указания ОА1 и ОА2 местоположения по существу совпадают, то вычислительное устройство 410 с помощью обоих указаний ОА1 и ОА2 местоположения создает, например, посредством усреднения, усредненное указание ОА местоположения, которое выдается на выходе А410 вычислительного устройства 410.The second software module SM2 serves to compare the first location indication OA1 of the first software module SM1 with the second location indication OA2 of the satellite positioning device 440. If the two location indications OA1 and OA2 essentially coincide, then the computing device 410, using both the location indications OA1 and OA2, creates, for example, by averaging, the averaged location indication OA, which is output at the output A410 of the computing device 410.

Однако, если оба указания ОА1 и ОА2 местоположения слишком сильно отклоняются друг от друга, то вычислительное устройство 410 создает на своем выходе А410 сигнал F ошибки, с помощью которого вычислительное устройство 410 показывает, что не вызывающее сомнений определение местоположения невозможно, поскольку выданное спутниковым устройством 410 определения местоположения второе указание ОА2 местоположения слишком сильно отклоняется от образованного с помощью привязанного ко времени сигнала SBZ занятости первого указания ОА1 местоположения.However, if both location directions OA1 and OA2 deviate too much from each other, then the computing device 410 generates an error signal F 410 at its output A4, by which the computing device 410 shows that it is not in doubt possible to determine the location since the satellite device 410 for determining the location, the second location indication OA2 deviates too far from the first location indication OA1 generated by the busy signal SBZ.

Хотя изобретение подробно иллюстрировано и пояснено с помощью предпочтительных вариантов выполнения, изобретение не ограничивается раскрытыми примерами, и специалистами в данной области техники могут быть выведены другие варианты выполнения, без выхода за объем защиты изобретения.Although the invention has been illustrated and explained in detail using preferred embodiments, the invention is not limited to the disclosed examples, and other embodiments may be deduced by those skilled in the art without departing from the scope of protection of the invention.

ПЕРЕЧЕНЬ ПОЗИЦИЙLIST OF POSITIONS

10 Железнодорожный рельсовый путь10 Railway track

15 Рельсовый участок15 Rail section

20 Устройство контроля незанятости пути20 Idle control device

21 Датчик21 Sensor

22 Датчик22 Sensor

30 Направляющее устройство30 Guide device

40 Рельсовое транспортное средство40 Rail vehicle

100 Устройство распознавания занятости100 Employment recognition device

110 Управляющее устройство110 control device

120 Устройство определения времени120 Time determination device

130 Радиочасы130 Clock Radio

200 Навигационная спутниковая система200 Navigation Satellite System

300 Длинноволновый передатчик300 Longwave Transmitter

410 Вычислительное устройство410 Computing device

420 Приемное устройство420 Receiver

430 Память430 Memory

440 Устройство определения местоположения440 Location device

А20 ВыходA20 Output

А410 ВыходA410 Output

D ДанныеD Data

F Сигнал ошибкиF Error signal

GPS Навигационный сигналGPS navigation signal

OA Указание местоположенияOA Location Indication

OA1 Указание местоположенияOA1 Location Indication

OA2 Указание местоположенияOA2 Location Indication

P Направление стрелкиP direction of arrow

SB Сигнал занятостиSB busy signal

SBZ Сигнал занятостиSBZ busy signal

SBZF РадиосигналSBZF Radio Signal

SM1 Модуль программного обеспеченияSM1 Software Module

SP Карта участкаSP Site Map

SZ Информация времениSZ Time Information

S1, S Сигнал датчикаS1, S Sensor signal

ZS Сигнал времени.ZS time signal.

Claims (23)

1. Способ создания указания (ОА) местоположения, которое указывает местоположение рельсового транспортного средства (40) на железнодорожном рельсовом пути (10), 1. A method of creating an indication (OA) of a location that indicates the location of a rail vehicle (40) on a rail track (10), в котором с помощью устройства (20) контроля незанятости пути генерируют сигнал (SB) занятости, который указывает занятие рельсовым транспортным средством (40) рельсового участка (15), контролируемого устройством (20) контроля незанятости пути, как только рельсовое транспортное средство (40) занимает рельсовый участок (15), in which, with the help of the device (20) monitoring the unemployment of the track, a busy signal (SB) is generated which indicates the occupation by the rail vehicle (40) of the rail section (15) controlled by the device (20) monitoring the unemployment of the track as soon as the rail vehicle (40) occupies a rail section (15), отличающийся тем, чтоcharacterized in that - сигнал (SB) занятости снабжают посредством устройства (120) определения времени устройства (20) контроля незанятости пути меткой времени с образованием привязанного ко времени сигнала (SBZ) занятости, который указывает момент времени занятия рельсового участка (15),- the busy signal (SB) is supplied by the time determination device (120) of the device for idle time control (20) with a time stamp to form a time-related busy signal (SBZ), which indicates the time of occupation of the rail section (15), - привязанный ко времени сигнал (SBZ) занятости передают в направляющее устройство (30), контролирующее устройство (20) контроля незанятости пути,- a time-bound busy signal (SBZ) is transmitted to a guiding device (30), a monitoring device (20) for monitoring idle paths, - привязанный ко времени сигнал (SBZ) занятости передают направляющим устройством (30) далее в рельсовое транспортное средство (40), и- the time-related busy signal (SBZ) is transmitted by the guiding device (30) further to the rail vehicle (40), and - в рельсовом транспортном средстве (40) на основании привязанного ко времени сигнала (SBZ) занятости определяют фактическое местоположение рельсового транспортного средства (40) и создают указание (OA) местоположения.- in the rail vehicle (40), based on the time-related busy signal (SBZ), the actual location of the rail vehicle (40) is determined and an indication (OA) of the location is created. 2. Способ по п. 1, отличающийся тем, что вычислительное устройство (410) рельсового транспортного средства (40) на основании сохраненного в памяти карты (SP) участка и на основании привязанного ко времени сигнала (SBZ) занятости определяет местоположение рельсового транспортного средства (40) в момент времени, указанном в привязанном ко времени сигнале (SBZ) занятости.2. The method according to p. 1, characterized in that the computing device (410) of the rail vehicle (40) based on the stored in the memory card (SP) section and based on the time-related signal (SBZ) busy determines the location of the rail vehicle ( 40) at a point in time indicated in a time-bound busy signal (SBZ). 3. Способ по п. 2, отличающийся тем, что вычислительное устройство (410) на основании скорости рельсового транспортного средства (40) в интервале времени между указанным в привязанном ко времени сигнале (SBZ) занятости моментом времени и моментом времени определения фактического местоположения определяет длину пути, который проходит рельсовое транспортное средство (40) за этот интервал времени, и вычисляет фактическое местоположение рельсового транспортного средства (40) посредством прибавления длины пути к местоположению в момент времени, указанный в привязанном ко времени сигнале (SBZ) занятости.3. The method according to p. 2, characterized in that the computing device (410) based on the speed of the rail vehicle (40) in the time interval between the time point indicated in the time-based busy signal (SBZ) and the time point of determining the actual location determines the length the path that the rail vehicle (40) travels during this time interval, and calculates the actual location of the rail vehicle (40) by adding the path length to the location at a point in time, indicating anny tethered to the time signal (SBZ) Allocation. 4. Способ по п. 1, отличающийся тем, что устройство (20) контроля незанятости пути использует передаваемую глобальной навигационной спутниковой системой (200) информацию времени для определения момента времени занятия рельсового участка (15) и с помощью информации времени образует метку времени.4. The method according to p. 1, characterized in that the device (20) monitoring the unemployment of the track uses the time information transmitted by the global navigation satellite system (200) to determine the time of occupation of the rail section (15) and using the time information forms a time stamp. 5. Способ по п. 1, отличающийся тем, что5. The method according to p. 1, characterized in that - рельсовое транспортное средство (40) содержит основанное на глобальной навигационной спутниковой системе (200) устройство определения (440) местоположения,- the rail vehicle (40) comprises a location determining device (440) based on the global navigation satellite system (200), - создают второе указание (ОА2) местоположения с помощью спутникового устройства (440) определения местоположения, и- create a second location indication (OA2) using the satellite positioning device (440), and - второе указание (ОА2) местоположения сравнивают с определяемым на основании привязанного ко времени сигнала (SBZ) занятости фактическим местоположением рельсового транспортного средства (40).- the second location indication (OA2) is compared with the actual location of the rail vehicle (40) determined based on the time-based busy signal (SBZ). 6. Способ по п. 5, отличающийся тем, что устройство (440) определения местоположения рельсового транспортного средства (40) использует ту же глобальную спутниковую навигационную систему (200), что и устройство (20) контроля незанятости пути для создания метки времени.6. A method according to claim 5, characterized in that the device (440) for determining the location of the rail vehicle (40) uses the same global satellite navigation system (200) as the device (20) for monitoring the unemployment of the track to create a time stamp. 7. Способ по любому из п. 5 или 6, отличающийся тем, что генерируют сигнал (F) ошибки, когда отклонение между фактическим местоположением рельсового транспортного средства (40), определяемым на основе привязанного ко времени сигнала (SBZ) занятости, и вторым указанием (ОА2) местоположения достигает или превышает заданное пороговое значение.7. The method according to any one of p. 5 or 6, characterized in that they generate an error signal (F) when the deviation between the actual location of the rail vehicle (40), determined based on the time-based busy signal (SBZ), and the second indication (OA2) location reaches or exceeds a predetermined threshold value. 8. Способ по п. 1, отличающийся тем, что направляющее устройство (30) передает привязанный ко времени сигнал (SBZ) занятости вместе с сигналом опознавания состава, который обозначает въехавший на рельсовый участок (15) состав.8. The method according to p. 1, characterized in that the guide device (30) transmits a time-bound busy signal (SBZ) together with a train identification signal that indicates a train that has entered the rail section (15). 9. Железнодорожный рельсовый путь (10), содержащий направляющее устройство (30) и соединенное с направляющим устройством (30) устройство (20) контроля незанятости пути, выполненное с возможностью генерировать сигнал (SB) занятости, который указывает занятие рельсовым транспортным средством (40) рельсового участка (15), контролируемого устройством (20) контроля незанятости пути, как только рельсовое транспортное средство (40) занимает рельсовый участок (15), 9. A rail track (10) comprising a guiding device (30) and an idle track control device (20) connected to a guiding device (30), configured to generate a busy signal (SB) that indicates occupancy by a rail vehicle (40) rail section (15), controlled by the device (20) control the unemployment of the track, as soon as the rail vehicle (40) occupies the rail section (15), отличающийся тем, что characterized in that устройство (20) контроля незанятости пути содержит устройство (120) определения времени, выполненное с возможностью снабжать сигнал (SB) занятости меткой времени с образованием привязанного ко времени сигнала (SBZ) занятости, который указывает момент времени занятия рельсового участка (15), иthe idle track control device (20) comprises a time determination device (120) configured to provide a busy signal (SB) with a time stamp to form a time-related busy signal (SBZ) that indicates a time point of occupation of the rail section (15), and направляющее устройство (30) выполнено так, что оно направляет привязанный ко времени сигнал (SBZ) занятости после приема от устройства (20) контроля незанятости пути далее в рельсовое транспортное средство (40).the guiding device (30) is configured so that it sends a time-bound busy signal (SBZ) after receiving from the device (20) the control of unemployment of the track further to the rail vehicle (40). 10. Рельсовое транспортное средство (40), содержащее устройство (440) определения местоположения, 10. A rail vehicle (40) comprising a positioning device (440), отличающееся тем, что устройство (440) определения местоположения имеет приемное устройство (420) для приема снабженного меткой времени сигнала (SBZ) занятости устройства (20) контроля незанятости пути железнодорожного рельсового пути (10) по п.9, и вычислительное устройство (410), которое программировано так, что оно на основании сохраненной в памяти карты (SP) участка и на основании привязанного ко времени сигнала (SBZ) занятости определяет местоположение рельсового транспортного средства (40) в момент времени, указанный в привязанном ко времени сигнале (SBZ) занятости.characterized in that the location determining device (440) has a receiving device (420) for receiving a time-stamped signal (SBZ) of a busy device (20) for monitoring the unemployment of a rail track (10) according to claim 9, and a computing device (410) which is programmed so that it determines the location of the rail vehicle (40) at the time indicated in the time-related signal on the basis of the area stored in the memory card (SP) and on the time-related busy signal (SBZ) le (SBZ) employment.
RU2014147689A 2012-06-29 2013-06-11 Determination of rail vehicles location RU2638052C2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102012211333.9A DE102012211333A1 (en) 2012-06-29 2012-06-29 Position determination of rail vehicles
DE102012211333.9 2012-06-29
PCT/EP2013/062010 WO2014001080A1 (en) 2012-06-29 2013-06-11 Determining the position of rail vehicles

Publications (2)

Publication Number Publication Date
RU2014147689A RU2014147689A (en) 2016-08-20
RU2638052C2 true RU2638052C2 (en) 2017-12-11

Family

ID=48652036

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2014147689A RU2638052C2 (en) 2012-06-29 2013-06-11 Determination of rail vehicles location

Country Status (6)

Country Link
EP (1) EP2849985B1 (en)
DE (1) DE102012211333A1 (en)
DK (1) DK2849985T3 (en)
ES (1) ES2645623T3 (en)
RU (1) RU2638052C2 (en)
WO (1) WO2014001080A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109649450B (en) * 2018-12-26 2021-03-12 交控科技股份有限公司 Automatic inter-station block control method and system under heavy-load mobile block

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5129605A (en) * 1990-09-17 1992-07-14 Rockwell International Corporation Rail vehicle positioning system
WO2005056363A1 (en) * 2003-12-05 2005-06-23 Westinghouse Brake And Signal Holdings Limited Railway vehicle detection
US20050192720A1 (en) * 2004-02-27 2005-09-01 Christie W. B. Geographic information system and method for monitoring dynamic train positions
EP1612119A1 (en) * 2004-06-16 2006-01-04 Hitachi, Ltd. Train position detection system
RU2326016C2 (en) * 2006-07-31 2008-06-10 Открытое акционерное общество "Научно-исследовательский институт точной механики" System of controlling motion of electrically propelled vehicles
US20080231506A1 (en) * 2007-03-19 2008-09-25 Craig Alan Stull System, method and computer readable media for identifying the track assignment of a locomotive

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19957258C2 (en) * 1999-11-19 2001-09-20 Siemens Ag Track vacancy detection method using axle counting
DE10131585A1 (en) * 2000-07-25 2002-06-06 Db Cargo Ag Identifying train vehicles involves reading vehicle-specific information from identification elements, storing for each train to associate information content and vehicle positions in train
DE102006061811A1 (en) * 2006-12-21 2008-06-26 Deutsches Zentrum für Luft- und Raumfahrt e.V. Method for locating a vehicle

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5129605A (en) * 1990-09-17 1992-07-14 Rockwell International Corporation Rail vehicle positioning system
WO2005056363A1 (en) * 2003-12-05 2005-06-23 Westinghouse Brake And Signal Holdings Limited Railway vehicle detection
US20050192720A1 (en) * 2004-02-27 2005-09-01 Christie W. B. Geographic information system and method for monitoring dynamic train positions
EP1612119A1 (en) * 2004-06-16 2006-01-04 Hitachi, Ltd. Train position detection system
RU2326016C2 (en) * 2006-07-31 2008-06-10 Открытое акционерное общество "Научно-исследовательский институт точной механики" System of controlling motion of electrically propelled vehicles
US20080231506A1 (en) * 2007-03-19 2008-09-25 Craig Alan Stull System, method and computer readable media for identifying the track assignment of a locomotive

Also Published As

Publication number Publication date
WO2014001080A1 (en) 2014-01-03
DK2849985T3 (en) 2017-10-30
RU2014147689A (en) 2016-08-20
EP2849985B1 (en) 2017-08-02
EP2849985A1 (en) 2015-03-25
DE102012211333A1 (en) 2014-01-02
ES2645623T3 (en) 2017-12-07

Similar Documents

Publication Publication Date Title
CN107976697B (en) Train safety positioning method and system based on Beidou/GPS combination
US10094671B2 (en) Position measurement method, own position measurement device, and on-board unit
CA2837684C (en) Vehicle localization system
CN110281988B (en) Method, device and equipment for correcting train running distance
CA2526224A1 (en) Method and system for detecting when an end of train has passed a point
CN103221291A (en) System for locating trains with real-ime check on the integrity of the estimate of position
US20080231506A1 (en) System, method and computer readable media for identifying the track assignment of a locomotive
DK1811480T3 (en) Automatic road payment system based solely on satellite navigation, taking into account position accuracy and approach
WO2014132432A1 (en) Device for controlling display of vehicle location and program for identifying vehicle location
KR20150078881A (en) Method for measureling position of vehicle using cloud computing
JP4426874B2 (en) Operation server for train position detection management and in-vehicle equipment for train position detection management
JP2023506870A (en) Method and monitoring system for determining rail vehicle position
Williams et al. A qualitative analysis of vehicle positioning requirements for connected vehicle applications
US10946881B2 (en) Automated testing and reporting of timely activation of crossing warning equipment based on data originated from a real-time train tracking system
de Miguel et al. Map-aided software enhancement for autonomous GNSS complementary positioning system for railway
RU2638052C2 (en) Determination of rail vehicles location
CN113687396A (en) Positioning processing method and device, positioning equipment, vehicle and storage medium
JP2010269620A (en) Device for detecting vehicle position
CN104386093A (en) Train positioning device and method
AU2019201373B2 (en) Method for determining the location of a railway vehicle and associated system
CN104071186A (en) Train positioning system
US20200393572A1 (en) Method and Apparatus for Detecting a Position of a Vehicle having a High Level of Automation
RU2011130935A (en) METHOD AND DEVICE OF INFORMATION EXCHANGE BY RADIO CHANNEL BETWEEN TRAIN LOCOMOTIVE AND STATIONARY ITEM
Li et al. GNSS/IMU/odometer based train positioning
CN116022199B (en) Train positioning method and device

Legal Events

Date Code Title Description
PD4A Correction of name of patent owner
PC41 Official registration of the transfer of exclusive right

Effective date: 20201029