RU2614180C1 - Prefabricated light support for emergency and restoration works on power lines - Google Patents
Prefabricated light support for emergency and restoration works on power lines Download PDFInfo
- Publication number
- RU2614180C1 RU2614180C1 RU2015155925A RU2015155925A RU2614180C1 RU 2614180 C1 RU2614180 C1 RU 2614180C1 RU 2015155925 A RU2015155925 A RU 2015155925A RU 2015155925 A RU2015155925 A RU 2015155925A RU 2614180 C1 RU2614180 C1 RU 2614180C1
- Authority
- RU
- Russia
- Prior art keywords
- support
- strut
- shaped
- base
- racks
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
Abstract
Description
Область техникиTechnical field
Изобретение относится к области электроэнергетики, в частности к конструкциям быстровозводимых облегченных опор для производства аварийно-восстановительных работ на линиях электропередачи.The invention relates to the field of electric power, in particular, to the designs of prefabricated lightweight supports for emergency repair work on power lines.
Уровень техникиState of the art
Известна опора для подвески проводов линии электропередачи (а.с. SU №65425, кл. 21 с, 12, опубл. 31.10.1945), включающая Х-образно пересекающиеся стержни, подкос, подпирающий указанные стержни в точке их пересечения, поддерживающую поперечную траверсу для проводов, стержни и подкос закреплены к массивным фундаментам или выполнена заделка их непосредственно в грунт.Known support for the suspension of wires of a power line (AS SU No. 65425, class 21 s, 12, publ. 10/31/1945), including X-shaped intersecting rods, strut, propping these rods at the point of intersection, supporting the transverse crosshead for wires, rods and struts are fixed to massive foundations or they are embedded directly in the ground.
Недостатком опоры является необходимость сооружения заглубленного фундамента для монтажа опоры, требующего применения тяжелой спецтехники, что не всегда возможно в полевых условиях.The disadvantage of the support is the need to build a deep foundation for the installation of the support, requiring the use of heavy special equipment, which is not always possible in the field.
Известна Х-образная опора линии электропередачи (а.с. US №3162719, кл. 174-45, опубл. 22.12.1964), включающая Х-образно пересекающиеся стержни, установленные в грунт и утрамбованные, две половинки хомута, установленные в точке пересечения стержней с зубьями для более эффективного зацепления со стержнями, поддерживающую поперечную траверсу для проводов.Known X-shaped transmission line support (AS US No. 3162719, class 174-45, publ. 12/22/1964), including X-shaped intersecting rods installed in the ground and rammed, two halves of the clamp installed at the intersection rods with teeth for more effective engagement with the rods, supporting the transverse traverse for wires.
Недостатками опоры являются необходимость сооружения заглубленного фундамента, сложность установки каждого из Х-образно пересекающихся стержней под углом к вертикали, неэффективность использования зубьев на половинках хомутов на металлических, бетонных и пластиковых опорах.The disadvantages of the support are the need to construct a buried foundation, the difficulty of installing each of the X-shaped intersecting rods at an angle to the vertical, the inefficiency of using teeth on the halves of the clamps on metal, concrete and plastic supports.
Известна быстромонтируемая V-образная шарнирная опора линии электропередачи (RU №2065013, МПК Е04Н 12/00, опубл. 10.08.1996), включающая две V-образно установленные металлические стойки, связанные между собой по вершинам гибкой изолирующей траверсой, опертые на один общий поверхностный удлиненный вдоль оси линии фундамент посредством двух рядом расположенных шарниров и раскрепленные боковыми оттяжками, прикрепленными к их вершинам размещенными поперек оси линии и дополнительными парными оттяжками, прикрепленными одним концом к верхней части стоек, а другим к дополнительным шарнирам, смонтированным на фундамент по разные стороны от опорного шарнира каждой стойки по одной с ним горизонтальной оси, а угол между гибкой изолирующей траверсой и горизонталью в монтажном режиме, устанавливаемый тяжением боковых оттяжек, определяют из соотношения Known quick-mounted V-shaped hinged support of the power line (RU No. 2065013, IPC Е04Н 12/00, publ. 08/10/1996), including two V-shaped mounted metal racks, interconnected along the tops of a flexible insulating traverse, supported on one common surface the foundation elongated along the axis of the line by means of two adjacent hinges and fastened with side braces attached to their vertices placed across the line axis and additional pair braces attached at one end to the upper part of the racks and others to additional hinges mounted on the foundation on opposite sides of the support hinge of each rack along one horizontal axis with it, and the angle between the flexible insulating traverse and the horizontal in the mounting mode, set by the tension of the side braces, is determined from the ratio
Недостатком опоры является необходимость сооружения заглубленного фундамента для фиксации опоры боковыми оттяжками, изменение геометрии опоры после установки на гибкую изолирующую траверсу проводов линии ВЛ, что ведет к дополнительным затратам времени при регулировании оттяжек и обязательному проведению расчетов для правильной предварительной установки опоры.The disadvantage of the support is the need to construct a buried foundation for fixing the support with lateral guy wires, changing the geometry of the support after installing the OHL line wires on a flexible insulating cross-beam, which leads to additional time costs when adjusting guy wires and the necessary calculations for the correct preliminary installation of the support.
Наиболее близким техническим решением к предложенному является опора линии электропередачи (RU №1416647, МПК Е04Н 12/00, опубл. 15.08.1988), включающая Х-образно соединенные стойки, установленные на фундаменты и снабженные горизонтальной балкой, установленной ниже их узла пересечения, подкос закреплен к балке с образованием консоли, при этом опора снабжена гибкими связями, одни из которых объединяют верхние концы стоек и основание подкоса, другие - верхние и нижние концы стоек, расположенные по одну сторону от вертикальной оси опоры, третьи - верхние и нижние концы стоек с консолью подкоса, дополнительными связями, объединяющими основание подкоса с консолью его через точку пересечения стоек, и затяжками, соединяющими точки опирания стоек и подкосов.The closest technical solution to the proposed one is the support of a power line (RU No. 1416647, IPC Е04Н 12/00, publ. 08/15/1988), including X-shaped racks installed on foundations and equipped with a horizontal beam installed below their intersection, strut fixed to the beam with the formation of the console, while the support is equipped with flexible connections, some of which combine the upper ends of the struts and the base of the strut, others - the upper and lower ends of the racks located on one side of the vertical axis of the support, the third - the upper and the lower ends of the struts with the strut console, additional ties that combine the base of the strut with its console through the point of intersection of the struts, and puffs connecting the points of support of the struts and struts.
Недостатком известного решения является недостаточная жесткость конструкции, не позволяющая осуществлять доставку полностью собранной опоры на место установки, а также осуществлять монтаж без использования тяжелой спецтехники, вертолета. Наличие большого количества натяжных приспособлений, крепящихся в одних и тех же точках значительно увеличивает время монтажа и создает сложность при выполнении условия одновременного в них предварительного натяжения. Х-образные стойки и подкос имеют значительную массу, так как выполнены не составными, что усложняет подготовку и монтаж опоры.A disadvantage of the known solution is the lack of structural rigidity, which does not allow delivery of a fully assembled support to the installation site, as well as installation without the use of heavy special equipment, a helicopter. The presence of a large number of tensioners mounted at the same points significantly increases the installation time and makes it difficult to meet the condition of simultaneous pre-tensioning in them. X-shaped struts and strut have a significant mass, as they are not composite, which complicates the preparation and installation of the support.
Сущность изобретенияSUMMARY OF THE INVENTION
Задачей предлагаемого изобретения является устранение вышеуказанных недостатков.The task of the invention is to remedy the above disadvantages.
Технический результат достигается тем, что две Х-образно соединенные стойки установлены на основание и снабжены горизонтальными балками, установленными ниже и выше их узла пересечения, подкос установлен на основание, а траверса выполнена гибкой, гибкие связи объединяют верхние и нижние концы стоек по одну сторону от вертикальной оси опоры, основание выполнено из трех секций, соединенных в треугольник, каждая из которых, а также Х-образно соединенные стойки и подкос состоят из двух частей с фланцевым соединением посередине, стойки основания, Х-образно соединенные стойки, подкос, секции основания и горизонтальные балки соединены между собой шарнирами, образуя жесткую пространственную конструкцию.The technical result is achieved by the fact that two X-shaped connected racks are installed on the base and equipped with horizontal beams installed below and above their intersection node, the strut is mounted on the base, and the beam is flexible, flexible connections combine the upper and lower ends of the racks on one side of the vertical axis of the support, the base is made of three sections connected in a triangle, each of which, as well as the X-shaped struts and the strut, consist of two parts with a flange connection in the middle, the strut base Ia, an X-shaped connection strut, brace, the base section and the horizontal beams are interconnected by hinges to form a rigid three-dimensional structure.
На чертеже изображена быстровозводимая облегченная опора для производства аварийно-восстановительных работ на линиях электропередачи (в аксонометрии).The drawing shows a prefabricated lightweight support for emergency recovery work on power lines (in axonometry).
Быстровозводимая облегченная опора включает две Х-образно соединенные стойки 1, подкос 2, три шарнирно соединенные секции - треугольное основание 3, состоящие из двух частей с фланцевым соединением 4 посередине, горизонтальные балки 5, 6, расположенные выше и ниже узла пересечения Х-образно соединенных стоек, гибкую траверсу 7, гибкие связи 8, объединяющие верхние и нижние концы Х-образно соединенных стоек 1 по одну сторону от вертикальной оси опоры.The quick-mounted lightweight support includes two
Две Х-образно соединенные стойки, подкос, треугольное основание, горизонтальные балки быстровозводимой облегченной опоры для производства аварийно-восстановительных работ на линиях электропередачи могут быть выполнены как из композитного материала, так и могут быть выполненными из металла, бетона, пластика, дерева, могут быть сплошного сечения или пустотелыми, с сечением в виде окружности или многоугольника. Количество частей в Х-образно соединенных стойках, подкосе, трех шарнирно соединенных секциях может увеличиваться, исходя из целесообразности выбора их массы для выполнения монтажа без спецтехники, а также могут быть выполнены как цилиндрическими, так и конусными или пирамидальными при необходимости оптимизации размеров в разных сечениях и удобства выполнения шарнирных и фланцевых соединений для сборки между собой.Two X-shaped racks, a strut, a triangular base, horizontal beams of a quick-erected lightweight support for emergency repair work on power lines can be made of either composite material, or they can be made of metal, concrete, plastic, wood, can be solid section or hollow, with a section in the form of a circle or polygon. The number of parts in the X-shaped struts, strut, three articulated sections can increase, based on the feasibility of choosing their mass for installation without special equipment, and can also be made either cylindrical, conical or pyramidal, if necessary, to optimize dimensions in different sections and the convenience of performing articulated and flange joints for assembly between themselves.
Возведение быстровозводимой облегченной опоры для производства аварийно-восстановительных работ на линиях электропередачи осуществляется в шесть этапов.The construction of a prefabricated lightweight support for emergency repair work on power lines is carried out in six stages.
На первом этапе из составных частей собирается подкос и секции основания 3 с помощью фланцевого соединения 4.At the first stage, the strut and sections of the
На втором этапе секции основания 3 собираются в треугольник с помощью шарнирного соединения.In the second stage, the sections of the
На третьем этапе собираются Х-образно соединенные стойки 1. К двум углам треугольного основания 3 крепят по одной части стоек 1 с помощью поворотного кронштейна-шарнира, затем к установленным частям стоек 1 крепят оставшиеся части с помощью фланцевого соединения 4. Собранные из частей стойки скрещивают и собирают между собой.At the third stage, X-shaped
На четвертом этапе устанавливаются горизонтальные балки 5, 6 и подкос 2. К Х-образно соединенным стойкам 1 крепят горизонтальные балки 5, 6, расположенные выше и ниже узла пересечения, горизонтальная балка выше узла пересечения 5 снабжена площадкой и используется при монтаже проводов, горизонтальная балка ниже узла пересечения 6 снабжена шарниром, к которому крепят подкос 2.At the fourth stage,
На пятом этапе устанавливается гибкая траверса 7 и гибкие связи 8. Гибкую траверсу 7 устанавливают между верхними концами Х-образно соединенных стоек 1, а гибкие связи 8 - между верхними и нижними концами Х-образно соединенных стоек 1 по одну сторону от вертикальной оси опоры. Гибкие связи 8 устанавливают с предварительным натяжением.At the fifth stage, a
На шестом этапе осуществляется окончательная сборка - монтаж быстровозводимой облегченной опоры. С помощью лебедки или спецтехники осуществляют подъем Х-образно соединенных стоек 1 до тех пор, пока подкос 2, скользящий нижним концом по поверхности земли, не встанет в свой шарнир в свободном углу треугольного основания 3, образуя жесткую пространственную конструкцию.At the sixth stage, the final assembly is carried out - the installation of a quick-mounted lightweight support. With the help of a winch or special equipment, X-shaped
Конструкция быстровозводимой облегченной опоры для производства аварийно-восстановительных работ на линиях электропередачи позволяет:The design of the quick-mounted lightweight support for emergency recovery work on power lines allows you to:
- доставлять опору на место монтажа в компактном виде;- deliver the support to the installation site in a compact form;
- закреплять опору на месте установки без возведения фундамента;- fix the support at the installation site without erecting a foundation;
- монтировать без использования спецтехники, вертолета;- mount without the use of special equipment, helicopter;
- повысить технологичность изготовления и уменьшить габаритный размер длины комплекта опоры, занимаемый на складе в транспортном положении из-за возможности разбора секций на составные части;- to increase the manufacturability and reduce the overall size of the length of the support set, occupied in the warehouse in a transport position due to the possibility of parsing sections into components;
- выполнить условие одновременного предварительного натяжения в гибких связях;- to fulfill the condition of simultaneous pre-tensioning in flexible bonds;
- использовать всего две гибкие связи;- use only two flexible connections;
- существенно сократить время ремонтно-восстановительных работ на воздушных линиях электропередачи, осуществляя доставку полностью собранной опоры на место установки.- significantly reduce the time of repair and restoration work on overhead power lines by delivering a fully assembled support to the installation site.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2015155925A RU2614180C1 (en) | 2015-12-24 | 2015-12-24 | Prefabricated light support for emergency and restoration works on power lines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2015155925A RU2614180C1 (en) | 2015-12-24 | 2015-12-24 | Prefabricated light support for emergency and restoration works on power lines |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2614180C1 true RU2614180C1 (en) | 2017-03-23 |
Family
ID=58452999
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2015155925A RU2614180C1 (en) | 2015-12-24 | 2015-12-24 | Prefabricated light support for emergency and restoration works on power lines |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2614180C1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU183313U1 (en) * | 2018-04-17 | 2018-09-18 | Федеральное государственное бюджетное учреждение науки Институт проблем нефти и газа Сибирского отделения Российской академии наук | Quick-mounted power transmission pylon |
RU183315U1 (en) * | 2018-04-18 | 2018-09-18 | Федеральное государственное бюджетное учреждение науки Институт проблем нефти и газа Сибирского отделения Российской академии наук | Quick-mounted support for emergency recovery work on power lines |
RU2768534C1 (en) * | 2021-07-19 | 2022-03-24 | Акционерное общество "Научно-производственное предприятие "Алтик" | Method of mounting a permanent quick-erect lightweight support for emergency recovery works on power transmission lines |
RU2781646C2 (en) * | 2022-04-04 | 2022-10-17 | Акционерное общество "Научно-производственное предприятие "Алтик" | Prefabricated lightweight support for emergency recovery work on power lines |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3162719A (en) * | 1962-07-30 | 1964-12-22 | Richard A Mulford | X-frame transmission line structure |
SU1004589A1 (en) * | 1981-09-22 | 1983-03-15 | Белорусское Отделение Ордена Октябрьской Революции Всесоюзного Государственного Проектно-Изыскательского И Научно-Исследовательского Института Энергетических Систем И Электрических Сетей "Энергосетьпроект" | Power transmission line support |
SU1416647A1 (en) * | 1986-10-31 | 1988-08-15 | Ухтинский индустриальный институт | Power transmission line support |
SU1707171A1 (en) * | 1990-03-30 | 1992-01-23 | Северо-Западное Отделение Всесоюзного Государственного Проектно-Изыскательского И Научно-Исследовательского Института Энергетических Систем И Электрических Сетей "Энергосетьпроект" | Supporting structure of power transmission line |
EP2952655A1 (en) * | 2013-02-01 | 2015-12-09 | Seccional Brasil SA | Lattice tower |
-
2015
- 2015-12-24 RU RU2015155925A patent/RU2614180C1/en active IP Right Revival
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3162719A (en) * | 1962-07-30 | 1964-12-22 | Richard A Mulford | X-frame transmission line structure |
SU1004589A1 (en) * | 1981-09-22 | 1983-03-15 | Белорусское Отделение Ордена Октябрьской Революции Всесоюзного Государственного Проектно-Изыскательского И Научно-Исследовательского Института Энергетических Систем И Электрических Сетей "Энергосетьпроект" | Power transmission line support |
SU1416647A1 (en) * | 1986-10-31 | 1988-08-15 | Ухтинский индустриальный институт | Power transmission line support |
SU1707171A1 (en) * | 1990-03-30 | 1992-01-23 | Северо-Западное Отделение Всесоюзного Государственного Проектно-Изыскательского И Научно-Исследовательского Института Энергетических Систем И Электрических Сетей "Энергосетьпроект" | Supporting structure of power transmission line |
EP2952655A1 (en) * | 2013-02-01 | 2015-12-09 | Seccional Brasil SA | Lattice tower |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU183313U1 (en) * | 2018-04-17 | 2018-09-18 | Федеральное государственное бюджетное учреждение науки Институт проблем нефти и газа Сибирского отделения Российской академии наук | Quick-mounted power transmission pylon |
RU183315U1 (en) * | 2018-04-18 | 2018-09-18 | Федеральное государственное бюджетное учреждение науки Институт проблем нефти и газа Сибирского отделения Российской академии наук | Quick-mounted support for emergency recovery work on power lines |
RU2768534C1 (en) * | 2021-07-19 | 2022-03-24 | Акционерное общество "Научно-производственное предприятие "Алтик" | Method of mounting a permanent quick-erect lightweight support for emergency recovery works on power transmission lines |
RU2781646C2 (en) * | 2022-04-04 | 2022-10-17 | Акционерное общество "Научно-производственное предприятие "Алтик" | Prefabricated lightweight support for emergency recovery work on power lines |
RU2806378C2 (en) * | 2023-03-14 | 2023-10-31 | Акционерное общество "Научно-производственное предприятие "Алтик" | Prefabricated support for power lines and method of its construction |
RU220429U1 (en) * | 2023-08-01 | 2023-09-13 | Публичное акционерное общество "Якутскэнерго" (ПАО "Якутскэнерго") | Temporary mobile power line support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2614180C1 (en) | Prefabricated light support for emergency and restoration works on power lines | |
CN204199836U (en) | A kind of power tower group lifting component device and pole thereof | |
PH12015500136A1 (en) | A cable pipe rack | |
RU2014144940A (en) | PROTECTIVE DESIGN OF A WATER RELEASE COLUMN OF A SELF-LIFTING PLATFORM | |
CN202117247U (en) | Stairway capable of eliminating diagonal bracing effect | |
RU2449093C2 (en) | Frame of rapidly erected structure and method of its assembly | |
WO2015034444A1 (en) | New overhead self-launching launching gantry systems | |
KR101364283B1 (en) | Tower Lifting Device and Method | |
CN102425099A (en) | Large cantilever wave-purlin combined PC bridge and manufacture method thereof | |
NL2012595B1 (en) | Traffic control device and method for establishing it. | |
RU146202U1 (en) | Dismountable flyovers for the quick arrangement of bridge crossings | |
WO2011021942A1 (en) | Method and device for assembly of an arch structure | |
RU114475U1 (en) | MOBILE ANTENNA SUPPORT | |
US3182761A (en) | Skeleton structure | |
CN211113218U (en) | Beam section mounting rack for cable-stayed bridge cable tower area | |
KR101254164B1 (en) | A pillar for a bridge | |
RU2396396C1 (en) | Combined arch cable coat | |
KR101881489B1 (en) | Suspension bridge stiffening girder construction apparatus | |
CN110777662A (en) | Beam section mounting rack of cable-stayed bridge cable tower area and mounting method thereof | |
RU123048U1 (en) | FORMWORK | |
RU2503611C2 (en) | Universal collapsible mobile gantry crane at crane trestle | |
CN205046572U (en) | Bulky concrete removes over -and -under type construction platform | |
US2397241A (en) | Scaffold structure and the like | |
RU139746U1 (en) | CONSOLE SPATIAL-ROD COVER DESIGN | |
CN211682054U (en) | Support is used in civil engineering construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20181225 |
|
PD4A | Correction of name of patent owner | ||
NF4A | Reinstatement of patent |
Effective date: 20200819 |